| number = ML18207A290
| number = ML18207A290
| issue date = 07/26/2018
| issue date = 07/26/2018
| title = Browns Ferry, Units 1, 2, and 3 - Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
| title = Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
| author name = Hughes D L
| author name = Hughes D
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::RIS 2018-02]]


=Text=
=Text=
{{#Wiki_filter:Tennessee  
{{#Wiki_filter:Tennessee Valley Authority, Post Offi ce Box 2000, Decatur, Alabama 35609-2000 July 26, 2018 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Valle y Authority , Pos t O ffi ce B ox 2000 , Dec a tur , A labam a 356 0 9-2 000 July 26, 2018 ATTN: Document Control Desk U.S. Nuc l ear Regulatory  
 
Commission  
==Subject:==
Washington , D.C. 20555-0001  
Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
Browns Ferry Nuclear Plant , Units 1 , 2 , and 3 Renewed Facility Operating  
 
License Nos. DPR-33 , DPR-52 , and DPR-68 NRC Docket Nos. 50-259 , 50-260 , and 50-296 10 CFR 50.4 Subject: Updated Response to NRC Regulatory  
==Reference:==
Issue Summary 2018-02, Preparation  
: 1. Letter from NRC to TVA, "Nuclear Regulatory Commission, Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations," dated March 26, 2018 [ML18029A423]
and Scheduling  
: 2. Letter from the TVA to NRC, "Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations," dated April 27, 2018 [ML18117A169]
of Operator Licensing  
The Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2018-02 requested specific information regarding the Browns Ferry Nuclear Plant projected operator licensing examination schedules and the estimated number of applicants. The Tennessee Valley Authority (TVA) provided the estimated exam schedule through 2023 in the letter referenced above dated April 27, 2018.
Examinations
However, due to a change in the number of candidates in the 2019 class, TVA is providing the enclosed revised exam schedule through 2023.
Reference: 1. Letter from NRC to TVA , "Nuclear Regulatory  
There are no new regulatory commitments associated with this submittal. Should you have any questions concerning this response, please contact Robert D. Busick at (256) 614-8188.
Commission , Regulatory  
D. L. Hughes Site Vice President
Issue Summary 2018-02 , Preparation  
 
and Scheduling  
US Nuclear Regulatory Commission Page 2 July 26, 2018
of Operator Licensing  
 
Examinations
==Enclosure:==
," dated March 26 , 2018 [ML 18029A423]  
Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure):
2. Letter from the TVA to NRC , "Response  
NRC Regional Administrator - Region II
to NRC Regulatory  
 
Issue Summary 2018-02 , Preparation  
ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations See Enclosed
and Scheduling  
 
of Operator Licensing  
NRC FORM 536                             U. S. NUCLEAR REGULATORY COMMISSION   APPROVED BY 0MB : NO. 3150-0131                                        EXPIRES: 11 /30/2020 (11-2017) v,f'AEG(.,,(
Examinations
                . :,""'           . ,,.                                       Estimated burden per response to comply wnh this voluntary information collection request: 1 hour. This
," dated April 27 , 2018 [ML 18117A169]  
            ~+~o~                            OPERATOR LICENSING                information collection is used to plan budgets and resources for operator examinations. Send t                           i                                     comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear
The Nuclear Regulatory  
            ~~:                                  EXAMINATION DATA
Commission (NRC) Regulatory  
            ~                            ~                                      Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,
Issue Summary 2018-02 requested  
              <;+.                   0$'                                       and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office 0             +
specific information  
of Management and Budget, Washington, DC 20503.               If a means used to impose an information collection does not display a cu rrently valid 0 MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
regarding  
FACILITY                                                                                                                         NRC REGION
the Browns Ferry Nuclear Plant projected  
!Browns Ferry Nuclear Plant 2
operator licensing  
11                                                       I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                                 CY 18               CY 19                                       CY 20                                    CY 21 ESTIMATED NUMBER OF LICENSEE-PREPARED                                   1                   1                                               1                                     1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                                   0                   0                                               0                                     0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                                 CY 18              CY 19                                 CY 20                                    CY 21 NUMBER OF REACTOR OPERATORS                                    7                   9                                             14                                   12 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                                5                   7                                               6                                     4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                                    1                   6                                             4                                     4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                                0                   0                                               0                                     0 PROPOSED DATES PRIMARY DATE                             07/16/201 8         11/04/201 9                               10/12/2020                             10/11/2021 ALTERNATE DATE                                                   12/02/20 19                               11/09/2020                             11/08/2021 NRG FORM 536 (1 1-20 17)
examination  
 
schedules  
NRC FORM 536                                     U.S. NUCLEAR REGULATORY COMMISSION     APPROVED BY 0MB: NO. 3150-0131                                         EXPIRES: 11/30/2020 (11-2017)
and the estimated  
                      ,.p-ll REG&#xa3;,
number of applicants. The Tennessee  
                .&sect; ~                 <,.>                                           Estimated burden per response to comply wrth this voluntary information collection request: 1 hour. This
Valley Authority (TVA) prov i ded the estimated  
            ~"~                           o..,. OPERATOR LICENSING                 information collection is used to plan budgets and resources for operator examinations. Send t                                 '2,                                     comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear
exam schedule through 2023 in the letter referenced  
            ~~                        F/              EXAMINATION DATA
above dated April 27 , 2018. However , due to a change in the number of candidates  
                  -    ::111111111;:                                                Regulatory Commission, Washington, DC20555-0001 , or by e-mail to lnfocollects.Resource@nrc.gov,
in the 2019 class , TVA is providing  
              -r;,._~                   ~0,$)                                         and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3 150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
the enclosed revised exam schedule through 2023. There are no new regulatory  
FACILITY                                                                                                                             NRC REGION
commitments  
[Browns Ferry Nuclear Plant 2
associated  
11                                                         I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                                       CY 22               CY 23                                       CY                                       CY ESTIMATED NUMBER OF LICENSEE-PREPARED                                       1                     1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED                                         0                     0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                                       CY 22             CY 23                                 CY                                       CY NUMBER OF REACTOR OPERATORS                                          8                     8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT                                       4                    4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4                    4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                                       0                    0 PROPOSED DATES PRIMARY DATE                                   10/10/2022           10/16/2023 ALTERNATE DATE                                   11/07/2022           11 /06/2023 NRC FORM 536 (11-2017)}}
with this submittal.  
Should you have any questions  
concerning  
this response , please contact Robert D. Busick at (256) 614-8188. D. L. Hughes Site Vice President
US Nuclear Regulatory  
Commission  
Page 2 July 26 , 2018 Enclosure: Updated Response to NRC Regulatory  
Issue Summary 2018-02 , Preparation  
and Scheduling  
of Operator Licensing  
Examinations  
cc (w/ Enclosure)
: NRC Regional Administrator  
-Region II
ENCLOSURE  
Tennessee  
Valley Authority  
Browns Ferry Nuclear Plant Units 1, 2, and 3 Updated Response to NRC Regulatory  
Issue Summary 2018-02, Preparation  
and Scheduling  
of Operator Licensing  
Examinations  
See Enclosed
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED B Y 0MB: NO. 3150-013 1 EXPIRES: 11/30/2020 (1 1-2017) v,f'AE G(.,, ( ..:,""' .. ,,. E sti m ated bu r d en per r e spo n se to comply wn h t hi s volu n tary informatio
n collection  
reques t: 1 h our. This OPERA TOR LICENSING
i nform a t i o n collection  
i s use d to plan b u dgets a nd resou r ces fo r ope r ato r exa m inat i ons. Send t i EXAMINATION
DATA co mm e n ts r egardi ng bu r de n esti m ate to t h e I n formatio n Services B ra n ch (T-2 F43), U.S. Nuclear R egul a tory Co mm issio n , W a s hing to n , D C20555-000
1 , o r by e-m ai l t o ln focollects
.R e sou r ce@n rc.gov , <;+. 0$' and to th e D esk Offi ce r , Offi c e o f Informa tion and R eg ulatory Aff ai r s , N EOB-10202 , (3150-0 1 3 1), Office 0 + ..... o f Mana g emen t and Bud g e t, W a s hingt o n , D C 20503. If a m ea n s u s ed to im pose a n i n fo rmatio n coll e ction d oes n ot di s p l a y a cu rren tly val i d 0 MB co n trol num ber , t h e NR G m ay n ot conduct o r sponsor , an d a pe rso n i s not re qu ired to respo nd to , t h e in formatio n collect i on. FACILITY NRC REGION !Browns Ferry Nuclear Plant 11 2 I A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 18 CY 19 CY 2 0 CY 21 --------ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
1 1 1 1 EXAMINAT I ONS ESTIMATED  
NUMBER OF NRG-PREPARED  
0 0 0 0 EXAMINATIONS  
B. INITIAL OPERATOR LICENSE EXAMINATIONS  
PROPOSED NUMBER CY 1 8 CY 19 CY 2 0 CY 21 ------------NUMBER OF REACTOR 7 9 14 12 OPERATORS
NUMBER OF SENIOR REACTOR 5 7 6 4 OPERATORS
-INSTANT NUMBER OF SENIOR REACTOR 1 6 4 4 OPERA T ORS-UPGRADE
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
-LIMITED PROPOSED DATES PRIMARY DATE 07/1 6/2 01 8 1 1/04/2 01 9 10/12/2020 10/11/2021  
A L TERNATE DATE 12/0 2/2 0 19 1 1/0 9/2020 11/08/2021 N RG F O R M 536 (1 1-20 1 7)
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY 0MB: NO. 3150-0131  
EXPIRES: 11/30/2020  
(11-2017)  
,.p-ll RE G&#xa3;, .&sect;~ <,.> E st ima ted burden per response to comply wrth t h is voluntary  
information  
collection  
request: 1 h our. This ~"~o..,. OPERA TOR LICENSING  
information  
collection  
is used to plan bu dge ts and resources  
for operato r examinat i ons. Send t '2, -:: 1111 11111;: F / EXAMINATION
DATA comments regarding  
burden estimate to t h e Information  
Services Branch (T-2 F 43), U.S. Nuclear Regu latory Co mmi ssio n , Was hing ton , DC20555-0001 , or by e-mail to lnfo collects.Resource@nrc
.gov , -r;,._~~0 ,$) and to t he Desk Officer , Office of Information  
and Regulatory  
Affairs , NEOB-10202 , (3 1 50-0131), Office ..... of Management  
and Budge t , Washington , DC 20503. I f a means used to impose an information  
collection  
does n ot display a currently  
valid 0M B control number , the NRC may not conduct or sponsor , and a person is not required to respond to , the information  
collection. FACILITY NRC REGION [Browns Fe r ry Nuclear Plant 11 2 I A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 22 CY 23 CY CY ------------ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
1 1 EXAMINATIONS  
ESTIMATED  
NUMBER OF NRG-PREPARED  
0 0 EXAMINATIONS  
B. INITIAL OPERATOR LICENSE EXAMINATIONS  
PROPOSED NUMBER CY 22 CY 23 CY CY ------------NUMBER OF REACTOR 8 8 OPERATORS
NUMBER OF SENIOR REACTOR 4 4 OPERATORS-
INSTANT NUMBER OF SENIOR REACTOR 4 4 OPERATORS-UPGRADE  
NUMBER OF SENIOR REACTOR 0 0 OPERATORS  
-LIMITED PROPOSED DATES PRIMARY DATE 10/10/2022  
10/16/2023 ALTERNATE  
DATE 11/07/2022 11/06/2023 NRC FORM 536 (11-2017)
}}

Latest revision as of 20:53, 2 February 2020

Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
ML18207A290
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/26/2018
From: Hughes D
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2018-002
Download: ML18207A290 (5)


Text

Tennessee Valley Authority, Post Offi ce Box 2000, Decatur, Alabama 35609-2000 July 26, 2018 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations

Reference:

1. Letter from NRC to TVA, "Nuclear Regulatory Commission, Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations," dated March 26, 2018 [ML18029A423]
2. Letter from the TVA to NRC, "Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations," dated April 27, 2018 [ML18117A169]

The Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2018-02 requested specific information regarding the Browns Ferry Nuclear Plant projected operator licensing examination schedules and the estimated number of applicants. The Tennessee Valley Authority (TVA) provided the estimated exam schedule through 2023 in the letter referenced above dated April 27, 2018.

However, due to a change in the number of candidates in the 2019 class, TVA is providing the enclosed revised exam schedule through 2023.

There are no new regulatory commitments associated with this submittal. Should you have any questions concerning this response, please contact Robert D. Busick at (256) 614-8188.

D. L. Hughes Site Vice President

US Nuclear Regulatory Commission Page 2 July 26, 2018

Enclosure:

Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure):

NRC Regional Administrator - Region II

ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Updated Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations See Enclosed

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB : NO. 3150-0131 EXPIRES: 11 /30/2020 (11-2017) v,f'AEG(.,,(

. :,""' . ,,. Estimated burden per response to comply wnh this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~+~o~ OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send t i comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear

~~: EXAMINATION DATA

~ ~ Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,

<;+. 0$' and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office 0 +

of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a cu rrently valid 0 MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION

!Browns Ferry Nuclear Plant 2

11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 NUMBER OF REACTOR OPERATORS 7 9 14 12 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 7 6 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 6 4 4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 07/16/201 8 11/04/201 9 10/12/2020 10/11/2021 ALTERNATE DATE 12/02/20 19 11/09/2020 11/08/2021 NRG FORM 536 (1 1-20 17)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

,.p-ll REG£,

.§ ~ <,.> Estimated burden per response to comply wrth this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~"~ o..,. OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send t '2, comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear

~~ F/ EXAMINATION DATA

-  ::111111111;: Regulatory Commission, Washington, DC20555-0001 , or by e-mail to lnfocollects.Resource@nrc.gov,

-r;,._~ ~0,$) and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3 150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION

[Browns Ferry Nuclear Plant 2

11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 22 CY 23 CY CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 22 CY 23 CY CY NUMBER OF REACTOR OPERATORS 8 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 10/10/2022 10/16/2023 ALTERNATE DATE 11/07/2022 11 /06/2023 NRC FORM 536 (11-2017)