ML19275A032: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
. .
NRC FORM %6                                                                                                                  U. S NUCLI AR REGUL ATORY COMMISSION (7 77)
NRC FORM %6                                                                                                                  U. S NUCLI AR REGUL ATORY COMMISSION (7 77)
LICENSEE EVENT REPORT                                                              EXHIBIT A CONTROL BLOCK: l l l l l l lh                                  (PLE ASE PRINT OR TYPE ALL REOutRED INFORMATION)
LICENSEE EVENT REPORT                                                              EXHIBIT A CONTROL BLOCK: l l l l l l lh                                  (PLE ASE PRINT OR TYPE ALL REOutRED INFORMATION)
Line 24: Line 23:
l A l Nl    Cont 0 l 1lgl 18      in 0 l0 l -l0LICEl 0NSElNvveth 0l 0l0l-l0l0lg;4 l1 l 1 l1 l 1 lg[
l A l Nl    Cont 0 l 1lgl 18      in 0 l0 l -l0LICEl 0NSElNvveth 0l 0l0l-l0l0lg;4 l1 l 1 l1 l 1 lg[
26
26
                                                                                                                                                                           ;g 20      LKLNi e*Pt 40        b, C A T be CON'T
                                                                                                                                                                           ;g 20      LKLNi e*Pt 40        b, C A T be CON'T IoIiI
                              '
IoIiI
       '          8
       '          8
                               ."c,I.%        LL_J@l0 l 5 p lC i 013 l l l 3l@l0 18 l 0 I 91719 l@l01812 13 l7 l9 l@
                               ."c,I.%        LL_J@l0 l 5 p lC i 013 l l l 3l@l0 18 l 0 I 91719 l@l01812 13 l7 l9 l@
fd        61            DOsm.Thuygge            te      69      (*ENTparg              Ja      FS    HFPOH1 OATE        80 EVENT DESCRIPTION AND PROB ADLE CONSEQUENCES h L'df}                Durino a NRC Performance Appraisal Team interview, it was discovered                                                                                      ,
fd        61            DOsm.Thuygge            te      69      (*ENTparg              Ja      FS    HFPOH1 OATE        80 EVENT DESCRIPTION AND PROB ADLE CONSEQUENCES h L'df}                Durino a NRC Performance Appraisal Team interview, it was discovered                                                                                      ,
ei that Pressurizer Safety Relief Valve, PSV-1002, was not properly testeo 1o 1 1 i in March, 1978. Documentation revealed the acceptance criteria of pro- i uu.s.j i cedure 401.03, requiring two consecutive lifts at 2500 + 1% psi, was not i 10161 I met.                      The AN0 Plant Safety Committee (PSC) ruled the test was not per-                                                                            i o , i            formed satisfactorily. There have been no similar occurrences. This                                                                                      ,
ei that Pressurizer Safety Relief Valve, PSV-1002, was not properly testeo 1o 1 1 i in March, 1978. Documentation revealed the acceptance criteria of pro- i uu.s.j i cedure 401.03, requiring two consecutive lifts at 2500 + 1% psi, was not i 10161 I met.                      The AN0 Plant Safety Committee (PSC) ruled the test was not per-                                                                            i o , i            formed satisfactorily. There have been no similar occurrences. This                                                                                      ,
o  -      1 occurrence _nportable oer T.S. 6.12.3.1.f.                                                                                                                  I
o  -      1 occurrence _nportable oer T.S. 6.12.3.1.f.                                                                                                                  I 7!F              'M!          Jea                    u,,ms      1 <=c                  #;'m            :=,
      '          ' '                                                                                                                                                            "
7!F              'M!          Jea                    u,,ms      1 <=c                  #;'m            :=,
i, n l ',1  ,                        l C l Al@ L,,AJO uLlJ @ Iz 9        .,
i, n l ',1  ,                        l C l Al@ L,,AJO uLlJ @ Iz 9        .,
o Iz i z i 21 z I zi@ t.z._j@ tz_j @
o Iz i z i 21 z I zi@ t.z._j@ tz_j @
                                                                                                                           ,,,            .            m, s i~1 ..                              L'%sV,2                          "EE!"                  ""?;"                    "'1T"'
                                                                                                                           ,,,            .            m, s i~1 ..                              L'%sV,2                          "EE!"                  ""?;"                    "'1T"'
                       @ .a,j,.:,.;,,;o
                       @ .a,j,.:,.;,,;o 17 191              L-J                                              1011 I 2,      u          a 10 11 1 1 !
                                    "
17 191              L-J                                              1011 I 2,      u          a 10 11 1 1 !
2          .c          M, 2            u          c,
2          .c          M, 2            u          c,
[T_J
[T_J L-J v
                                                                                                                                            .
L-J v
LO_J u
LO_J u
Yant'      A TO            ON PLA 7          METHC              ++ 0U 5'1  22      iB      D        FO    b b                M                  .ER LEj@LHj@ l zl@
Yant'      A TO            ON PLA 7          METHC              ++ 0U 5'1  22      iB      D        FO    b b                M                  .ER LEj@LHj@ l zl@
Line 51: Line 42:
40    el                si              4)          as              as c Aust OEscn.ntiON ANo cORREe nvf ACTIONS @
40    el                si              4)          as              as c Aust OEscn.ntiON ANo cORREe nvf ACTIONS @
g The test acceptability was initially justified based on high pressure gagp siiiiiindication due to exceedingly hot ambient temperature.                                                                                  The valve was                  i ri m                retested on 8/12/79, successfully, with no adjustments ns .essary.                                                                                        ,
g The test acceptability was initially justified based on high pressure gagp siiiiiindication due to exceedingly hot ambient temperature.                                                                                  The valve was                  i ri m                retested on 8/12/79, successfully, with no adjustments ns .essary.                                                                                        ,
          ,
il l J
il l J
U_L'.J l                                                                                                                                                                      i
U_L'.J l                                                                                                                                                                      i
                        '                                                                                                                                                      "
                     's t'A O''            uo ia                      or-c., svatus @                ti'                              0,s i s LZl@                010101@l              n/a                        I  "'sC"A LJ @,, [ NRC P Aerview    . .                      T. IElny0,v ,,nos              ; g
                     's t'A O''            uo ia                      or-c., svatus @                ti'                              0,s
    '
i s LZl@                010101@l              n/a                        I  "'sC"A LJ @,, [ NRC P Aerview    . .                      T. IElny0,v ,,nos              ; g
                 " J,, v, , ,                        "        "                        a      a
                 " J,, v, , ,                        "        "                        a      a
* Co'  1,,,,                                                                                                                                =
* Co'  1,,,,                                                                                                                                =
Line 63: Line 50:
         '    c                                          NA .ox r e, AC1, .n @ l                              NA
         '    c                                          NA .ox r e, AC1, .n @ l                              NA
     '              LZ_J @ LU@l                                                                      l                                                                          l
     '              LZ_J @ LU@l                                                                      l                                                                          l
                '
                           . .sosa n,osas                                              "              "                                                                      a LM
                           . .sosa n,osas                                              "              "                                                                      a LM
                           . uv. . .
                           . uv. . .
Line 70: Line 56:
* l n.
* l n.
                     ' ..i umaso sn',sm'4 se c sC,... n o,.@
                     ' ..i umaso sn',sm'4 se c sC,... n o,.@
    ,
i    -
i    -
                 . 9 10      i 010 l@lo NA
                 . 9 10      i 010 l@lo NA
                                       ,,                                                                                                                                        l EB LZJ@:=NAr,u.
                                       ,,                                                                                                                                        l EB LZJ@:=NAr,u.
ea                                ~" @                                                                          2031                l98
ea                                ~" @                                                                          2031                l98 7          A 9 L
                                                                                                                                                                              "
7          A 9 L
10                                                                                                                                              l PV5LICif y                                                                                                                                          8''
10                                                                                                                                              l PV5LICif y                                                                                                                                          8''
essu(D      DE sCaiP TION 4s                                                                                                          NRC USC ONLY l !!!lllllll lll
essu(D      DE sCaiP TION 4s                                                                                                          NRC USC ONLY l !!!lllllll lll
                                                                                                                                                                              "
                                     ,ygo,,,,,,ng,                    Chris N. Shively                                            ,u g,            5dI/968-2519 7908300T7/
                                     ,ygo,,,,,,ng,                    Chris N. Shively                                            ,u g,            5dI/968-2519 7908300T7/
                      . _ .
. ..
: 1. Reportable Occurrence Report No. 50-313/79-011
: 1. Reportable Occurrence Report No. 50-313/79-011
: 2. Report Datc:    08/23/79            3. Occurrence Date:  08/09/79
: 2. Report Datc:    08/23/79            3. Occurrence Date:  08/09/79 4    Facility:    Arkansas Nuclear One - Unit One Russellville, Arkansas 72801
                                                                                  .
4    Facility:    Arkansas Nuclear One - Unit One Russellville, Arkansas 72801
: 5. Identification of Occurrence:
: 5. Identification of Occurrence:
Personnel error in procedure execution which could prevent the fulfillment of the functional requirement of the pressurizer relief system to cope with accidents analyzed in the FSAR.
Personnel error in procedure execution which could prevent the fulfillment of the functional requirement of the pressurizer relief system to cope with accidents analyzed in the FSAR.
Line 98: Line 75:
2031    199
2031    199


                              .
. ..
Reportable Occurrence Peport No. 50-313/79-011
Reportable Occurrence Peport No. 50-313/79-011
: 8. Designation of Apparent Cause of Occurrence:                              ,
: 8. Designation of Apparent Cause of Occurrence:                              ,
Line 112: Line 87:
2031    200
2031    200


  -
..
Reportable occurrence Report No. 50-313/79-011
Reportable occurrence Report No. 50-313/79-011
: 10. Corrective Action:
: 10. Corrective Action:
                                                                                .
Valve PSV-1002 was retested for lift pressure on 8/12/79. The setpoint was tested three times, with calculated lift pressures of 2518, 2493, and 2523 psi. This met the acceptance criteria of procedure 1401.03 for two consecutive lifts at 2500 + 1% psi. There were no adjustments necessa ry. It can therefore be concluded that the valve was operable during the period of March, 1978 to August, 1979.
Valve PSV-1002 was retested for lift pressure on 8/12/79. The setpoint was tested three times, with calculated lift pressures of 2518, 2493, and 2523 psi. This met the acceptance criteria of procedure 1401.03 for two consecutive lifts at 2500 + 1% psi. There were no adjustments necessa ry. It can therefore be concluded that the valve was operable during the period of March, 1978 to August, 1979.
                                                                            .
2031      201
2031      201
: 11. Failure Data:
: 11. Failure Data:
N/A}}
N/A}}

Latest revision as of 17:29, 1 February 2020

LER 79-011/01T-0 on 790809:during NRC Performance Appraisal Team Interview,Discovered That Pressurizer Safety Relief Valve PSV-1002 Was Not Properly Tested in Mar 1978.Valve Retested 790812 W/No Adjustments Required
ML19275A032
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/23/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19275A031 List:
References
LER-79-011-01T, LER-79-11-1T, NUDOCS 7908300571
Download: ML19275A032 (4)


Text

-

NRC FORM %6 U. S NUCLI AR REGUL ATORY COMMISSION (7 77)

LICENSEE EVENT REPORT EXHIBIT A CONTROL BLOCK: l l l l l l lh (PLE ASE PRINT OR TYPE ALL REOutRED INFORMATION)

FI l .i 9AlR LICINsEE 7

l A l Nl Cont 0 l 1lgl 18 in 0 l0 l -l0LICEl 0NSElNvveth 0l 0l0l-l0l0lg;4 l1 l 1 l1 l 1 lg[

26

g 20 LKLNi e*Pt 40 b, C A T be CON'T IoIiI

' 8

."c,I.% LL_J@l0 l 5 p lC i 013 l l l 3l@l0 18 l 0 I 91719 l@l01812 13 l7 l9 l@

fd 61 DOsm.Thuygge te 69 (*ENTparg Ja FS HFPOH1 OATE 80 EVENT DESCRIPTION AND PROB ADLE CONSEQUENCES h L'df} Durino a NRC Performance Appraisal Team interview, it was discovered ,

ei that Pressurizer Safety Relief Valve, PSV-1002, was not properly testeo 1o 1 1 i in March, 1978. Documentation revealed the acceptance criteria of pro- i uu.s.j i cedure 401.03, requiring two consecutive lifts at 2500 + 1% psi, was not i 10161 I met. The AN0 Plant Safety Committee (PSC) ruled the test was not per- i o , i formed satisfactorily. There have been no similar occurrences. This ,

o - 1 occurrence _nportable oer T.S. 6.12.3.1.f. I 7!F 'M! Jea u,,ms 1 <=c #;'m  :=,

i, n l ',1 , l C l Al@ L,,AJO uLlJ @ Iz 9 .,

o Iz i z i 21 z I zi@ t.z._j@ tz_j @

,,, . m, s i~1 .. L'%sV,2 "EE!" ""?;" "'1T"'

@ .a,j,.:,.;,,;o 17 191 L-J 1011 I 2, u a 10 11 1 1 !

2 .c M, 2 u c,

[T_J L-J v

LO_J u

Yant' A TO ON PLA 7 METHC ++ 0U 5'1 22 iB D FO b b M .ER LEj@LHj@ l zl@

JJ 44 33

[z_J@

36 i 0 l 010 l l 38 [N'TJ@@@ su2j@ L *- 9 l z' A N ACT9I 9l@

40 el si 4) as as c Aust OEscn.ntiON ANo cORREe nvf ACTIONS @

g The test acceptability was initially justified based on high pressure gagp siiiiiindication due to exceedingly hot ambient temperature. The valve was i ri m retested on 8/12/79, successfully, with no adjustments ns .essary. ,

il l J

U_L'.J l i

's t'A O uo ia or-c., svatus @ ti' 0,s i s LZl@ 010101@l n/a I "'sC"A LJ @,, [ NRC P Aerview . . T. IElny0,v ,,nos  ; g

" J,, v, , , " " a a

  • Co' 1,,,, =

ru Aau Counas. tom,0~o,,,n,Au @

' c NA .ox r e, AC1, .n @ l NA

' LZ_J @ LU@l l l

. .sosa n,osas " " a LM

. uv. . .

10 . of Ol@LZ J@l" NA 1... c i ,,,,,,0~ @

'

  • l n.

' ..i umaso sn',sm'4 se c sC,... n o,.@

i -

. 9 10 i 010 l@lo NA

,, l EB LZJ@:=NAr,u.

ea ~" @ 2031 l98 7 A 9 L

10 l PV5LICif y 8

essu(D DE sCaiP TION 4s NRC USC ONLY l !!!lllllll lll

,ygo,,,,,,ng, Chris N. Shively ,u g, 5dI/968-2519 7908300T7/

1. Reportable Occurrence Report No. 50-313/79-011
2. Report Datc: 08/23/79 3. Occurrence Date: 08/09/79 4 Facility: Arkansas Nuclear One - Unit One Russellville, Arkansas 72801
5. Identification of Occurrence:

Personnel error in procedure execution which could prevent the fulfillment of the functional requirement of the pressurizer relief system to cope with accidents analyzed in the FSAR.

6. Conditions Prior to Occurrence:

Steady-State Power Reactor Power MWth lio t Standby Net Output MWe Cold Shutdown Percent of Full Power S.

Refueling Shutdown Load Changes During Routine Power Operation Routine Startup Operation Routine Shutdown Operation Other (speci fy)

Routine power operation following incorrect testing of pressurizer relief valve.

7. Description of Occurren;c:

Upon investigation of an item discussed during the NRC Performance Appraisal Team exit interview on 8/3/79, it was discovered that Pressurizer Safety Relief Valve, PSV-1002, was not properly tested per procedure 1401.03, " Pressurizer Code Relief Valve Test", in March, 1978.

2031 199

Reportable Occurrence Peport No. 50-313/79-011

8. Designation of Apparent Cause of Occurrence: ,

Design Procedure bbnufacture Unusual Service Condition Including Environmental Installation /

Const ruction Component Failure (See Failure Data)

Operator Other (specify) Engineering personnel

9. Analysis of Occurrence:

Per T.S.4.L b , Table 4.1-2, Item 3, the pressurizer code safety valve setpoint must be tested on one of the relief valves every 18 months.

The documentation shows that valve, PSC-1002, was tested for lift pressure per procedure three times on March 18, 1978, with calculated lift pressures of 2499, 2530, and 2531 psi. The acceptance criteria of procedure 1401.03 requires two consecutive lifts at 2500 + 1% psi.

The data sheet on file with this test procedure contains a note written by the engineer supervising the test. He justified the acceptability of the test results. based on the fact that the pressure gage indicated higher than actual due to the exceedingly hot ambient temperature in the area. However, the test gage in question was not calibrated follow-ing the test, as it was not specifically required by the procedule.

The AN0 Plant Safety Committee (PSC) met on 8/9/79 and reviewed all documentation pertaining to the test in question. It was ruled that the justification for acceptability was not a valid argument, and the test results were not satisfactory.

2031 200

Reportable occurrence Report No. 50-313/79-011

10. Corrective Action:

Valve PSV-1002 was retested for lift pressure on 8/12/79. The setpoint was tested three times, with calculated lift pressures of 2518, 2493, and 2523 psi. This met the acceptance criteria of procedure 1401.03 for two consecutive lifts at 2500 + 1% psi. There were no adjustments necessa ry. It can therefore be concluded that the valve was operable during the period of March, 1978 to August, 1979.

2031 201

11. Failure Data:

N/A