|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML060410075 | | | number = ML060410075 |
| | issue date = 01/30/2006 | | | issue date = 01/30/2006 |
| | title = 2006/01/30-Comment (17) of Janet W. and Walter F. Schwarz, Opposing the 20% Power Uprate at the Vermont Yankee Nuclear Power Plant | | | title = Comment (17) of Janet W. and Walter F. Schwarz, Opposing the 20% Power Uprate at the Vermont Yankee Nuclear Power Plant |
| | author name = Schwarz J W, Schwarz W F | | | author name = Schwarz J, Schwarz W |
| | author affiliation = - No Known Affiliation | | | author affiliation = - No Known Affiliation |
| | addressee name = Lesar M T | | | addressee name = Lesar M |
| | addressee affiliation = NRC/ADM/DAS/RDB | | | addressee affiliation = NRC/ADM/DAS/RDB |
| | docket = 05000271 | | | docket = 05000271 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:7/fl<X t/774/WO C Michael T. Lesar Chief,'Rules and Directives Branch Division of Administrative Services U.S. Nuclear Regulatory Commission Washington, DC 20555 850 Meadowbrook Road Brattleboro, Vermont 05301 January 30, 2006 T- i K-i.AJrj CZ)1 C171 Fl Crr U1 CD-,_ ... `-IA ' ] ': ...'I,- I' )RA.. ..--eR -3 Orn | | {{#Wiki_filter:WOC 7/fl<X t/774/ 850 Meadowbrook Road Brattleboro, Vermont 05301 January 30, 2006 I'-2 J |
| | Fl Crr rj CZ) |
| | Michael T. Lesar T-i 1 |
| | -,_ . .. `- |
| | U1 IA ' ] CD ': .. |
| | C171 Chief,'Rules and Directives Branch . 'I,- |
| | .. . .--eR -3 I' )RA Division of Administrative Services U.S. Nuclear Regulatory Commission K-i Orn |
| | .A Washington, DC 20555 |
| | .n |
|
| |
|
| ==Dear Chief Lesar:== | | ==Dear Chief Lesar:== |
| Re: page 1774 Federal Register/Vol. | | |
| 71, No. 7 / Wednesday, January 11, 2006 We are strongly opposed to a 20% power uprate at the Vermont Yankee Nuclear Power Plant (VY). The conclusion reached by the NRC that the uprate "would not involve a significant reduction in a margin of safety" is flawed because it assumes the plant is new and not an aging 33-year-old plant.Arnold Gunderson, nuclear engineer and safety consultant, has stated that "age related equipment failures are already affecting the performance of VY." For example, "VY's steam dryer is already cracked, the Main Steam Isolation Valves are no longer able to meet their original leak criterion, and... any one of several small single failures within the containment system must inevitably also cause the failure of the emergency cooling systems." It is essential that the NRC conduct an in-depth 20,000 hour Independent Safety Assessment like the one done at Maine Yankee by the NRC in 1996 before an uprate is approved.Sincerely, Janet W. Schwarz Walter F. Schwarz 5p/ ee 1A 9,4E, ff3 eI3 X_ 6 , /.) > :)9}} | | Re: page 1774 Federal Register/Vol. 71, No. 7 / Wednesday, January 11, 2006 We are strongly opposed to a 20% power uprate at the Vermont Yankee Nuclear Power Plant (VY). The conclusion reached by the NRC that the uprate "would not involve a significant reduction in a margin of safety" is flawed because it assumes the plant is new and not an aging 33-year-old plant. |
| | Arnold Gunderson, nuclear engineer and safety consultant, has stated that "age related equipment failures are already affecting the performance of VY." For example, "VY's steam dryer is already cracked, the Main Steam Isolation Valves are no longer able to meet their original leak criterion, and... any one of several small single failures within the containment system must inevitably also cause the failure of the emergency cooling systems." |
| | It is essential that the NRC conduct an in-depth 20,000 hour Independent Safety Assessment like the one done at Maine Yankee by the NRC in 1996 before an uprate is approved. |
| | Sincerely, Janet W. Schwarz Walter F. Schwarz 5p/ ee X_ 6 , /.) > :)9 1A 9,4E, ff3 eI3}} |
|
---|
Category:General FR Notice Comment Letter
MONTHYEARML17179A2462017-06-22022 June 2017 Comment (4) of Schuyler Gould Regarding Vermont Yankee Nuclear Power Station; Entergy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML17179A2452017-06-21021 June 2017 Comment (3) of Anonymous Regarding Vermont Yankee Nuclear Power Station; Entergy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML17163A0882017-06-0303 June 2017 Comment (2) of Robert Oeser on Vermont Yankee Power Station; Energy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML17163A0872017-05-29029 May 2017 Comment (1) of Richard Holschuh on Behalf of Elnu Abenaki Tribe on Vermont Yankee Power Station; Energy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML15159A1832015-06-0101 June 2015 Comment (2) of Kyle Landis-Marinello on Behalf of State of VT on Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Draft Environmental Assessment and Finding of No Significant Impact; Request for Comment ML15159A1842015-06-0101 June 2015 Comment (3) of Sandra and Charles Kosterman Opposing Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Draft Environmental Assessment and Finding of No Significant Impact; Request for Comment ML15138A0942015-05-0101 May 2015 Comment (1) of Clay Turnbull on Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Draft Environmental Assessment and Finding of No Significant Impact; Request for Comment ML15096A4582015-03-23023 March 2015 Comment (36) by Louise Amyot on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4422015-03-23023 March 2015 Comment (31) by Wendy Lapointe on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4522015-03-23023 March 2015 Comment (35) by Carol Levin on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4472015-03-23023 March 2015 Comment (34) by Virginia Hastings on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4452015-03-23023 March 2015 Comment (33) by John Cevasco on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4432015-03-23023 March 2015 Comment (32) by Charles Kosterman on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4402015-03-23023 March 2015 Comment (30) by Thomas Gajewski on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4392015-03-23023 March 2015 Comment (29) of Maggie Gunderson on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4382015-03-23023 March 2015 Comment (28) by Beth Watrous on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4372015-03-23023 March 2015 Comment (27) by John Tuthill on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4362015-03-23023 March 2015 Comment (26) by Nancy Hazard on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4352015-03-23023 March 2015 Comment (25) by Anonymous Individual on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4342015-03-23023 March 2015 Comment (24) by Erik Hoffner on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4332015-03-23023 March 2015 Comment (23) by Constance Harvard on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4322015-03-23023 March 2015 Comment (22) by David Jacke on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4602015-03-23023 March 2015 Comment (38) by Suzanne Carlson on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4612015-03-23023 March 2015 Comment (39) by Michael Rice on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4622015-03-23023 March 2015 Comment (40) by Susan Pelis on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4632015-03-23023 March 2015 Comment (41) by Elyssa Serrilli on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4592015-03-23023 March 2015 Comment (37) by Loren Kramer on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4652015-03-23023 March 2015 Comment (43) by Tim Murphy on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4292015-03-22022 March 2015 Comment (19) by Leslie Sachs on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4302015-03-22022 March 2015 Comment (20) by Jon King on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4642015-03-22022 March 2015 Comment (42) by Nancy Meagher on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4672015-03-20020 March 2015 Comment (17) by Anonymous Individual on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4692015-03-20020 March 2015 Comment (16) by Ulrike Von Molrke on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0502015-03-20020 March 2015 Comment (4) of Anonymous Individual on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15084A2242015-03-20020 March 2015 Comment (13) of Clay Turnbull Request for Extension of Time to File Public Comments ML15096A4662015-03-20020 March 2015 Comment (44) by Christopher Williams on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4272015-03-20020 March 2015 Comment (18) by Nancy First on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15097A0792015-03-19019 March 2015 Comment (2) by State of Vermont on NRC-2015-0029, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML15091A2552015-03-19019 March 2015 Comment (14) of Peter B. Elwell on Behalf of Town of Brattleboro on Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4682015-03-18018 March 2015 Comment (15) by an Anonymous Individual on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0662015-03-18018 March 2015 Comment (12) of Susan Lantz on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0652015-03-17017 March 2015 Comment (11) of Bob Dickerman on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0632015-03-15015 March 2015 Comment (10) of Anne Stevens on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0622015-03-15015 March 2015 Comment (9) of Sue Prent on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0612015-03-13013 March 2015 Comment (8) of D. Brigham on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0602015-03-12012 March 2015 Comment (7) of Robert Oeser Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A2342015-03-0606 March 2015 Comment (6) by William Irwin, on Behalf of State of Vermont Department of Health, Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0592015-02-27027 February 2015 Comment (5) of Valerie Stuart on Entergy Nuclear Operations, Inc., Venriont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0492015-02-19019 February 2015 Comment (3) of Norton Garber on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15049A0332015-02-0909 February 2015 Comment (24) of Shauna Lynn Opposing Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station; License Amendment Aplication; Reopening of Public Comment Period 2017-06-03
[Table view] |
Text
WOC 7/fl<X t/774/ 850 Meadowbrook Road Brattleboro, Vermont 05301 January 30, 2006 I'-2 J
Fl Crr rj CZ)
Michael T. Lesar T-i 1
-,_ . .. `-
U1 IA ' ] CD ': ..
C171 Chief,'Rules and Directives Branch . 'I,-
.. . .--eR -3 I' )RA Division of Administrative Services U.S. Nuclear Regulatory Commission K-i Orn
.A Washington, DC 20555
.n
Dear Chief Lesar:
Re: page 1774 Federal Register/Vol. 71, No. 7 / Wednesday, January 11, 2006 We are strongly opposed to a 20% power uprate at the Vermont Yankee Nuclear Power Plant (VY). The conclusion reached by the NRC that the uprate "would not involve a significant reduction in a margin of safety" is flawed because it assumes the plant is new and not an aging 33-year-old plant.
Arnold Gunderson, nuclear engineer and safety consultant, has stated that "age related equipment failures are already affecting the performance of VY." For example, "VY's steam dryer is already cracked, the Main Steam Isolation Valves are no longer able to meet their original leak criterion, and... any one of several small single failures within the containment system must inevitably also cause the failure of the emergency cooling systems."
It is essential that the NRC conduct an in-depth 20,000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> Independent Safety Assessment like the one done at Maine Yankee by the NRC in 1996 before an uprate is approved.
Sincerely, Janet W. Schwarz Walter F. Schwarz 5p/ ee X_ 6 , /.) > :)9 1A 9,4E, ff3 eI3