ML18139C161: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 11/18/1982 | | issue date = 11/18/1982 | ||
| title = Public Version of Revision 1 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure. | | title = Public Version of Revision 1 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure. | ||
| author name = | | author name = Cox F, Saunders R | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.. | {{#Wiki_filter:.....~ | ||
;* * *:: : .*'t e e SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES EPIP-1. 01 Enclosed are recently revised pages to the Surry Power Station Emergency Plan Implementing Procedures. | ..~ - | ||
Please take the following actions in order to keep your manual updated with the most recent revisions. | ;* * *:: : .*'t e e SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES EPIP-1. 01 Enclosed are recently revised pages to the Surry Power Station Emergency Plan Implementing Procedures. Please take the following actions in order to keep your manual updated with the most recent revisions. | ||
EPIP-1.01 Emergency Manager Controlling Procedure Remove and Destroy Page 1 of 8 and page 5 of 8 dated 07-29-82 | EPIP-1.01 Emergency Manager Controlling Procedure Remove and Destroy Enter Page 1 of 8 and Page 1 of 8 page 5 of 8 dated and page 5 of 07-29-82 8 dated 11-18-82 1 -8212170044 821210--~---*- | ||
PDR ADOCK 05000280 F PDR | |||
: 1. Another station procedure directs initiation of this procedure OR 2. A potential emergency condition is reported to the Shift Supervisor. | . *,. :...*_ . ---~. . . | ||
REVISION RECORD REV, 00 | .*.*** * * ***** *.! * ,, .. *. . ~ ."' .. | ||
PAGE(S): PAGE(S): PAGE(S): APPROVAL RECOMMENDED | ' ND. 9711117231 e * . VIRGINIA' ELECTRIC AND POWER*COMPAN'.'f e | ||
-*e,d~ CHAIRMAN STA noN NUCLEAR SAFETY | SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION 01 EPIP-1.01 EMERGENCY MANAGER CONTROLLING PROCEDURE PAGE (With 1 Attachment) 1 of 8 PURPOSE To initially assess a potential emergency condition and initiate corrective actions. | ||
: 5. VERIFY EALS EXCEEDED: | USER Shift Supervisor or Station Emergency Manager ENTRY CONDITIONS Any~ of the following: | ||
a) Assure EALs -EXCEEDED a) IF EALs NOT exceeded, DO NOT declare an emergency classification. | : 1. Another station procedure directs initiation of this procedure OR | ||
: 2. A potential emergency condition is reported to the Shift Supervisor. | |||
REVISION RECORD REV, 00 PAGE(S): ENTIRE PROCEDURE DATE :JUH 2 9 1982 REV. 01 PAGE(S): 1 of 8 and 5 of 8 DATE :NOY 1 8 13S2 REV, PAGE(S): DATE: | |||
REV, PAGE(S)": DATE:. | |||
REV. PAGE(S): DATE: | |||
REV, PAGE(S): DATE: | |||
REV. PAGE(S): DATE: | |||
APPROVAL RECOMMENDED | |||
-*e,d~ CHAIRMAN STA noN NUCLEAR SAFETY DATE AND OPERATING COMMITTEE NOY t 8 1982 | |||
No. 97867211 NUMBER | |||
- PROCEDURE TITLE e | |||
REVISION | |||
() l EPIP-1. 01 EMERGENCY l-lANAGER CONTROLLING PROCEDURE PAGE 5 of 8 STEP 1-----1 ACTION/EXPECTED RESPONSE RESPONSE /VDT OBTAINED 4* (CONTINUED) | |||
: 2) SRO-On-Call R. Johnson / ~t~em~! contact via beeper | |||
-~\ | |||
OR J. Peterson Attempt contact via beeper | |||
/ *--- - - - ~ ' / | |||
c) Verify classification | |||
; d). IF required by Alert, Site Emergency or General Emergency, request initiation of Standing Order 21 NOTE: Return to Step 2 of this instruction as necessary during the course of the situation for additional events and reclassification. | |||
: 5. VERIFY EALS EXCEEDED: | |||
a) Assure EALs - EXCEEDED a) IF EALs NOT exceeded, DO NOT declare an emergency classification. | |||
: 1) Continue appropriate corrective action IAW procedures. | : 1) Continue appropriate corrective action IAW procedures. | ||
: 2) GO TO Step 7 of this procedure.}} | : 2) GO TO Step 7 of this procedure.}} |
Latest revision as of 23:54, 2 February 2020
ML18139C161 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 11/18/1982 |
From: | Cox F, Saunders R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML18139C159 | List: |
References | |
EPIP-1.01-01, EPIP-1.01-1, NUDOCS 8212170044 | |
Download: ML18139C161 (3) | |
Text
.....~
..~ -
- * *
- : : .*'t e e SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES EPIP-1. 01 Enclosed are recently revised pages to the Surry Power Station Emergency Plan Implementing Procedures. Please take the following actions in order to keep your manual updated with the most recent revisions.
EPIP-1.01 Emergency Manager Controlling Procedure Remove and Destroy Enter Page 1 of 8 and Page 1 of 8 page 5 of 8 dated and page 5 of 07-29-82 8 dated 11-18-82 1 -8212170044 821210--~---*-
. *,. :...*_ . ---~. . .
.*.*** * * ***** *.! * ,, .. *. . ~ ."' ..
' ND. 9711117231 e * . VIRGINIA' ELECTRIC AND POWER*COMPAN'.'f e
SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION 01 EPIP-1.01 EMERGENCY MANAGER CONTROLLING PROCEDURE PAGE (With 1 Attachment) 1 of 8 PURPOSE To initially assess a potential emergency condition and initiate corrective actions.
USER Shift Supervisor or Station Emergency Manager ENTRY CONDITIONS Any~ of the following:
- 1. Another station procedure directs initiation of this procedure OR
- 2. A potential emergency condition is reported to the Shift Supervisor.
REVISION RECORD REV, 00 PAGE(S): ENTIRE PROCEDURE DATE :JUH 2 9 1982 REV. 01 PAGE(S): 1 of 8 and 5 of 8 DATE :NOY 1 8 13S2 REV, PAGE(S): DATE:
REV, PAGE(S)": DATE:.
REV. PAGE(S): DATE:
REV, PAGE(S): DATE:
REV. PAGE(S): DATE:
APPROVAL RECOMMENDED
-*e,d~ CHAIRMAN STA noN NUCLEAR SAFETY DATE AND OPERATING COMMITTEE NOY t 8 1982
No. 97867211 NUMBER
- PROCEDURE TITLE e
REVISION
() l EPIP-1. 01 EMERGENCY l-lANAGER CONTROLLING PROCEDURE PAGE 5 of 8 STEP 1-----1 ACTION/EXPECTED RESPONSE RESPONSE /VDT OBTAINED 4* (CONTINUED)
- 2) SRO-On-Call R. Johnson / ~t~em~! contact via beeper
-~\
OR J. Peterson Attempt contact via beeper
/ *--- - - - ~ ' /
c) Verify classification
- d). IF required by Alert, Site Emergency or General Emergency, request initiation of Standing Order 21 NOTE
- Return to Step 2 of this instruction as necessary during the course of the situation for additional events and reclassification.
- 5. VERIFY EALS EXCEEDED:
a) Assure EALs - EXCEEDED a) IF EALs NOT exceeded, DO NOT declare an emergency classification.
- 1) Continue appropriate corrective action IAW procedures.
- 2) GO TO Step 7 of this procedure.