| number = ML18149A288
| number = ML18149A288
| issue date = 05/24/2018
| issue date = 05/24/2018
| title = Request for Additional Information - Reactor Core Isolation Cooling Piping Modification (L-2018-LLA-0029)
| title = NRR E-mail Capture - River Bend Station Request for Additional Information - Reactor Core Isolation Cooling Piping Modification (L-2018-LLA-0029)
| author name = Regner L M
| author name = Regner L
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name = Schenk T A
| addressee name = Schenk T
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000458
| docket = 05000458
Line 13: Line 13:
| document type = E-Mail, Request for Additional Information (RAI)
| document type = E-Mail, Request for Additional Information (RAI)
| page count = 3
| page count = 3
| project =
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRR-DMPSPEm Resource From:                            Regner, Lisa Sent:                            Thursday, May 24, 2018 9:54 AM To:                              TIM SCHENK Cc:                              Bridget Johns; Regner, Lisa
 
==Subject:==
Re: DRAFT RAI RCIC Piping Modification (L-2018-LLA-0029)
Attachments:                      DRAFT-RBS-RCIC RAI - to licensee (Regner, Lisa).docx Final Request for Additional Information (L-2017-LLS-0002)
On May 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff sent Entergy (the licensee) a draft Request for Additional Information (RAI). These RAI questions relate to a license amendment request (LAR) dated January 29, 2018, for a license amendment to modify the Reactor Core Isolation Cooling (RCIC) piping.
Entergy informed the NRC staff that a clarification call was not needed. Mr. Tim Schenk agreed to provide a response to this final RAI on or before June 25, 2018. If Entergy does not respond by this date, the requested completion date for the LAR decision may not be met by the NRC.
The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System (ADAMS). While this RAI is considered
'final' based on the draft questions sent on May 22, the NRC staff may have more questions to complete it's review.
By letter dated January 29, 2018, (ADAMS package Accession No. ML18029A187), the licensee requested an amendment to the Operating License for River Bend Station. The proposed amendment requests to relocate the RCIC piping. The NRC staff requires additional information to complete its review of this request as detailed in the attached document.
From: Regner, Lisa Sent: Tuesday, May 22, 2018 10:21 AM To: TIM SCHENK Cc: Regner, Lisa
 
==Subject:==
DRAFT RAI RCIC Piping Modification (L-2018-LLA-0029)
Hi Tim, Attached are the draft questions associated with your RCIC piping relocation amendment request.
Please let me know if you need a clarification call.
Thank you, Lisa 1
 
Hearing Identifier:    NRR_DMPS Email Number:          390 Mail Envelope Properties    (CY1PR09MB11465097E8592AEE8E339FF9E56A0)
 
==Subject:==
Re: DRAFT RAI RCIC Piping Modification (L-2018-LLA-0029)
Sent Date:            5/24/2018 9:53:54 AM Received Date:        5/24/2018 9:53:57 AM From:                  Regner, Lisa Created By:            Lisa.Regner@nrc.gov Recipients:
"Bridget Johns" <bjohns@entergy.com>
Tracking Status: None "Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None "TIM SCHENK" <tschenk@entergy.com>
Tracking Status: None Post Office:          CY1PR09MB1146.namprd09.prod.outlook.com Files                        Size                  Date & Time MESSAGE                      1764                  5/24/2018 9:53:57 AM DRAFT-RBS-RCIC RAI - to licensee (Regner, Lisa).docx                      21873 Options Priority:                    Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:
 
REQUEST ADDITIONAL INFORMATION (RAI)
FOR RIVER BEND STATION RELOCATION OF THE REACTOR CORE ISOLATION COOLING (RCIC) INJECTION POINT By letter dated January 29, 2018, Entergy submitted a license amendment application. The licensee stated that the 6-inch Reactor Core Isolation Cooling (RCIC) system injection line is routed to the 20-inch Feedwater A Loop by tapping into the 10-inch Reactor Heat Removal system shutdown cooling mode return line to feedwater inside the main steam tunnel just south of the jet impingement wall. The staff noted that the piping system has to be qualified in accordance with ASME Code Section III requirements and meet 10 CFR 50.55(a) and relevant GDCs. The staff requests the licensee to address the following items related to the piping analysis:
: a. Piping analysis model: The staff noted that this change affects 3 different systems.
Figure 3A.24-1 of USAR provides RCIC piping system used in analysis of water hammer loads. The staff noted that the piping model does not appear to address the RHR piping.
Please explain. Also, describe the piping model used for other load cases.
: b. Please provide the piping stress summary for RCIC and RHR systems.
: c. Please discuss any thermal mode or transient changes and loading condition changes since the Cumulative Usage Factors (CUFs) and stresses are shown to lessen from previous values as specified below:
: 1. Table 3.6A-9a of the USAR lists the CUFs and the stresses for the feedwater system inside containment. The NRC staff noted that there is no routing change inside containment. Please explain what causes the reduction in stresses and CUFs.
: 2. Table 3.6A-10a of the USAR lists the stresses for the feedwater system outside of containment. The NRC staff noted that there is no routing change for the feedwater system outside of the containment. Please explain what causes the reduction in stresses.}}

Latest revision as of 06:13, 2 December 2019

NRR E-mail Capture - River Bend Station Request for Additional Information - Reactor Core Isolation Cooling Piping Modification (L-2018-LLA-0029)
ML18149A288
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/24/2018
From: Lisa Regner
Plant Licensing Branch IV
To: Schenk T
Entergy Nuclear Operations
References
L-2018-LLA-0029
Download: ML18149A288 (3)


Text

NRR-DMPSPEm Resource From: Regner, Lisa Sent: Thursday, May 24, 2018 9:54 AM To: TIM SCHENK Cc: Bridget Johns; Regner, Lisa

Subject:

Re: DRAFT RAI RCIC Piping Modification (L-2018-LLA-0029)

Attachments: DRAFT-RBS-RCIC RAI - to licensee (Regner, Lisa).docx Final Request for Additional Information (L-2017-LLS-0002)

On May 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff sent Entergy (the licensee) a draft Request for Additional Information (RAI). These RAI questions relate to a license amendment request (LAR) dated January 29, 2018, for a license amendment to modify the Reactor Core Isolation Cooling (RCIC) piping.

Entergy informed the NRC staff that a clarification call was not needed. Mr. Tim Schenk agreed to provide a response to this final RAI on or before June 25, 2018. If Entergy does not respond by this date, the requested completion date for the LAR decision may not be met by the NRC.

The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System (ADAMS). While this RAI is considered

'final' based on the draft questions sent on May 22, the NRC staff may have more questions to complete it's review.

By letter dated January 29, 2018, (ADAMS package Accession No. ML18029A187), the licensee requested an amendment to the Operating License for River Bend Station. The proposed amendment requests to relocate the RCIC piping. The NRC staff requires additional information to complete its review of this request as detailed in the attached document.

From: Regner, Lisa Sent: Tuesday, May 22, 2018 10:21 AM To: TIM SCHENK Cc: Regner, Lisa

Subject:

DRAFT RAI RCIC Piping Modification (L-2018-LLA-0029)

Hi Tim, Attached are the draft questions associated with your RCIC piping relocation amendment request.

Please let me know if you need a clarification call.

Thank you, Lisa 1

Hearing Identifier: NRR_DMPS Email Number: 390 Mail Envelope Properties (CY1PR09MB11465097E8592AEE8E339FF9E56A0)

Subject:

Re: DRAFT RAI RCIC Piping Modification (L-2018-LLA-0029)

Sent Date: 5/24/2018 9:53:54 AM Received Date: 5/24/2018 9:53:57 AM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:

"Bridget Johns" <bjohns@entergy.com>

Tracking Status: None "Regner, Lisa" <Lisa.Regner@nrc.gov>

Tracking Status: None "TIM SCHENK" <tschenk@entergy.com>

Tracking Status: None Post Office: CY1PR09MB1146.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1764 5/24/2018 9:53:57 AM DRAFT-RBS-RCIC RAI - to licensee (Regner, Lisa).docx 21873 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

REQUEST ADDITIONAL INFORMATION (RAI)

FOR RIVER BEND STATION RELOCATION OF THE REACTOR CORE ISOLATION COOLING (RCIC) INJECTION POINT By letter dated January 29, 2018, Entergy submitted a license amendment application. The licensee stated that the 6-inch Reactor Core Isolation Cooling (RCIC) system injection line is routed to the 20-inch Feedwater A Loop by tapping into the 10-inch Reactor Heat Removal system shutdown cooling mode return line to feedwater inside the main steam tunnel just south of the jet impingement wall. The staff noted that the piping system has to be qualified in accordance with ASME Code Section III requirements and meet 10 CFR 50.55(a) and relevant GDCs. The staff requests the licensee to address the following items related to the piping analysis:

a. Piping analysis model: The staff noted that this change affects 3 different systems.

Figure 3A.24-1 of USAR provides RCIC piping system used in analysis of water hammer loads. The staff noted that the piping model does not appear to address the RHR piping.

Please explain. Also, describe the piping model used for other load cases.

b. Please provide the piping stress summary for RCIC and RHR systems.
c. Please discuss any thermal mode or transient changes and loading condition changes since the Cumulative Usage Factors (CUFs) and stresses are shown to lessen from previous values as specified below:
1. Table 3.6A-9a of the USAR lists the CUFs and the stresses for the feedwater system inside containment. The NRC staff noted that there is no routing change inside containment. Please explain what causes the reduction in stresses and CUFs.
2. Table 3.6A-10a of the USAR lists the stresses for the feedwater system outside of containment. The NRC staff noted that there is no routing change for the feedwater system outside of the containment. Please explain what causes the reduction in stresses.