ML110260271: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:QF-1075-01 Rev. 3 (FP
{{#Wiki_filter:QF-1075-01 Rev. 3 (FP-T-SAT-75)
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   RESPOND TO INADVERTENT ADS INITIATION JPM NUMBER:                   JPM-C.4-G-001                   REV.       0 RELATED PRA                   None INFORMATION:
RESPOND TO INADVERTENT ADS INITIATION JPM NUMBER:
TASK NUMBERS /               CR200.204 TASK TITLE(S):               Perform the procedure for an inadvertent ECCS initiation 218000 A4.02                 Rating: SRO/RO:             4.2/4.2 K/A NUMBERS:
JPM-C.4-G-001 REV. 0   RELATED PRA INFORMATION:
ADS Logic initiation APPLICABLE METHOD OF TESTING:
None  TASK NUMBERS / TASK TITLE(S): CR200.204 Perform the procedure for an inadvertent ECCS initiation K/A NUMBERS:
Discussion:               Simulate/walkthrough:               Perform:
218000 A4.02 ADS Logic initiation Rating: SRO/RO:
EVALUATION LOCATION:             In-Plant:                             Control Room:
4.2/4.2 APPLICABLE METHOD OF TESTING:
Simulator:                             Other:
Discussion:
Lab:
Simulate/walkthrough:
Time for Completion:         10     Minutes                   Time Critical:     No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:               NLO Additional site-specific signatures may be added as desired.
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
10 Minutes Time Critical:
No     Alternate Path
: Yes     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                               Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 2 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM Number:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 2 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 JPM Number: JPM-C.4-G-001 JPM
JPM-C.4-G-001   JPM Title:
 
==Title:==
Respond To Inadvertent ADS Initiation (2010 ILT NRC SIM 1)
Respond To Inadvertent ADS Initiation (2010 ILT NRC SIM 1)
Examinee:       Evaluator:
Examinee:                                                   Evaluator:
Job Title:
Job
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).


EVALUATOR'S SIGNATURE:
==Title:==
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 3 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 3 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 58: Line 52:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the BOP.
* You are the BOP.
The plant is at rated power.
* The plant is at rated power.
RCIC Quarterly Surveillance is scheduled for later in your shift It has been determined that Core Spray needs to be placed in service in the Torus Mixing Mode
* RCIC Quarterly Surveillance is scheduled for later in your shift
* It has been determined that Core Spray needs to be placed in service in the Torus Mixing Mode INITIATING CUES (IF APPLICABLE):
* Place A Core Spray Loop in Torus Mixing Mode.
EVALUATOR NOTE: When the Core Spray pump is started and AC INTERLOCK alarm received, the ADS Timer will inadvertently initiate. This will require immediate entry into C.4-G and placement of the ADS inhibit switches to the INHIBIT position.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


INITIATING CUES (IF APPLICABLE):
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 4 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:
Place "A" Core Spray Loop in Torus Mixing Mode.
* None General  
EVALUATOR NOTE
:  When the Core Spray pump is started and AC INTERLOCK alarm received, the ADS Timer will inadvertently initiate. This will require immediate entry into C.4
-G and placement of the ADS inhibit switches to the INHIBIT position
.
QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 4 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
None General  


==References:==
==References:==
* B.03.01-05.G.4, C.4-G Task Standards:
* Respond to an inadvertent ECCS Initiation IAW C.4-G Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1          Locate and review procedure B.03.01-05 G.4 Critical: N Standard:                    Locate and review procedure B.03.01-05 G.4 Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2        Procedure Step 1 Critical: N Verify MO-1753, 11 CS INJECTION INBOARD, is CLOSED.
Standard:                  Uses light indication to verify MO-1753 CLOSED Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                          Page 5 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Performance Step: 3          Procedure Step 2 Critical: N Perform the following:
: a. Verify 11 CS Pump Suction Pressure PI-14-36A (Local) indicates 0 psig.
: b. Verify Div I CS Pump Pressure PI-14-48A (Panel C-03) indicates 30 psig.
CAUTION:
Do NOT start pump if system is NOT pressurized, as damage could result from suddenly filling and pressurizing an unfilled pipe.
Standard:                    Contacts Rx Bldg NLO to verify PI-14-36A indicates 0 psig.
Verifies PI-14-48A indicates 30 psig.
Evaluator Cue:              As the Out Plant Operator, report that PI-14-36A indicates 5 psig.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 4        Procedure Step 3 Critical: Y START 11 Core Spray Pump by placing 14A-S5A, 11 Core Spray Pump, control switch in START position.
Standard:                  Starts 11 Core Spray Pump by placing 14A-S5A in START position.
Non-Critical Portion of Standard:
* Prior to starting Pump, announces over plant PA system that they will be cycling a breaker in the lower 4 KV Room
* Acknowledges and reports Annunciator C-03-A-41, AC Interlock.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                  Page 6 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Performance Step: 5          Respond to annunciator C03-A-25 (Auto Blowdown Timer Activated).
Critical: N Standard:                    Responds to annunciator and notifies Shift Supervision.
Evaluator Cue:                As CRS, acknowledge the report.
Performance:                  SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 6          Recognizes entry into C.4.G (Inadvertent ECCS Initiation).
Critical: N                  Auto Blowdown Timers are timing down but Confirmatory Indications from C03-A-25 are NOT present:
* Low RPV water level on LI-2-3-85A & B on C05
* Annunciator C03-A-38 (Reactor Low Low Level)
* Annunciator C05-B-24 (Reactor Water Level Hi/Lo)
Standard:                    Entry into C.4.G recognized (Alternate Path).
Evaluator Cue:                As CRS, acknowledge the initiation of the ADS timers and entry into C.4-G.
Performance:                  SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 7        C.4-G Procedure Step 2 Critical: N Using all available information sources, determine if the initiation is the result of an inadvertent or spurious actuation signal and manual override is allowed.
: a. If the initiation CAN NOT be determined to be the result of an inadvertent or spurious actuation signal, Then EXIT this procedure and control the plant in accordance with appropriate procedures.
Standard:                  Verifies annunciator 3-A-38 (Reactor Low Low Level) is not in alarm and that the initiation is spurious.
Performance:                SATISFACTORY              UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


B.03.01-05.G.4, C.4
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                               Page 7 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Performance Step: 8            C.4-G Procedure Step 4 Critical: Y If the ADS timer has started, Then place both ADS INHIBIT switches in the INHIBIT position.
-G Task Standards:
Standard:                     Places both inhibit switches in the INHIBIT position before an Auto Blowdown is initiated.
Respond to an inadvertent ECCS Initiation IAW C.4
Evaluator Cue:                 As CRS, acknowledge placing the ADS Inhibit switches to the INHIBIT position.
-G  Start Time:
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
Terminating Cues:         Inform the examinee that the JPM is complete once ADS is inhibited.
, the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step:  1 Critical:  N Locate and review procedure B.03.01
-05 G.4  Standard: Locate and review procedure B.03.01
-05 G.4  Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
2 Critical:  N Procedure Step 1 Verify MO-1753, 11 CS INJECTION INBOARD, is CLOSED.
Standard: Uses light indication to verify MO
-1753 CLOSED Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 5 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
3 Critical:  N Procedure Step 2 Perform the following:
: a. Verify 11 CS Pump Suction Pressure PI 36A (Local) indicates  0 psig. b. Verify Div I CS Pump Pressure PI 48A (Panel C
-03) indicates  30 psig. CAUTION: Do NOT start pump if system is NOT pressurized, as damage could result from suddenly filling and pressurizing an unfilled pipe.
Standard: Contacts Rx Bldg NLO to verify PI 36A indicates 0 psig. Verifies PI 48A indicates 30 psig. Evaluator Cue:
As the Out Plant Operator, report that PI-14-36A indicates 5 psig.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
4 Critical:  Y Procedure Step 3 START 11 Core Spray Pump by placing 14A
-S5A, 11 Core Spray Pump, control switch in START position.
Standard: Starts 11 Core Spray Pump by placing 14A
-S5A in START position.
Non-Critical Portion of Standard
:  Prior to starting Pump, announces over plant PA system that they will be cycling a breaker in the lower 4 KV Room Acknowledges and reports Annunciator C A-41, AC Interlock.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  0 QF-1075-01 Rev. 3 (FP-T-SAT-75)  Page 6 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
5 Critical:  N Respond to annunciator C03
-A-25 (Auto Blowdown Timer Activated)
. Standard: Responds to annunciator and notifies Shift Supervision.
Evaluator Cue:
As CRS, acknowledge the report.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
6 Critical:  N Recognizes entry into C.4.G (Inadvertent ECCS Initiation
). Auto Blowdown Timers are timing down but Confirmatory Indications from C03-A-25 are NOT present:
Low RPV water level on LI 3-85A & B on C05 Annunciator C03
-A-38 (Reactor Low Low Level
)  Annunciator C05
-B-24 (Reactor Water Level Hi/Lo
)  Standard: Entry into C.4.G recognized (Alternate Path)
. Evaluator Cue:
As CRS, acknowledge the initiation of the ADS timers and entry into C.4-G. Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
7 Critical:  N C.4-G Procedure Step 2 Using all available information sources, determine if the initiation is the result of an inadvertent or spurious actuation signal and manual override is allowed.
: a. I f the initiation CAN NOT be determined to be the result of an inadvertent or spurious actuation signal, T hen EXIT this procedure and control the plant in accordance with appropriate procedures.
Standard: Verifies annunciator 3
-A-38 (Reactor Low Low Level) is not in alarm and that the initiation is spurious.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75)  Page 7 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
8 Critical: Y C.4-G Procedure Step 4 I f the ADS timer has started, Then place both ADS INHIBIT switches in the INHIBIT position. Standard: Places both inhibit switches in the INHIBIT position before an Auto Blowdown is initiated.
Evaluator Cue:
As CRS, acknowledge placing the ADS Inhibit switche s to the INHIBIT position. Performance:
SATISFACTORY UNSATISFACTORY Comments:   Terminating Cues:
Inform the examinee that the JPM is complete once ADS is inhibited.
Stop Time:
Stop Time:
Historical Record:
Historical Record:
This JPM was newly developed for the 2010 NRC ILT Exam. It is based on Core Spray B.03.01-05 Rev. 30 and Inadvertent ECCS Initiation C.4.G Rev. 8
* This JPM was newly developed for the 2010 NRC ILT Exam. It is based on Core Spray
* B.03.01-05 Rev. 30 and Inadvertent ECCS Initiation C.4.G Rev. 8 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
-G-RM-01. TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the BOP.
* You are the BOP.
The plant is at rated power.
* The plant is at rated power.
It is August and upstream river temperature is high.
* It is August and upstream river temperature is high.
It has been determined that Core Spray needs to be placed in service in the Torus Mixing Mode INITIATING CUES (IF APPLICABLE):
* It has been determined that Core Spray needs to be placed in service in the Torus Mixing Mode INITIATING CUES (IF APPLICABLE):
Place "A" Core Spray Loop in Torus Mixing Mode.
* Place A Core Spray Loop in Torus Mixing Mode.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   MANUAL INITIATION OF RCIC JPM NUMBER:                   JPM-B.02.03-010                 REV.       0 RELATED PRA                   None INFORMATION:
MANUAL INITIATION OF RCIC JPM NUMBER:
TASK NUMBERS /               CR217.107 TASK TITLE(S):               Manually Initiate RCIC K/A NUMBERS:                 217000         A4.04         Rating: SRO/RO:             3.6 / 3.6 APPLICABLE METHOD OF TESTING:
JPM-B.02.03-010 REV. 0   RELATED PRA INFORMATION:
Discussion:               Simulate/walkthrough:               Perform:
None  TASK NUMBERS / TASK TITLE(S): CR217.107 Manually Initiate RCIC K/A NUMBERS:
EVALUATION LOCATION:             In-Plant:                             Control Room:
217000 A4.04 Rating: SRO/RO:
Simulator:                             Other:
3.6 / 3.6 APPLICABLE METHOD OF TESTING:
Lab:
Discussion:
Time for Completion:         15     Minutes                   Time Critical:     No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:               NLO Additional site-specific signatures may be added as desired.
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
15 Minutes Time Critical:
No     Alternate Path
: Yes     TASK APPLICABILITY:
SRO:   RO:   NL O    Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                               Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 10 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM Number:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 10 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 JPM Number: JPM-B.02.03-010 JPM
JPM-B.02.03-010   JPM Title:
 
Manual Initiation of RCIC Examinee:       Evaluator:
==Title:==
Job Title:
Manual Initiation of RCIC Examinee:                                                   Evaluator:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
Job
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).


EVALUATOR'S SIGNATURE:
==Title:==
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 11 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 11 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 192: Line 162:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A reactor scram has occurred due to a LONOP. HPCI is unavailable.
* A reactor scram has occurred due to a LONOP.
* HPCI is unavailable.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to restore and maintain RPV Water Level to +9 to +48 inches by manually initiating RCIC IAW the Hard Card.
* The CRS directs you to restore and maintain RPV Water Level to +9 to +48 inches by manually initiating RCIC IAW the Hard Card.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 12 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                             Page 12 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:
-G-RM-01. JPM PERFORMANCE INFORMATION   Required Materials:
* None General  
None General  


==References:==
==References:==
* B.02.03-05 Task Standards:
* Inject with RCIC into the RPV Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1          At any time while performing this procedure, Critical: N                  If conditions permit, Then place RHR in torus Cooling for cooling/mixing the Torus water, per Ops Man Section B.03.04-05.
Standard:                    Informs CRS of step to place Torus Cooling in service.
Evaluator Cue:              Acknowledge report and state that another operator will be directed to place Torus Cooling in service.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2          Verify flow controller FIC-13-91 is in AUTO, And set to 400 gpm.
Critical: N Standard:                    Verifies flow controller FIC-13-91 is in AUTO, And set to 400 gpm.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


B.02.03-05 Task Standards:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                     Page 13 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 3         OPEN MO-2096, RCIC Cooling Water Supply Valve.
Inject with RCIC into the RPV Start Time:
Critical Y Standard:                   Opens MO-2096, RCIC Cooling Water Supply Valve.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
Non-Critical Portion of Standard:
, the examinee looks or asks for the indication).
Verifies red light on and green light off.
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Performance Step:
Performance Step: 4         Place P-211 (RCIC Barometric Condenser Vacuum Pump) Handswitch, Critical Y                  13A-S15, in the START position.
1 Critical: N At any time while performing this procedure, If conditions permit, Then place RHR in torus Cooling for cooling/mixing the Torus water, per Ops Man Section B.03.04-05. Standard: Informs CRS of step to place Torus Cooling in service.
Standard:                   Places Handswitch, 13A-S15, in the START position.
Evaluator Cue:
Non-Critical Portion of Standard:
Acknowledge report and state that another operator will be directed to place Torus Cooling in service.
Verifies red light on and green light off.
Performance:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
Performance Step: 5         OPEN CV-2104, RCIC Pump Minimum flow Valve.
2 Critical:  N Verify flow controller FIC 91 is in AUTO, And set to 400 gpm.
Critical Y Standard:                   Opens CV-2104, RCIC Pump Minimum flow Valve.
Standard: Verifies flow controller FIC 91 is in AUTO, And set to 400 gpm.
Non-Critical Portion of Standard:
Performance:
Verifies red light on and green light off.
SATISFACTORY UNSATISFACTORY Comments:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 13 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-G-RM-01. Performance Step:
3 Critical  Y  OPEN MO-2096, RCIC Cooling Water Supply Valve.
Standard: Opens MO-2096, RCIC Cooling Water Supply Valve.
Non-Critical Portion of Standard: Verifies red light on and green light off.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
4 Critical  Y  Place P-211 (RCIC Barometric Condenser Vacuum Pump) Handswitch, 13A-S15, in the START position.
Standard: Places Handswitch, 13A
-S15, in the START position.
Non-Critical Portion of Standard
: Verifies red light on and green light off.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
5 Critical  Y  OPEN CV-2104, RCIC Pump Minimum flow Valve.
Standard: Opens CV-2104, RCIC Pump Minimum flow Valve.
Non-Critical Portion of Standard
: Verifies red light on and green light off.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75)  Page 14 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
6 Critical:  Y OPEN the following:
: a. MO-2107, RCIC Pump Disch Inbd valve
: b. MO-2106, RCIC Pump Disch Otbd valve Standard: Opens MO-2107 and MO
-2106. Non-Critical Portion of Standard
: Verifies red light on and green light off.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
7 Critical:  Y OPEN MO-2078, RCIC Turbine Steam Supply.
Standard: Opens MO-2078, RCIC Turbine Steam Supply.
Non-Critical Portion of Standard
: Verifies red light on and green light off.
EVALUATOR NOTE
:  The Exhaust Diaphragm High Pressure annunciator is triggered to be received 15 seconds after MO
-2078 is opened. The next four steps of the RCIC startup are verification steps and are NOT critical. They may be marked as Not Applicable (N/A) if they not performed before the annunciator activates.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
8 Critical:  N Verify the following valves are closed: a. CV-2848 and CV
-2849, RCIC Cond Pump Discharge to CRW
: b. CV-2082A and CV
-2082B RCIC Steam Line Drain to Main Condenser  Standard: CV-2848, CV-2849, CV-2082A, and CV
-2082B verified CLOSED.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75)  Page 15 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
9 Critical:  N Verify SI-7321, RCIC Turbine Speed Indicator is increasing, indicating that unit is rolling.
Standard: Verifies that SI
-7321, RCIC Turbine Speed Indicator is increasing.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
10 Critical:  N Verify AO-13-22, RCIC Injection Testable Ckv, is open.
Standard: Verifies AO 22, RCIC Injection Testable Ckv, is open.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
11 Critical:  N Verify RCIC pump flow is maintained at desired level.
Standard: Verifies RCIC pump flow is maintained at desired level.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
12 Critical:  N Respond to annunciator C04
-A-10 (RCIC Turbine Exhaust Diaphragm Hi Press). Standard: Notifies the CRS of the unexpected alarm and references C
.6-04-A-10. Evaluator Cue:
Role Play CRS as necessary to acknowledge the unexpected alarm.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  This begins the Alternate Path portion of the JPM


QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 16 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 14 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 6          OPEN the following:
-G-RM-01. Performance Step:
Critical: Y                      a. MO-2107, RCIC Pump Disch Inbd valve
13 Critical: Y ARP C-4-A10 Step 1.a, Perform the following: Depress 13A
: b. MO-2106, RCIC Pump Disch Otbd valve Standard:                    Opens MO-2107 and MO-2106.
-S17 RCIC TURBINE TRIP Pushbutton.
Non-Critical Portion of Standard:
Standard: RCIC TURBINE TRIP Pushbutton depressed.
Verifies red light on and green light off.
Performance:
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Performance Step: 7          OPEN MO-2078, RCIC Turbine Steam Supply.
14 Critical:  Y ARP C-4-A10 Step 1.b, Perform the following: CLOSE the following Steam Isolation Valves 1) MO
Critical: Y Standard:                    Opens MO-2078, RCIC Turbine Steam Supply.
-2075 2) MO
Non-Critical Portion of Standard:
-2076   Standard: MO-2075 and MO
Verifies red light on and green light off.
-2076 CLOSED.
EVALUATOR NOTE:              The Exhaust Diaphragm High Pressure annunciator is triggered to be received 15 seconds after MO-2078 is opened. The next four steps of the RCIC startup are verification steps and are NOT critical. They may be marked as Not Applicable (N/A) if they not performed before the annunciator activates.
Non-Critical Portion of Standard
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
: Verifies red lights off and green lights on.
Performance Step: 8          Verify the following valves are closed:
Performance:
Critical: N                      a. CV-2848 and CV-2849, RCIC Cond Pump Discharge to CRW
SATISFACTORY UNSATISFACTORY Comments:   Terminating Cues:
: b. CV-2082A and CV-2082B RCIC Steam Line Drain to Main Condenser Standard:                    CV-2848, CV-2849, CV-2082A, and CV-2082B verified CLOSED.
When the Steam Isolation Valves are CLOSED, state that the JPM is completed.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                            Page 15 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 9          Verify SI-7321, RCIC Turbine Speed Indicator is increasing, indicating that Critical: N                  unit is rolling.
Standard:                    Verifies that SI-7321, RCIC Turbine Speed Indicator is increasing.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 10        Verify AO-13-22, RCIC Injection Testable Ckv, is open.
Critical: N Standard:                    Verifies AO-13-22, RCIC Injection Testable Ckv, is open.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 11        Verify RCIC pump flow is maintained at desired level.
Critical: N Standard:                    Verifies RCIC pump flow is maintained at desired level.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 12        Respond to annunciator C04-A-10 (RCIC Turbine Exhaust Diaphragm Hi Critical: N                  Press).
Standard:                    Notifies the CRS of the unexpected alarm and references C.6-04-A-10.
Evaluator Cue:              Role Play CRS as necessary to acknowledge the unexpected alarm.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:                    This begins the Alternate Path portion of the JPM Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                          Page 16 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 13        ARP C-4-A10 Step 1.a, Perform the following: Depress 13A-S17 RCIC Critical: Y                  TURBINE TRIP Pushbutton.
Standard:                   RCIC TURBINE TRIP Pushbutton depressed.
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
Performance Step: 14         ARP C-4-A10 Step 1.b, Perform the following: CLOSE the following Steam Critical: Y                  Isolation Valves 1) MO-2075 2) MO-2076 Standard:                   MO-2075 and MO-2076 CLOSED.
Non-Critical Portion of Standard:
Verifies red lights off and green lights on.
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
Terminating Cues:         When the Steam Isolation Valves are CLOSED, state that the JPM is completed.
Stop Time:
Stop Time:
Historical Record:
Historical Record:
This JPM was newly developed for the 2010 NRC ILO Exam. It is based on RCIC B.02.03
* This JPM was newly developed for the 2010 NRC ILO Exam. It is based on RCIC B.02.03-05 Rev. 21 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-05 Rev. 21 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A reactor scram has occurred due to a LONOP.
* A reactor scram has occurred due to a LONOP.
HPCI is unavailable.
* HPCI is unavailable.
 
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to restore and maintain RPV Water Level to +9 to +48 inches by manually initiating RCIC IAW the Hard Card.
* The CRS directs you to restore and maintain RPV Water Level to +9 to +48 inches by manually initiating RCIC IAW the Hard Card.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   RESTORE LC-103 FROM LC-104 JPM NUMBER:                   JPM-E.4-07-001                   REV.       5 RELATED PRA                   ACB309409Y" INFORMATION:
RESTORE LC
TASK NUMBERS /               CR305.125 TASK TITLE(S):               Restore LC-103 from LC-104 295003 AA1.01                           Rating: SRO/RO:     3.8/3.7 K/A NUMBERS:
-103 FROM LC
A.C. electrical distribution system APPLICABLE METHOD OF TESTING:
-104   JPM NUMBER:
Discussion:                 Simulate/walkthrough:             Perform:
JPM-E.4-07-001 REV. 5   RELATED PRA INFORMATION:  
EVALUATION LOCATION:             In-Plant:                             Control Room:
"ACB309409Y"  TASK NUMBERS / TASK TITLE(S): CR305.125 Restore LC
Simulator:                             Other:
-103 from LC
Lab:
-104   K/A NUMBERS:
Time for Completion:         10     Minutes                   Time Critical:   No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:             NLO Additional site-specific signatures may be added as desired.
295003 AA1.01 A.C. electrical distribution system Rating: SRO/RO:
3.8/3.7 APPLICABLE METHOD OF TESTING:   Discussion:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
10 Minutes Time Critical:
No     Alternate Path
: No     TASK APPLICABILITY:
SRO:   RO:   NL O    Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                 Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75)  Page 19 of 73 JPM-E.4-07-001 (Restore L C-103 From LC
-104) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM Number:
JPM-E.4-07-001  JPM Title:
Restore L C-103 From LC
-104 Examinee:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).


EVALUATOR'S SIGNATURE:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                        Page 19 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 JPM Number: JPM-E.4-07-001 JPM
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


QF-1075-01 Rev. 3 (FP
==Title:==
-T-SAT-75) Page 20 of 73 JPM-E.4-07-001 (Restore L C-103 From LC
Restore LC-103 From LC-104 Examinee:                                                    Evaluator:
-104) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Job
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs.
 
Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
==Title:==
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 20 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 362: Line 290:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LONOP occurred 45 minutes ago.
* A LONOP occurred 45 minutes ago.
C.4-B.09.02.B (Loss of Normal Off
* C.4-B.09.02.B (Loss of Normal Off-Site Power) has been performed up to Step 13.
-Site Power) has been performed up to Step 13.
* No. 12 EDG is running, supplying 16 Bus and LC-104.
No. 12 EDG is running, supplying 16 Bus and LC
* No. 11 EDG failed to start and 15 Bus is dead.
-104. No. 11 EDG failed to start and 15 Bus is dead.
* Reactor water level is being maintained using RCIC.
Reactor water level is being maintained using RCIC.
* There are NO Faults on LC-103.
There are NO Faults on LC-103. INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The Control Room Supervisor directs you to restore LC
* The Control Room Supervisor directs you to restore LC-103 from LC-104 using procedure E.4-07.
-103 from LC
* Steps 1 and 2 have been performed.
-104 using procedure E.4
* You are to perform Steps 3 through 8 to energize LC-103.
-07. Steps 1 and 2 have been performed.
* The remaining steps will be performed by an Outplant operator at a later time.
You are to perform Steps 3 through 8 to energize LC
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-103. The remaining steps will be performed by an Outplant operator at a later time.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 21 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 JPM PERFORMANCE INFORMATION Required Materials:
-T-SAT-75) Page 21 of 73 JPM-E.4-07-001 (Restore L C-103 From LC
* Simulator General  
-104) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Simulator General  


==References:==
==References:==
* None Task Standards:
* E.4-07, Rev 1 Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1          (Procedure STEP 3)
Critical: Y                  Place 52-301/CS, 103 LOAD CTR SEC ACB-52-301, to TRIP.
Standard:                    Trips ACB 52-301, 103 LC SEC ACB.
Verifies Red light OFF and Green light ON for ACB 52-301.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 2          (Procedure STEP 4)
Critical: Y                  Verify 103/104 LC BUS TIE ACB-52-309 is OPEN.
Standard:                    Verifies or OPENS ACB-52-309, 103/104 LC BUS TIE.
NON-CRITICAL PORTION OF STANDARD:
Verifies Green light ON and Red light OFF for ACB 52-309.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


None Task Standards:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                        Page 22 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 Performance Step: 3          (Procedure STEP 5)
E.4-07, Rev 1  Start Time:
Critical: Y                  Place 52-409/CS, 103/104 LC BUS TIE ACB-52-409, to CLOSE.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
Standard:                   Closes 52-409 ACB, 103/104 LC BUS TIE.
, the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step:
1 Critical:  Y (Procedure STEP 3)
Place 52-301/CS, 103 LOAD CTR SEC ACB 301, to TRIP.
Standard: Trips ACB 52
-301, 103 LC SEC ACB.
Verifies Red light OFF and Green light ON for ACB 52
-301. Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
2 Critical:  Y (Procedure STEP 4)
Verify 103/104 LC BUS TIE ACB-52-309 is OPEN.
Standard: Verifies or OPENS ACB 309, 103/104 LC BUS TIE.
NON-CRITICAL PORTION OF STANDARD:
NON-CRITICAL PORTION OF STANDARD:
Verifies Green light ON and Red light OFF for ACB 52
Verifies Red light ON and Green light OFF for ACB 52-409.
-309. Performance:
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4         (Procedure STEP 6)
QF-1075-01 Rev. 3 (FP
Critical: Y                  Place 52-309/SS, SYNC 103/104 LC BUS TIE ACB-52-309, to ON.
-T-SAT-75)  Page 22 of 73 JPM-E.4-07-001 (Restore L C-103 From LC
Standard:                   Places 52-309/SS to ON.
-104) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
-G-RM-01. Performance Step:
Performance Step: 5         (Procedure STEP 7)
3 Critical:  Y (Procedure STEP 5)
Critical: Y                  NOTE: ACB 5-309 will not CLOSE unless ACB-52-409 is CLOSED.
Place 52-409/CS, 103/104 LC BUS TIE ACB-52-409, to CLOSE.
Place 52-309/CS, 103/104 LC BUS TIE ACB-52-309, to CLOSE Standard:                   Closes 52-309ACB, 103/104 LC BUS TIE.
Standard: Closes 52-409 ACB, 103/104 LC BUS TIE.
(NON-CRITICAL PORTION OF STANDARD)
NON-CRITICAL PORTION OF STANDARD:
Observes 103 LC amperage meter for indication.
Verifies Red light ON and Green light OFF for ACB 52
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
-409. Performance:
Performance Step: 6         (Procedure STEP 8)
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N                  Place 52-309/SS, SYNC 103/104 LC BUS TIE ACB-52-309, to OFF.
4 Critical:  Y (Procedure STEP 6)
Standard:                   Turns OFF 52-309/SS, Sync 103/104 LC BUS TIE.
Place 52-309/SS, SYNC 103/104 LC BUS TIE ACB 309, to ON.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Standard: Places 52-309/SS to ON.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
 
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                     Page 23 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 Performance Step: 7         INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard:                   Operator informs evaluator that the task is completed.
5 Critical:  Y (Procedure STEP 7)
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
NOTE: ACB 5-309 will not CLOSE unless ACB 409 is CLOSED.
Terminating Cues:
Place 52-309/CS, 103/104 LC BUS TIE ACB 309, to CLOSE Standard: Closes 52-309ACB, 103/104 LC BUS TIE.
(NON-CRITICAL PORTION OF STANDARD) Observes 103 LC amperage meter for indication.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
6 Critical:  N (Procedure STEP 8)
Place 52-309/SS, SYNC 103/104 LC BUS TIE ACB 309, to OFF.
Standard: Turns OFF 52
-309/SS, Sync 103/104 LC BUS TIE.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75) Page 23 of 73 JPM-E.4-07-001 (Restore L C-103 From LC
-104) Rev. 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
7 Critical:  N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Standard: Operator informs evaluator that the task is completed.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Terminating Cues:
Stop Time:
Stop Time:
Historical Record:
Historical Record:
MNGP JPM Bank; Minor edits for 2009 NRC Exam Minor edits for 2010 NRC Exam. Updated to current JPM Template, QF
* MNGP JPM Bank; Minor edits for 2009 NRC Exam
-107501 Rev.3 Updated to current revisions of procedures: C.
* Minor edits for 2010 NRC Exam. Updated to current JPM Template, QF-107501 Rev.3
4-B.09.02.B Rev.12 and E.4.07 Rev. 1
* Updated to current revisions of procedures: C.4-B.09.02.B Rev.12 and E.4.07 Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
-G-RM-01. TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LONOP occurred 45 minutes ago.
* A LONOP occurred 45 minutes ago.
C.4-B.09.02.B (Loss of Normal Off
* C.4-B.09.02.B (Loss of Normal Off-Site Power) has been performed up to Step 13.
-Site Power) has been performed up to Step 13.
* No. 12 EDG is running, supplying 16 Bus and LC-104.
No. 12 EDG is running, supplying 16 Bus and LC
* No. 11 EDG failed to start and 15 Bus is dead.
-104. No. 11 EDG failed to start and 15 Bus is dead.
* Reactor water level is being maintained using RCIC.
Reactor water level is being maintained using RCIC.
* There are NO Faults on LC-103.
There are NO Faults on LC-103. INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The Control Room Supervisor directs you to restore LC
* The Control Room Supervisor directs you to restore LC-103 from LC-104 using procedure E.4-07.
-103 from LC
* Steps 1 and 2 have been performed.
-104 using procedure E.4
* You are to perform Steps 3 through 8 to energize LC-103.
-07. Steps 1 and 2 have been performed.
* The remaining steps will be performed by an Outplant operator at a later time.
You are to perform Steps 3 through 8 to energize LC
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-103. The remaining steps will be performed by an Outplant operator at a later time.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   APRM GAIN ADJUSTMENT WITHOUT THE PLANT COMPUTER JPM NUMBER:                   JPM-C.2-05.B.04-001             REV.         1 RELATED PRA                   None INFORMATION:
APRM GAIN ADJUSTMENT WITHOUT THE PLANT COMPUTER   JPM NUMBER:
TASK NUMBERS /               CR200.130 TASK TITLE(S):               APRM Gain Adjustment Factor Monitoring 215005         A1.07 APRM (gain           Rating: SRO/RO:       3.0/3.4 K/A NUMBERS:
JPM-C.2-05.B.04-001 REV. 1   RELATED PRA INFORMATION:
adjustment factor)
None  TASK NUMBERS / TASK TITLE(S): CR200.130 APRM Gain Adjustment Factor Monitoring K/A NUMBERS:
APPLICABLE METHOD OF TESTING:
215005 A1.07 APRM (gain adjustment factor)
Discussion:               Simulate/walkthrough:               Perform:
Rating: SRO/RO:
EVALUATION LOCATION:             In-Plant:                             Control Room:
3.0/3.4 APPLICABLE METHOD OF TESTING:
Simulator:                             Other:
Discussion:
Lab:
Simulate/walkthrough:
Time for Completion:         15     Minutes                     Time Critical:   No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:               NLO Additional site-specific signatures may be added as desired.
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
15 Minutes Time Critical:
No     Alternate Path
: No     TASK APPLICABILITY:
SRO:   RO:   NL O    Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                               Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 26 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM Number:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 26 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 JPM Number: JPM-C.2-05.B.04-001 JPM
JPM-C.2-05.B.04-001   JPM Title:
 
==Title:==
APRM Gain Adjustment Without Plant Computer (2010 ILT NRC SIM 4)
APRM Gain Adjustment Without Plant Computer (2010 ILT NRC SIM 4)
Examinee:       Evaluator:
Examinee:                                                   Evaluator:
Job Title:
Job
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATOR'S SIGNATURE:
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


QF-1075-01 Rev. 3 (FP
==Title:==
-T-SAT-75) Page 27 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Date:
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 27 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 506: Line 408:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant computer is OOS for maintenance and APRM 3 is bypassed for maintenance.
* The plant computer is OOS for maintenance and APRM 3 is bypassed for maintenance.
APRM #3 is ready to be unbypassed.
* APRM #3 is ready to be unbypassed.
The plant is operating at 100% power.
* The plant is operating at 100% power.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to adjust the gain on APRM #3 to read 100% power IAW C.2-05 B.4 Part D AND remove the bypass from APRM 3.
The CRS directs you to adjust the gain on APRM #3 to read 100% power IAW C.2-05 B.4 Part D AND remove the bypass from APRM 3.
QF-1075-01 Rev. 3 (FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 28 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 28 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:
None General  
* None General  


==References:==
==References:==
* C.2-05 (Power Operation - System Operation)
Task Standards:
* C.2-05 B.4 Part D Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1          Procedure Step 24. Bypass APRM to be adjusted by placing switch 7B-S3 Critical N                  (APRM Bypass) in the associated APRM number and verify associated white Bypassed lamp is ON or associated APRM ODA display header display indicates BYP in inverse video. [M76053A]
Standard:                    Verifies APRM #3 is bypassed Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2          Procedure Step 25 & 25.a. At Panel C-37, on APRM, Navigate to (press Critical: N                  ETC softkey as necessary) and Press ENTER SET MODE softkey, enter password 4221 (with numeric keypad) and press ENT key on keypad.
Standard:                    Press ENTER SET MODE softkey, enter password 4221 with numeric keypad and press ENT key on keypad. Multiple attempts to successfully enter password within 10 seconds are allowed.
Evaluator Note:              Step 26 must be completed within 10 seconds or display will revert to main display.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                Page 29 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Performance Step: 3          Procedure Step 26. Using cursor keys, select APRM GAIN.
Critical: N Standard:                    Using cursor keys, selects APRM GAIN.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 4          Procedure Step 27. Press SET PARAMETERS softkey.
Critical: Y Standard:                    Press SET PARAMETERS softkey.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 5          Procedure Step 28. Adjust APRM gains per the following:
Critical: Y                      a. Use left/right cursor keys for desired digit(s) changes.
: b. Use up/down cursor keys for attaining projected flux values equal to desired power as determined by nomogram of C.2-06, Control Room Core Power Nomogram at 1000 psig.
: c. Repeat Steps 28.a and 28.b for other digit(s) changes.
Standard:                    Adjusts APRM gain so projected flux is within 2% of 100% power.
Evaluator Note:              Expected gain range is 2.44-2.56.
Evaluator Cue:              Inform operator that core thermal power from the Control Room Core Power Nomogram is 100%.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 6          Procedure Step 29. Press ACCEPT softkey to change the APRM gain.
Critical: Y Standard:                    Press ACCEPT softkey to change the APRM gain after verifying reading is within 2% of 100% CTP.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


C.2-05 (Power Operation
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 30 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Performance Step: 7         Procedure Step 30. Press EXIT softkey.
- System Operation)
Critical: N Standard:                   Press EXIT softkey.
Task Standards:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
C.2-05 B.4 Part D Start Time:
Performance Step: 8         Procedure Step 31. Press EXIT SET MODE softkey.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
Critical: N Standard:                   Press EXIT SET MODE softkey.
, the examinee looks or asks for the indication).
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 9         Procedure Step 32. Press YES softkey.
Performance Step:
Critical: N Standard:                   Presses YES.
1 Critical  N Procedure Step 24. Bypass APRM to be adjusted by placing switch 7B
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
-S3 (APRM Bypass) in the associated APRM number and verify associated white Bypassed lamp is ON or associated APRM ODA display header display indicates BYP in inverse video. [M76053A]  Standard: Verifies APRM #3 is bypassed Performance:
Performance Step: 10        Procedure Step 33. Place switch 7B-S3 (APRM Bypass) in the neutral Critical: Y                  position and verify associated white Bypassed lamp is OFF or associated APRM ODA display header does NOT indicate BYP in inverse video.
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
[M76053A]
2 Critical:  N Procedure Step 25 & 25.a. At Panel C
Standard:                   7B-S3 placed in the neutral position.
-37, on APRM, Navigate to (press ETC softkey as necessary) and Press ENTER SET MODE softkey, enter password 4221 (with numeric keypad
Non-critical portion of the Standard:
) and press ENT key on keypad.
Verifies that APRM 3 is not bypassed.
Standard: Press ENTER SET MODE softkey, enter password 4221 with numeric keypad and press ENT key on keypad. Multiple attempts to successfully enter password within 10 seconds are allowed.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Evaluator Note:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Step 26 must be completed within 10 seconds or display will revert to main display.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75) Page 29 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
3 Critical:  N Procedure Step 2 6. Using cursor keys, select APRM GAIN.
Standard: Using cursor keys, selects APRM GAIN.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
4 Critical:  Y Procedure Step 2 7. Press SET PARAMETERS softkey.
Standard: Press SET PARAMETERS softkey.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
5 Critical:  Y Procedure Step 2 8. Adjust APRM gains per the following:
: a. Use left/right cursor keys for desired digit(s) changes.
: b. Use up/down cursor keys for attaining projected flux values equal to desired power as determined by nomogram of C.2
-06, Control Room Core Power Nomogram at 1000 psig.
: c. Repeat Steps 2 8.a and 2 8.b for other digit(s) changes.
Standard: Adjusts APRM gain so projected flux is within 2% of 100% power.
Evaluator Note:
Expected gain range is 2.44
-2.56. Evaluator Cue:
Inform operator that core thermal power from the Control Room Core Power Nomogram is 100%.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
6 Critical:  Y Procedure Step 29. Press ACCEPT softkey to change the APRM gain.
Standard: Press ACCEPT softkey to change the APRM gain after verifying reading is within 2% of 100% CTP
. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75)  Page 30 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
7 Critical: N Procedure Step 3 0. Press EXIT softkey.
Standard: Press EXIT softkey
. Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
8 Critical:  N Procedure Step 3 1. Press EXIT SET MODE softkey.
Standard: Press EXIT SET MODE softkey.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
9 Critical:  N Procedure Step 3 2. Press YES softkey.
Standard: Presses YES
. Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
1 0 Critical:  Y Procedure Step 3 3. Place switch 7B
-S3 (APRM Bypass) in the neutral position and verify associated white Bypassed lamp is OFF or associated APRM ODA display header does NOT indicate BYP in inverse video. [M76053A]   Standard: 7B-S3 placed in the neutral position.
Non-critical portion of the Standard
: Verifies that APRM 3 is not bypassed. Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75)  Page 31 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
1 1 Critical:  N Informs evaluator APRM #3 gains are adjusted and that JPM is complete.
Standard: Informs evaluator APRM #3 gains are adjusted.
Evaluator Cue:
Acknowledge report, and inform candidate that JPM is complete.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Terminating Cues:
Gain on APRM 3 has been adjusted and APRM 3 is unbypassed Stop Time:


QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                          Page 31 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Performance Step: 11          Informs evaluator APRM #3 gains are adjusted and that JPM is complete.
Critical: N Standard:                    Informs evaluator APRM #3 gains are adjusted.
Evaluator Cue:                Acknowledge report, and inform candidate that JPM is complete.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:          Gain on APRM 3 has been adjusted and APRM 3 is unbypassed Stop Time:
Historical Record:
Historical Record:
Minor edits for 2010 NRC Exam.
* Minor edits for 2010 NRC Exam.
Updated to current JPM Template, QF
* Updated to current JPM Template, QF-107501 Rev.3.
-107501 Rev.3.
* Updated to current revisions of procedures: C.2-05 Rev. 37.
Updated to current revisions of procedures: C.2
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-05 Rev. 37.


Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
-G-RM-01. TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant computer is OOS for maintenance and APRM 3 is bypassed for maintenance.
* The plant computer is OOS for maintenance and APRM 3 is bypassed for maintenance.
APRM #3 is ready to be unbypassed.
* APRM #3 is ready to be unbypassed.
The plant is operating at 100% power.
* The plant is operating at 100% power.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS directs you to adjust the gain on APRM #3 to read 100% power IAW C.2-05 B.4 Part D AND remove the bypass from APRM 3.
The CRS directs you to adjust the gain on APRM #3 to read 100% power IAW C.2-05 B.4 Part D AND remove the bypass from APRM 3.
QF-1075-01 Rev. 3 (FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75)  Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
 
PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:
QF-1075-01 Rev. 3 (FP-T-SAT-75)
JPM-B.05.12-001 REV. 1   RELATED PRA INFORMATION:
JOB PERFORMANCE MEASURE (JPM)
None  TASK NUMBERS / TASK TITLE(S): CR272.102 Perform the Area Radiation Monitor Functional Test   K/A NUMBERS:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER:                   JPM-B.05.12-001                 REV.       1 RELATED PRA                   None INFORMATION:
272000 A4.02 Rating: SRO/RO:
TASK NUMBERS /               CR272.102 TASK TITLE(S):               Perform the Area Radiation Monitor Functional Test 272000                       Rating: SRO/RO:             3.0/3.0 K/A NUMBERS:
3.0/3.0 APPLICABLE METHOD OF TESTING:
A4.02 APPLICABLE METHOD OF TESTING:
Discussion:
Discussion:               Simulate/walkthrough:               Perform:
Simulate/walkthrough:
EVALUATION LOCATION:             In-Plant:                             Control Room:
Perform:   EVALUATION LOCATION:
Simulator:                             Other:
In-Plant:   Control Room:
Lab:
Simulator:
Time for Completion:         25     Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:               NLO Additional site-specific signatures may be added as desired.
Other:           Lab:       Time for Completion:
25 Minutes Time Critical:
No     Alternate Path
: No     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                               Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 34 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JPM Number:
 
JPM-B.05.12-001   JPM Title:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 34 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 JPM Number: JPM-B.05.12-001 JPM
 
==Title:==
Perform The Area Radiation Monitor Functional Test (2010 ILT NRC SIM 5)
Perform The Area Radiation Monitor Functional Test (2010 ILT NRC SIM 5)
Examinee:       Evaluator:
Examinee:                                                   Evaluator:
Job Title:
Job
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).


EVALUATOR'S SIGNATURE:
==Title:==
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 35 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 35 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 650: Line 525:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Plant is operating at 100% power. Maintenance was performed on ARM Channel A1 and it requires PMT.
* Plant is operating at 100% power.
* Maintenance was performed on ARM Channel A1 and it requires PMT.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS has directed you to perform Test 1025
* The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 36 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                             Page 36 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:         Copy of Test 1025-A (Area Radiation Monitor Functional)
Copy of Test 1025
-A (Area Radiation Monitor Functional)
Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.
Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.
Check "other" as the reason for performing.
Check other as the reason for performing.
STEPS 3, 5, and 7
* STEPS 3, 5, and 7-11 should be marked N/A.
-11 should be marked N/A.
General  
General  


==References:==
==References:==
 
* Ops Manual B.05.12
Ops Manual B.05.12 ARM Alarm Setpoint Sheet (Operator Aid posted on panel)
* ARM Alarm Setpoint Sheet (Operator Aid posted on panel)
Task Standards:
Task Standards:
Test 1025-A (Area Radiation Monitor Functional)
* Test 1025-A (Area Radiation Monitor Functional)
Start Time:
Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
, the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1       Obtains copy of Test 1025-A, APRM Functional Critical: N Standard:                 Obtains copy of Test 1025-A, most recent revision.
Performance Step:
Evaluator Cue:             Provides an initiated copy of the current revision of Test 1025-A.
1 Critical:  N Obtains copy of Test 1025
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
-A, APRM Functional Standard: Obtains copy of Test 1025
Performance Step: 2       Procedure Step 1:
-A, most recent revision.
Critical: N                Makes plant announcement that Area Radiation Monitor testing will begin.
Evaluator Cue:
Standard:                 Makes plant announcement Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Provides an initiated copy of the current revision of Test 1025
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-A. Performance:
 
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                               Page 37 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 3          Procedure Step 2.a:
2 Critical:  N Procedure Step 1:
Critical: N                 Turn the TRIP CHECK ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
Makes plant announcement that Area Radiation Monitor testing will begin.
Standard:                   Turn the TRIP AND ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.
Standard: Makes plant announcement Performance:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4         Procedure Step 2.b:
QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 37 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. Performance Step:
Critical: Y                  Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.
3 Critical: N Procedure Step 2.a:
Standard:                   Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.
Turn the "TRIP CHECK ADJUST" knob on the power supply fully counter
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
-clockwise, A nd then 1/4 turn clockwise.
Performance Step: 5         Procedure Step 2.c:
Standard: Turn the "TRIP AND ADJUST" knob on the power supply fully counter
Critical: N                Record the meter reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.
-clockwise, A nd then 1/4 turn clockwise.
Standard:                   Record the meter reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.
Performance:
Performance:               SATISFACTORY              UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Performance Step: 6         Procedure Step 2.d:
4 Critical:  Y Procedure Step 2.b:
Critical: N                Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION I of Figure 1.
Simultaneously depress the "TRIP CHECK" button on the Indicator and Trip unit A nd turn the "TRIP CHECK ADJUST" knob on the power supply unit slowly counter
Standard:                   Records initials under LT column.
-clockwise until the downscale trip occurs.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard: Simultaneously depress the "TRIP CHECK" button on the Indicator and Trip unit A nd turn the "TRIP CHECK ADJUST" knob on the power supply unit slowly counter
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-clockwise until the downscale trip occurs.
 
Performance:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                              Page 38 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 7        Procedure Step 2.e:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N               Verify that annunciator 4-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled ANN under SECTION I of Figure 1.
5 Critical:  N Procedure Step 2.c:
Standard:                 Records initials.
Record the meter reading at which the downscale trip occurred in the column labeled "mr/hr" under SECTION I of Figure 1.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard: Record the meter reading at which the downscale trip occurred in the column labeled "mr/hr" under SECTION I of Figure 1.
Performance Step: 8       Procedure Step 2.f:
Performance:
Critical: Y                Turn the TRIP CHECK ADJUST knob on the power supply unit clockwise to just above the low trip set point, AND leave in this condition.
SATISFACTOR Y    UNSATISFACTORY Comments:   Performance Step:
Standard:                 Adjusts trip check adjust knob.
6 Critical:  N Procedure Step 2.d:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled "LT" under SECTION I of Figure 1.
Performance Step: 9       Procedure Step 2.g:
Standard: Records initials under "LT" column.
Critical: Y                Depress the RESET button on the Indicator and Trip unit, AND verify the downscale light is OFF and annunciator 4-A-31 (Area Monitor Downscale) is RESET.
Performance:
Standard:                 Verifies annunciator is reset.
SATISFACTORY UNSATISFACTORY Comments:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75)  Page 38 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. Performance Step:
Performance Step: 10       Procedure Step 2.h:
7 Critical: N Procedure Step 2.e:
Critical: N                Circle all downscale meter readings that do not fall within the acceptance criteria of +/-50% of the downscale setpoint on posted ARM setpoint sheet.
Verify that annunciator 4
Standard:                 Circles out of acceptance readings.
-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled "ANN" under SECTION I of Figure 1. Standard: Records initials.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
 
8 Critical:  Y Procedure Step 2.f:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                Page 39 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 11      Procedure Step 4.a:
Turn the "TRIP CHECK ADJUST" knob on the power supply unit clockwise to just above the low trip set point, A ND leave in this condition.
Critical: Y               Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit, And turn the TRIP CHECK ADJUST knob on the power supply unit slowly clockwise until the upscale trip occurs.
Standard: Adjusts trip check adjust knob.
Standard:                 Adjusts until upscale trip occurs.
Performance:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Performance Step: 12       Procedure Step 4.b:
9 Critical:  Y Procedure Step 2.g:
Critical: N                Record the meter reading at which the upscale trip occurred in the column labeled mr/hr under SECTION II of Figure 1.
Depress the "RESET" button on the Indicator and Trip unit, A ND verify the downscale light is OFF and annunciator 4
Standard:                 Records meter reading.
-A-31 (Area Monitor Downscale) is RESET. Standard: Verifies annunciator is reset.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Performance Step: 13       Procedure Step 4.c:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N                Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION II of Figure 1.
10 Critical:  N Procedure Step 2.h:
Standard:                 Verifies upscale light is ON.
Circle all downscale meter readings that do not fall within the acceptance criteria of 50% of the downscale setpoint on posted ARM setpoint sheet.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard: Circles out of acceptance readings.
Performance Step: 14       Procedure Step 4.d:
Performance:
Critical: N                Verify the appropriate annunciator is in ALARM by recording initials in column labeled ANN under SECTION II of Figure 1.
SATISFACTORY UNSATISFACTORY Comments:
Standard:                 Verifies alarm and initials form.
QF-1075-01 Rev. 3 (FP-T-SAT-75)  Page 39 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. Performance Step:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
11 Critical: Y Procedure Step 4.a:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Simultaneously depress the "TRIP CHECK" button on the Indicator and Trip unit, A nd turn the "TRIP CHECK ADJUST" knob on the power supply unit slowly clockwise until the upscale trip occurs.
 
Standard: Adjusts until upscale trip occurs.
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                              Page 40 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 15      Procedure Step 4.e:
Performance:
Critical: N                From the SPDS display, record the meter readings in the column labeled mr/hr under SECTION III of Figure 1.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Standard:                 Records readings from SPDS.
12 Critical:  N Procedure Step 4.b:
Evaluator Note:           For the performance of this JPM SPDS may be OOS for other JPMs. If so provide the following cue:
Record the meter reading at which the upscale trip occurred in the column labeled "mr/hr" under SECTION II of Figure 1.
Evaluator Cue:            SPDS reads 20 mr/hr.
Standard: Records meter reading.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance:
Performance Step: 16      Procedure Step 4.f:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: Y                Turn the TRIP CHECK ADJUST knob on the power supply unit counter-clockwise to just below the high trip set-point, AND leave in this condition.
13 Critical:  N Procedure Step 4.c:
Standard:                 Adjusts trip check adjust knob.
Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled "LT" under SECTION II of Figure 1.
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Standard: Verifies upscale light is ON.
Performance Step: 17      Procedure Step 4.g:
Performance:
Critical: Y                Depress the RESET button on the Indicator and Trip unit, AND verify the upscale light is OFF and appropriate annunciator is RESET.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Standard:                 Resets the annunciator.
14 Critical:  N Procedure Step 4.d:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Verify the appropriate annunciator is in ALARM by recording initials in column labeled "ANN" under SECTION II of Figure 1.
Performance Step: 18      Procedure Step 4.h:
Standard: Verifies alarm and initials form.
Critical: N                Circle all upscale meter readings that do not fall within the acceptance criteria of +/-30% of the upscale setpoint on posted ARM setpoint sheet.
Performance:
Standard:                 Circles out of acceptance readings.
SATISFACTORY UNSATISFACTORY Comments:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75)  Page 40 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. Performance Step:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
15 Critical:  N Procedure Step 4.e:
 
From the SPDS display, record the meter readings in the column labeled "mr/hr" under SECTION III of Figure 1.
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 41 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 19        Procedure step 6 Critical: N                Announce over the page that Area Radiation Monitor testing is complete.
Standard: Records readings from SPDS.
Standard:                  Makes plant announcement.
Evaluator Note:
Performance:               SATISFACTORY            UNSATISFACTORY Comments:
For the performance of this JPM SPDS may be OOS for other JPMs. If so provide the following cue:
Performance Step: 6          INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Evaluator Cue:
Critical: N Standard:                    Operator informs evaluator that the task is completed.
SPDS reads 20 mr/hr.
Evaluator Cue:                JPM Complete Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Terminating Cues:         Candidate informs evaluator JPM is complete.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
16 Critical:  Y Procedure Step 4.f:
Turn the "TRIP CHECK ADJUST" knob on the power supply unit counter
-clockwise to just below the high trip set
-point, A ND leave in this condition.
Standard: Adjusts trip check adjust knob.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
17 Critical:  Y Procedure Step 4.g:
Depress the "RESET" button on the Indicator and Trip unit, A ND verify the upscale light is OFF and appropriate annunciator is RESET.
Standard: Resets the annunciator.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
18 Critical: N Procedure Step 4.h:
Circle all upscale meter readings that do not fall within the acceptance criteria of 30% of the upscale setpoint on posted ARM setpoint sheet.
Standard: Circles out of acceptance readings.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 41 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. Performance Step:
19 Critical: N Procedure step 6 Announce over the page that Area Radiation Monitor testing is complete.
Standard: Makes plant announcement.
Performance:
SATISFACTORY UNSATISFACTORY Comments:  Performance Step:
6 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard: Operator informs evaluator that the task is completed.
Evaluator Cue:
JPM Complete Performance:
SATISFACTORY UNSATISFACTORY Comments:    Terminating Cues:
Candidate informs evaluator "JPM is complete."
Stop Time:
Stop Time:
Historical Record:
Historical Record:
Rev.1 deletes the statement "All operator actions are to be simulated" from the Initiating Cues. It is based on Test 1025
* Rev.1 deletes the statement All operator actions are to be simulated from the Initiating Cues. It is based on Test 1025-A Rev. 15.
-A Rev. 15.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. TURNOVER SHEET INITIAL CONDITIONS:
Plant is operating at 100% power.


TURNOVER SHEET INITIAL CONDITIONS:
* Plant is operating at 100% power.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
The CRS has directed you to perform Test 1025
The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   CRD COUPLING TEST JPM NUMBER:                   JPM-B.01.03-008                 REV.       7 RELATED PRA                   None INFORMATION:
CRD COUPLING TEST JPM NUMBER:
TASK NUMBERS /               CR201.102 TASK TITLE(S):               Perform the Control Rod Drive Coupling Test 201003                       Rating: SRO/RO:             3.7/3.8 K/A NUMBERS:
JPM-B.01.03-008 REV. 7   RELATED PRA INFORMATION:
A2.02 APPLICABLE METHOD OF TESTING:
None  TASK NUMBERS / TASK TITLE(S): CR201.102 Perform the Control Rod Drive Coupling Test   K/A NUMBERS:
Discussion:               Simulate/walkthrough:               Perform:
201003 A2.02 Rating: SRO/RO:
EVALUATION LOCATION:             In-Plant:                             Control Room:
3.7/3.8 APPLICABLE METHOD OF TESTING:
Simulator:                             Other:
Discussion:
Lab:
Simulate/walkthrough:
Time for Completion:         20     Minutes                   Time Critical:     No Alternate Path:               No TASK APPLICABILITY:               SRO:             RO:               NLO Additional site-specific signatures may be added as desired.
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
No     Alternate Path
: No     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                               Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 44 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM Number:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 44 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 JPM Number: JPM-B.01.03-008 JPM
JPM-B.01.03-008   JPM Title:
CRD Coupling Test Examinee:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).


EVALUATOR'S SIGNATURE:
==Title:==
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
CRD Coupling Test Examinee:                                                   Evaluator:
Job


QF-1075-01 Rev. 3 (FP
==Title:==
-T-SAT-75) Page 45 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Date:
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 45 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 846: Line 681:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant is in Mode 4.
* The Plant is in Mode 4.
Preparation for a plant startup is in progress with all control rod drives fully inserted.
* Preparation for a plant startup is in progress with all control rod drives fully inserted.
INITIATING CUES:
INITIATING CUES:
Shift Supervision directs you to perform CRD coupling check on Rod 22-27 IAW Test 0075.
* Shift Supervision directs you to perform CRD coupling check on Rod 22-27 IAW Test 0075.
The prerequisites for the test have been met and the Mode Switch is in REFUEL.
* The prerequisites for the test have been met and the Mode Switch is in REFUEL.
OSP-CRD-0539 PART A has been completed for rod 22
* OSP-CRD-0539 PART A has been completed for rod 22-27.
-27.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 3 (FP
 
-T-SAT-75) Page 46 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                 Page 46 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 JPM PERFORMANCE INFORMATION Required Materials:
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
* Initialize to any startup IC with all rods inserted and at <212&deg;F.
Initialize to any startup IC with all rods inserted and at <212
* Fill out Procedure 0075 (Control Rod Drive Coupling Test) as follows:
&deg;F. Fill out Procedure 0075 (Control Rod Drive Coupling Test) as follows:
                                      - CRS approval on coversheet
  - CRS approval on coversheet
                                      - Reason to perform - other
  - Reason to perform  
                                      - Comment section should read:
- other - Comment section should read:
                                      - Perform the coupling check for only CRD 22-27 to satisfy drive replacement PMT.
  - Perform the coupling check for only CRD 22
                                      - Complete the prerequisites.
-27 to satisfy drive replacement PMT.
  - Complete the prerequisites.
General  
General  


==References:==
==References:==
* Procedure 0075 Task Standards:
* Performs the CRD coupling test Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1          (Procedure STEP 1)
Critical: N Place RWM mode select switch (C-05) to BYPASS position.
Standard:                    Places RWM keyswitch in BYPASS.
Evaluator Cue:                RWM mode switch has been witnessed to be in the BYPASS position.
Performance:                  SATISFACTORY              UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Procedure 0075 Task Standards:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                               Page 47 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Performance Step: 2         (Procedure STEP 3)
Performs the CRD coupling test Start Time:
Critical: N                  If plant is in Mode 4, Then verify OSP-CRD-0539 (Special Operations Checklist For Tech Spec LCO 3.10.4) Part A is complete for control rod to be tested.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
Standard:                   OSP-CRD-0539 verified complete.
, the examinee looks or asks for the indication).
Evaluator Cue:               As CRS, inform candidate that OSP-CRD-0539 is complete for rod 22-27.
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Evaluate Note:               Procedure Step 2 is not applicable in Mode 4.
Performance Step:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
1 Critical:  N (Procedure STEP 1)
Performance Step: 3         (Procedure STEP 4)
Place RWM mode select switch (C
Critical: Y Fully withdraw CRD and observe that the control rod drive does not go to the overtravel position by verifying both:
-05) to BYPASS position.
: 1. The alarm 5-A-11 (Rod Overtravel) does not annunciate when attempting to withdraw the drive beyond position 48.
Standard: Places RWM keyswitch in BYPASS.
Evaluator Cue:
RWM mode switch has been witnessed to be in the BYPASS position.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75) Page 47 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
2 Critical:  N (Procedure STEP 3)
I f plant is in Mode 4, Then verify OSP
-CRD-0539 (Special Operations Checklist For Tech Spec LCO 3.10.4) Part A is complete for control rod to be tested.
Standard: OSP-CRD-0539 verified complete.
Evaluator Cue:
As CRS, inform candidate that OSP
-CRD-0539 is complete for rod 22
-27. Evaluate Note:
Procedure Step 2 is not applicable in Mode 4.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
3 Critical:  Y (Procedure STEP 4)
Fully withdraw CRD and observe that the control rod drive does not go to the overtravel position by verifying both:
: 1. The alarm 5
-A-11 (Rod Overtravel) does not annunciate when attempting to withdraw the drive beyond position 48.
: 2. The selected rod position is not blank when the drive is fully withdrawn.
: 2. The selected rod position is not blank when the drive is fully withdrawn.
Standard: 1. Selects Rod 22
Standard:                         1. Selects Rod 22-27.
-27. 2. Fully withdraws rod to position 48 by simultaneously using the ROD MOVEMENT CONTROL switch (3A
: 2. Fully withdraws rod to position 48 by simultaneously using the ROD MOVEMENT CONTROL switch (3A-S2) in the ROD OUT NOTCH position and ROD OUT NOTCH OVERRIDE switch (3A-S3) in the NOTCH OVERRIDE position.
-S2) in the ROD OUT NOTCH position and ROD OUT NOTCH OVERRIDE switch (3A
Non-Critical portion of the Standard:
-S3) in the NOTCH OVERRIDE position.
: 1. Verifies ROD OVERTRAVEL alarm 5-A-11 does not annunciate.
Non-Critical portion of the Standard
: 2. Verifies rod position indication for 22-27 does not go blank.
: 1. Verifies ROD OVERTRAVEL alarm 5
Evaluator Note:             When control rod has settled at position 48, the operator may attempt to withdraw the control rod by simultaneously using the rod movement control switch 3A-S2 in the rod out notch position and rod out notch override with 3A-S3 in the notch override position.
-A-11 does not annunciate.
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
: 2. Verifies rod position indication for 22
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-27 does not go blank.
 
Evaluator Note:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                 Page 48 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Performance Step: 4       (Procedure STEP 5)
When control rod has settled at position 48, the operator may attempt to withdraw the control rod by simultaneously using the rod movement control switch 3A
Critical: Y If both conditions in STEP 4 are verified, Then initial the appropriate square on Figure 1 (signifying a satisfactory coupling check for that control rod drive),
-S2 in the rod out notch position and rod out notch override with 3A
And fully insert CRD.
-S3 in the notch override position.
Standard:                 Fully inserts Control Rod 22-27 to position 00 using the ROD MOVEMENT CONTROL switch (3A-S2) in the ROD IN position.
Performance:
Non-Critical portion of Standard:
SATISFACTORY UNSATISFACTORY Comments:
Initials the proper location on Figure 1 of Test 0075.
QF-1075-01 Rev. 3 (FP
Performance:             SATISFACTORY             UNSATISFACTORY Comments:
-T-SAT-75) Page 48 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Performance Step: 5         (Procedure STEP 6)
-G-RM-01. Performance Step:
Critical: N If both conditions in STEP 2 are NOT verified, And only one attempt has been made at recoupling, Then perform the following:
4 Critical:  Y (Procedure STEP 5)
I f both conditions in STEP 4 are verified, T hen initial the appropriate square on Figure 1 (signifying a satisfactory coupling check for that control rod drive), A nd fully insert CRD.
Standard: Fully inserts Control Rod 22
-27 to position 00 using the ROD MOVEMENT CONTROL switch (3A
-S2) in the ROD IN position.
Non-Critical portion of Standard
: Initials the proper location on Figure 1 of Test 0075.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
5 Critical:  N (Procedure STEP 6)
I f both conditions in STEP 2 are NOT verified, A nd only one attempt has been made at recoupling, T hen perform the following:
: 1. Note this situation in the COMMENTS section.
: 1. Note this situation in the COMMENTS section.
: 2. Attempt to couple the drive by fully inserting the control rod.
: 2. Attempt to couple the drive by fully inserting the control rod.
: 3. Perform the coupling check again by returning to STEP 2 and re-performing the procedure.
: 3. Perform the coupling check again by returning to STEP 2 and re-performing the procedure.
Standard: None - Step will be N/A Evaluator Note:
Standard:                   None - Step will be N/A Evaluator Note:             This step is not applicable. All rods are coupled.
This step is not applicable. All rods are coupled.
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Performance Step: 6         (Procedure STEP 7)
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N If the second attempt to verify control rod coupling is unsatisfactory, Then perform Procedure B.01.03-05.H.3 (Control Rod System Failure).
6 Critical:  N (Procedure STEP 7)
Standard:                   None - Step will be N/A Evaluator Note;             This step is not applicable. All rods are coupled.
I f the second attempt to verify control rod coupling is unsatisfactory, T hen perform Procedure B.01.03
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
-05.H.3 (Control Rod System Failure
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
). Standard: None - Step will be N/A Evaluator Note; This step is not applicable. All rods are coupled.
 
Performance:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 49 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Performance Step: 7         (Procedure STEP 8)
SATISFACTORY UNSATISFACTORY Comments:
Critical: N Repeat STEPs 2 through 7 for each CRD to be tested.
QF-1075-01 Rev. 3 (FP
Standard:                   None Evaluator Note:             Step is N/Ad.
-T-SAT-75) Page 49 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
-G-RM-01. Performance Step:
Performance Step: 8         (Procedure STEP 9)
7 Critical:  N (Procedure STEP 8)
Critical: N Place RWM mode select switch (C-05) to OPERATE position.
Repeat STEPs 2 through 7 for each CRD to be tested.
Standard:                   Operator places keylock handswitch to OPERATE.
Standard: None   Evaluator Note:
Evaluator Cue:               RWM mode switch has been witnessed to be in the OPERATE position.
Step is N/A'd.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Performance Step: 9         INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N Standard:                   Operator informs evaluator that the task is completed.
8 Critical:  N (Procedure STEP 9)
Evaluator Cue:             JPM Complete Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Place RWM mode select switch (C
Terminating Cues:
-05) to OPERATE position.
Standard: Operator places keylock handswitch to OPERATE.
Evaluator Cue:
RWM mode switch has been witnessed to be in the OPERATE position. Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
9 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.
Standard: Operator informs evaluator that the task is completed.
Evaluator Cue:
JPM Complete Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
Stop Time:
Stop Time:
Historical Record:
Historical Record:
Rev.7 deletes the statement "All operator actions are to be simulated" from the Initiating Cues. It is based on Test 0075 Rev. 17, in which Steps 2 and 3 are newly added from a previous revision.
* Rev.7 deletes the statement All operator actions are to be simulated from the Initiating Cues. It is based on Test 0075 Rev. 17, in which Steps 2 and 3 are newly added from a previous revision.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
-G-RM-01. TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant is in Mode 4.
* The Plant is in Mode 4.
Preparation for a plant startup is in progress with all control rod drives fully inserted.
* Preparation for a plant startup is in progress with all control rod drives fully inserted.
INITIATING CUES:
* Shift Supervision directs you to perform CRD coupling check on Rod 22-27 IAW Test 0075.
* The prerequisites for the test have been met and the Mode Switch is in REFUEL.
* OSP-CRD-0539 PART A has been completed for rod 22-27.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


INITIATING CUES:
QF-1075-01 Rev. 3 (FP-T-SAT-75)
Shift Supervision directs you to perform CRD coupling check on Rod 22-27 IAW Test 0075.
JOB PERFORMANCE MEASURE (JPM)
The prerequisites for the test have been met and the Mode Switch is in REFUEL.
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   MANUALLY ISOLATE SCTMT JPM NUMBER:                   JPM-B.04.02-005                 REV.       1 RELATED PRA                   None INFORMATION:
OSP-CRD-0539 PART A has been completed for rod 22
TASK NUMBERS /               CR261.108 TASK TITLE(S):               Manually Isolate SCTMT 290001 / A3.01                           Rating: SRO/RO:     4.0/3.9 K/A NUMBERS:
-27.
Secondary Containment Isolation APPLICABLE METHOD OF TESTING:
QF-1075-01 Rev. 3 (FP
Discussion:               Simulate/walkthrough:               Perform:
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
EVALUATION LOCATION:             In-Plant:                             Control Room:
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
Simulator:                             Other:
MANUALLY ISOLATE SCTMT JPM NUMBER:
Lab:
JPM-B.04.02-005 REV. 1   RELATED PRA INFORMATION:
Time for Completion:         20     Minutes                   Time Critical:   No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:               NLO Additional site-specific signatures may be added as desired.
None  TASK NUMBERS / TASK TITLE(S): CR261.108 Manually Isolate SCTMT K/A NUMBERS:
290001 / A3.01 Secondary Containment Isolation Rating: SRO/RO:
4.0/3.9 APPLICABLE METHOD OF TESTING:
Discussion:
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
No     Alternate Path
: Yes     TASK APPLICABILITY:
SRO:   RO:   NLO   Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                 Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                 Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                             Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75)  Page 52 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM Number:
JPM-B.04.02-005  JPM Title:
Manually Isolate SCTMT Examinee:      Evaluator:
Job Title:
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).


EVALUATOR'S SIGNATURE:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                        Page 52 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 JPM Number: JPM-B.04.02-005 JPM
NOTE:  Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.


QF-1075-01 Rev. 3 (FP
==Title:==
-T-SAT-75) Page 53 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Manually Isolate SCTMT Examinee:                                                    Evaluator:
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
Job
 
==Title:==
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
 
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 53 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,022: Line 814:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is nearing the end of a refuel outage and is in Mode 4
* The plant is nearing the end of a refuel outage and is in Mode 4.
. I & C has replaced an isolation relay for Secondary Containment.
* I & C has replaced an isolation relay for Secondary Containment.
No OPDRVs or fuel movements are in progress.
* No OPDRVs or fuel movements are in progress.
PMT requires that a manual secondary containment isolation be performed.
* PMT requires that a manual secondary containment isolation be performed.
A SBGT has been verified in AUTO/STANDBY INITIATING CUES (IF APPLICABLE):
* A SBGT has been verified in AUTO/STANDBY INITIATING CUES (IF APPLICABLE):
Manually isolate Secondary Containment IAW the B
* Manually isolate Secondary Containment IAW the B-Manual procedure.
-Manual procedure.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                             Page 54 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:
-T-SAT-75) Page 54 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* Simulator General  
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
Simulator General  


==References:==
==References:==
* B.04.02-005.D.2 Task Standards:
* Manually isolate secondary containment, recognize the improper startup of SBGT B, place SBGT in manual and inform CRS to enter appropriate Technical Specification.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1          Locates procedure B.04.02-05.D2 (Manually Isolate SCTMT)
Critical: N Standard:                    Locates procedure B.04.02-05.D2 (Manually Isolate SCTMT), reviews PURPOSE and PRECAUTIONS AND LIMITATIONS Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2          PREREQUISITES 1 Critical: N                  At least one SBGT Train is in Auto/Standby.
Standard:                    Verifies SBGT Train A is in Auto/Standby.
Evaluator Cue:                As stated in the initial conditions, state that A SBGT has been verified in AUTO/STANDBY.
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                Page 55 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 3          PREREQUISITES 2 Critical: N                  Either:
: a. No painting has occurred within Reactor Building for at least 32 hours (online) or 48 hours (outage),
Or
: b. If painting has occurred within 32 hours (online) or 48 hours (outage) of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters Standard:                    Verifies no painting has occurred within Reactor Building for at least 32 hours.
Evaluator Cue:                Inform operator that no painting has occurred within Reactor Building for at least 48 hours.
Performance:                  SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 4          Procedure Step 1:
Critical: N                  If this procedure is being initiated in response to rising radioactive releases from the Reactor Building, Then perform this procedure concurrently with Abnormal Procedure C.4-B.02.04.A (Steam Leaks Outside Primary Containment), And, Or C.4-B.04.01.B (Primary Containment Group 2 - Isolation).
Standard:                    Based on initial conditions and initiating cue this step is N/A Performance:                  SATISFACTORY              UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


B.04.02-005.D.2 Task Standards:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 56 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 5          Procedure Step 2:
Manually isolate secondary containment, recognize the improper startup of SBGT B, place SBGT in manual and inform CRS to enter appropriate Technical Specification.
Critical: Y                   If the Turbine Building ventilation is to remain operating, Then perform the following:
Start Time:
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
, the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step:
1 Critical:  N Locates procedure B.04.02
-05.D2 (Manually Isolate SCTMT)
Standard: Locates procedure B.04.02
-05.D2 (Manually Isolate SCTMT), reviews PURPOSE and PRECAUTIONS AND LIMITATIONS Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
2 Critical:  N PREREQUISITES 1 At least one SBGT Train is in Auto/Standby.
Standard: Verifies SBGT Train A is in Auto/Standby.
Evaluator Cue:
As stated in the initial conditions, state that A SBGT has been verified in AUTO/STANDBY.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75) Page 55 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
3 Critical:  N PREREQUISITES 2 Either: a. No painting has occurred within Reactor Building for at least 32 hours (online) or 48 hours (outage),  Or b. If painting has occurred within 32 hours (online) or 48 hours (outage) of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters Standard: Verifies no painting has occurred within Reactor Building for at least 32 hours. Evaluator Cue:
Inform operator that no painting has occurred within Reactor Building for at least 48 hours. Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
4 Critical:  N Procedure Step 1:
If this procedure is being initiated in response to rising radioactive releases from the Reactor Building, Then perform this procedure concurrently with Abnormal Procedure C.4
-B.02.04.A (Steam Leaks Outside Primary Containment), And , Or C.4-B.04.01.B (Primary Containment Group 2  
- Isolation).
Standard: Based on initial conditions and initiating cue this step is N/A Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75)  Page 56 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
5 Critical: Y Procedure Step 2: If the Turbine Building ventilation is to remain operating, Then perform the following:
: a. Evaluate Tech Spec 3.3.6.2 and enter applicable Condition for inoperable Secondary Containment Instrumentation.
: a. Evaluate Tech Spec 3.3.6.2 and enter applicable Condition for inoperable Secondary Containment Instrumentation.
: b. Evaluate Tech Spec 3.6.4.1 and enter applicable Condition for SCTMT inoperable.
: b. Evaluate Tech Spec 3.6.4.1 and enter applicable Condition for SCTMT inoperable.
: c. On Panel C
: c. On Panel C-24A, place HS-4887 in BYPASS.
-24A, place HS-4887 in BYPASS.
: d. On Panel C-24B, place HS-4888 in BYPASS.
: d. On Panel C
Standard:                           a. On Panel C-24A, places HS-4887 in BYPASS.
-24B, place HS
: b. On Panel C-24B, places HS-4888 in BYPASS.
-4888 in BYPASS.
NON-CRITIAL PORTION OF STANDARD:
Standard: a. On Panel C
* Evaluate Tech Spec 3.3.6.2 and enter applicable Condition for inoperable Secondary Containment Instrumentation.
-24A, places HS
* Evaluate Tech Spec 3.6.4.1 and enter applicable Condition for SCTMT inoperable.
-4887 in BYPASS.
* Acknowledges expected alarms Evaluator Cue:               Inform operator Turbine Building ventilation IS to remain operating.
: b. On Panel C
-24B, places HS
-4888 in BYPASS.
NON-CRITIAL PORTION OF STANDARD
Evaluate Tech Spec 3.3.6.2 and enter applicable Condition for inoperable Secondary Containment Instrumentation.
Evaluate Tech Spec 3.6.4.1 and enter applicable Condition for SCTMT inoperable.
Acknowledges expected alarms Evaluator Cue:
Inform operator Turbine Building ventilation IS to remain operating.
Tech Spec 3.3.6.2 and 3.6.4.1 have been evaluated by the CRS.
Tech Spec 3.3.6.2 and 3.6.4.1 have been evaluated by the CRS.
Evaluator Note:
Evaluator Note:               Both Tech Specs do not require entry based on the initial conditions.
Both Tech Spec s do not require entry based on the initial conditions
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
. Performance:
Performance Step: 6           Procedure Step 3:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: Y                  Isolate SCTMT by pushing both TEST pushbuttons on Panels C-24A and C-24B.
6 Critical:  Y Procedure Step 3:
Standard:                     Isolates SCTMT by pushing both TEST pushbuttons on Panels C-24A and C-24B.
Isolate SCTMT by pushing both TEST pushbuttons on Panels C
NON-CRITIAL PORTION OF STANDARD:
-24A and C-24B. Standard: Isolate s SCTMT by pushing both TEST pushbuttons on Panels C
Acknowledges alarms Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
-24A and C-24B. NON-CRITIAL PORTION OF STANDARD
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
: Acknowledges alarms Performance:
 
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 57 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 7           NOTE: Only SBGT A Train should start by using the TEST Critical: Y                            pushbuttons.
QF-1075-01 Rev. 3 (FP
Standard:                     Candidate should recognize that SBGT A failed to start and SBGT B started (Alternate Path)
-T-SAT-75) Page 57 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
NON-CRITIAL PORTION OF STANDARD:
-G-RM-01. Performance Step:
Acknowledges alarms Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
7 Critical:  Y NOTE: Only SBGT A Train should start by using the TEST pushbuttons.
Performance Step: 8           Procedure Step 4:
Standard: Candidate should recognize that SBGT A failed to start and SBGT B started (Alternate Path)
Critical: N                  If SBGT A Train and SBGT B Train automatically start, Then attempt to determine the reason for the start of B Train, And either:
NON-CRITIAL PORTION OF STANDARD
Standard:                     This step is N/A Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
: Acknowledges alarms Performance:
Performance Step: 9           Procedure Step 5:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N                  If SBGT B Train remained in AUTO/STANDBY condition, Then verify the following indications:
8 Critical:  N Procedure Step 4:
Standard:                     This step is N/A Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
If SBGT A Train and SBGT B Train automatically start, Then attempt to determine the reason for the start of B Train, And either:   Standard: This step is N/A Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
 
9 Critical:  N Procedure Step 5:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 58 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 10         Procedure Step 6.a (Alternate Path)
If SBGT B Train remained in AUTO/STANDBY condition, Then verify the following indications:
Critical: N                  If SBGT A Train failed, And SBGT B Train initiated, Then perform the following:
Standard: This step is N/A Performance:
: a. Verify the following indications at Panel C-24B:
SATISFACTORY UNSATISFACTORY Comments:
: 1) DPI-4424 -0.25 WC (more negative)
QF-1075-01 Rev. 3 (FP
: 2) V-EF-17B ON
-T-SAT-75) Page 58 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
: 3) FILTER HEATER E-34B-1 ON
-G-RM-01. Performance Step:
: 4) AO-2944 OPEN
10 Critical:  N Procedure Step 6.a (Alternate Path)
: 5) AO-2978 OPEN
If SBGT A Train failed, And SBGT B Train initiated, Then perform the following:
: 6) CV-2942 100% OPEN
: a. Verify the following indications at Panel C
: 7) FIC-2942  3150 cfm and 4000 cfm Standard:                         a. Verifies the following indications at Panel C-24B:
-24B: 1) DPI-4424 -0.25 WC (more negative)
: 1) DPI-4424 -0.25 WC (more negative)
: 2) V-EF-17B ON 3) FILTER HEATER E
: 2) V-EF-17B ON
-34B-1 ON 4) AO-2944 OPEN 5) AO-2978 OPEN 6) CV-2942 100% OPEN
: 3) FILTER HEATER E-34B-1 ON
: 7) FIC-2942  3150 cfm and 000 cfm   Standard: a. Verifies the following indications at Panel C
: 4) AO-2944 OPEN
-24B: 1) DPI-4424 -0.25 WC (more negative)
: 5) AO-2978 OPEN
: 2) V-EF-17B ON 3) FILTER HEATER E
: 6) CV-2942 100% OPEN
-34B-1 ON 4) AO-2944 OPEN 5) AO-2978 OPEN 6) CV-2942 100% OPEN
: 7) FIC-2942 3150 cfm and 4000 cfm Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
: 7) FIC-2942 3150 cfm and 4000 cfm Performance:
Performance Step: 11         Procedure Step 6.b:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N                  Declare SBGT A Train INOPERABLE, AND enter Tech Spec 3.6.4.3 Condition A.
11 Critical:  N Procedure Step 6.b:
Standard:                         b. Informs CRS to declare SBGT A Train INOPERABLE, And evaluate Tech Spec 3.6.4.3 Condition A.
Declare SBGT A Train INOPERABLE, AND enter Tech Spec 3.6.4.3 Condition A.
Evaluator Cue:               Acknowledge as CRS the inoperability of SBGT A.
Standard: b. Informs CRS to declare SBGT A Train INOPERABLE, And evaluate Tech Spec 3.6.4.3 Condition A.
Performance:                 SATISFACTORY           UNSATISFACTORY Comments:
Evaluator Cue:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Acknowledge as CRS the inoperability of SBGT A
 
. Performance:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                 Page 59 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 12           Procedure Step 6.c:
SATISFACTORY UNSATISFACTORY Comments:
Critical: Y                    Investigate cause of SBGT A Train failure and perform the following at Panel C-24A:
QF-1075-01 Rev. 3 (FP
: 1) Place HS-2988A to Position 1 (MANUAL) and verify blue light is ON.
-T-SAT-75) Page 59 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
: 2) Verify the following indications:
-G-RM-01. Performance Step:
a) V-EF-17A OFF b) FILTER HEATER E-34A-1 OFF c) AO-2945 CLOSED d) AO-2979 CLOSED Standard:                       c. Investigates cause of SBGT A Train failure and perform the following at Panel C-24A:
12 Critical:  Y Procedure Step 6.c: Investigate cause of SBGT A Train failure and perform the following at Panel C-24A: 1) Place HS-2988A to Position 1 (MANUAL) and verify blue light is                               ON. 2) Verify the following indications:
: 1) Places HS-2988A to Position 1 (MANUAL) and verifies blue light is ON.
a) V-EF-17A OFF b) FILTER HEATER E
: 2) Verifies the following indications NON-CRITICAL PORTION OF STANDARD:
-34A-1 OFF c) AO-2945 CLOSED d) AO-2979 CLOSED Standard: c. Investigates cause of SBGT A Train failure and perform the following at Panel C-24A: 1) Places HS-2988A to Position 1 (MANUAL) and verifies blue light is ON. 2) Verifies the following indications NON-CRITICAL PORTION OF STANDARD
a) V-EF-17A OFF b) FILTER HEATER E-34A-1 OFF c) AO-2945 CLOSED d) AO-2979 CLOSED Evaluator Cue:                 Inform candidate that another operator will continue the investigation and that they should complete the procedure.
: a) V-EF-17A OFF b) FILTER HEATER E
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
-34A-1 OFF c) AO-2945 CLOSED d) AO-2979 CLOSED Evaluator Cue:
Performance Step: 13           Procedure Step 6.d:
Inform candidate that another operator will continue the investigation and that they should complete the procedure.
Critical: N                    Notify CRS.
Performance:
Standard:                       Notifies CRS.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Evaluator Cue:                 Acknowledge the notification as CRS and terminate the JPM.
13 Critical:  N Procedure Step 6.d: Notify CRS.
Performance:                   SATISFACTORY           UNSATISFACTORY Comments:
Standard: Notifies CRS.
Terminating Cues:         The remaining portion of the procedure is notifications and verifications (not all modeled in the simulator). When operator informs CRS, terminate JPM.
Evaluator Cue:
Stop Time:
Acknowledge the notification as CRS and terminate the JPM.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
SATISFACTORY UNSATISFACTORY Comments:   Terminating Cues:
The remaining portion of the procedure is notifications and verifications (not all modeled in the simulator). When operator informs CRS, terminate JPM
. Stop Time:  


Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01. TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is nearing the end of a refuel outage and is in Mode 4.
* The plant is nearing the end of a refuel outage and is in Mode 4.
I & C has replaced an isolation relay for Secondary Containment.
* I & C has replaced an isolation relay for Secondary Containment.
No OPDRVs or fuel movements are in progress.
* No OPDRVs or fuel movements are in progress.
PMT requires that a manual secondary containment isolation be performed.
* PMT requires that a manual secondary containment isolation be performed.
A SBGT has been verified in AUTO/STANDBY INITIATING CUES (IF APPLICABLE):
* A SBGT has been verified in AUTO/STANDBY INITIATING CUES (IF APPLICABLE):
Manually isolate Secondary Containment IAW the B
* Manually isolate Secondary Containment IAW the B-Manual procedure.
-Manual procedure.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)
-T-SAT-75)   Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
JOB PERFORMANCE MEASURE (JPM)
-G-RM-01. JOB PERFORMANCE MEASURE (JPM)   SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:
SITE:                         MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:                   COLD STARTUP OF NO. 11 RECIRC PUMP JPM NUMBER:                   JPM-B.01.04-004                 REV.       4 RELATED PRA INFORMATION:
COLD STARTUP OF NO. 11 RECIRC PUMP JPM NUMBER:
TASK NUMBERS /               202.106 TASK TITLE(S):               Cold Startup of 11 (12) Recirc Pump K/A NUMBERS:                 202001 A4.01                 Rating: SRO/RO:             3.7/3.7 APPLICABLE METHOD OF TESTING:
JPM-B.01.04-004 REV. 4   RELATED PRA INFORMATION:
Discussion:               Simulate/walkthrough:               Perform:
TASK NUMBERS / TASK TITLE(S): 202.106 Cold Startup of 11 (12) Recirc Pump K/A NUMBERS:
EVALUATION LOCATION:             In-Plant:                             Control Room:
202001 A4.01 Rating: SRO/RO:
Simulator:                             Other:
3.7/3.7 APPLICABLE METHOD OF TESTING:
Lab:
Discussion:
Time for Completion:         20     Minutes                   Time Critical:     No Alternate Path:             Yes TASK APPLICABILITY:               SRO:             RO:               NLO Additional site-specific signatures may be added as desired.
Simulate/walkthrough:
Perform:   EVALUATION LOCATION:
In-Plant:   Control Room:
Simulator:
Other:           Lab:       Time for Completion:
20 Minutes Time Critical:
No     Alternate Path
: Yes     TASK APPLICABILITY:
SRO:   RO:   NL O    Additional site
-specific signatures may be added as desired.
Developed by:
Developed by:
Developer Date   Validated by:
Developer                                   Date Validated by:
Validator (See JPM Validation Checklist, Attachment 1)
Validator                                   Date (See JPM Validation Checklist, Attachment 1)
Date    Approved by:
Approved by:
Training Supervisor Date QF-1075-01 Rev. 3 (FP
Training Supervisor                               Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 62 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. JPM Number:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 62 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 JPM Number: JPM-B.01.04-004 JPM
JPM-B.01.04-004   JPM Title:
 
==Title:==
Cold Startup Of No. 11 Recirc Pump (2010 ILT NRC SIM 8)
Cold Startup Of No. 11 Recirc Pump (2010 ILT NRC SIM 8)
Examinee:       Evaluator:
Examinee:                                                   Evaluator:
Job Title:
Job
Date:      Start Time Finish Time PERFORMANCE RESULTS:
SAT:  UNSAT:        COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).


EVALUATOR'S SIGNATURE:
==Title:==
NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Date:
Start Time                                                Finish Time PERFORMANCE RESULTS:                                SAT:                      UNSAT:
COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                     Page 63 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
-T-SAT-75) Page 63 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.
Line 1,211: Line 972:
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Reactor startup is planned for next shift.
* A Reactor startup is planned for next shift.
All control rods are fully inserted and reactor water level is above 30".
* All control rods are fully inserted and reactor water level is above 30.
2R is supplying all 4.16KV busses.
* 2R is supplying all 4.16KV busses.
Temperature difference between reactor coolant temperature and the Recirc loop is  
* Temperature difference between reactor coolant temperature and the Recirc loop is < 50&deg;F AND SR 3.4.9.3 was just completed satisfactorily.
< 50&deg;F AND SR 3.4.9.3 was just completed satisfactorily.
* The 2114 Form (REACTOR RECIRC PRESTART CHECKLIST) has already been completed by another operator INITIATING CUES (IF APPLICABLE):
The 2114 Form (REACTOR RECIRC PRESTART CHECKLIST) has already been completed by another operator INITIATING CUES (IF APPLICABLE):
* The Control Room Supervisor directs you to perform a Cold Start No. 11 Recirculation Pump.
The Control Room Supervisor directs you to perform a Cold Start No. 11 Recirculation Pump.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                             Page 64 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 JPM PERFORMANCE INFORMATION Required Materials:
-T-SAT-75) Page 64 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
* See Simulator Setup General  
-G-RM-01. JPM PERFORMANCE INFORMATION Required Materials:
See Simulator Setup General  


==References:==
==References:==
* B.01.04-05.D.1
* C.6-004-B-25 Task Standards:
* Perform and Cold Startup of 11 Recirc Pump Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1        Locates procedure B.01.04-05.D.1and verifies all prerequisites are met.
Critical: N Standard:                  Locates procedure and Reads precaution that SR 3.4.9.3 must be logged within 15 minutes prior to starting 11 Recirc pump, and Verifies form 2114 has been completed as a prerequisite.
Evaluator Note:            Both of these are complete IAW the JPM Initial Conditions.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 2        (Procedure STEP 1)
Critical: N                If power to Bus 11 is being supplied from 2R, Then check knife switch 4 in Panel C-31 CLOSED.
Standard:                  Verifies knife switch 4 CLOSED.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.


B.01.04-05.D.1  C.6-004-B-25  Task Standards:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 65 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 3         (Procedure STEP 2)
Perform and Cold Startup of 11 Recirc Pump Start Time:
Critical: N                If power to Bus 11 is being supplied from 1R, Then check knife switch 16 or Knife Switch 4 in Panel C-31 OPEN.
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e.
Standard:                   None - This step is N/A Performance:               SATISFACTORY           UNSATISFACTORY Comments:
, the examinee looks or asks for the indication).
Performance Step: 3         (Procedure STEP 3)
IMPORTANT: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM , per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Critical: N                Verify the following for start of 11 Recirc Pump:
Performance Step:
1 Critical:  N Locates procedure B.01.04-05.D.1and verifies all prerequisites are met.
Standard: Locates procedure and Reads precaution that SR 3.4.9.3 must be logged within 15 minutes prior to starting 11 Recirc pump, and Verifies form 2114 has been completed as a prerequisite.
Evaluator Note:
Both of these are complete IAW the JPM Initial Conditions.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    Performance Step:
2 Critical:  N (Procedure STEP 1)
If power to Bus 11 is being supplied from 2R, Then check knife switch 4 in Panel C
-31 CLOSED.
Standard: Verifies knife switch 4 CLOSED.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75) Page 65 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
3 Critical:  N (Procedure STEP
: 2) If power to Bus 11 is being supplied from 1 R, Then check knife switch 16 or Knife Switch 4 in Panel C
-31 OPEN. Standard: None - This step is N/A Performance:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
3 Critical:
N (Procedure STEP 3)
Verify the following for start of 11 Recirc Pump:
: a. Valve MO-2-53A (11 Recirc Pump Discharge Closed).
: a. Valve MO-2-53A (11 Recirc Pump Discharge Closed).
: b. Valve MO-2-43A (11 Recirc Pump Suction Open).
: b. Valve MO-2-43A (11 Recirc Pump Suction Open).
: c. Position Indicator 2
: c. Position Indicator 2-184-22A reads approximately 2.55 (2.45 -
-184-22A reads approximately 2.55   (2.45  
2.65) for 11 Recirc Pump.
- 2.65) for 11 Recirc Pump.
: d. Scoop tube lock is reset for 11 Recirc Pump.
: d. Scoop tube lock is reset for 11 Recirc Pump.
: e. The recirculation system annunciation on Panel C
: e. The recirculation system annunciation on Panel C-04 is normal for 11 Recirc Pump.
-04 is normal for 11 Recirc Pump.
: f. Valve SV-2-2-11A (11 Recirc Pmp Seal Leakoff) is CLOSED as indicated on Panel C-04 (green light on).
: f. Valve SV-2-2-11A (11 Recirc Pmp Seal Leakoff) is CLOSED as indicated on Panel C
: g. Verify approximately 3 gpm seal injection flow to P-200A, 11 Recirc Pump.
-04 (green light on).
Standard:                       a. Verifies valve MO-2-53A is closed.
: g. Verify approximately 3 gpm seal injection flow to P
: b. Verifies valve MO-2-43A is open.
-200A, 11 Recirc Pump. Standard: a. Verifies valve MO 53A is closed.
: c. Verifies that No. 11 Recirc pump Position Indicator 2-184-22A reads approx 2.55 (2.45 - 2.65).
: b. Verifies valve MO 43A is open.
: d. Verifies alarm C04-C-05 is not in the alarm condition.
: c. Verifies that No. 11 Recirc pump Position Indicator 2
: e. Verifies no abnormal or unexpected annunciators are in the alarm.
-184-22A reads approx 2.55 (2.45  
: f. Verifies green light on.
- 2.65). d. Verifies alarm C04
-C-05 is not in the alarm condition.
: e. Verifies no abnormal or unexpected annunciators are in the alar
: m. f. Verifies green light on.
: g. Calls Reactor Building Operator(RBO) to verify 3 gpm seal injection flow to 11 Recirc Pump.
: g. Calls Reactor Building Operator(RBO) to verify 3 gpm seal injection flow to 11 Recirc Pump.
Evaluator Cue:
Evaluator Cue:                 Respond as RBO that 3 gpm seal injection flow has been established to 11 Recirc Pump.
Respond as RBO that 3 gpm seal injection flow has been established to 11 Recirc Pump. Performance:
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 3 (FP
-T-SAT-75)  Page 66 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
4 Critical:  N NOTE: Reactor Coolant Temperature can be obtained using any of the suction temperatures (e.g. RWCU, RHR Shutdown Cooling, or Running Loop of Recirc) provided there is flow present.


QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                Page 66 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 4        NOTE: Reactor Coolant Temperature can be obtained using any of Critical: N                          the suction temperatures (e.g. RWCU, RHR Shutdown Cooling, or Running Loop of Recirc) provided there is flow present.
(Procedure STEP 4)
(Procedure STEP 4)
If in MODES 1, 2, 3 or 4, Then perform SR 3.4.9.3 within 15 minutes prior to Recirc Pump start by confirming that the idle loop temperature is within 50
If in MODES 1, 2, 3 or 4, Then perform SR 3.4.9.3 within 15 minutes prior to Recirc Pump start by confirming that the idle loop temperature is within 50&deg;F of reactor coolant temperature.
&deg;F of reactor coolant temperature.
: a. IF the temperature difference is greater than 50&deg;F, THEN DO NOT restart the isolated pump AND Enter B.01.04-05.H.6 (Stratification Recovery.
: a. IF the temperature difference is greater than 50&deg;F, THEN DO NOT restart the isolated pump AND Enter B.01.04
: b. IF the temperature difference is less than or equal to 50&deg;F, THEN Log completion time of SR 3.4.9.3 within 15 minutes prior to starting 11 Recirc Pump.
-05.H.6 (Stratification Recovery. b. IF the temperature difference is less than or equal to 50&deg;F, THEN Log completion time of SR 3.4.9.3 within 15 minutes prior to starting 11 Recirc Pump
Standard:                   Reads and acknowledges this requirement.
. Standard: Reads and acknowledges this requirement.
Evaluator Cue:             IAW JPM initial conditions, differential temperature is < 50&deg;F and another operator will log the completion of SR 3.4.9.3.
Evaluator Cue:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
IAW JPM initial conditions, differential temperature is < 50&deg;F and another operator will log the completion of SR 3.4.9.3.
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75)  Page 67 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
5 Critical:  Y  NOTE:  Actuation of relay 2A
-K34A, 11 Recirc MG Overcurrent Sensing Relay, may occur upon start of Recirc Pump and result in alarm of 4
-C-6 (RECIRC PUMP MOTOR A LOCKED ROTOR TRIP).
CAUTION: The RECIRC PUMP DISCHARGE valve must be at least 20
-25% open within 66 seconds of MG Set start or a trip will occur. 20
-25% open corresponds to a 6
-8 second open signal with the valve control switch.


QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                              Page 67 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 5          NOTE: Actuation of relay 2A-K34A, 11 Recirc MG Overcurrent Critical: Y                              Sensing Relay, may occur upon start of Recirc Pump and result in alarm of 4-C-6 (RECIRC PUMP MOTOR A LOCKED ROTOR TRIP).
CAUTION:
The RECIRC PUMP DISCHARGE valve must be at least 20-25%
open within 66 seconds of MG Set start or a trip will occur. 20-25%
open corresponds to a 6-8 second open signal with the valve control switch.
(Procedure STEP 5)
(Procedure STEP 5)
Place 11 MG Set drive motor control switch to START and observe:
Place 11 MG Set drive motor control switch to START and observe:
: a. Generator speed peaks between 80 to 100%
: a. Generator speed peaks between 80 to 100% speed (because field generator breaker is OPEN).
speed (because field generator breaker is OPEN).
: b. Generator field breaker CLOSED approximately 6 seconds after drive motor breaker is CLOSED.
: b. Generator field breaker CLOSED approximately 6 seconds after drive motor breaker is CLOSED.
: c. Generator speed lowers to about 40% speed and then lowers to minimum speed.
: c. Generator speed lowers to about 40% speed and then lowers to minimum speed.
Standard: Places #11 Recirc MG Set drive motor handswitch (2A
Standard:                     Places #11 Recirc MG Set drive motor handswitch (2A-S1A) to the START position momentarily.
-S1A) to the START position momentarily.
Non-Critical portion of Standard:
Non-Critical portion of Standard
Verifies pump start by the following:
: Verifies pump start by the following:
: 1. MG Set Drive Motor light indication changes from green to red, And
: 1. MG Set Drive Motor light indication changes from green to red, And 2. Generator speed peaks at a point between 80 and 100% speed, as indicated on meter SI 2
: 2. Generator speed peaks at a point between 80 and 100% speed, as indicated on meter SI 2-184-16A, Pump Speed.
-184-16A, Pump Speed.
And
And 3. Generator field breaker closes about 6 seconds after the drive motor breaker is closed, as indicated by the indicating light changing from green to red, And 4. After the field breaker closes, generator speed slowly decreases to 40% speed and then lowers to minimum (approx. 30%).
: 3. Generator field breaker closes about 6 seconds after the drive motor breaker is closed, as indicated by the indicating light changing from green to red, And
Performance:
: 4. After the field breaker closes, generator speed slowly decreases to 40% speed and then lowers to minimum (approx. 30%).
SATISFACTORY UNSATISFACTORY Comments:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 68 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. Performance Step:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 68 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 6           (Procedure STEP 6)
6 Critical:  Y  (Procedure STEP 6)
Critical: Y                  When 10 seconds have passed after MG Set start, Then OPEN MO-2-53A (11 Recirc Pump Discharge),
When 10 seconds have passed after MG Set start, Then OPEN MO-2-53A (11 Recirc Pump Discharge), And observe the following:
And observe the following:
: a. Loop flow rises to 6500 gpm.
: a. Loop flow rises to 6500 gpm.
: b. Pump speed remains constant.
: b. Pump speed remains constant.
: c. Jet pump flow rises to 20% of rated (6 x 10 6 lb/Hr). d. Pump Current  
: c. Jet pump flow rises to 20% of rated (6 x 106 lb/Hr).
- 50 (Normal for 25% speed)
: d. Pump Current - 50 (Normal for 25% speed)
: e. Pump Volts  
: e. Pump Volts - 900V (Normal for 25% speed)
- 900 V (Normal for 25% speed)
: f. Drive Motor Amps - 150A (Normal for 25% speed)
: f. Drive Motor Amps  
: g. Valve SV-2-2-11A, 11 RECIRC PMP SEAL LEAKOFF, is OPEN as indicated on Panel C-04 (green light off).
- 150 A (Normal for 25% speed)
Standard:                     Opens #11 recirc pump discharge valve by holding handswitch 2A-S7A, CW to the OPEN position, until the valve position indication changes from green to red.
: g. Valve SV-2-2-11A, 11 RECIRC PMP SEAL LEAKOFF, is OPEN as indicated on Panel C
Non-Critical portion of Standard:
-04 (green light off).
Standard: Opens #11 recirc pump discharge valve by holding handswitch 2A
-S7A, CW to the OPEN position, until the valve position indication changes from green to red.
Non-Critical portion of Standard
: 1. Performs required observations and verifications:
: 1. Performs required observations and verifications:
: a. Loop Flow - min 6500 gpm on FI 159A. b. Pump speed remains constant SI 184-16A. c. Jet Pump Flow  
: a. Loop Flow - min 6500 gpm on FI-2-159A.
- Flow on FI 3-92B is dependent on plant condition.
: b. Pump speed remains constant SI-2-184-16A.
: d. Pump Amps  
: c. Jet Pump Flow - Flow on FI-2-3-92B is dependent on plant condition.
- min 50 A on 2-184-22A e. Pump Volts  
: d. Pump Amps - min 50A on 2-184-22A
- min 900 V on 2-184-23A. f. Drive Motor Amps  
: e. Pump Volts - min 900V on 2-184-23A.
- min 150 A on 2- 184-24A. g. Seal Leakoff Block valve light indication, SV 2-11A, is no longer lit.
: f. Drive Motor Amps - min 150A on 2- 184-24A.
Performance:
: g. Seal Leakoff Block valve light indication, SV-2-2-11A, is no longer lit.
SATISFACTORY UNSATISFACTORY Comments:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
-T-SAT-75) Page 69 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
 
-G-RM-01. Performance Step:
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                           Page 69 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 7           NOTE: The pumps will be operated at minimum speed until reactor Critical: N                            power is increased to approximately 60% by control rod withdrawal per Ops. Manual C.1 (Startup Procedure).
7 Critical: N NOTE: The pumps will be operated at minimum speed until reactor power is increased to approximately 60% by control rod withdrawal per Ops. Manual C.1 (Startup Procedure).
(Procedure STEP 7)
(Procedure STEP 7)
Monitor and adjust service water at 11 MG Set oil cooler to maintain lube oil temperature at approximately 100&deg;F leaving the cooler.
Monitor and adjust service water at 11 MG Set oil cooler to maintain lube oil temperature at approximately 100&deg;F leaving the cooler.
Standard: Calls APEO to monitor temperature and adjust it as necessary to maintain 100&deg;F.
Standard:                     Calls APEO to monitor temperature and adjust it as necessary to maintain 100&deg;F.
Evaluator Cue:
Evaluator Cue:               Outlet of lube oil heat exchanger is 100&deg;F.
Outlet of lube oil heat exchanger is 100&deg;F.
Evaluator Note:               The high vibration alarm will activate 30 seconds after the pump is started. This step may be omitted if the candidate is responding to C04-B-25.
Evaluator Note:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
The high vibration alarm will activate 30 seconds after the pump is started. This step may be omitted if the candidate is responding to C04-B-25. Performance:
Performance Step: 8           (Procedure STEP 8)
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Critical: N Increase speed to the maximum allowed by the Feedwater interlocks, about 30%.
8 Critical:  N (Procedure STEP 8)
Standard:                     11 Recirc Pump speed should already be about 30%
Increase speed to the maximum allowed by the Feedwater interlocks, about 30%. Standard: 11 Recirc Pump speed should already be about 30%   Evaluator Cue:
Evaluator Cue:               The high vibration alarm will activate 30 seconds after the pump is started. This step may be omitted if the candidate is responding to C04-B-25.
The high vibration alarm will activate 30 seconds after the pump is started. This step may be omitted if the candidate is responding to C04-B-25. Performance:
Performance:                 SATISFACTORY             UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
QF-1075-01 Rev. 3 (FP
 
-T-SAT-75) Page 70 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 70 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 9         Respond to annunciator C.6-004-B-25 (Recirc Pump MTR A Hi Vibration)
-G-RM-01. Performance Step:
Critical: N Standard:                   Procedure C.6-004-B-25 referenced and CRS informed of the unexpected alarm.
9 Critical:  N Respond to annunciator C.6
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
-004-B-25 (Recirc Pump MTR A Hi Vibration
Performance Step: 10       (Procedure C.6-004-B-25 STEP 1)
)    Standard: Procedure C.6
Critical: N                Monitor A Pump Motor temperatures and vibration via SPDS an R-2-2-31 (C-21)
-004-B-25 referenced and CRS informed of the unexpected alarm. Performance:
Standard:                   A Recirc Pump Motor temperatures monitored.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
10 Critical:  N (Procedure C.6
-004-B-25 STEP 1)
Monitor A Pump Motor temperatures and vibration via SPDS an R 2-31 (C-21)   Standard: A Recirc Pump Motor temperatures monitored.
(TR-2-2-31, Points 1 & 2; SPDS screen 510, point REC126.)
(TR-2-2-31, Points 1 & 2; SPDS screen 510, point REC126.)
Performance:
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Performance Step: 11       (Procedure C.6-004-B-25 STEP 2)
11 Critical:  N (Procedure C.6
Critical: N                Monitor A Pump Motor run speed via SI-2-184-16A, Recirc Pump 11 Speed (C-04).
-004-B-25 STEP 2)
Standard:                   A Recirc Pump speed monitored.
Monitor A Pump Motor run speed via SI 184-16A, Recirc Pump 11 Speed (C-04). Standard: A Recirc Pump speed monitored.
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Performance:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
SATISFACTORY UNSATISFACTORY Comments:
 
QF-1075-01 Rev. 3 (FP
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                         Page 71 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 12       (Procedure C.6-004-B-25 STEP 3)
-T-SAT-75) Page 71 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
Critical: N                Dispatch an operator to the Recirc MG Set Room to determine A Recirc Pump Motor vibration as indicated on local indicator VM-5602.
-G-RM-01. Performance Step:
Standard:                   Operator dispatched.
12 Critical:  N (Procedure C.6
Evaluator Cue:               When candidate dispatches RBO to MG Set Room, inform him vibration on No. 11 pump motor is at 6 mils and rising, and oil flow and temperature appear to be normal.
-004-B-25 STEP 3)
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
Dispatch an operator to the Recirc MG Set Room to determine A Recirc Pump Motor vibration as indicated on local indicator VM
Performance Step: 13       (Procedure C.6-004-B-25 STEP 5)
-5602. Standard: Operator dispatched.
Critical: N                If the pump motor speed is less than or equal to 50%,
Evaluator Cue:
And motor vibration is at or above 5 mils, Then shutdown A Recirc MG Set using B.01.04-05 (Reactor Recirculation System-System Operation).
When candidate dispatches RBO to MG Set Room, inform him vibration on No. 11 pump motor is at 6 mils and rising, and oil flow and temperature appear to be normal.
Standard:                   B.01.04-05 referenced for shutdown of the Recirc Pump.
Performance:
Evaluator Cue:             The procedure to be used is B.01.04-05 F.1.
SATISFACTORY UNSATISFACTORY Comments:   Performance Step:
Evaluator Note:             Procedure C.6-004-B-25 STEP 4 is not applicable because the pump speed will be less than 50%.
13 Critical:  N (Procedure C.6
Performance:               SATISFACTORY           UNSATISFACTORY Comments:
-004-B-25 STEP 5)
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
If the pump motor speed is less than or equal to 50%, And motor vibration is at or above 5 mils, Then shutdown A Recirc MG Set using B.01.04
 
-05 (Reactor Recirculation System-System Operation
QF-1075-01 Rev. 3 (FP-T-SAT-75)                                                                 Page 72 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 14           B.01.04-05. F.1. Steps 1-3 are N/A Critical: Y (Procedure STEPS 4-7)
). Standard: B.01.04-05 referenced for shutdown of the Recirc Pump.
: 4. Place the MG Set drive motor control switch for one pump to STOP.
Evaluator Cue: The procedure to be used is B.01.04
-05 F.1. Evaluator Note:
Procedure C.6-004-B-25 STEP 4 is not applicable because the pump speed will be less than 50%.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
QF-1075-01 Rev. 3 (FP
-T-SAT-75) Page 72 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
-G-RM-01. Performance Step:
14 Critical: Y B.01.04-05. F.1. Steps 1
-3 are N/A (Procedure STEPS 4-7) 4. Place the MG Set drive motor control switch for one pump to STOP.
: 5. Verify the drive motor breaker OPENED.
: 5. Verify the drive motor breaker OPENED.
: 6. Verify the generator field breaker OPENED.
: 6. Verify the generator field breaker OPENED.
: 7. CLOSE the stopped pump RECIRC PUMP DISCHARGE valve.
: 7. CLOSE the stopped pump RECIRC PUMP DISCHARGE valve.
a) MO-2-53A, Or b) MO-2-53B. Standard: 4. Places the MG Set drive motor control switch for 11 recirc pump to STOP.
a) MO-2-53A, Or b) MO-2-53B.
Non-Critical portion of Standard
Standard:                       4. Places the MG Set drive motor control switch for 11 recirc pump to STOP.
Non-Critical portion of Standard:
: 5. Verify the 11 recirc pump drive motor breaker OPENED.
: 5. Verify the 11 recirc pump drive motor breaker OPENED.
: 6. Verify the 11 recirc pump generator field breaker OPENED.
: 6. Verify the 11 recirc pump generator field breaker OPENED.
: 7. CLOSE 11 RECIRC PUMP DISCHARGE valve MO 53 A. Evaluator Cue:
: 7. CLOSE 11 RECIRC PUMP DISCHARGE valve MO-2-53A.
After completion of these steps inform the candidate, "This JPM is complete."
Evaluator Cue:                 After completion of these steps inform the candidate, This JPM is complete.
Evaluator Note:
Evaluator Note:               The high vibration malfunction will reinsert and then delete on Event Trigger 4 when the Pump handswitch is taken to STOP.
The high vibration malfunction will reinsert and then delete on Event Trigger 4 when the Pump handswitch is taken to STOP.
Performance:                   SATISFACTORY             UNSATISFACTORY Comments:
Performance:
Terminating Cues:         See Evaluator Cue in Performance Step 14 Stop Time:
SATISFACTORY UNSATISFACTORY Comments:   Terminating Cues:
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.
See Evaluator Cue in Performance Step 14 Stop Time:  


Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP
TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
-G-RM-01. TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Reactor startup is planned for next shift.
* A Reactor startup is planned for next shift.
All control rods are fully inserted and reactor water level is above 30".
* All control rods are fully inserted and reactor water level is above 30.
2R is supplying all 4.16KV busses.
* 2R is supplying all 4.16KV busses.
Temperature difference between reactor coolant temperature and the Recirc loop is  
* Temperature difference between reactor coolant temperature and the Recirc loop is < 50&deg;F AND SR 3.4.9.3 was just completed satisfactorily.
< 50&deg;F AND SR 3.4.9.3 was just completed satisfactorily.
* The 2114 Form (REACTOR RECIRC PRESTART CHECKLIST) has already been completed by another operator INITIATING CUES (IF APPLICABLE):
The 2114 Form (REACTOR RECIRC PRESTART CHECKLIST) has already been completed by another operator INITIATING CUES (IF APPLICABLE):
* The Control Room Supervisor directs you to perform a Cold Start No. 11 Recirculation Pump.
The Control Room Supervisor directs you to perform a Cold Start No. 11 Recirculation Pump.}}
Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.}}

Latest revision as of 11:05, 6 December 2019

2010 Monticello Nuclear Generating Plant Initial License Examination Administered Control Room JPMs
ML110260271
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/17/2010
From: Mcneil D
Operations Branch III
To:
Northern States Power Co, Xcel Energy
References
Download: ML110260271 (73)


Text

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: RESPOND TO INADVERTENT ADS INITIATION JPM NUMBER: JPM-C.4-G-001 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / CR200.204 TASK TITLE(S): Perform the procedure for an inadvertent ECCS initiation 218000 A4.02 Rating: SRO/RO: 4.2/4.2 K/A NUMBERS:

ADS Logic initiation APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 2 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 JPM Number: JPM-C.4-G-001 JPM

Title:

Respond To Inadvertent ADS Initiation (2010 ILT NRC SIM 1)

Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 3 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the BOP.
  • The plant is at rated power.
  • RCIC Quarterly Surveillance is scheduled for later in your shift
  • It has been determined that Core Spray needs to be placed in service in the Torus Mixing Mode INITIATING CUES (IF APPLICABLE):

EVALUATOR NOTE: When the Core Spray pump is started and AC INTERLOCK alarm received, the ADS Timer will inadvertently initiate. This will require immediate entry into C.4-G and placement of the ADS inhibit switches to the INHIBIT position.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 4 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:

  • None General

References:

  • B.03.01-05.G.4, C.4-G Task Standards:
  • Respond to an inadvertent ECCS Initiation IAW C.4-G Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Locate and review procedure B.03.01-05 G.4 Critical: N Standard: Locate and review procedure B.03.01-05 G.4 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Procedure Step 1 Critical: N Verify MO-1753, 11 CS INJECTION INBOARD, is CLOSED.

Standard: Uses light indication to verify MO-1753 CLOSED Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 5 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Performance Step: 3 Procedure Step 2 Critical: N Perform the following:

a. Verify 11 CS Pump Suction Pressure PI-14-36A (Local) indicates 0 psig.
b. Verify Div I CS Pump Pressure PI-14-48A (Panel C-03) indicates 30 psig.

CAUTION:

Do NOT start pump if system is NOT pressurized, as damage could result from suddenly filling and pressurizing an unfilled pipe.

Standard: Contacts Rx Bldg NLO to verify PI-14-36A indicates 0 psig.

Verifies PI-14-48A indicates 30 psig.

Evaluator Cue: As the Out Plant Operator, report that PI-14-36A indicates 5 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Procedure Step 3 Critical: Y START 11 Core Spray Pump by placing 14A-S5A, 11 Core Spray Pump, control switch in START position.

Standard: Starts 11 Core Spray Pump by placing 14A-S5A in START position.

Non-Critical Portion of Standard:

  • Prior to starting Pump, announces over plant PA system that they will be cycling a breaker in the lower 4 KV Room

Performance: SATISFACTORY UNSATISFACTORY Comments:

0 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 6 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Performance Step: 5 Respond to annunciator C03-A-25 (Auto Blowdown Timer Activated).

Critical: N Standard: Responds to annunciator and notifies Shift Supervision.

Evaluator Cue: As CRS, acknowledge the report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Recognizes entry into C.4.G (Inadvertent ECCS Initiation).

Critical: N Auto Blowdown Timers are timing down but Confirmatory Indications from C03-A-25 are NOT present:

  • Low RPV water level on LI-2-3-85A & B on C05

Standard: Entry into C.4.G recognized (Alternate Path).

Evaluator Cue: As CRS, acknowledge the initiation of the ADS timers and entry into C.4-G.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 C.4-G Procedure Step 2 Critical: N Using all available information sources, determine if the initiation is the result of an inadvertent or spurious actuation signal and manual override is allowed.

a. If the initiation CAN NOT be determined to be the result of an inadvertent or spurious actuation signal, Then EXIT this procedure and control the plant in accordance with appropriate procedures.

Standard: Verifies annunciator 3-A-38 (Reactor Low Low Level) is not in alarm and that the initiation is spurious.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 7 of 73 JPM-C.4-G-001 (Respond To Inadvertent ADS Initiation) Rev. 0 Performance Step: 8 C.4-G Procedure Step 4 Critical: Y If the ADS timer has started, Then place both ADS INHIBIT switches in the INHIBIT position.

Standard: Places both inhibit switches in the INHIBIT position before an Auto Blowdown is initiated.

Evaluator Cue: As CRS, acknowledge placing the ADS Inhibit switches to the INHIBIT position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Inform the examinee that the JPM is complete once ADS is inhibited.

Stop Time:

Historical Record:

  • This JPM was newly developed for the 2010 NRC ILT Exam. It is based on Core Spray
  • B.03.01-05 Rev. 30 and Inadvertent ECCS Initiation C.4.G Rev. 8 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the BOP.
  • The plant is at rated power.
  • It is August and upstream river temperature is high.
  • It has been determined that Core Spray needs to be placed in service in the Torus Mixing Mode INITIATING CUES (IF APPLICABLE):

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: MANUAL INITIATION OF RCIC JPM NUMBER: JPM-B.02.03-010 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / CR217.107 TASK TITLE(S): Manually Initiate RCIC K/A NUMBERS: 217000 A4.04 Rating: SRO/RO: 3.6 / 3.6 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 10 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 JPM Number: JPM-B.02.03-010 JPM

Title:

Manual Initiation of RCIC Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 11 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A reactor scram has occurred due to a LONOP.
  • HPCI is unavailable.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to restore and maintain RPV Water Level to +9 to +48 inches by manually initiating RCIC IAW the Hard Card.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 12 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:

  • None General

References:

  • B.02.03-05 Task Standards:
  • Inject with RCIC into the RPV Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 At any time while performing this procedure, Critical: N If conditions permit, Then place RHR in torus Cooling for cooling/mixing the Torus water, per Ops Man Section B.03.04-05.

Standard: Informs CRS of step to place Torus Cooling in service.

Evaluator Cue: Acknowledge report and state that another operator will be directed to place Torus Cooling in service.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Verify flow controller FIC-13-91 is in AUTO, And set to 400 gpm.

Critical: N Standard: Verifies flow controller FIC-13-91 is in AUTO, And set to 400 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 13 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 3 OPEN MO-2096, RCIC Cooling Water Supply Valve.

Critical Y Standard: Opens MO-2096, RCIC Cooling Water Supply Valve.

Non-Critical Portion of Standard:

Verifies red light on and green light off.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Place P-211 (RCIC Barometric Condenser Vacuum Pump) Handswitch, Critical Y 13A-S15, in the START position.

Standard: Places Handswitch, 13A-S15, in the START position.

Non-Critical Portion of Standard:

Verifies red light on and green light off.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 OPEN CV-2104, RCIC Pump Minimum flow Valve.

Critical Y Standard: Opens CV-2104, RCIC Pump Minimum flow Valve.

Non-Critical Portion of Standard:

Verifies red light on and green light off.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 14 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 6 OPEN the following:

Critical: Y a. MO-2107, RCIC Pump Disch Inbd valve

b. MO-2106, RCIC Pump Disch Otbd valve Standard: Opens MO-2107 and MO-2106.

Non-Critical Portion of Standard:

Verifies red light on and green light off.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 OPEN MO-2078, RCIC Turbine Steam Supply.

Critical: Y Standard: Opens MO-2078, RCIC Turbine Steam Supply.

Non-Critical Portion of Standard:

Verifies red light on and green light off.

EVALUATOR NOTE: The Exhaust Diaphragm High Pressure annunciator is triggered to be received 15 seconds after MO-2078 is opened. The next four steps of the RCIC startup are verification steps and are NOT critical. They may be marked as Not Applicable (N/A) if they not performed before the annunciator activates.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Verify the following valves are closed:

Critical: N a. CV-2848 and CV-2849, RCIC Cond Pump Discharge to CRW

b. CV-2082A and CV-2082B RCIC Steam Line Drain to Main Condenser Standard: CV-2848, CV-2849, CV-2082A, and CV-2082B verified CLOSED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 15 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 9 Verify SI-7321, RCIC Turbine Speed Indicator is increasing, indicating that Critical: N unit is rolling.

Standard: Verifies that SI-7321, RCIC Turbine Speed Indicator is increasing.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Verify AO-13-22, RCIC Injection Testable Ckv, is open.

Critical: N Standard: Verifies AO-13-22, RCIC Injection Testable Ckv, is open.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Verify RCIC pump flow is maintained at desired level.

Critical: N Standard: Verifies RCIC pump flow is maintained at desired level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Respond to annunciator C04-A-10 (RCIC Turbine Exhaust Diaphragm Hi Critical: N Press).

Standard: Notifies the CRS of the unexpected alarm and references C.6-04-A-10.

Evaluator Cue: Role Play CRS as necessary to acknowledge the unexpected alarm.

Performance: SATISFACTORY UNSATISFACTORY Comments: This begins the Alternate Path portion of the JPM Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 16 of 73 JPM-B.02.03-010 (Manual Initiation of RCIC) Rev. 0 Performance Step: 13 ARP C-4-A10 Step 1.a, Perform the following: Depress 13A-S17 RCIC Critical: Y TURBINE TRIP Pushbutton.

Standard: RCIC TURBINE TRIP Pushbutton depressed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 ARP C-4-A10 Step 1.b, Perform the following: CLOSE the following Steam Critical: Y Isolation Valves 1) MO-2075 2) MO-2076 Standard: MO-2075 and MO-2076 CLOSED.

Non-Critical Portion of Standard:

Verifies red lights off and green lights on.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the Steam Isolation Valves are CLOSED, state that the JPM is completed.

Stop Time:

Historical Record:

  • This JPM was newly developed for the 2010 NRC ILO Exam. It is based on RCIC B.02.03-05 Rev. 21 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A reactor scram has occurred due to a LONOP.
  • HPCI is unavailable.

INITIATING CUES (IF APPLICABLE):

  • The CRS directs you to restore and maintain RPV Water Level to +9 to +48 inches by manually initiating RCIC IAW the Hard Card.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: RESTORE LC-103 FROM LC-104 JPM NUMBER: JPM-E.4-07-001 REV. 5 RELATED PRA ACB309409Y" INFORMATION:

TASK NUMBERS / CR305.125 TASK TITLE(S): Restore LC-103 from LC-104 295003 AA1.01 Rating: SRO/RO: 3.8/3.7 K/A NUMBERS:

A.C. electrical distribution system APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 19 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 JPM Number: JPM-E.4-07-001 JPM

Title:

Restore LC-103 From LC-104 Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 20 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A LONOP occurred 45 minutes ago.
  • C.4-B.09.02.B (Loss of Normal Off-Site Power) has been performed up to Step 13.
  • No. 12 EDG is running, supplying 16 Bus and LC-104.
  • No. 11 EDG failed to start and 15 Bus is dead.
  • Reactor water level is being maintained using RCIC.
  • There are NO Faults on LC-103.

INITIATING CUES (IF APPLICABLE):

  • The Control Room Supervisor directs you to restore LC-103 from LC-104 using procedure E.4-07.
  • Steps 1 and 2 have been performed.
  • You are to perform Steps 3 through 8 to energize LC-103.
  • The remaining steps will be performed by an Outplant operator at a later time.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 21 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 JPM PERFORMANCE INFORMATION Required Materials:

  • Simulator General

References:

  • None Task Standards:
  • E.4-07, Rev 1 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 (Procedure STEP 3)

Critical: Y Place 52-301/CS, 103 LOAD CTR SEC ACB-52-301, to TRIP.

Standard: Trips ACB 52-301, 103 LC SEC ACB.

Verifies Red light OFF and Green light ON for ACB 52-301.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 (Procedure STEP 4)

Critical: Y Verify 103/104 LC BUS TIE ACB-52-309 is OPEN.

Standard: Verifies or OPENS ACB-52-309, 103/104 LC BUS TIE.

NON-CRITICAL PORTION OF STANDARD:

Verifies Green light ON and Red light OFF for ACB 52-309.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 22 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 Performance Step: 3 (Procedure STEP 5)

Critical: Y Place 52-409/CS, 103/104 LC BUS TIE ACB-52-409, to CLOSE.

Standard: Closes52-409 ACB, 103/104 LC BUS TIE.

NON-CRITICAL PORTION OF STANDARD:

Verifies Red light ON and Green light OFF for ACB 52-409.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 (Procedure STEP 6)

Critical: Y Place 52-309/SS, SYNC 103/104 LC BUS TIE ACB-52-309, to ON.

Standard: Places 52-309/SS to ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 (Procedure STEP 7)

Critical: Y NOTE: ACB 5-309 will not CLOSE unless ACB-52-409 is CLOSED.

Place 52-309/CS, 103/104 LC BUS TIE ACB-52-309, to CLOSE Standard: Closes 52-309ACB, 103/104 LC BUS TIE.

(NON-CRITICAL PORTION OF STANDARD)

Observes 103 LC amperage meter for indication.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 (Procedure STEP 8)

Critical: N Place 52-309/SS, SYNC 103/104 LC BUS TIE ACB-52-309, to OFF.

Standard: Turns OFF 52-309/SS, Sync 103/104 LC BUS TIE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 23 of 73 JPM-E.4-07-001 (Restore LC-103 From LC-104) Rev. 5 Performance Step: 7 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED Critical: N Standard: Operator informs evaluator that the task is completed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

Historical Record:

  • MNGP JPM Bank; Minor edits for 2009 NRC Exam
  • Minor edits for 2010 NRC Exam. Updated to current JPM Template, QF-107501 Rev.3
  • Updated to current revisions of procedures: C.4-B.09.02.B Rev.12 and E.4.07 Rev. 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A LONOP occurred 45 minutes ago.
  • C.4-B.09.02.B (Loss of Normal Off-Site Power) has been performed up to Step 13.
  • No. 12 EDG is running, supplying 16 Bus and LC-104.
  • No. 11 EDG failed to start and 15 Bus is dead.
  • Reactor water level is being maintained using RCIC.
  • There are NO Faults on LC-103.

INITIATING CUES (IF APPLICABLE):

  • The Control Room Supervisor directs you to restore LC-103 from LC-104 using procedure E.4-07.
  • Steps 1 and 2 have been performed.
  • You are to perform Steps 3 through 8 to energize LC-103.
  • The remaining steps will be performed by an Outplant operator at a later time.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: APRM GAIN ADJUSTMENT WITHOUT THE PLANT COMPUTER JPM NUMBER: JPM-C.2-05.B.04-001 REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / CR200.130 TASK TITLE(S): APRM Gain Adjustment Factor Monitoring 215005 A1.07 APRM (gain Rating: SRO/RO: 3.0/3.4 K/A NUMBERS:

adjustment factor)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 26 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 JPM Number: JPM-C.2-05.B.04-001 JPM

Title:

APRM Gain Adjustment Without Plant Computer (2010 ILT NRC SIM 4)

Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 27 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant computer is OOS for maintenance and APRM 3 is bypassed for maintenance.
  • APRM #3 is ready to be unbypassed.
  • The plant is operating at 100% power.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to adjust the gain on APRM #3 to read 100% power IAW C.2-05 B.4 Part D AND remove the bypass from APRM 3.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 28 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:

  • None General

References:

  • C.2-05 (Power Operation - System Operation)

Task Standards:

  • C.2-05 B.4 Part D Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Procedure Step 24. Bypass APRM to be adjusted by placing switch 7B-S3 Critical N (APRM Bypass) in the associated APRM number and verify associated white Bypassed lamp is ON or associated APRM ODA display header display indicates BYP in inverse video. [M76053A]

Standard: Verifies APRM #3 is bypassed Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Procedure Step 25 & 25.a. At Panel C-37, on APRM, Navigate to (press Critical: N ETC softkey as necessary) and Press ENTER SET MODE softkey, enter password 4221 (with numeric keypad) and press ENT key on keypad.

Standard: Press ENTER SET MODE softkey, enter password 4221 with numeric keypad and press ENT key on keypad. Multiple attempts to successfully enter password within 10 seconds are allowed.

Evaluator Note: Step 26 must be completed within 10 seconds or display will revert to main display.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 29 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Performance Step: 3 Procedure Step 26. Using cursor keys, select APRM GAIN.

Critical: N Standard: Using cursor keys, selects APRM GAIN.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Procedure Step 27. Press SET PARAMETERS softkey.

Critical: Y Standard: Press SET PARAMETERS softkey.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Procedure Step 28. Adjust APRM gains per the following:

Critical: Y a. Use left/right cursor keys for desired digit(s) changes.

b. Use up/down cursor keys for attaining projected flux values equal to desired power as determined by nomogram of C.2-06, Control Room Core Power Nomogram at 1000 psig.
c. Repeat Steps 28.a and 28.b for other digit(s) changes.

Standard: Adjusts APRM gain so projected flux is within 2% of 100% power.

Evaluator Note: Expected gain range is 2.44-2.56.

Evaluator Cue: Inform operator that core thermal power from the Control Room Core Power Nomogram is 100%.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Procedure Step 29. Press ACCEPT softkey to change the APRM gain.

Critical: Y Standard: Press ACCEPT softkey to change the APRM gain after verifying reading is within 2% of 100% CTP.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 30 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Performance Step: 7 Procedure Step 30. Press EXIT softkey.

Critical: N Standard: Press EXIT softkey.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Procedure Step 31. Press EXIT SET MODE softkey.

Critical: N Standard: Press EXIT SET MODE softkey.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Procedure Step 32. Press YES softkey.

Critical: N Standard: Presses YES.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Procedure Step 33. Place switch 7B-S3 (APRM Bypass) in the neutral Critical: Y position and verify associated white Bypassed lamp is OFF or associated APRM ODA display header does NOT indicate BYP in inverse video.

[M76053A]

Standard: 7B-S3 placed in the neutral position.

Non-critical portion of the Standard:

Verifies that APRM 3 is not bypassed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 31 of 73 JPM-C.2-05.B.04-001 (APRM Gain Adjustment Without The Plant Computer) Rev. 1 Performance Step: 11 Informs evaluator APRM #3 gains are adjusted and that JPM is complete.

Critical: N Standard: Informs evaluator APRM #3 gains are adjusted.

Evaluator Cue: Acknowledge report, and inform candidate that JPM is complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Gain on APRM 3 has been adjusted and APRM 3 is unbypassed Stop Time:

Historical Record:

  • Minor edits for 2010 NRC Exam.
  • Updated to current JPM Template, QF-107501 Rev.3.
  • Updated to current revisions of procedures: C.2-05 Rev. 37.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant computer is OOS for maintenance and APRM 3 is bypassed for maintenance.
  • APRM #3 is ready to be unbypassed.
  • The plant is operating at 100% power.

INITIATING CUES (IF APPLICABLE):

The CRS directs you to adjust the gain on APRM #3 to read 100% power IAW C.2-05 B.4 Part D AND remove the bypass from APRM 3.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: PERFORM THE AREA RADIATION MONITOR FUNCTIONAL TEST JPM NUMBER: JPM-B.05.12-001 REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / CR272.102 TASK TITLE(S): Perform the Area Radiation Monitor Functional Test 272000 Rating: SRO/RO: 3.0/3.0 K/A NUMBERS:

A4.02 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 25 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 34 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 JPM Number: JPM-B.05.12-001 JPM

Title:

Perform The Area Radiation Monitor Functional Test (2010 ILT NRC SIM 5)

Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 35 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Plant is operating at 100% power.
  • Maintenance was performed on ARM Channel A1 and it requires PMT.

INITIATING CUES (IF APPLICABLE):

  • The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 36 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials: Copy of Test 1025-A (Area Radiation Monitor Functional)

Initiating Approval to commence In the comments state the performance of this test is for ONLY Detector A1 to satisfy PMT following maintenance.

Check other as the reason for performing.

  • STEPS 3, 5, and 7-11 should be marked N/A.

General

References:

  • Ops Manual B.05.12
  • ARM Alarm Setpoint Sheet (Operator Aid posted on panel)

Task Standards:

  • Test 1025-A (Area Radiation Monitor Functional)

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Obtains copy of Test 1025-A, APRM Functional Critical: N Standard: Obtains copy of Test 1025-A, most recent revision.

Evaluator Cue: Provides an initiated copy of the current revision of Test 1025-A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Procedure Step 1:

Critical: N Makes plant announcement that Area Radiation Monitor testing will begin.

Standard: Makes plant announcement Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 37 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 3 Procedure Step 2.a:

Critical: N Turn the TRIP CHECK ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.

Standard: Turn the TRIP AND ADJUST knob on the power supply fully counter-clockwise, And then 1/4 turn clockwise.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Procedure Step 2.b:

Critical: Y Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.

Standard: Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit And turn the TRIP CHECK ADJUST knob on the power supply unit slowly counter-clockwise until the downscale trip occurs.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Procedure Step 2.c:

Critical: N Record the meter reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.

Standard: Record the meter reading at which the downscale trip occurred in the column labeled mr/hr under SECTION I of Figure 1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Procedure Step 2.d:

Critical: N Verify that the downscale alarm light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION I of Figure 1.

Standard: Records initials under LT column.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 38 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 7 Procedure Step 2.e:

Critical: N Verify that annunciator 4-A-31 (Area Monitor Downscale) is in ALARM by recording initials in the column labeled ANN under SECTION I of Figure 1.

Standard: Records initials.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Procedure Step 2.f:

Critical: Y Turn the TRIP CHECK ADJUST knob on the power supply unit clockwise to just above the low trip set point, AND leave in this condition.

Standard: Adjusts trip check adjust knob.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Procedure Step 2.g:

Critical: Y Depress the RESET button on the Indicator and Trip unit, AND verify the downscale light is OFF and annunciator 4-A-31 (Area Monitor Downscale) is RESET.

Standard: Verifies annunciator is reset.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Procedure Step 2.h:

Critical: N Circle all downscale meter readings that do not fall within the acceptance criteria of +/-50% of the downscale setpoint on posted ARM setpoint sheet.

Standard: Circles out of acceptance readings.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 39 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 11 Procedure Step 4.a:

Critical: Y Simultaneously depress the TRIP CHECK button on the Indicator and Trip unit, And turn the TRIP CHECK ADJUST knob on the power supply unit slowly clockwise until the upscale trip occurs.

Standard: Adjusts until upscale trip occurs.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Procedure Step 4.b:

Critical: N Record the meter reading at which the upscale trip occurred in the column labeled mr/hr under SECTION II of Figure 1.

Standard: Records meter reading.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Procedure Step 4.c:

Critical: N Verify the upscale light on the Indicator and Trip unit is ON by recording initials in the column labeled LT under SECTION II of Figure 1.

Standard: Verifies upscale light is ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Procedure Step 4.d:

Critical: N Verify the appropriate annunciator is in ALARM by recording initials in column labeled ANN under SECTION II of Figure 1.

Standard: Verifies alarm and initials form.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 40 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 15 Procedure Step 4.e:

Critical: N From the SPDS display, record the meter readings in the column labeled mr/hr under SECTION III of Figure 1.

Standard: Records readings from SPDS.

Evaluator Note: For the performance of this JPM SPDS may be OOS for other JPMs. If so provide the following cue:

Evaluator Cue: SPDS reads 20 mr/hr.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Procedure Step 4.f:

Critical: Y Turn the TRIP CHECK ADJUST knob on the power supply unit counter-clockwise to just below the high trip set-point, AND leave in this condition.

Standard: Adjusts trip check adjust knob.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Procedure Step 4.g:

Critical: Y Depress the RESET button on the Indicator and Trip unit, AND verify the upscale light is OFF and appropriate annunciator is RESET.

Standard: Resets the annunciator.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Procedure Step 4.h:

Critical: N Circle all upscale meter readings that do not fall within the acceptance criteria of +/-30% of the upscale setpoint on posted ARM setpoint sheet.

Standard: Circles out of acceptance readings.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 41 of 73 JPM-B.05.12-001 (Perform The Area Radiation Monitor Functional Test) Rev. 1 Performance Step: 19 Procedure step 6 Critical: N Announce over the page that Area Radiation Monitor testing is complete.

Standard: Makes plant announcement.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: N Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: JPM Complete Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Candidate informs evaluator JPM is complete.

Stop Time:

Historical Record:

  • Rev.1 deletes the statement All operator actions are to be simulated from the Initiating Cues. It is based on Test 1025-A Rev. 15.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET INITIAL CONDITIONS:

  • Plant is operating at 100% power.

INITIATING CUES (IF APPLICABLE):

The CRS has directed you to perform Test 1025-A (Area Radiation Monitor Functional), Steps 1, 2, 4 and 6 for ONLY Channel A1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: CRD COUPLING TEST JPM NUMBER: JPM-B.01.03-008 REV. 7 RELATED PRA None INFORMATION:

TASK NUMBERS / CR201.102 TASK TITLE(S): Perform the Control Rod Drive Coupling Test 201003 Rating: SRO/RO: 3.7/3.8 K/A NUMBERS:

A2.02 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 44 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 JPM Number: JPM-B.01.03-008 JPM

Title:

CRD Coupling Test Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 45 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The Plant is in Mode 4.
  • Preparation for a plant startup is in progress with all control rod drives fully inserted.

INITIATING CUES:

  • The prerequisites for the test have been met and the Mode Switch is in REFUEL.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 46 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 JPM PERFORMANCE INFORMATION Required Materials:

  • Initialize to any startup IC with all rods inserted and at <212°F.

- CRS approval on coversheet

- Reason to perform - other

- Comment section should read:

- Perform the coupling check for only CRD 22-27 to satisfy drive replacement PMT.

- Complete the prerequisites.

General

References:

  • Procedure 0075 Task Standards:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 (Procedure STEP 1)

Critical: N Place RWM mode select switch (C-05) to BYPASS position.

Standard: Places RWM keyswitch in BYPASS.

Evaluator Cue: RWM mode switch has been witnessed to be in the BYPASS position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 47 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Performance Step: 2 (Procedure STEP 3)

Critical: N If plant is in Mode 4, Then verify OSP-CRD-0539 (Special Operations Checklist For Tech Spec LCO 3.10.4) Part A is complete for control rod to be tested.

Standard: OSP-CRD-0539 verified complete.

Evaluator Cue: As CRS, inform candidate that OSP-CRD-0539 is complete for rod 22-27.

Evaluate Note: Procedure Step 2 is not applicable in Mode 4.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 (Procedure STEP 4)

Critical: Y Fully withdraw CRD and observe that the control rod drive does not go to the overtravel position by verifying both:

1. The alarm 5-A-11 (Rod Overtravel) does not annunciate when attempting to withdraw the drive beyond position 48.
2. The selected rod position is not blank when the drive is fully withdrawn.

Standard: 1. Selects Rod 22-27.

2. Fully withdraws rod to position 48 by simultaneously using the ROD MOVEMENT CONTROL switch (3A-S2) in the ROD OUT NOTCH position and ROD OUT NOTCH OVERRIDE switch (3A-S3) in the NOTCH OVERRIDE position.

Non-Critical portion of the Standard:

1. Verifies ROD OVERTRAVEL alarm 5-A-11 does not annunciate.
2. Verifies rod position indication for 22-27 does not go blank.

Evaluator Note: When control rod has settled at position 48, the operator may attempt to withdraw the control rod by simultaneously using the rod movement control switch 3A-S2 in the rod out notch position and rod out notch override with 3A-S3 in the notch override position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 48 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Performance Step: 4 (Procedure STEP 5)

Critical: Y If both conditions in STEP 4 are verified, Then initial the appropriate square on Figure 1 (signifying a satisfactory coupling check for that control rod drive),

And fully insert CRD.

Standard: Fully inserts Control Rod 22-27 to position 00 using the ROD MOVEMENT CONTROL switch (3A-S2) in the ROD IN position.

Non-Critical portion of Standard:

Initials the proper location on Figure 1 of Test 0075.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 (Procedure STEP 6)

Critical: N If both conditions in STEP 2 are NOT verified, And only one attempt has been made at recoupling, Then perform the following:

1. Note this situation in the COMMENTS section.
2. Attempt to couple the drive by fully inserting the control rod.
3. Perform the coupling check again by returning to STEP 2 and re-performing the procedure.

Standard: None - Step will be N/A Evaluator Note: This step is not applicable. All rods are coupled.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 (Procedure STEP 7)

Critical: N If the second attempt to verify control rod coupling is unsatisfactory, Then perform Procedure B.01.03-05.H.3 (Control Rod System Failure).

Standard: None - Step will be N/A Evaluator Note; This step is not applicable. All rods are coupled.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 49 of 73 JPM-B.01.03-008 (CRD Coupling Test) Rev. 7 Performance Step: 7 (Procedure STEP 8)

Critical: N Repeat STEPs 2 through 7 for each CRD to be tested.

Standard: None Evaluator Note: Step is N/Ad.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 (Procedure STEP 9)

Critical: N Place RWM mode select switch (C-05) to OPERATE position.

Standard: Operator places keylock handswitch to OPERATE.

Evaluator Cue: RWM mode switch has been witnessed to be in the OPERATE position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: N Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: JPM Complete Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

Historical Record:

  • Rev.7 deletes the statement All operator actions are to be simulated from the Initiating Cues. It is based on Test 0075 Rev. 17, in which Steps 2 and 3 are newly added from a previous revision.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The Plant is in Mode 4.
  • Preparation for a plant startup is in progress with all control rod drives fully inserted.

INITIATING CUES:

  • The prerequisites for the test have been met and the Mode Switch is in REFUEL.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: MANUALLY ISOLATE SCTMT JPM NUMBER: JPM-B.04.02-005 REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / CR261.108 TASK TITLE(S): Manually Isolate SCTMT 290001 / A3.01 Rating: SRO/RO: 4.0/3.9 K/A NUMBERS:

Secondary Containment Isolation APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 52 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 JPM Number: JPM-B.04.02-005 JPM

Title:

Manually Isolate SCTMT Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 53 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is nearing the end of a refuel outage and is in Mode 4.
  • No OPDRVs or fuel movements are in progress.
  • A SBGT has been verified in AUTO/STANDBY INITIATING CUES (IF APPLICABLE):

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 54 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:

  • Simulator General

References:

  • B.04.02-005.D.2 Task Standards:
  • Manually isolate secondary containment, recognize the improper startup of SBGT B, place SBGT in manual and inform CRS to enter appropriate Technical Specification.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Locates procedure B.04.02-05.D2 (Manually Isolate SCTMT)

Critical: N Standard: Locates procedure B.04.02-05.D2 (Manually Isolate SCTMT), reviews PURPOSE and PRECAUTIONS AND LIMITATIONS Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 PREREQUISITES 1 Critical: N At least one SBGT Train is in Auto/Standby.

Standard: Verifies SBGT Train A is in Auto/Standby.

Evaluator Cue: As stated in the initial conditions, state that A SBGT has been verified in AUTO/STANDBY.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 55 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 3 PREREQUISITES 2 Critical: N Either:

a. No painting has occurred within Reactor Building for at least 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> (online) or 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> (outage),

Or

b. If painting has occurred within 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> (online) or 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> (outage) of SBGT operation, Then notify the SCTMT System Engineer to evaluate the effect on the charcoal filters Standard: Verifies no painting has occurred within Reactor Building for at least 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />.

Evaluator Cue: Inform operator that no painting has occurred within Reactor Building for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Procedure Step 1:

Critical: N If this procedure is being initiated in response to rising radioactive releases from the Reactor Building, Then perform this procedure concurrently with Abnormal Procedure C.4-B.02.04.A (Steam Leaks Outside Primary Containment), And, Or C.4-B.04.01.B (Primary Containment Group 2 - Isolation).

Standard: Based on initial conditions and initiating cue this step is N/A Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 56 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 5 Procedure Step 2:

Critical: Y If the Turbine Building ventilation is to remain operating, Then perform the following:

a. Evaluate Tech Spec 3.3.6.2 and enter applicable Condition for inoperable Secondary Containment Instrumentation.
b. Evaluate Tech Spec 3.6.4.1 and enter applicable Condition for SCTMT inoperable.
c. On Panel C-24A, place HS-4887 in BYPASS.
d. On Panel C-24B, place HS-4888 in BYPASS.

Standard: a. On Panel C-24A, places HS-4887 in BYPASS.

b. On Panel C-24B, places HS-4888 in BYPASS.

NON-CRITIAL PORTION OF STANDARD:

  • Acknowledges expected alarms Evaluator Cue: Inform operator Turbine Building ventilation IS to remain operating.

Tech Spec 3.3.6.2 and 3.6.4.1 have been evaluated by the CRS.

Evaluator Note: Both Tech Specs do not require entry based on the initial conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Procedure Step 3:

Critical: Y Isolate SCTMT by pushing both TEST pushbuttons on Panels C-24A and C-24B.

Standard: Isolates SCTMT by pushing both TEST pushbuttons on Panels C-24A and C-24B.

NON-CRITIAL PORTION OF STANDARD:

Acknowledges alarms Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 57 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 7 NOTE: Only SBGT A Train should start by using the TEST Critical: Y pushbuttons.

Standard: Candidate should recognize that SBGT A failed to start and SBGT B started (Alternate Path)

NON-CRITIAL PORTION OF STANDARD:

Acknowledges alarms Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Procedure Step 4:

Critical: N If SBGT A Train and SBGT B Train automatically start, Then attempt to determine the reason for the start of B Train, And either:

Standard: This step is N/A Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Procedure Step 5:

Critical: N If SBGT B Train remained in AUTO/STANDBY condition, Then verify the following indications:

Standard: This step is N/A Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 58 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 10 Procedure Step 6.a (Alternate Path)

Critical: N If SBGT A Train failed, And SBGT B Train initiated, Then perform the following:

a. Verify the following indications at Panel C-24B:
1) DPI-4424 -0.25 WC (more negative)
2) V-EF-17B ON
3) FILTER HEATER E-34B-1 ON
4) AO-2944 OPEN
5) AO-2978 OPEN
6) CV-2942 100% OPEN
7) FIC-2942 3150 cfm and 4000 cfm Standard: a. Verifies the following indications at Panel C-24B:
1) DPI-4424 -0.25 WC (more negative)
2) V-EF-17B ON
3) FILTER HEATER E-34B-1 ON
4) AO-2944 OPEN
5) AO-2978 OPEN
6) CV-2942 100% OPEN
7) FIC-2942 3150 cfm and 4000 cfm Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Procedure Step 6.b:

Critical: N Declare SBGT A Train INOPERABLE, AND enter Tech Spec 3.6.4.3 Condition A.

Standard: b. Informs CRS to declare SBGT A Train INOPERABLE, And evaluate Tech Spec 3.6.4.3 Condition A.

Evaluator Cue: Acknowledge as CRS the inoperability of SBGT A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 59 of 73 JPM-B.04.02-005 (Manually Isolate SCTMT) Rev. 1 Performance Step: 12 Procedure Step 6.c:

Critical: Y Investigate cause of SBGT A Train failure and perform the following at Panel C-24A:

1) Place HS-2988A to Position 1 (MANUAL) and verify blue light is ON.
2) Verify the following indications:

a) V-EF-17A OFF b) FILTER HEATER E-34A-1 OFF c) AO-2945 CLOSED d) AO-2979 CLOSED Standard: c. Investigates cause of SBGT A Train failure and perform the following at Panel C-24A:

1) Places HS-2988A to Position 1 (MANUAL) and verifies blue light is ON.
2) Verifies the following indications NON-CRITICAL PORTION OF STANDARD:

a) V-EF-17A OFF b) FILTER HEATER E-34A-1 OFF c) AO-2945 CLOSED d) AO-2979 CLOSED Evaluator Cue: Inform candidate that another operator will continue the investigation and that they should complete the procedure.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Procedure Step 6.d:

Critical: N Notify CRS.

Standard: Notifies CRS.

Evaluator Cue: Acknowledge the notification as CRS and terminate the JPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The remaining portion of the procedure is notifications and verifications (not all modeled in the simulator). When operator informs CRS, terminate JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is nearing the end of a refuel outage and is in Mode 4.
  • No OPDRVs or fuel movements are in progress.
  • A SBGT has been verified in AUTO/STANDBY INITIATING CUES (IF APPLICABLE):

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: COLD STARTUP OF NO. 11 RECIRC PUMP JPM NUMBER: JPM-B.01.04-004 REV. 4 RELATED PRA INFORMATION:

TASK NUMBERS / 202.106 TASK TITLE(S): Cold Startup of 11 (12) Recirc Pump K/A NUMBERS: 202001 A4.01 Rating: SRO/RO: 3.7/3.7 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: RO: NLO Additional site-specific signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 62 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 JPM Number: JPM-B.01.04-004 JPM

Title:

Cold Startup Of No. 11 Recirc Pump (2010 ILT NRC SIM 8)

Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 63 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A Reactor startup is planned for next shift.
  • All control rods are fully inserted and reactor water level is above 30.
  • 2R is supplying all 4.16KV busses.
  • Temperature difference between reactor coolant temperature and the Recirc loop is < 50°F AND SR 3.4.9.3 was just completed satisfactorily.
  • The 2114 Form (REACTOR RECIRC PRESTART CHECKLIST) has already been completed by another operator INITIATING CUES (IF APPLICABLE):
  • The Control Room Supervisor directs you to perform a Cold Start No. 11 Recirculation Pump.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 64 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 JPM PERFORMANCE INFORMATION Required Materials:

  • See Simulator Setup General

References:

  • B.01.04-05.D.1
  • C.6-004-B-25 Task Standards:
  • Perform and Cold Startup of 11 Recirc Pump Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step SHALL result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Locates procedure B.01.04-05.D.1and verifies all prerequisites are met.

Critical: N Standard: Locates procedure and Reads precaution that SR 3.4.9.3 must be logged within 15 minutes prior to starting 11 Recirc pump, and Verifies form 2114 has been completed as a prerequisite.

Evaluator Note: Both of these are complete IAW the JPM Initial Conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 (Procedure STEP 1)

Critical: N If power to Bus 11 is being supplied from 2R, Then check knife switch 4 in Panel C-31 CLOSED.

Standard: Verifies knife switch 4 CLOSED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 65 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 3 (Procedure STEP 2)

Critical: N If power to Bus 11 is being supplied from 1R, Then check knife switch 16 or Knife Switch 4 in Panel C-31 OPEN.

Standard: None - This step is N/A Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 (Procedure STEP 3)

Critical: N Verify the following for start of 11 Recirc Pump:

a. Valve MO-2-53A (11 Recirc Pump Discharge Closed).
b. Valve MO-2-43A (11 Recirc Pump Suction Open).
c. Position Indicator 2-184-22A reads approximately 2.55 (2.45 -

2.65) for 11 Recirc Pump.

d. Scoop tube lock is reset for 11 Recirc Pump.
e. The recirculation system annunciation on Panel C-04 is normal for 11 Recirc Pump.
f. Valve SV-2-2-11A (11 Recirc Pmp Seal Leakoff) is CLOSED as indicated on Panel C-04 (green light on).
g. Verify approximately 3 gpm seal injection flow to P-200A, 11 Recirc Pump.

Standard: a. Verifies valve MO-2-53A is closed.

b. Verifies valve MO-2-43A is open.
c. Verifies that No. 11 Recirc pump Position Indicator 2-184-22A reads approx 2.55 (2.45 - 2.65).
d. Verifies alarm C04-C-05 is not in the alarm condition.
e. Verifies no abnormal or unexpected annunciators are in the alarm.
f. Verifies green light on.
g. Calls Reactor Building Operator(RBO) to verify 3 gpm seal injection flow to 11 Recirc Pump.

Evaluator Cue: Respond as RBO that 3 gpm seal injection flow has been established to 11 Recirc Pump.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 66 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 4 NOTE: Reactor Coolant Temperature can be obtained using any of Critical: N the suction temperatures (e.g. RWCU, RHR Shutdown Cooling, or Running Loop of Recirc) provided there is flow present.

(Procedure STEP 4)

If in MODES 1, 2, 3 or 4, Then perform SR 3.4.9.3 within 15 minutes prior to Recirc Pump start by confirming that the idle loop temperature is within 50°F of reactor coolant temperature.

a. IF the temperature difference is greater than 50°F, THEN DO NOT restart the isolated pump AND Enter B.01.04-05.H.6 (Stratification Recovery.
b. IF the temperature difference is less than or equal to 50°F, THEN Log completion time of SR 3.4.9.3 within 15 minutes prior to starting 11 Recirc Pump.

Standard: Reads and acknowledges this requirement.

Evaluator Cue: IAW JPM initial conditions, differential temperature is < 50°F and another operator will log the completion of SR 3.4.9.3.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 67 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 5 NOTE: Actuation of relay 2A-K34A, 11 Recirc MG Overcurrent Critical: Y Sensing Relay, may occur upon start of Recirc Pump and result in alarm of 4-C-6 (RECIRC PUMP MOTOR A LOCKED ROTOR TRIP).

CAUTION:

The RECIRC PUMP DISCHARGE valve must be at least 20-25%

open within 66 seconds of MG Set start or a trip will occur. 20-25%

open corresponds to a 6-8 second open signal with the valve control switch.

(Procedure STEP 5)

Place 11 MG Set drive motor control switch to START and observe:

a. Generator speed peaks between 80 to 100% speed (because field generator breaker is OPEN).
b. Generator field breaker CLOSED approximately 6 seconds after drive motor breaker is CLOSED.
c. Generator speed lowers to about 40% speed and then lowers to minimum speed.

Standard: Places #11 Recirc MG Set drive motor handswitch (2A-S1A) to the START position momentarily.

Non-Critical portion of Standard:

Verifies pump start by the following:

1. MG Set Drive Motor light indication changes from green to red, And
2. Generator speed peaks at a point between 80 and 100% speed, as indicated on meter SI 2-184-16A, Pump Speed.

And

3. Generator field breaker closes about 6 seconds after the drive motor breaker is closed, as indicated by the indicating light changing from green to red, And
4. After the field breaker closes, generator speed slowly decreases to 40% speed and then lowers to minimum (approx. 30%).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 68 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 6 (Procedure STEP 6)

Critical: Y When 10 seconds have passed after MG Set start, Then OPEN MO-2-53A (11 Recirc Pump Discharge),

And observe the following:

a. Loop flow rises to 6500 gpm.
b. Pump speed remains constant.
c. Jet pump flow rises to 20% of rated (6 x 106 lb/Hr).
d. Pump Current - 50 (Normal for 25% speed)
e. Pump Volts - 900V (Normal for 25% speed)
f. Drive Motor Amps - 150A (Normal for 25% speed)
g. Valve SV-2-2-11A, 11 RECIRC PMP SEAL LEAKOFF, is OPEN as indicated on Panel C-04 (green light off).

Standard: Opens #11 recirc pump discharge valve by holding handswitch 2A-S7A, CW to the OPEN position, until the valve position indication changes from green to red.

Non-Critical portion of Standard:

1. Performs required observations and verifications:
a. Loop Flow - min 6500 gpm on FI-2-159A.
b. Pump speed remains constant SI-2-184-16A.
c. Jet Pump Flow - Flow on FI-2-3-92B is dependent on plant condition.
d. Pump Amps - min 50A on 2-184-22A
e. Pump Volts - min 900V on 2-184-23A.
f. Drive Motor Amps - min 150A on 2- 184-24A.
g. Seal Leakoff Block valve light indication, SV-2-2-11A, is no longer lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 69 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 7 NOTE: The pumps will be operated at minimum speed until reactor Critical: N power is increased to approximately 60% by control rod withdrawal per Ops. Manual C.1 (Startup Procedure).

(Procedure STEP 7)

Monitor and adjust service water at 11 MG Set oil cooler to maintain lube oil temperature at approximately 100°F leaving the cooler.

Standard: Calls APEO to monitor temperature and adjust it as necessary to maintain 100°F.

Evaluator Cue: Outlet of lube oil heat exchanger is 100°F.

Evaluator Note: The high vibration alarm will activate 30 seconds after the pump is started. This step may be omitted if the candidate is responding to C04-B-25.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 (Procedure STEP 8)

Critical: N Increase speed to the maximum allowed by the Feedwater interlocks, about 30%.

Standard: 11 Recirc Pump speed should already be about 30%

Evaluator Cue: The high vibration alarm will activate 30 seconds after the pump is started. This step may be omitted if the candidate is responding to C04-B-25.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 70 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 9 Respond to annunciator C.6-004-B-25 (Recirc Pump MTR A Hi Vibration)

Critical: N Standard: Procedure C.6-004-B-25 referenced and CRS informed of the unexpected alarm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 (Procedure C.6-004-B-25 STEP 1)

Critical: N Monitor A Pump Motor temperatures and vibration via SPDS an R-2-2-31 (C-21)

Standard: A Recirc Pump Motor temperatures monitored.

(TR-2-2-31, Points 1 & 2; SPDS screen 510, point REC126.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 (Procedure C.6-004-B-25 STEP 2)

Critical: N Monitor A Pump Motor run speed via SI-2-184-16A, Recirc Pump 11 Speed (C-04).

Standard: A Recirc Pump speed monitored.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 71 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 12 (Procedure C.6-004-B-25 STEP 3)

Critical: N Dispatch an operator to the Recirc MG Set Room to determine A Recirc Pump Motor vibration as indicated on local indicator VM-5602.

Standard: Operator dispatched.

Evaluator Cue: When candidate dispatches RBO to MG Set Room, inform him vibration on No. 11 pump motor is at 6 mils and rising, and oil flow and temperature appear to be normal.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 (Procedure C.6-004-B-25 STEP 5)

Critical: N If the pump motor speed is less than or equal to 50%,

And motor vibration is at or above 5 mils, Then shutdown A Recirc MG Set using B.01.04-05 (Reactor Recirculation System-System Operation).

Standard: B.01.04-05 referenced for shutdown of the Recirc Pump.

Evaluator Cue: The procedure to be used is B.01.04-05 F.1.

Evaluator Note: Procedure C.6-004-B-25 STEP 4 is not applicable because the pump speed will be less than 50%.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 3 (FP-T-SAT-75) Page 72 of 73 JPM-B.01.04-004 (Cold Startup Of No. 11 Recirc Pump) Rev. 4 Performance Step: 14 B.01.04-05. F.1. Steps 1-3 are N/A Critical: Y (Procedure STEPS 4-7)

4. Place the MG Set drive motor control switch for one pump to STOP.
5. Verify the drive motor breaker OPENED.
6. Verify the generator field breaker OPENED.
7. CLOSE the stopped pump RECIRC PUMP DISCHARGE valve.

a) MO-2-53A, Or b) MO-2-53B.

Standard: 4. Places the MG Set drive motor control switch for 11 recirc pump to STOP.

Non-Critical portion of Standard:

5. Verify the 11 recirc pump drive motor breaker OPENED.
6. Verify the 11 recirc pump generator field breaker OPENED.
7. CLOSE 11 RECIRC PUMP DISCHARGE valve MO-2-53A.

Evaluator Cue: After completion of these steps inform the candidate, This JPM is complete.

Evaluator Note: The high vibration malfunction will reinsert and then delete on Event Trigger 4 when the Pump handswitch is taken to STOP.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: See Evaluator Cue in Performance Step 14 Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

TURNOVER SHEET DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A Reactor startup is planned for next shift.
  • All control rods are fully inserted and reactor water level is above 30.
  • 2R is supplying all 4.16KV busses.
  • Temperature difference between reactor coolant temperature and the Recirc loop is < 50°F AND SR 3.4.9.3 was just completed satisfactorily.
  • The 2114 Form (REACTOR RECIRC PRESTART CHECKLIST) has already been completed by another operator INITIATING CUES (IF APPLICABLE):
  • The Control Room Supervisor directs you to perform a Cold Start No. 11 Recirculation Pump.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.