|
|
(7 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML12118A465 | | | number = ML12118A465 |
| | issue date = 04/26/2012 | | | issue date = 04/26/2012 |
| | title = 2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Addtional Information - Replacement Draft Items.2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to | | | title = NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Addtional Information - Replacement Draft Items.2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - |
| | author name = Feintuch K | | | author name = Feintuch K |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
| | addressee name = Gadzala J, Sly C D | | | addressee name = Gadzala J, Sly C |
| | addressee affiliation = Dominion Energy Kewaunee, Inc | | | addressee affiliation = Dominion Energy Kewaunee, Inc |
| | docket = 05000305 | | | docket = 05000305 |
Line 14: |
Line 14: |
| | page count = 4 | | | page count = 4 |
| | project = TAC:ME8205, TAC:ME8460 | | | project = TAC:ME8205, TAC:ME8460 |
| | stage = Other | | | stage = Draft Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Feintuch, KarlSent:Thursday, April 26, 2012 9:04 AMTo:'Jack Gadzala'; 'Craig D Sly'Cc:Paige, Jason; Parks, BenjaminSubject:FW: ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS From: Feintuch, Karl [mailto:Karl.Feintuch@nrc.gov] To: Craig D Sly (Generation - 6); Jack Gadzala (Generation - 4) Cc: Paige, Jason; Parks, Benjamin Subject: ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Thursday, April 26, 2012 9:04 AM To: 'Jack Gadzala'; 'Craig D Sly' Cc: Paige, Jason; Parks, Benjamin |
|
| |
|
| By letter dated March 15, 2012 (ADAMS Accession No. ML12079A287), the licensee, Kewaunee Power Station, submitted a Title 10 Code of Federal Regulations (10 CFR) 50.54(f) response to the NRC's information request related to the estimated effect on peak cladding temperature resulting from thermal conductivity degradation in the Westinghouse furnished realistic emergency core cooling evaluation. The licensee also stated that this response served as a 30-day report in accordance with requirements of 10 CFR 50.46.
| | ==Subject:== |
| | FW: ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS From: Feintuch, Karl [mailto:Karl.Feintuch@nrc.gov] |
| | To: Craig D Sly (Generation - 6); Jack Gadzala (Generation - 4) |
| | Cc: Paige, Jason; Parks, Benjamin |
|
| |
|
| In the course of the Reactor Systems Branch (SRXB) 10 CFR 50.46 response review, the NRC staff has determined that additional information is necessary to complete its review. In an email message dated Friday, March 23, 2012 3:50 PM, I (Project Manager Karl Feintuch) transmitted Draft Items from SRXB staff. A replacement email message was sent on Monday, April 23, 2012 3:56 PM. | | ==Subject:== |
| | ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS By letter dated March 15, 2012 (ADAMS Accession No. ML12079A287), the licensee, Kewaunee Power Station, submitted a Title 10 Code of Federal Regulations (10 CFR) 50.54(f) response to the NRCs information request related to the estimated effect on peak cladding temperature resulting from thermal conductivity degradation in the Westinghouse furnished realistic emergency core cooling evaluation. The licensee also stated that this response served as a 30-day report in accordance with requirements of 10 CFR 50.46. |
| | In the course of the Reactor Systems Branch (SRXB) 10 CFR 50.46 response review, the NRC staff has determined that additional information is necessary to complete its review. In an email message dated Friday, March 23, 2012 3:50 PM, I (Project Manager Karl Feintuch) transmitted Draft Items from SRXB staff. A replacement email message was sent on Monday, April 23, 2012 3:56 PM. |
| | This current email message is a replacement in the entirety for the messages of Friday, March 23, 2012 3:50 PM and of Monday, April 23, 2012 3:56 PM. The changes are in items 1 and 4 (both deleted), 5a, 5b, 6 (all changed text), and an added item 9 below. Italics are used to emphasize changed text and are not part of the RAI. |
| | The NRC staff requests a prompt response to the replacement RAI items (RAII). The NRC staff requests an acknowledgement of these RAIIs and their proposed request by date(s), or a clarification call to resolve this information. For a clarification call the NRC staff proposes Monday, April 30, 2012, at 1:00 PM ET. The participating Reviewer would be Benjamin Parks. |
| | The NRC staffs replacement request for additional information follows. Please contact Karl Feintuch (301-415-3079) to discuss the schedule for response or any need for clarification. |
| | KEWAUNEE POWER STATION 10 CFR 50.46, 30-DAY RESPONSE REQUEST FOR ADDITIONAL INFORMATION (RAI) |
| | REPLACEMENT DRAFT ITEMS Consistent with the identification of RAI items (RAII) for other projects, each of the 9 RAII below are assigned tracking numbers: |
| | ME8460-RAII-SRXB-Parks-001-2012-05-23 ME8460-RAII-SRXB-Parks-002-2012-05-23 ME8460-RAII-SRXB-Parks-003-2012-05-23 1 |
|
| |
|
| This current email message is a replacement in the entirety for the messages of Friday, March 23, 2012 3:50 PM and of Monday, April 23, 2012 3:56 PM. The changes are in items 1 and 4 (both deleted), 5a, 5b, 6 (all changed text), and an added item 9 below. Italics are used to emphasize changed text and are not part of the RAI.
| | ME8460-RAII-SRXB-Parks-004-2012-05-23 ME8460-RAII-SRXB-Parks-005-2012-05-23 ME8460-RAII-SRXB-Parks-006-2012-05-23 ME8460-RAII-SRXB-Parks-007-2012-05-23 ME8460-RAII-SRXB-Parks-008-2012-05-23 ME8460-RAII-DORL-Paige-009-2012-05-23 The tracking numbers are in the form: |
| | [TAC number]-RAII-[Reviewing Technical Branch]-[Reviewer-sequence #]-[Request-by date expressed as year-month-day] |
| | : 1. (ME8460-RAII-SRXB-Parks-001-2012-05-23) Please explain how the 10 CFR 50.46(a)(3) error report enclosed in your response to the NRCs Information Request pursuant to 10 CFR 50.54(f) remains adherent to the WCAP-14449-P-A methodology, which includes a supplement describing the method for fulfilling 10 CFR 50.46(a)(3) re-analysis requirements. |
| | : 2. (ME8460-RAII-SRXB-Parks-002-2012-05-23) Justify the evaluation of reduced peaking factors at beginning-of-life conditions to obtain analytic margin to offset the TCD effect. Show that peaking factor reductions affect PCT in a manner that is substantially independent of fuel burnup. |
| | : 3. (ME8460-RAII-SRXB-Parks-003-2012-05-23) Fully explain all peaking factor adjustments and provide the rationale for each adjustment. |
| | : 4. (ME8460-RAII-SRXB-Parks-004-2012-05-23) Compare the results of the TCD and offset sensitivity studies to the fuel rod parameter sensitivity studies discussed in the Code Qualification Document. |
| | Please explain any significant discrepancies in the results. |
| | : 5. (ME8460-RAII-SRXB-Parks-005-2012-05-23) Your submittal referenced a March 7, 2012 letter sent by Westinghouse Electric Company to the NRC. |
| | a) The final paragraph on Page 2 of 9 refers to small differences in fuel characteristics that were claimed to be compared. The paragraph also discusses confirmatory evaluations concluding that other operating characteristics were acceptable. Provide the results of this comparison for Kewaunee, including the relevant conclusions and the technical basis supporting those conclusions. |
| | For any conclusion that differences in a particular fuel or operating characteristic are offset by other conservatisms, list those conservatisms and provide a quantitative estimate of each conservatism, as well as a brief description of the rigor associated with that estimate. |
| | b) Please provide the values for the coefficients used in the PAD 4.0+TCD UO2 thermal conductivity equation. |
| | c) Please explain any error corrections, code improvements, and miscellaneous code cleanup between the WCOBRA/TRAC and HOTSPOT code versions used in the TCD evaluations and those used in the plants AOR. |
| | d) What is the thermal conductivity model impact of code version changes in HOTSPOT? |
| | : 6. (ME8460-RAII-SRXB-Parks-006-2012-05-23) Please provide additional detail concerning the steady-state initialization process. In particular, please explain what fuel characteristics are adjusted within the ASTRUM/CQD models to obtain convergence and agreement between HOTSPOT and PAD4.0TCD. |
| | 2 |
| | : 7. (ME8460-RAII-SRXB-Parks-007-2012-05-23) Please explain how the changed design values will be verified during operation of the plant, i.e. TS limits, Surveillances, etc. Also, explain what compensatory actions will be taken if a value is found to be outside of the limits assumed in the analysis. |
| | : 8. (ME8460-RAII-SRXB-Parks-008-2012-05-23) Page 3 of Attachment 2 to Serial 12-100 states that Dominion and its vendor, Westinghouse Electric Company, LLC, utilize processes which ensure that LOCA analysis input values conservatively bound the as-operated plant values for those parameters. |
| | Please explain these processes. |
| | : 9. (ME8460-RAII-DORL-Paige-009-2012-05-23) Based on the NRCs review of the March 15,, 2012, submittal it appears that the licensee has revised inputs to a method of evaluation as described in the FSAR (as updated) used in establishing the design bases or in the safety analyses. |
| | a) Address whether the methodology permits the licensee to establish how to select the value of an input parameter to yield adequately conservative results and whether the revised value is more conservative than that required by the selection method. |
| | b) Further, address whether any of the changes (i.e., to the UO2 thermal conductivity equation) constitute a change in the calculational framework used for evaluating behavior or response of a system, structure or component. |
| | 3 |
|
| |
|
| The NRC staff requests a prompt response to the replacement RAI items (RAII). The NRC staff requests an acknowledgement of these RAIIs and their proposed "request by" date(s), or a clarification call to resolve this information. For a clarification call the NRC staff proposes Monday, April 30, 2012, at 1:00 PM ET. The participating Reviewer would be Benjamin Parks.
| | Hearing Identifier: NRR_PMDA Email Number: 352 Mail Envelope Properties (26E42474DB238C408C94990815A02F097B313C94B4) |
| | |
| The NRC staff's replacement request for additional information follows. Please contact Karl Feintuch (301-415-3079) to discuss the schedule for response or any need for clarification. KEWAUNEE POWER STATION 10 CFR 50.46, 30-DAY RESPONSE REQUEST FOR ADDITIONAL INFORMATION (RAI) REPLACEMENT DRAFT ITEMS Consistent with the identification of RAI items (RAII) for other projects, each of the 9 RAII below are assigned tracking numbers: ME8460-RAII-SRXB-Parks-001-2012-05-23 ME8460-RAII-SRXB-Parks-002-2012-05-23 ME8460-RAII-SRXB-Parks-003-2012-05-23 2ME8460-RAII-SRXB-Parks-004-2012-05-23 ME8460-RAII-SRXB-Parks-005-2012-05-23 ME8460-RAII-SRXB-Parks-006-2012-05-23 ME8460-RAII-SRXB-Parks-007-2012-05-23 ME8460-RAII-SRXB-Parks-008-2012-05-23 ME8460-RAII-DORL-Paige-009-2012-05-23 The tracking numbers are in the form:
| |
| [TAC number]-RAII-[Reviewing Technical Branch]-[Reviewer-sequence #]-[Request-by date expressed as year-month-day] 1. (ME8460-RAII-SRXB-Parks-001-2012-05-23) Please explain how the 10 CFR 50.46(a)(3) error report enclosed in your response to the NRC's Information Request pursuant to 10 CFR 50.54(f) remains adherent to the WCAP-14449-P-A methodology, which includes a supplement describing the method for fulfilling 10 CFR 50.46(a)(3) re-analysis requirements. 2. (ME8460-RAII-SRXB-Parks-002-2012-05-23) Justify the evaluation of reduced peaking factors at beginning-of-life conditions to obtain analytic margin to offset the TCD effect. Show that peaking factor reductions affect PCT in a manner that is substantially independent of fuel burnup. 3. (ME8460-RAII-SRXB-Parks-003-2012-05-23) Fully explain all peaking factor adjustments and provide the rationale for each adjustment. 4. (ME8460-RAII-SRXB-Parks-004-2012-05-23) Compare the results of the TCD and offset sensitivity studies to the fuel rod parameter sensitivity studies discussed in the Code Qualification Document. Please explain any significant discrepancies in the results. 5. (ME8460-RAII-SRXB-Parks-005-2012-05-23) Your submittal referenced a March 7, 2012 letter sent by Westinghouse Electric Company to the NRC. a) The final paragraph on Page 2 of 9 refers to small differences in fuel characteristics that were claimed to be compared. The paragraph also discusses confirmatory evaluations concluding that other operating characteristics were acceptable. Provide the results of this comparison for Kewaunee, including the relevant conclusions and the technical basis supporting those conclusions. For any conclusion that differences in a particular fuel or operating characteristic are offset by other conservatisms, list those conservatisms and provide a quantitative estimate of each conservatism, as well as a brief description of the rigor associated with that estimate." b) Please provide the values for the coefficients used in the PAD 4.0+TCD UO2 thermal conductivity equation. c) Please explain any error corrections, code improvements, and miscellaneous code cleanup between the WCOBRA/TRAC and HOTSPOT code versions used in the TCD evaluations and those used in the plant's AOR. d) What is the thermal conductivity model impact of code version changes in HOTSPOT? 6. (ME8460-RAII-SRXB-Parks-006-2012-05-23) Please provide additional detail concerning the steady-state initialization process. In particular, please explain what fuel characteristics are adjusted within the ASTRUM/CQD models to obtain convergence and agreement between HOTSPOT and PAD4.0TCD.
| |
| : 37. (ME8460-RAII-SRXB-Parks-007-2012-05-23) Please explain how the changed design values will be verified during operation of the plant, i.e. TS limits, Surveillances, etc. Also, explain what compensatory actions will be taken if a value is found to be outside of the limits assumed in the analysis. 8. (ME8460-RAII-SRXB-Parks-008-2012-05-23) Page 3 of Attachment 2 to Serial 12-100 states that "Dominion and its vendor, Westinghouse Electric Company, LLC, utilize processes which ensure that LOCA analysis input values conservatively bound the as-operated plant values for those parameters." Please explain these processes. 9. (ME8460-RAII-DORL-Paige-009-2012-05-23) Based on the NRC's review of the March 15,, 2012, submittal it appears that the licensee has revised inputs to a method of evaluation as described in the FSAR (as updated) used in establishing the design bases or in the safety analyses. a) Address whether the methodology permits the licensee to establish how to select the value of an input parameter to yield adequately conservative results and whether the revised value is more conservative than that required by the selection method. b) Further, address whether any of the changes (i.e., to the UO2 thermal conductivity equation) constitute a change in the calculational framework used for evaluating behavior or response of a system, structure or component.
| |
| | |
| Hearing Identifier: NRR_PMDA Email Number: 352 Mail Envelope Properties (26E42474DB238C408C94990815A02F097B313C94B4) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FW: ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS Sent Date: 4/26/2012 9:04:29 AM Received Date: 4/26/2012 9:04:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients: "Paige, Jason" <Jason.Paige@nrc.gov> Tracking Status: None "Parks, Benjamin" <Benjamin.Parks@nrc.gov> Tracking Status: None | | FW: ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS Sent Date: 4/26/2012 9:04:29 AM Received Date: 4/26/2012 9:04:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients: |
| "'Jack Gadzala'" <jack.gadzala@dom.com> Tracking Status: None "'Craig D Sly'" <craig.d.sly@dom.com> | | "Paige, Jason" <Jason.Paige@nrc.gov> |
| Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 7052 4/26/2012 9:04:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | | Tracking Status: None "Parks, Benjamin" <Benjamin.Parks@nrc.gov> |
| }} | | Tracking Status: None |
| | "'Jack Gadzala'" <jack.gadzala@dom.com> |
| | Tracking Status: None |
| | "'Craig D Sly'" <craig.d.sly@dom.com> |
| | Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 7052 4/26/2012 9:04:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Draft Other |
---|
|
|
MONTHYEARML12079A2872012-03-15015 March 2012 Response to Information Request Pursuant to 10 CFR 50-54 (F) Related to the Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in the Westinghouse Furnished Realistic Emergency Core... Project stage: Request ML12087A0502012-03-26026 March 2012 NRR E-mail Capture - FW: ME8205 - Kewaunee Power Station - 10 CFR 50.46, 30-DAY Response - Request for Additional Information - Draft Items Project stage: Draft RAI ML12087A0482012-03-26026 March 2012 NRR E-mail Capture - ME8205 - Kewaunee Power Station - 10 CFR 50.46, 30-DAY Response - Request for Additional Information - Draft Items Project stage: Draft RAI ML12109A2672012-04-17017 April 2012 NRR E-mail Capture - ME8205 - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Additional Information - Draft Items Project stage: Draft RAI ML12115A0752012-04-23023 April 2012 NRR E-mail Capture - ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Additional Information - Replacement Draft Items Project stage: Draft RAI ML1210803262012-04-25025 April 2012 Closeout of Information Request Pursuant to 50.54(f) Related to the Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in the Westinghouse-Furnished Resulting Emergency Core Cooling System Evaluati Project stage: Other ML12118A4652012-04-26026 April 2012 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Addtional Information - Replacement Draft Items.2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Project stage: Draft Other ML12123A7352012-05-0202 May 2012 NRR E-mail Capture - ME8460 (Successor to ME8205) - Kewaunee - 10 CFR 50.46, 30-DAY Response - RAI Conference Call - Replacement Draft Items - Record of Conference Call Project stage: Draft RAI ML12138A0072012-05-15015 May 2012 NRR E-mail Capture - ME7110 Scvb Draft RAI Set Adoption of TSTF-51 & TSTF- 448, as Part of Chi-over-Q Action Project stage: Draft RAI ML12144A1282012-05-22022 May 2012 NRR E-mail Capture - ME8460 Rai'S - Clarification Call - Continuation Project stage: Other ML12164A7862012-06-0808 June 2012 Response to Request for Additional Information Related to the Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in the Westinghouse Furnished Realistic Emergency Cooling System Project stage: Response to RAI ML13066A7802013-02-27027 February 2013 Non-Proprietary - Evaluation of Report Describing the Nature of an Estimated Effect on, Peak Cladding Temperature Resulting from a Significant Emergency Core Cooling System Evaluation Model Error Project stage: Other 2012-04-26
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23222A1532023-08-29029 August 2023 Solutions Restore Enclosure RAI 1 - Final ML22032A3252022-02-0202 February 2022 Enclosure - Request for Additional Information ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments ML21257A0692021-09-30030 September 2021 Enclosure - Request for Additional Information - Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendment ML20050E1012020-02-21021 February 2020 Letter-RAI 1 - MAGNASTOR-Kewaunee Exemption with Enclosure ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A1562016-02-10010 February 2016 Request for Additional Information for Kewaunee Power Station License Amendment Request for Emergency Plan Changes ML14115A0412014-08-14014 August 2014 Request for Additional Information, License Amendment Request to Revise Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML12138A0072012-05-15015 May 2012 NRR E-mail Capture - ME7110 Scvb Draft RAI Set Adoption of TSTF-51 & TSTF- 448, as Part of Chi-over-Q Action ML12118A4652012-04-26026 April 2012 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Addtional Information - Replacement Draft Items.2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - ML12115A0752012-04-23023 April 2012 NRR E-mail Capture - ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Additional Information - Replacement Draft Items ML12093A4812012-04-0202 April 2012 RAI - Kewaunee Relief Requests Under TAC ME7378 ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12066A0082012-03-0202 March 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request- Chi-over-Q - Aadb Request for Additional ML12023A0572012-01-13013 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) - Firm RAI Items ML12023A0472012-01-0909 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) ML11339A0012011-12-0101 December 2011 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Eicb Request for Additional Information (RAI) ML1106303592011-03-0707 March 2011 Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan ML1036305892011-01-0606 January 2011 Request for Additional Information, Kewaunee Power Station Relief Request No. RR-2-2, Steam Generator Large-Bore Snubber Inspection and Testing for Fourth 10-Year Interval ML1028102572010-10-0505 October 2010 Attachment: ME4011 Request for Additional Information (RAI) ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application ML1025003572010-09-10010 September 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1014103222010-05-27027 May 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1009503792010-04-14014 April 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1006903992010-03-11011 March 2010 Request for Additional Information for the Review of the Kewaunee Power Station, License Renewal Application ML1007003002010-03-11011 March 2010 Draft RAI Re. Use of TSTF-490-A in Kewaunee'S ITS Conversion ML0935003062010-01-0404 January 2010 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0933104432009-12-16016 December 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0932400952009-12-0303 December 2009 Request for Additional Information for the Review of the Kewaunee License Renewal Application - Aging Management Review/Aging Management Program ML0918908362009-11-20020 November 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application ML0928702112009-10-14014 October 2009 Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 ML0923900632009-10-13013 October 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0921205462009-08-28028 August 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0920400062009-08-14014 August 2009 RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) ML0920902962009-07-27027 July 2009 Response to Request for Additional Information for Inservice Inspection Program Fourth Ten-year Interval Proposed Alternative No. RR-1-11 ML0920802542009-07-27027 July 2009 E-mail 7/27/09 Re Kewaunee Request for Information ML0918805552009-07-16016 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Structures Scoping/Fire Protection ML0918109582009-07-13013 July 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Programs ML0918900172009-07-10010 July 2009 RAI Regarding the Environmental Review of the License Renewal Application for Kewaunee Power Station ML0911903892009-07-0707 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Leak-Before-Break ML0918311242009-07-0202 July 2009 Request a Conference Call to Discuss an Open Issue in the Draft Safety Evaluation Regarding Fire Protection for Extended Power Uprate ML0917406492009-06-22022 June 2009 Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps ML0911201992009-04-30030 April 2009 RAI, Review of the License Renewal Application - Scoping & Screening Methodology ML0907607862009-04-0303 April 2009 License Renewal Application Review, Request for Additional Information - Balance of Plant Scoping and Screening 2023-09-21
[Table view] |
Text
NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Thursday, April 26, 2012 9:04 AM To: 'Jack Gadzala'; 'Craig D Sly' Cc: Paige, Jason; Parks, Benjamin
Subject:
FW: ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS From: Feintuch, Karl [1]
To: Craig D Sly (Generation - 6); Jack Gadzala (Generation - 4)
Cc: Paige, Jason; Parks, Benjamin
Subject:
ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS By letter dated March 15, 2012 (ADAMS Accession No. ML12079A287), the licensee, Kewaunee Power Station, submitted a Title 10 Code of Federal Regulations (10 CFR) 50.54(f) response to the NRCs information request related to the estimated effect on peak cladding temperature resulting from thermal conductivity degradation in the Westinghouse furnished realistic emergency core cooling evaluation. The licensee also stated that this response served as a 30-day report in accordance with requirements of 10 CFR 50.46.
In the course of the Reactor Systems Branch (SRXB) 10 CFR 50.46 response review, the NRC staff has determined that additional information is necessary to complete its review. In an email message dated Friday, March 23, 2012 3:50 PM, I (Project Manager Karl Feintuch) transmitted Draft Items from SRXB staff. A replacement email message was sent on Monday, April 23, 2012 3:56 PM.
This current email message is a replacement in the entirety for the messages of Friday, March 23, 2012 3:50 PM and of Monday, April 23, 2012 3:56 PM. The changes are in items 1 and 4 (both deleted), 5a, 5b, 6 (all changed text), and an added item 9 below. Italics are used to emphasize changed text and are not part of the RAI.
The NRC staff requests a prompt response to the replacement RAI items (RAII). The NRC staff requests an acknowledgement of these RAIIs and their proposed request by date(s), or a clarification call to resolve this information. For a clarification call the NRC staff proposes Monday, April 30, 2012, at 1:00 PM ET. The participating Reviewer would be Benjamin Parks.
The NRC staffs replacement request for additional information follows. Please contact Karl Feintuch (301-415-3079) to discuss the schedule for response or any need for clarification.
KEWAUNEE POWER STATION 10 CFR 50.46, 30-DAY RESPONSE REQUEST FOR ADDITIONAL INFORMATION (RAI)
REPLACEMENT DRAFT ITEMS Consistent with the identification of RAI items (RAII) for other projects, each of the 9 RAII below are assigned tracking numbers:
ME8460-RAII-SRXB-Parks-001-2012-05-23 ME8460-RAII-SRXB-Parks-002-2012-05-23 ME8460-RAII-SRXB-Parks-003-2012-05-23 1
ME8460-RAII-SRXB-Parks-004-2012-05-23 ME8460-RAII-SRXB-Parks-005-2012-05-23 ME8460-RAII-SRXB-Parks-006-2012-05-23 ME8460-RAII-SRXB-Parks-007-2012-05-23 ME8460-RAII-SRXB-Parks-008-2012-05-23 ME8460-RAII-DORL-Paige-009-2012-05-23 The tracking numbers are in the form:
[TAC number]-RAII-[Reviewing Technical Branch]-[Reviewer-sequence #]-[Request-by date expressed as year-month-day]
- 1. (ME8460-RAII-SRXB-Parks-001-2012-05-23) Please explain how the 10 CFR 50.46(a)(3) error report enclosed in your response to the NRCs Information Request pursuant to 10 CFR 50.54(f) remains adherent to the WCAP-14449-P-A methodology, which includes a supplement describing the method for fulfilling 10 CFR 50.46(a)(3) re-analysis requirements.
- 2. (ME8460-RAII-SRXB-Parks-002-2012-05-23) Justify the evaluation of reduced peaking factors at beginning-of-life conditions to obtain analytic margin to offset the TCD effect. Show that peaking factor reductions affect PCT in a manner that is substantially independent of fuel burnup.
- 3. (ME8460-RAII-SRXB-Parks-003-2012-05-23) Fully explain all peaking factor adjustments and provide the rationale for each adjustment.
- 4. (ME8460-RAII-SRXB-Parks-004-2012-05-23) Compare the results of the TCD and offset sensitivity studies to the fuel rod parameter sensitivity studies discussed in the Code Qualification Document.
Please explain any significant discrepancies in the results.
- 5. (ME8460-RAII-SRXB-Parks-005-2012-05-23) Your submittal referenced a March 7, 2012 letter sent by Westinghouse Electric Company to the NRC.
a) The final paragraph on Page 2 of 9 refers to small differences in fuel characteristics that were claimed to be compared. The paragraph also discusses confirmatory evaluations concluding that other operating characteristics were acceptable. Provide the results of this comparison for Kewaunee, including the relevant conclusions and the technical basis supporting those conclusions.
For any conclusion that differences in a particular fuel or operating characteristic are offset by other conservatisms, list those conservatisms and provide a quantitative estimate of each conservatism, as well as a brief description of the rigor associated with that estimate.
b) Please provide the values for the coefficients used in the PAD 4.0+TCD UO2 thermal conductivity equation.
c) Please explain any error corrections, code improvements, and miscellaneous code cleanup between the WCOBRA/TRAC and HOTSPOT code versions used in the TCD evaluations and those used in the plants AOR.
d) What is the thermal conductivity model impact of code version changes in HOTSPOT?
- 6. (ME8460-RAII-SRXB-Parks-006-2012-05-23) Please provide additional detail concerning the steady-state initialization process. In particular, please explain what fuel characteristics are adjusted within the ASTRUM/CQD models to obtain convergence and agreement between HOTSPOT and PAD4.0TCD.
2
- 7. (ME8460-RAII-SRXB-Parks-007-2012-05-23) Please explain how the changed design values will be verified during operation of the plant, i.e. TS limits, Surveillances, etc. Also, explain what compensatory actions will be taken if a value is found to be outside of the limits assumed in the analysis.
- 8. (ME8460-RAII-SRXB-Parks-008-2012-05-23) Page 3 of Attachment 2 to Serial 12-100 states that Dominion and its vendor, Westinghouse Electric Company, LLC, utilize processes which ensure that LOCA analysis input values conservatively bound the as-operated plant values for those parameters.
Please explain these processes.
- 9. (ME8460-RAII-DORL-Paige-009-2012-05-23) Based on the NRCs review of the March 15,, 2012, submittal it appears that the licensee has revised inputs to a method of evaluation as described in the FSAR (as updated) used in establishing the design bases or in the safety analyses.
a) Address whether the methodology permits the licensee to establish how to select the value of an input parameter to yield adequately conservative results and whether the revised value is more conservative than that required by the selection method.
b) Further, address whether any of the changes (i.e., to the UO2 thermal conductivity equation) constitute a change in the calculational framework used for evaluating behavior or response of a system, structure or component.
3
Hearing Identifier: NRR_PMDA Email Number: 352 Mail Envelope Properties (26E42474DB238C408C94990815A02F097B313C94B4)
Subject:
FW: ME8460 (successor to ME8205) - KEWAUNEE POWER STATION - 10 CFR 50.46, 30-DAY RESPONSE - REQUEST FOR ADDITIONAL INFORMATION - REPLACEMENT DRAFT ITEMS Sent Date: 4/26/2012 9:04:29 AM Received Date: 4/26/2012 9:04:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:
"Paige, Jason" <Jason.Paige@nrc.gov>
Tracking Status: None "Parks, Benjamin" <Benjamin.Parks@nrc.gov>
Tracking Status: None
"'Jack Gadzala'" <jack.gadzala@dom.com>
Tracking Status: None
"'Craig D Sly'" <craig.d.sly@dom.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 7052 4/26/2012 9:04:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: