ML13170A335: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:1 2 | {{#Wiki_filter:1 2 | ||
Terry Reis Director, Division of Reactor Safety NRC Region II 3 Introductions Background NRC Inspection Focus Areas Major SIT Activities Exam & Repair Results NRC Evaluation for Continued Operations NRC Conclusions Public Questions and Comments | Terry Reis Director, Division of Reactor Safety NRC Region II 3 | ||
10 11 12 Determine the facts surrounding the event | * Introductions | ||
* Background | |||
* NRC Inspection Focus Areas | |||
* Major SIT Activities | |||
* Exam & Repair Results | |||
* NRC Evaluation for Continued Operations | |||
* NRC Conclusions | |||
* Public Questions and Comments 4 | |||
* Terry Reis, Director, Division of Reactor Safety (DRS) | |||
* Steven Vias, Chief, Engineering Branch 3 (EB3), DRS | |||
* Dr. Robert Williams, Reactor Inspector, EB3, DRS - SIT Lead Inspector | |||
* Jay Collins, Senior Materials Engineer, Nuclear Reactor Regulation (NRR) | |||
* Joey Ledford, Public Affairs Officer | |||
* Gena Woodruff, Regional Government Liaison Officer, Meeting Facilitator | |||
* Joe Austin, Senior Resident Inspector, DRP | |||
* Patrick Lessard, Resident Inspector, DRP | |||
* Brendan Collins, Reactor Inspector, EB3, SIT Team member | |||
* Ann Kroeger, Site Administrative Assistant 5 | |||
Dr. Robert Williams Reactor Inspector SIT Lead Inspector 6 | |||
Fission Product Barriers Barrier #1: | |||
cladding enclosing the fuel Barrier #2: | |||
reactor vessel & piping Barrier #3: | |||
containment 7 | |||
* Generic Issues/NRC Order EA-03-009 | |||
* Harris-specific evaluation | |||
* Reactor vessel head inspections 8 | |||
9 10 11 12 NRC SIT Focus Areas | |||
* Determine the facts surrounding the event | |||
* Observe and evaluate the examinations and the repair | |||
* Evaluate the non-destructive examinations from the 2012 outage and the corrective actions taken 13 | |||
* Develop a timeline of the event | |||
* Assess the condition of the vessel head | |||
* Review the 2012 refueling outage vessel head examinations | |||
* Observe the nozzle weld repair process and its return to service | |||
* Assess the licensees compliance with regulatory requirements 14 | |||
* Plant safety was not compromised | |||
* There were no indications of leakage | |||
* Vessel head structural integrity was not challenged | |||
* The flaw was successfully repaired | |||
* Licensee failed to identify the flaw in 2012 15 | |||
16 | |||
==Contact:== | |||
NRC Region II Office of Public Affairs 404-997-4000 Roger Hannah Joey Ledford 17}} |
Latest revision as of 13:09, 5 December 2019
ML13170A335 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 06/13/2013 |
From: | Reis T Division of Reactor Safety II |
To: | |
References | |
Download: ML13170A335 (17) | |
Text
1 2
Terry Reis Director, Division of Reactor Safety NRC Region II 3
- Introductions
- Background
- NRC Inspection Focus Areas
- Major SIT Activities
- Exam & Repair Results
- NRC Evaluation for Continued Operations
- NRC Conclusions
- Public Questions and Comments 4
- Terry Reis, Director, Division of Reactor Safety (DRS)
- Steven Vias, Chief, Engineering Branch 3 (EB3), DRS
- Dr. Robert Williams, Reactor Inspector, EB3, DRS - SIT Lead Inspector
- Jay Collins, Senior Materials Engineer, Nuclear Reactor Regulation (NRR)
- Joey Ledford, Public Affairs Officer
- Gena Woodruff, Regional Government Liaison Officer, Meeting Facilitator
- Patrick Lessard, Resident Inspector, DRP
- Brendan Collins, Reactor Inspector, EB3, SIT Team member
- Ann Kroeger, Site Administrative Assistant 5
Dr. Robert Williams Reactor Inspector SIT Lead Inspector 6
Fission Product Barriers Barrier #1:
cladding enclosing the fuel Barrier #2:
reactor vessel & piping Barrier #3:
containment 7
- Generic Issues/NRC Order EA-03-009
- Harris-specific evaluation
- Reactor vessel head inspections 8
9 10 11 12 NRC SIT Focus Areas
- Determine the facts surrounding the event
- Observe and evaluate the examinations and the repair
- Evaluate the non-destructive examinations from the 2012 outage and the corrective actions taken 13
- Develop a timeline of the event
- Assess the condition of the vessel head
- Review the 2012 refueling outage vessel head examinations
- Observe the nozzle weld repair process and its return to service
- Assess the licensees compliance with regulatory requirements 14
- Plant safety was not compromised
- There were no indications of leakage
- Vessel head structural integrity was not challenged
- The flaw was successfully repaired
- Licensee failed to identify the flaw in 2012 15
16
Contact: