|
|
(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14232A301 | | | number = ML14232A301 |
| | issue date = 08/20/2014 | | | issue date = 08/20/2014 |
| | title = Memo S Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 | | | title = Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 |
| | author name = Koenick S S | | | author name = Koenick S |
| | author affiliation = NRC/NMSS/SFST/LID/RIOB | | | author affiliation = NRC/NMSS/SFST/LID/RIOB |
| | addressee name = Wastler S L | | | addressee name = Wastler S |
| | addressee affiliation = NRC/NSIR/DSP/DDMS/MTWSB | | | addressee affiliation = NRC/NSIR/DSP/DDMS/MTWSB |
| | docket = 05000293, 07201044 | | | docket = 05000293, 07201044 |
| | license number = | | | license number = |
| | contact person = Wharton L R | | | contact person = Wharton L |
| | case reference number = EA-13-132, TAC L24940 | | | case reference number = EA-13-132, TAC L24940 |
| | document type = License-Technical Assistance Request (TAR), Reply to, Memoranda | | | document type = License-Technical Assistance Request (TAR), Reply to, Memoranda |
| | page count = 2 | | | page count = 2 |
| | project = | | | project = TAC:L24940 |
| | stage = Approval | | | stage = Approval |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:August 20, 2014 | | {{#Wiki_filter:August 20, 2014 MEMORANDUM TO: Sandra Wastler, Chief Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Stephen S. Koenick, Acting Chief /RA/ |
| | | Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards |
| MEMORANDUM TO: Sandra Wastler, Chief Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Stephen S. Koenick, Acting Chief | |
| /RA/ Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation | |
| | |
| Office of Nuclear Material Safety and Safeguards | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION | | TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. L24940) |
| | | The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project: |
| (TAC NO. L24940) | | PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA 132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures. |
| The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security | | DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Pilgrim Nuclear Power Station supporting NRCs safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIRs review. |
| | | Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. |
| Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project: | | Name of NSIR/DSP assigned Reviewer: _________________________________ |
| | | NSIR/DSP Project Completion Date: _________________________________ |
| PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA-13-132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan | | NSIR/DSP Branch Chief Signature: _________________________________ |
| | |
| (PSP) and verify implementation of the additional security measures. | |
| | |
| DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Pilgrim Nuclear Power Station supporting NRC's safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIR's review. Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. | |
| | |
| Name of NSIR/DSP assigned Reviewer: _________________________________ | |
| NSIR/DSP Project Completion Date: _________________________________ | |
|
| |
|
| NSIR/DSP Branch Chief Signature: _________________________________
| | ==Contact:== |
| | Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort. |
|
| |
|
| Contact: Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
| | August 20, 2014 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Stephen S. Koenick, Acting Chief /RA/ |
| August 20, 2014 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response | | Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards |
| | |
| FROM: Stephen S. Koenick, Acting Chief | |
| /RA/ Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. L24940) | | TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. L24940) |
| The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project: | | The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project: |
| PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA-13-132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures. | | PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA-13-132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures. |
| | | DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Beaver Valley Power Station supporting NRCs safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIRs review. |
| DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Beaver Valley Power Station supporting NRC's safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIR's review. | |
| | |
| Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. | | Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. |
| Name of NSIR/DSP assigned Reviewer: _________________________________ | | Name of NSIR/DSP assigned Reviewer: _________________________________ |
| | | NSIR/DSP Project Completion Date: _________________________________ |
| NSIR/DSP Project Completion Date: _________________________________ | | NSIR/DSP Branch Chief Signature: _________________________________ |
|
| |
|
| NSIR/DSP Branch Chief Signature: _________________________________
| | ==Contact:== |
| Contact: Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
| | Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort. |
| Distribution: SFST r/f DMarcano ADAMS P8 No.: ML14232A301 OFC SFST SFST SFST NAME RWharton WWheatley via e-mail SKoenick DATE 08/12/14 08/13 /14 08/20/14 OFFICIAL RECORD COPY}} | | Distribution: SFST r/f DMarcano ADAMS P8 No.: ML14232A301 OFC SFST SFST SFST NAME RWharton WWheatley via e-mail SKoenick DATE 08/12/14 08/13 /14 08/20/14 OFFICIAL RECORD COPY}} |
Letter Sequence Approval |
---|
|
|
MONTHYEARML14232A3012014-08-20020 August 2014 Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 Project stage: Approval ML14300A0962014-10-28028 October 2014 Staff Review of the Pilgrim Physical Security Plan (Revision 12) for the Independent Spent Fuel Storage Installation Security and Verification of ASM Incorporation (TAC L24940) Project stage: Approval 2014-10-28
[Table View] |
|
---|
Category:License-Technical Assistance Request (TAR)
MONTHYEARML14232A3012014-08-20020 August 2014 Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 2014-08-20
[Table view] Category:Reply to
MONTHYEARML14232A3012014-08-20020 August 2014 Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 2014-08-20
[Table view] Category:Memoranda
MONTHYEARML22321A1042022-12-0101 December 2022 Lessons Learned Recommendations Effectiveness Review ML21060B1152021-03-31031 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Pilgrim ISFSI ML19274B6662019-11-13013 November 2019 Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML18158A1302018-06-0707 June 2018 Evaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML18157A0402018-06-0606 June 2018 Inspection Procedure 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML18158A1332018-06-0606 June 2018 Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML16153A2762016-06-20020 June 2016 Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML14294A5712014-11-0404 November 2014 Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis ML14300A0962014-10-28028 October 2014 Staff Review of the Pilgrim Physical Security Plan (Revision 12) for the Independent Spent Fuel Storage Installation Security and Verification of ASM Incorporation (TAC L24940) ML14232A3012014-08-20020 August 2014 Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 ML14086A2912014-04-22022 April 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1 ML13351A2732014-01-0909 January 2014 G20130846/LTR-13-0911 - James Brett, the New England Council Ltr. Chairman'S Recent Tour and the Council'S Support for the Pilgrim Nuclear Power Station - Response ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13267A2342013-08-30030 August 2013 G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656) ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12137A0602012-05-29029 May 2012 Nuclear Regulatory Commission'S Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1, 2 & 3; and Pilgrim Nuclear Power Station ML12090A2122012-03-30030 March 2012 Referring Jones River Watershed Association Petition to Intervene and Request to File New Contentions, or in Alternative, Jones River Watershed Association and Pilgrim Water Motion to Reopen the Pilgrim Nuclear Power Station, Docket No. 50- ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11174A3252011-06-30030 June 2011 Memo Forwarding of Supplement 2 to NUREG-1891, SER Related to the Lr of Pilgrim Nuclear Power Station, Docket No. 50-293, to the Advisory Committee on Reactor Safeguards ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1109700342011-04-19019 April 2011 Summary of Tele Conf Call Held on 4/6/11, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108206892011-04-19019 April 2011 February 24, 2011, Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1100404192011-02-15015 February 2011 Summary of Telephone Conference Call Held on December 6, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operating, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application (Tac No. MC9669) ML1018900452010-07-0808 July 2010 Notification of Information in the Matter of Pilgrim Nuclear Power Station ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML1029505722009-01-23023 January 2009 Task Interface Agreement - Evaluation of Application of Technical Specification 4.0.3, Surveillance Requirement Applicability, at Pilgrim ML0836601742009-01-23023 January 2009 TIA - Task Interface Agreement - Evaluation at Pilgrim of Application of TS 4.0.3, 12/31/08 ML1029505762009-01-23023 January 2009 Task Interface Agreement Evaluation of Application of Technical Specification 4.0.3, Surveillance Requirement Applicability, at Pilgrim ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0718400342007-07-0606 July 2007 ACRS Review of the Pilgrim Nuclear Power Station License Renewal Application - Safety Evaluation Report ML0713100692007-06-0808 June 2007 Summary of Conference Call on May 10, 2007, with Entergy Nuclear Operations, Inc., Regarding the Pilgrim License Renewal Application ML0708104422007-03-15015 March 2007 Request for Additional Information on Time-Limited Aging Analyses for the Reactor Vessel and Internals, Pilgrim Nuclear Power Station, License Renewal Application ML0706402522007-03-0606 March 2007 ACRS Review of the Pilgrim Nuclear Plant Station Renewal Application - Safety Evaluation Report ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0700501532007-01-0808 January 2007 01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station ML0634800242006-12-13013 December 2006 Drop-In Visit from Entergy (Pilgrim) ML0633406952006-11-28028 November 2006 Memorandum to Levin from Albert, Access to Security, Radiological, Vital and Protected Areas of the Pilgrim Nuclear Station ML0629104322006-11-17017 November 2006 Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station ML0627605082006-11-0707 November 2006 Summary of Conference Call on September 25, 2006, with Entergy Nuclear Operations, Inc ML0628504072006-10-23023 October 2006 2006/10/23-Summary of Conference Call on October 10, 2006 with Entergy Nuclear Operations. Inc., to Clarify Information Sent to the NRC in Response to Requests for Additional Information Regarding the Pilgrim License Renewal Application ML0625801622006-09-15015 September 2006 Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, Dated January 25, 2006 ML0617000552006-07-13013 July 2006 2006/07/13-Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application ML0618104242006-06-30030 June 2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Powe 2022-12-01
[Table view] |
Text
August 20, 2014 MEMORANDUM TO: Sandra Wastler, Chief Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Stephen S. Koenick, Acting Chief /RA/
Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards
SUBJECT:
TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. L24940)
The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:
PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA 132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures.
DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Pilgrim Nuclear Power Station supporting NRCs safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIRs review.
Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
Name of NSIR/DSP assigned Reviewer: _________________________________
NSIR/DSP Project Completion Date: _________________________________
NSIR/DSP Branch Chief Signature: _________________________________
Contact:
Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
August 20, 2014 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Stephen S. Koenick, Acting Chief /RA/
Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards
SUBJECT:
TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. L24940)
The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:
PROJECT: Review Pilgrim Nuclear Power Station (Pilgrim) response to Order (EA-13-132) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures.
DOCKET NOS.: 50-293, 72-1044 TAC NO: L24940 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and the security Order response for the Beaver Valley Power Station supporting NRCs safety inspection prior to its initial loading campaign. Prepare a memorandum documenting the results of NSIRs review.
Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
Name of NSIR/DSP assigned Reviewer: _________________________________
NSIR/DSP Project Completion Date: _________________________________
NSIR/DSP Branch Chief Signature: _________________________________
Contact:
Raynard Wharton (301) 287-9196 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
Distribution: SFST r/f DMarcano ADAMS P8 No.: ML14232A301 OFC SFST SFST SFST NAME RWharton WWheatley via e-mail SKoenick DATE 08/12/14 08/13 /14 08/20/14 OFFICIAL RECORD COPY