| {{#Wiki_filter:}} | | {{#Wiki_filter:e VIRGINIA ELECTRIC AND PowER COMPANY RICHMOND,VIROINIA 23261 June '28, '197$', |
| | * Mr. Edson G. Case, Acting Director Serial No. 045A/020177 Nuclear Reactor Regulation PO&M/RWC:das U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, .D. C. 20555 50-281 License Nqs. DPR-32 DPR-37 Attn: Mr. Albert Schwencer, Chief Operating Reactor Branch 1 |
| | |
| | ==Dear Mr. Case:== |
| | |
| | This is a status report on the auxiliary building ventilation system modifi-cations. The preliminary design is complete and follows the framework presented in our May 9,' 1977 letter (re:sponse to questions .1114 and. //16). |
| | The exhaust from all ECCS equipment areas is reduced to within the capacity of a single filter train while the second.train is reserved as standby. A new nonsafety related filter train is provided to allow continuous filtration of ex-haust from most of the auxiliary building cubicles. |
| | The final design work has begun and construction is scheduled to commence early in 1979. We will continue to keep you informed of our progress in this matter. |
| | Ver!(mlY_/?rs, *f Vic lf&~~~/***G/ |
| | M. Stallings _.. |
| | ident - ~wer s~j ly ** |
| | and Pnbduction I Operations |
| | / __ ; !;;. ** |
| | <c |
| | ; 'i ~ |
| | ::J ~~. i~ |
| | :~cj-~ |
| | £7-~1~~ |
| | --r-, :::: z_-::J |
| | --;(_: |
| | -*l 0 |
| | rr1 C) |
| | ()) |
| | .1:)}} |
Latest revision as of 11:02, 2 February 2020
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 ML24212A0772024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24003A9022024-01-0303 January 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 – NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) 2024-09-03
[Table view] Category:Status Report
MONTHYEARML23089A3642023-03-30030 March 2023 Decommissioning Funding Status Report ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML15244B2022015-08-24024 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML15069A2292015-03-0202 March 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14245A4022014-08-26026 August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14069A0102014-02-27027 February 2014 Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14069A0152014-02-27027 February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML13242A0132013-08-23023 August 2013 Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) ML13242A0162013-08-23023 August 2013 Virginia Electric & Power Company Surry Power Station Units 1 & 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12024A3762011-12-28028 December 2011 State-of-the-Art Reactor Consequence Analyses, Current Status and Next Steps ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0506300702005-03-0202 March 2005 January Monthly Report on the Status of Open TIAs Assigned to NRR ML0501202612005-01-12012 January 2005 December Monthly Report on the Status of Open TIAs Assigned to NRR ML0434802422004-12-29029 December 2004 November Monthly Report on the Status of Open TIAs Assigned to NRR ML0224601532002-08-29029 August 2002 Undated Document, Current Status of High Susceptibility Plants That May Receive Orders ML0224007982002-02-0101 February 2002 E-mail from Beth Wetzel Bulletin 2001-01 Status Report ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report ML19093B1161978-06-28028 June 1978 Status Report on the Auxiliary Building Ventilation System Modifications 2023-03-30
[Table view] |
Text
e VIRGINIA ELECTRIC AND PowER COMPANY RICHMOND,VIROINIA 23261 June '28, '197$',
- Mr. Edson G. Case, Acting Director Serial No. 045A/020177 Nuclear Reactor Regulation PO&M/RWC:das U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, .D. C. 20555 50-281 License Nqs. DPR-32 DPR-37 Attn: Mr. Albert Schwencer, Chief Operating Reactor Branch 1
Dear Mr. Case:
This is a status report on the auxiliary building ventilation system modifi-cations. The preliminary design is complete and follows the framework presented in our May 9,' 1977 letter (re:sponse to questions .1114 and. //16).
The exhaust from all ECCS equipment areas is reduced to within the capacity of a single filter train while the second.train is reserved as standby. A new nonsafety related filter train is provided to allow continuous filtration of ex-haust from most of the auxiliary building cubicles.
The final design work has begun and construction is scheduled to commence early in 1979. We will continue to keep you informed of our progress in this matter.
Ver!(mlY_/?rs, *f Vic lf&~~~/***G/
M. Stallings _..
ident - ~wer s~j ly **
and Pnbduction I Operations
/ __ ; !;;. **
<c
- 'i ~
- J ~~. i~
- ~cj-~
£7-~1~~
--r-, :::: z_-::J
--;(_:
-*l 0
rr1 C)
())
.1:)