| title = 2006/01/30-Comment (17) of Janet W. and Walter F. Schwarz, Opposing the 20% Power Uprate at the Vermont Yankee Nuclear Power Plant
| title = Comment (17) of Janet W. and Walter F. Schwarz, Opposing the 20% Power Uprate at the Vermont Yankee Nuclear Power Plant
| author name = Schwarz J W, Schwarz W F
| author name = Schwarz J, Schwarz W
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
| addressee name = Lesar M T
| addressee name = Lesar M
| addressee affiliation = NRC/ADM/DAS/RDB
| addressee affiliation = NRC/ADM/DAS/RDB
| docket = 05000271
| docket = 05000271
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:7/fl<X t/774/WO C Michael T. Lesar Chief,'Rules and Directives Branch Division of Administrative Services U.S. Nuclear Regulatory Commission Washington, DC 20555 850 Meadowbrook Road Brattleboro, Vermont 05301 January 30, 2006 T- i K-i.AJrj CZ)1 C171 Fl Crr U1 CD-,_ ... `-IA ' ] ': ...'I,- I' )RA.. ..--eR -3 Orn  
{{#Wiki_filter:WOC 7/fl<X t/774/                             850 Meadowbrook Road Brattleboro, Vermont 05301 January 30, 2006                   I'-2 J
Fl Crr rj CZ)
Michael T. Lesar                                                                T-i             1
                                                                                                          -,_       . ..     `-
U1 IA '     ] CD ': ..
C171 Chief,'Rules and Directives Branch                                                                  .   'I,-
                                                                                                            .. . .--eR -3 I'    )RA Division of Administrative Services U.S. Nuclear Regulatory Commission K-i                                  Orn
                                                                                        .A Washington, DC 20555
                                                                                                      .n


==Dear Chief Lesar:==
==Dear Chief Lesar:==
Re: page 1774 Federal Register/Vol.
 
71, No. 7 / Wednesday, January 11, 2006 We are strongly opposed to a 20% power uprate at the Vermont Yankee Nuclear Power Plant (VY). The conclusion reached by the NRC that the uprate "would not involve a significant reduction in a margin of safety" is flawed because it assumes the plant is new and not an aging 33-year-old plant.Arnold Gunderson, nuclear engineer and safety consultant, has stated that "age related equipment failures are already affecting the performance of VY." For example, "VY's steam dryer is already cracked, the Main Steam Isolation Valves are no longer able to meet their original leak criterion, and... any one of several small single failures within the containment system must inevitably also cause the failure of the emergency cooling systems." It is essential that the NRC conduct an in-depth 20,000 hour Independent Safety Assessment like the one done at Maine Yankee by the NRC in 1996 before an uprate is approved.Sincerely, Janet W. Schwarz Walter F. Schwarz 5p/ ee 1A 9,4E, ff3 eI3 X_ 6 , /.) > :)9}}
Re: page 1774 Federal Register/Vol. 71, No. 7 / Wednesday, January 11, 2006 We are strongly opposed to a 20% power uprate at the Vermont Yankee Nuclear Power Plant (VY). The conclusion reached by the NRC that the uprate "would not involve a significant reduction in a margin of safety" is flawed because it assumes the plant is new and not an aging 33-year-old plant.
Arnold Gunderson, nuclear engineer and safety consultant, has stated that "age related equipment failures are already affecting the performance of VY." For example, "VY's steam dryer is already cracked, the Main Steam Isolation Valves are no longer able to meet their original leak criterion, and... any one of several small single failures within the containment system must inevitably also cause the failure of the emergency cooling systems."
It is essential that the NRC conduct an in-depth 20,000 hour Independent Safety Assessment like the one done at Maine Yankee by the NRC in 1996 before an uprate is approved.
Sincerely, Janet W. Schwarz                     Walter F. Schwarz 5p/ ee X_ 6 , /.) > :)9 1A    9,4E, ff3              eI3}}

Latest revision as of 20:56, 7 December 2019

Comment (17) of Janet W. and Walter F. Schwarz, Opposing the 20% Power Uprate at the Vermont Yankee Nuclear Power Plant
ML060410075
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/30/2006
From: Schwarz J, Schwarz W
- No Known Affiliation
To: Lesar M
NRC/ADM/DAS/RDB
References
%dam200606, 71FR1774 00017
Download: ML060410075 (1)


Text

WOC 7/fl<X t/774/ 850 Meadowbrook Road Brattleboro, Vermont 05301 January 30, 2006 I'-2 J

Fl Crr rj CZ)

Michael T. Lesar T-i 1

-,_ . .. `-

U1 IA ' ] CD ': ..

C171 Chief,'Rules and Directives Branch . 'I,-

.. . .--eR -3 I' )RA Division of Administrative Services U.S. Nuclear Regulatory Commission K-i Orn

.A Washington, DC 20555

.n

Dear Chief Lesar:

Re: page 1774 Federal Register/Vol. 71, No. 7 / Wednesday, January 11, 2006 We are strongly opposed to a 20% power uprate at the Vermont Yankee Nuclear Power Plant (VY). The conclusion reached by the NRC that the uprate "would not involve a significant reduction in a margin of safety" is flawed because it assumes the plant is new and not an aging 33-year-old plant.

Arnold Gunderson, nuclear engineer and safety consultant, has stated that "age related equipment failures are already affecting the performance of VY." For example, "VY's steam dryer is already cracked, the Main Steam Isolation Valves are no longer able to meet their original leak criterion, and... any one of several small single failures within the containment system must inevitably also cause the failure of the emergency cooling systems."

It is essential that the NRC conduct an in-depth 20,000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> Independent Safety Assessment like the one done at Maine Yankee by the NRC in 1996 before an uprate is approved.

Sincerely, Janet W. Schwarz Walter F. Schwarz 5p/ ee X_ 6 , /.) > :)9 1A 9,4E, ff3 eI3