ML060320288: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
| author name = Kalyanam N
| author name = Kalyanam N
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Gresham J A
| addressee name = Gresham J
| addressee affiliation = Westinghouse Electric Co, LLC
| addressee affiliation = Westinghouse Electric Co, LLC
| docket = 05000361, 05000362
| docket = 05000361, 05000362
Line 14: Line 14:
| page count = 3
| page count = 3
| project = TAC:MC8850, TAC:MC8851
| project = TAC:MC8850, TAC:MC8851
| stage = Other
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:January 26, 2006Mr. J. A. Gresham, ManagerRegulatory Compliance and Plant Licensing Westinghouse Electric Company
{{#Wiki_filter:January 26, 2006 Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355
 
P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355  


==SUBJECT:==
==SUBJECT:==
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-05-2042) (TAC NOS. MC8850 AND MC8851)
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-05-2042) (TAC NOS. MC8850 AND MC8851)


==Dear Mr. Gresham:==
==Dear Mr. Gresham:==


By letter dated November 3, 2005, Southern California Edison (SCE, the licensee) submitted anaffidavit dated August 16, 2005, executed by you, requesting that information contained in thefollowing document be withheld from public disclosure pursuant to Title 10 of the Code ofFederal Regulations (10 CFR) Section 2.390:WCAP-16208-P, Revision 1, Supplement 1, "NDE [nondestructive examination]Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold LegExplosive Expansions," dated July 2005A nonproprietary copy of this document has been placed in the Nuclear RegulatoryCommission's (NRC's) Public Document Room and added to the Agencywide DocumentsAccess and Management System Public Electronic Reading Room.The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons: (i)The information sought to be withheld from public disclosure is owned and hasbeen held in confidence by Westinghouse. (ii)The information is of a type customarily held in confidence by Westinghouse andnot customarily disclosed to the public.(a) The information reveals the distinguishing aspects of a process (orcomponent, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.(b)It consists of supporting data, including test data, relative to a process (orcomponent, structure, tool, method, etc.), the application of which datasecures a competitive economic advantage, e.g., by optimization or improved marketability.
By letter dated November 3, 2005, Southern California Edison (SCE, the licensee) submitted an affidavit dated August 16, 2005, executed by you, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
J. Gresham- 2 -(c)Its use by a competitor would reduce his expenditure of resources orimprove his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.(e)It reveals aspects of past, present, or future Westinghouse or customerfunded development plans and programs of potential commercial value to Westinghouse. We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information in the document entitled, "NDE Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) andSection 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-1480.Sincerely,/RA/N. Kalyanam, Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-361 and 50-362 cc: See next page J. Gresham- 2 -(c)Its use by a competitor would reduce his expenditure of resources orimprove his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.(e)It reveals aspects of past, present, or future Westinghouse or customerfunded development plans and programs of potential commercial value to Westinghouse. We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information in the document entitled, "NDE Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) andSection 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-1480.Sincerely,/RA/
WCAP-16208-P, Revision 1, Supplement 1, NDE [nondestructive examination]
N. Kalyanam, Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-361 and 50-362 cc: See next pageDISTRIBUTION
Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions, dated July 2005 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
:PUBLIC RidsAcrsAcnwMailCenterRidsNrrLALFeizollahi LPLIV r/f RidsNrrDorlLpliv (DTerao)RidsOgcRp RidsRgn4MailCenter (TPruett)  COsterholtzRidsNrrPMNKalyanamACCESSION NO:  ML060320288OFFICENRR/LPLIV/PMNRR/LPLIV/LANRR/DCI/CSGBNRR/LPLIV/BCNAMENKalyanamLFeizollahiAHiserDTerao DATE11/15/0511/15/0501/26/0601/26/06OFFICIAL RECORD COPYDOCUMENT NAME:  E:\Filenet\ML060320288.wpd November 2005San Onofre Nuclear Generating Station Units 2 and 3 cc:Mr. Daniel P. Breig Southern California Edison Company San Onofre Nuclear Generating Station
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
 
(i)     The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
P. O. Box 128 San Clemente, CA  92674-0128Mr. Douglas K. Porter, EsquireSouthern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770Mr. David Spath, ChiefDivision of Drinking Water and Environmental Management P. O. Box 942732 Sacramento, CA  94234-7320Chairman, Board of SupervisorsCounty of San Diego 1600 Pacific Highway, Room 335 San Diego, CA  92101Eileen M. Teichert, Esq.Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522Mr. Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA  92504Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011-8064Mr. Michael OlsonSan Diego Gas & Electric Company P.O. Box 1831 San Diego, CA  92112-4150Mr. Ed Bailey, ChiefRadiologic Health Branch State Department of Health Services Post Office Box 997414 (MS7610)
(ii)   The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public.
Sacramento, CA  95899-7414Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission Post Office Box 4329 San Clemente, CA  92674Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA  92672Mr. James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station
(a)   The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
 
(b)   It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
P.O. Box 128 San Clemente, CA  92674-0128Mr. James D. Boyd, CommissionerCalifornia Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA  95814Mr. Ray Waldo, Vice PresidentSouthern California Edison Company San Onofre Nuclear Generating Station


P.O. Box 128 San Clemente, CA 92764-0128Mr. Brian KatzSouthern California Edison Company San Onofre Nuclear Generating Station
J. Gresham                                                        (c)    Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(e)    It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the information in the document entitled, NDE Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1480.
Sincerely,
                                              /RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: See next page


P.O. Box 128 San Clemente, CA 92764-0128 November 2005San Onofre Nuclear Generating Station            Units 2 and 3 cc:Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899Mr. A. Edward SchererSouthern California Edison Company San Onofre Nuclear Generating Station
J. Gresham                                                        (c)    Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(e)    It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the information in the document entitled, NDE Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1480.
Sincerely,
                                              /RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: See next page DISTRIBUTION:
PUBLIC                                  RidsAcrsAcnwMailCenter                RidsNrrLALFeizollahi LPLIV r/f                              RidsNrrDorlLpliv (DTerao)              RidsOgcRp RidsRgn4MailCenter (TPruett)            COsterholtz                            RidsNrrPMNKalyanam ACCESSION NO: ML060320288 OFFICE      NRR/LPLIV/PM        NRR/LPLIV/LA    NRR/DCI/CSGB          NRR/LPLIV/BC NAME        NKalyanam          LFeizollahi      AHiser                DTerao DATE        11/15/05            11/15/05        01/26/06              01/26/06 OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML060320288.wpd


P.O. Box 128 San Clemente, CA 92674-0128Mr. Richard M. RosenblumChief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station
San Onofre Nuclear Generating Station Units 2 and 3 cc:
Mr. Daniel P. Breig                  Mr. Ed Bailey, Chief Southern California Edison Company    Radiologic Health Branch San Onofre Nuclear Generating Station State Department of Health Services P. O. Box 128                         Post Office Box 997414 (MS7610)
San Clemente, CA 92674-0128          Sacramento, CA 95899-7414 Mr. Douglas K. Porter, Esquire        Resident Inspector/San Onofre NPS Southern California Edison Company    c/o U.S. Nuclear Regulatory Commission 2244 Walnut Grove Avenue              Post Office Box 4329 Rosemead, CA 91770                    San Clemente, CA 92674 Mr. David Spath, Chief                Mayor Division of Drinking Water and        City of San Clemente Environmental Management            100 Avenida Presidio P. O. Box 942732                      San Clemente, CA 92672 Sacramento, CA 94234-7320 Mr. James T. Reilly Chairman, Board of Supervisors        Southern California Edison Company County of San Diego                  San Onofre Nuclear Generating Station 1600 Pacific Highway, Room 335        P.O. Box 128 San Diego, CA 92101                  San Clemente, CA 92674-0128 Eileen M. Teichert, Esq.              Mr. James D. Boyd, Commissioner Supervising Deputy City Attorney      California Energy Commission City of Riverside                    1516 Ninth Street (MS 31) 3900 Main Street                      Sacramento, CA 95814 Riverside, CA 92522 Mr. Ray Waldo, Vice President Mr. Gary L. Nolff                    Southern California Edison Company Power Projects/Contracts Manager      San Onofre Nuclear Generating Station Riverside Public Utilities            P.O. Box 128 2911 Adams Street                    San Clemente, CA 92764-0128 Riverside, CA 92504 Mr. Brian Katz Regional Administrator, Region IV    Southern California Edison Company U.S. Nuclear Regulatory Commission    San Onofre Nuclear Generating Station 611 Ryan Plaza Drive, Suite 400      P.O. Box 128 Arlington, TX 76011-8064              San Clemente, CA 92764-0128 Mr. Michael Olson San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 November 2005


P.O. Box 128 San Clemente, CA 92674-0128}}
San Onofre Nuclear Generating Station Units 2 and 3 cc:
Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899 Mr. A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Mr. Richard M. Rosenblum Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 November 2005}}

Latest revision as of 23:45, 23 November 2019

Westinghouse Electric Company Request for Withholding Information (WCAP-16208-P, Rev. 1, Suppl. 1) from Public Disclosure
ML060320288
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/26/2006
From: Kalyanam N
Plant Licensing Branch III-2
To: Gresham J
Westinghouse
Kalyanam N, NRR/DLPM, 415-1480
References
CAW-05-2042, TAC MC8850, TAC MC8851
Download: ML060320288 (3)


Text

January 26, 2006 Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-05-2042) (TAC NOS. MC8850 AND MC8851)

Dear Mr. Gresham:

By letter dated November 3, 2005, Southern California Edison (SCE, the licensee) submitted an affidavit dated August 16, 2005, executed by you, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:

WCAP-16208-P, Revision 1, Supplement 1, NDE [nondestructive examination]

Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions, dated July 2005 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.

(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public.

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

J. Gresham (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the information in the document entitled, NDE Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1480.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: See next page

J. Gresham (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the information in the document entitled, NDE Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1480.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: See next page DISTRIBUTION:

PUBLIC RidsAcrsAcnwMailCenter RidsNrrLALFeizollahi LPLIV r/f RidsNrrDorlLpliv (DTerao) RidsOgcRp RidsRgn4MailCenter (TPruett) COsterholtz RidsNrrPMNKalyanam ACCESSION NO: ML060320288 OFFICE NRR/LPLIV/PM NRR/LPLIV/LA NRR/DCI/CSGB NRR/LPLIV/BC NAME NKalyanam LFeizollahi AHiser DTerao DATE 11/15/05 11/15/05 01/26/06 01/26/06 OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML060320288.wpd

San Onofre Nuclear Generating Station Units 2 and 3 cc:

Mr. Daniel P. Breig Mr. Ed Bailey, Chief Southern California Edison Company Radiologic Health Branch San Onofre Nuclear Generating Station State Department of Health Services P. O. Box 128 Post Office Box 997414 (MS7610)

San Clemente, CA 92674-0128 Sacramento, CA 95899-7414 Mr. Douglas K. Porter, Esquire Resident Inspector/San Onofre NPS Southern California Edison Company c/o U.S. Nuclear Regulatory Commission 2244 Walnut Grove Avenue Post Office Box 4329 Rosemead, CA 91770 San Clemente, CA 92674 Mr. David Spath, Chief Mayor Division of Drinking Water and City of San Clemente Environmental Management 100 Avenida Presidio P. O. Box 942732 San Clemente, CA 92672 Sacramento, CA 94234-7320 Mr. James T. Reilly Chairman, Board of Supervisors Southern California Edison Company County of San Diego San Onofre Nuclear Generating Station 1600 Pacific Highway, Room 335 P.O. Box 128 San Diego, CA 92101 San Clemente, CA 92674-0128 Eileen M. Teichert, Esq. Mr. James D. Boyd, Commissioner Supervising Deputy City Attorney California Energy Commission City of Riverside 1516 Ninth Street (MS 31) 3900 Main Street Sacramento, CA 95814 Riverside, CA 92522 Mr. Ray Waldo, Vice President Mr. Gary L. Nolff Southern California Edison Company Power Projects/Contracts Manager San Onofre Nuclear Generating Station Riverside Public Utilities P.O. Box 128 2911 Adams Street San Clemente, CA 92764-0128 Riverside, CA 92504 Mr. Brian Katz Regional Administrator, Region IV Southern California Edison Company U.S. Nuclear Regulatory Commission San Onofre Nuclear Generating Station 611 Ryan Plaza Drive, Suite 400 P.O. Box 128 Arlington, TX 76011-8064 San Clemente, CA 92764-0128 Mr. Michael Olson San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 November 2005

San Onofre Nuclear Generating Station Units 2 and 3 cc:

Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899 Mr. A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Mr. Richard M. Rosenblum Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 November 2005