November 9, 2006 Mr. Richard M. Rosenblum Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
ISSUANCE OF AMENDMENTS RE: CHANGE, DEFINE THE EXTENT OF THE REQUIRED TUBE INSPECTIONS, AND REPAIR CRITERIA WITHIN THE TUBESHEET REGION OF THE STEAM GENERATORS (TAC NOS. MC8850 AND MC8851)
Dear Mr. Rosenblum:
The Commission has issued the enclosed Amendment No. 206 to Facility Operating License No. NPF-10 and Amendment No. 198 to Facility Operating License No. NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated November 3, 2005, as supplemented by letters dated May 1, August 15, and October 5, 2006.
The amendments revise TSs Section 5.5.2.11 to modify the definitions of the steam generator tube Repair Limit and Tube Inspection. The purpose of these changes is to define the extent of the required tube inspections and repair criteria within the tubesheet regions.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA by D. Terao for/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362
Enclosures:
- 1. Amendment No. 206 to NPF-10
- 2. Amendment No. 198 to NPF-15
- 3. Safety Evaluation cc w/encls:
See next page
Pkg ML062970441 (ML062970444, TS Pages ML063130496)
OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DCI/CSGB NRR/DIRS/ITSB OGC-NLO NRR/LPL4/BC NAME NKalyanam:DT for LFeizollahi AHiser*
TKobetz BPoole DTerao DATE 11/9/06 10/23/06 10/17/06 10/26/06 11/7/06 11/8/06
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE, CALIFORNIA THE CITY OF ANAHEIM, CALIFORNIA DOCKET NO. 50-361 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 206 License No. NPF-10 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al.
(SCE or the licensee), dated November 3, 2005, as supplemented by letters dated May 1, August 15, and October 5, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: November 9, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 206 FACILITY OPERATING LICENSE NO. NPF-10 DOCKET NO. 50-361 Replace the following page of the Facility Operating License with the attached revised page.
The revised page is identified by an amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 5.0-15 5.0-15 5.0-15a
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE, CALIFORNIA THE CITY OF ANAHEIM, CALIFORNIA DOCKET NO. 50-362 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 198 License No. NPF-15 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al.
(SCE or the licensee), dated November 3, 2005, as supplemented by letters dated May 1, August 15, and October 5, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: November 9, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 198 FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362 Replace the following page of the Facility Operating License with the attached revised page.
The revised page is identified by an amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 5.0-15 5.0-15 5.0-15a
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 206 TO FACILITY OPERATING LICENSE NO. NPF-10 AND AMENDMENT NO. 198 TO FACILITY OPERATING LICENSE NO. NPF-15 STEAM GENERATOR TUBE INSPECTIONS WITHIN THE TUBESHEET REGION SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE, CALIFORNIA THE CITY OF ANAHEIM, CALIFORNIA SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 DOCKET NOS. 50-361 AND 50-362
1.0 INTRODUCTION
By letter dated November 3, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML053110282), and supplemented by letters dated May 1 (ADAMS Accession No. ML061240311), August 15 (ADAMS Accession No. ML062340146), and October 5, 2006 (ADAMS Accession No. ML062830030), Southern California Edison, the licensee for San Onofre Nuclear Generating Station, Units 2 and 3 (SONGS 2 and 3),
requested changes to the Technical Specifications (TSs). The proposal would revise the requirements for steam generator (SG) tube repair in the hot-leg and cold-leg tubesheet regions by applying a methodology called C* (C-star). The supplements dated May 1, August 15, and October 5, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published in the Federal Register on December 6, 2005 (70 FR 72676).
The C* methodology was developed for Combustion Engineering (CE) plants with tubes that were expanded into the tubesheet with an explosive process called explansion. The existing SONGS 2 and 3 TS 5.5.2.11.c specifies that tubes containing flaws equal to or greater than 44 percent in depth must be plugged or repaired by sleeving unless an exception applies. The proposed amendment adds TS 5.5.2.11.c.4, which specifies that the 44 percent depth criteria for tube repair does not need to be applied in the hot-leg and cold-leg tubesheet regions below a certain elevation, generally referred to as the C* distance. According to the C* methodology in TS 5.5.2.11.c.4, flaws below these elevations may remain in service regardless of size.
Implementing the C* methodology also eliminates the need to inspect the portion of the tube within the hot-leg and cold-leg tubesheet regions below the C* distance, since the inspection provision in TS 5.5.2.11.d requires that tubes be inspected with the objective of detecting flaws that may satisfy the applicable tube repair criteria. With no repair criteria to satisfy, the portions of the tube below the C* distance are not subject to the inspection provision. Separate C*
distances are calculated for the hot leg and cold leg.
Flaws located below the top of the tubesheet or bottom of the expansion transition, whichever is higher, but above the C* elevations proposed in TS 5.5.2.11.c.4, in both the hot-leg and cold-leg regions, would have to be plugged or repaired by sleeving according to proposed TS 5.5.2.11.c.2. For tubes that have been repaired by sleeving, flaws would be acceptable within the tubesheet region if they are located below the lower sleeve joint or below the C*
distance, whichever is lower.
2.0 REGULATORY EVALUATION
SG tubes function as an integral part of the reactor coolant pressure boundary (RCPB) and, in addition, serve to isolate radiological fission products in the primary coolant from the secondary coolant and the environment. Because of the importance of SG tube integrity, the Nuclear Regulatory Commission (NRC) requires licensees to perform periodic inservice inspections of SG tubes. These inspections detect, in part, flaws in the tubes resulting from interaction with the SG operating environment, including both primary and secondary coolant. Inservice inspections may also provide a means of characterizing the nature and cause of any tube flaws so that corrective measures can be taken. Tubes with flaws that exceed the tube repair limits specified in a plants TS are removed from service by plugging or are repaired by sleeving (if approved by the NRC for use at the plant). The plant TSs provide the acceptance criteria related to the results of SG tube inspections.
The requirements for the inspection of SG tubes are intended to ensure that this portion of the reactor coolant system maintains its integrity. Tube integrity means that the tubes are capable of performing these functions in accordance with the plant design and licensing basis, including the technical specifications. Tube integrity includes both structural and leakage integrity.
Structural integrity refers to maintaining adequate margins against gross failure, rupture, and collapse of the SG tubes. Leakage integrity refers to limiting primary-to-secondary leakage during normal operation, plant transients, and postulated accidents. These limits ensure the radiological dose consequences associated with any leakage are within acceptable limits and they limit the frequency of SG tube ruptures.
In reviewing requests of this nature, the NRC staff verifies that a methodology exists that maintains the structural and leakage integrity of the tubes consistent with the plant design and licensing basis. This includes verifying that the applicable General Design Criteria (GDC) in Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix A (e.g., GDC 14, 32) are satisfied. The staffs evaluation is based, in part, on ensuring that the structural margins set forth in Regulatory Guide (RG) 1.121, "Bases for Plugging Degraded PWR
[Pressurized-Water Reactor] Steam Generator Tubes," are maintained. The staffs evaluation also includes verifying that a conservative methodology exists for determining the amount of primary-to-secondary leakage that may occur during design-basis accidents. The amount of leakage is limited to ensure that offsite and control room dose criteria are met. The radiological dose criteria are specified, in part, in 10 CFR Part 100 and GDC 19.
In 2006, the NRC approved a similar redefinition of the tube repair criteria for St. Lucie, Unit 2, (ADAMS Accession No. ML060790352) and Waterford, Unit 3 (ADAMS Accession No. ML062420419). In each case, plant-specific repair criteria were established.
3.0 TECHNICAL EVALUATION
3.1 Background
SONGS 2 and 3 are 2-loop, CE-design plants with Model 3410 SGs. Each SG contains approximately 9,350 mill-annealed Alloy 600 tubes with an outside diameter of 0.75 inch and a wall thickness of 0.048 inch. The tubes were explosively expanded (explansion process) at both ends for the full length of the tubesheet. The tubesheets were gun drilled and the resulting surface finish is termed rough bore. A weld joins each tube end to the cladding on the primary face of the tubesheet, providing a leak-tight boundary and resistance to tube pullout. The explansion process produces an interference fit between the tube and tubesheet, which can also provide resistance to tube pullout. The transition from the expanded portion of the tube to the unexpanded portion of the tube is referred to as the expansion transition.
Each SG contains horizontal supports (eggcrates), diagonal supports (batwings), and vertical supports. All tube support material is carbon steel. The shorter tubes, located in the first 18 rows at the center of the tube bundle, have 180-degree bends (i.e., are bent in the shape of a U). Higher row number tubes (Rows19-147) have double 90-degree bends with a horizontal run between the bends.
The tube-to-tubesheet joint consists of the tube, which is explosively expanded against the bore of the tubesheet, the tube-to-tubesheet weld located at the tube end, and the tubesheet.
Typically, plants designed the tube-to-tubesheet joint as a welded joint rather than a friction or expansion joint. That is, the weld itself was designed as a pressure boundary element, and it was designed to transmit the entire end cap pressure load during normal and design-basis accident conditions from the tube to the tubesheet with no credit taken for the friction developed between the explosively expanded tube and the tubesheet. In addition, the weld serves to make the joint leak tight.
The existing inspection requirements in the plant TSs do not take into account the reinforcing effect of the tubesheet on the external surface of the expanded tube. Nonetheless, the presence of the tubesheet constrains the tube and complements tube integrity in that region by essentially precluding tube deformation beyond the expanded outside diameter of the tube.
The resistance to both tube rupture and tube collapse is significantly enhanced by the tubesheet reinforcement. In addition, the proximity of the tubesheet to the expanded tube significantly reduces the leakage from any through-wall defect.
Based on these considerations, power reactor licensees have proposed, and the NRC has approved, alternate repair criteria for defects located in the SG tube contained in the lower portion of the tubesheet, when these defects are a specific distance below the expansion transition or the top of the tubesheet, whichever is lower.
The C* methodology defines a distance, referred to as the C* distance, such that any type or combination of flaws below this distance (including flaws in the tube-to-tubesheet weld) are considered acceptable. That is, even if inspections below the C* distance identify flaws, the regulatory requirements pertaining to tube structural and leakage integrity would be met provided there were no significant flaws within the C* distance. The C* distance is determined by calculating the amount of undegraded tubing needed to ensure the tube will not pull out of the tubesheet and that the amount of leakage from flaws below the C* distance is limited (i.e., within acceptance limits). The C* distance is measured from the top of the tubesheet or the bottom of the expansion transition, whichever is lower. Because temperature affects the tightness of the tube-to-tubesheet joint, the difference in temperature between the hot-leg and cold-leg portions of the tubesheet makes it necessary to calculate the C* distance separately for these two regions.
Nondestructive examination (NDE) uncertainties are accounted for in determining the C*
distance. These uncertainties include, but are not limited to, the uncertainties in determining the location of the bottom of the expansion transition and the total inspection distance. These uncertainties are based on previous data for a tubesheet inspection methodology for Westinghouse-designed plants (W*) and were reviewed and approved as part of the staffs safety evaluation approving the W* repair criteria for Diablo Canyon, Units 1 and 2 (ADAMS Accession No. ML052970178).
The C* analysis presented in Westinghouse Commercial Atomic Power Report, WCAP-16208, Revision 1, uses non-plant-specific values for primary system pressure, secondary pressure, and primary temperature to determine the C* distance for tubing within the tubesheet. The hot-leg C* distance was adjusted for the hot-leg temperature at SONGS 2 and 3, since the hot-leg temperature at the plant is lower (less conservative) than that assumed in the generic C* analysis. The cold-leg C* distance was determined from the plant-specific analysis in WCAP-16208, Revision 1, Supplement 1, which used a cold-leg temperature that bounds the operating conditions at SONGS.
The C* analysis considered the forces acting to pull the tube out of the tubesheet (i.e., from the internal pressure in the tube) and the forces acting to keep the tube in place. These latter forces are a result of friction and the forces arising from (1) the residual preload from the explansion process, (2) the differential thermal expansion between the tube and the tubesheet, and (3) internal pressure in the tube within the tubesheet. In addition, the effects of tubesheet bow, due to pressure and thermal differentials across the tubesheet, were considered since this bow causes dilation of the tubesheet holes from the secondary face to approximately the midpoint of the tubesheet and reduces the ability of the tube to resist pullout. The amount of tubesheet bow varies as a function of radial position with locations near the periphery and near the stay cylinder experiencing less bow. The effects of tubesheet hole dilation were analyzed using the worst case hole (location) in the tubesheet.
3.2 SONGS 2 and 3 Proposal The licensees basis for revising the criteria for tube repair within the tubesheet regions is documented in its license amendment request, in WCAP-16208, Revision 1, Supplement 1, NDE Inspection Length for San Onofre 2 & 3 Steam Generator Tubesheet Region Cold Leg Explosive Expansions, and in its supplemental letters listed above. These documents also referred to WCAP-16208, Revision 1, NDE Inspection Length for CE Steam Generator Tubesheet Region Explosive Expansions, which describes the analysis and testing performed to justify a similar modification in the tube repair criteria for St. Lucie, Unit 2.
Proposed TS 5.5.2.11.c.2.a and 5.5.2.11.c.2.b specify that a tube must be repaired or plugged if any flaw is detected in the non-sleeved region of a tube below the bottom of the expansion transition or top of the tubesheet (TTS), whichever is higher, in both the hot-leg and cold-leg regions. For tubes with sleeves installed, proposed TS 5.5.2.11.c.3.a and 5.5.2.11.c.3.b specify that a tube must be plugged if a flaw is detected in the sleeve or in the sleeve or original tube wall at a sleeve-to-tube joint.
Alternatives to the repair criteria in TS 5.5.2.11.c.2 are proposed in TS 5.5.2.11.c.4. In the case of tubes that have not been repaired (sleeved) in the tubesheet region, the C* criteria proposed in TS 5.5.2.11.c.4.a and 5.5.2.11.c.4.b allow tubes with flaws to remain in service if the flaws are located greater than 10.6 inches below the hot-leg TTS or bottom of the expansion transition (BET), whichever elevation is lower, or greater than 11.0 inches below the cold-leg TTS or BET, whichever elevation is lower.
For tubes that have been sleeved in the hot-leg tubesheet region, proposed TS 5.5.2.11.c.4.c specifies that tubes with flaws may remain in service if the flaw is below the bottom of the lower sleeve joint, more than 10.6 inches below the BET, or more than 10.6 inches below the TTS, whichever of these three is lowest. Similarly, for tubes that have been sleeved in the cold-leg tubesheet region, proposed TS 5.5.2.11.c.4.d specifies that tubes with flaws may remain in service if the flaw is below the bottom of the lower sleeve joint, more than 11.0 inches below the BET, or more than 11.0 inches below the top of the TTS, whichever of these three is lowest. In addition, the proposed modification to TS 5.5.2.11.d would indicate that for tubes repaired by sleeving, reinspection of the original tube wall between the sleeve joints is not required.
The following sections summarize the staffs evaluation of the SONGS 2 and 3 C* proposal in terms of maintaining SG structural and leakage integrity.
3.3 Tube Structural Integrity The proposed amendment will permit tubes with flaws to remain in service; therefore, the licensee must demonstrate that the tubes returned to service using the C* methodology will maintain adequate structural integrity for the period of time between inspections. Tube rupture and the pullout of a tube from the tubesheet are two potential modes of structural failure considered for tubes returned to service under the C* methodology.
In order for a tube to rupture as a result of implementing the C* criteria, a flaw would need to grow above the tubesheets secondary face. If the entire flaw remains within the tubesheet, the reinforcement provided by the tubesheet will prevent tube rupture. The C* methodology proposed by SONGS requires an inspection of the C* distance and the repair of any flaws in the C* distance. Therefore, any known flaws remaining in service following the examinations will be located a minimum of 10.6 inches below the top of the hot-leg side of the tubesheet and 11.0 inches below the cold-leg side of the tubesheet. Industry operating experience shows flaw growth rates within the tubesheet are well below that necessary to propagate a flaw from 10 inches below the TTS to outside the tubesheet. Therefore, it is unlikely that any of these flaws will grow in an axial direction and extend outside the tubesheet during one operating cycle. Thus, tube burst is precluded for these flaws due to the reinforcement provided by the surrounding tubesheet.
The other postulated structural failure mode for tubes remaining in service using the C*
methodology is pullout of the tube from the tubesheet due to axial loading on the tube.
Differential pressures from the primary side to the secondary side of the SG impart axial loads into each tube that are reacted at the tube-to-tubesheet interface. Axial tube loading during normal operating conditions can be significant. The peak postulated loading, however, occurs during events involving a depressurization of the secondary side of the SG (e.g., main steam line break (MSLB)). The presence of flaws within an SG tube decreases the load bearing capability of the affected tube. If a tube becomes sufficiently degraded, these loads could lead to an axial separation of the tube.
Resistance to tube pullout is provided by the interference fit created during the tube explosive expansion (i.e., explansion) process. In addition, the differential thermal expansion between the tube and the tubesheet and the internal pressure of the tube tightens the interference fit between the tube and the tubesheet to further resist tube pullout. Conversely, resistance to tube pullout is reduced by tubesheet bow, which causes the tubesheet holes to dilate near the top of the tubesheet.
The analysis supporting the licensees proposed modifications to the tube inspection requirements addressed the limiting conditions necessary to maintain adequate structural integrity of the tube-to-tubesheet joint. Specifically, the tube must not experience excessive displacement relative to the tubesheet under bounding loading conditions with appropriate factors of safety considered. For C*, the most limiting condition for structural integrity is maintaining a margin of three against the axial loads experienced during normal operation.
To justify the acceptability of any type or combination of tube flaws below the C* distance from a structural integrity standpoint, the licensee completed an assessment using analytical calculations and laboratory experiments. The laboratory experiments included tests of prototypical SG tube-to-tubesheet joints to evaluate the length of sound tubing necessary to maintain structural integrity (i.e., to ensure the tube would not pull out of the tubesheet under axial loading conditions). Laboratory data from two sources were used in performing this assessment. These data include data obtained under Combustion Engineering Owners Group (CEOG) Task 1154 and data obtained during the development of WCAP-16208. These later data are referred to as pullout screening tests since they were performed simply to confirm that the joint length would satisfy the limiting load condition (i.e., three times the normal operating load) rather than determining the axial load resistance provided by the joint. On the other hand, the Task 1154 samples were tested to determine the axial load resistance of various joint lengths. The Task 1154 data are from the following sources:
C An 8-inch thick, seven tube-to-tubesheet joint mockup built for Ringhals.
C A portion of the as-built SG tubesheet from a cancelled Boston Edison contract.
C Tube-to-tubesheet mockups fabricated for CEOG Task 1154 tube pullout and leakage tests.
Results from pullout testing of the Task 1154 prototypical SG tube-to-tubesheet joints provided the basis for determining the length of sound tubing necessary to maintain the appropriate structural margins for tubes that may be severed from flaws within the tubesheet. The test specimens were subjected to axial loadings in order to demonstrate acceptable structural capabilities. The axial resistance provided by these specimens was evaluated using the load required to move the tube within the tubesheet (maximum load). To determine the axial load resistance provided by just the explansion process, only the tests performed under ambient pressure and room temperature conditions were evaluated. Adjustments were made to the data to account for differences in testing and in the tube wall thickness. A 95-percent lower bound fit to the adjusted data was used in evaluating the axial load resistance provided by the explansion process. The pullout screening tests discussed above confirmed the adequacy of the pullout forces measured under the Task 1154 program.
In addition to the resistance from pullout provided by the explansion process, the following were also considered in determining the appropriate inspection distance from a structural integrity (tube pullout) standpoint: (1) resistance to tube pullout from the differential thermal expansion between the tube and the tubesheet, (2) resistance to tube pullout from the internal pressure in the tube within the tubesheet, (3) uncertainty in determining the amount of tube inspected, and (4) reduction in the resistance to tube pullout from the bowing of the tubesheet.
Consideration of the effects of pressure and temperature were based on analytical calculations (rather than test results). Although the increase in joint tightness (i.e., increase in the axial load resistance of the tube-to-tubesheet joint) as a result of internal pressure and differential thermal expansion between the tube and tubesheet was addressed analytically, the pullout tests performed at operating pressure and/or temperature were reviewed to verify that the results from these tests supported the analytical adjustments made to account for these effects.
Consideration of the uncertainty in determining the amount of tube inspected (i.e., the NDE axial position uncertainty) was based on testing as discussed in WCAP-16208. The uncertainties used in determining the appropriate C* inspection distance were based on data obtained during the development of the W* inspection distance since both involve inspection of tubes explosively expanded into the tubesheet.
Consideration of the effects of tubesheet bow were based on analytical (finite element) calculations as discussed in WCAP-16208. Since the analytical model considered the point of maximum tubesheet deflection, it will result in the most dilation and the greatest reduction in the axial load carrying capability of the tube-to-tubesheet joint.
The above factors were combined and it was determined that an inspection distance of approximately 3 inches was required to prevent tube pullout, which is significantly less than the C* inspection distances of 10.6 and 11.0 inches proposed by the licensee. This is because the C* inspection distance is governed by leakage integrity considerations rather than structural integrity considerations.
With respect to the licensees assessment of tube pullout, the staff notes that instead of considering a lower 95-percent bound of the tube pullout data, it considered the most limiting pullout data since all tubes should resist pullout from the tubesheet. In addition, the staff considered the load associated with the first movement of the joint since movement of this joint was not considered (to the staffs knowledge) in the original design of the tube-to-tubesheet joint. This consideration would only increase the inspection distance for ensuring structural integrity by a minor amount. As a result, the structural integrity inspection distance is still significantly less than the proposed inspection distances of 10.6 and 11.0 inches and is considered acceptable. In addition, the staff notes that it did not review the scaling procedures that the licensee applied to the tube pullout data in detail; however, the adjustments made appeared reasonable and even if no adjustments were made to the data it would not have significantly affected the inspection distance.
With respect to the finite element model, the staff reviewed the input assumptions and the results of the model. As a result of the staffs review, the staff concludes that the input assumptions were conservatively chosen and that the results of the analysis are comparable to other analyses reviewed and approved by the staff given the design configuration of the CE SGs (e.g., stay cylinder, explosive expansions).
In summary, the NRC staff concludes that the proposed tube-to-tubesheet joint length (or inspection distance) is acceptable to ensure structural integrity of the tubesheet joint. This conclusion is based on numerous factors including the presence of the tubesheet which precludes tube burst, past inspection results which indicate that flaws are detected early enough to prevent structurally significant flaws from developing within the C* inspection distance, the conservative assumptions in the tube pullout analysis (e.g., worst case tube dilation, use of limiting pullout data, use of a 95-percent NDE uncertainty adjustment), the confirmation through testing that the analytical adjustments for pressure and temperature are supported, and the restriction to tube pullout provided by the tube bundle upper support structure. The upper support structure design is such that vertical movement of tubes is limited by supports or neighboring tubes for all tubes except those on the periphery of the tube bundle.
The proposed inspection distance takes no credit for restriction to tube movement inherent to the SG design.
In addition to the above, in its letter dated October 5, 2006, the licensee also clarified that in tubes repaired by sleeving, inspection of the original tube wall between the sleeve joints is not required. The staff finds this acceptable because the sleeve was intended to remove the flaw from service and, therefore, reinspection of this region is no longer needed.
3.4 Tube Leakage Integrity In assessing leakage integrity of an SG under postulated accident conditions, the leakage from all sources (i.e., all types of flaws at all locations and all non-leak tight repairs) must be assessed. The combined leakage from all sources is limited to below a plant-specific limit based on radiological dose consequences. The licensee reported this plant-specific limit for both SONGS 2 and SONGS 3 is 0.5 gallons per minute (gpm) per SG and 1 gpm through both SGs. This limit is referred to as the accident-induced leakage limit.
As part of the C* methodology, the licensee restricts the amount of primary-to-secondary leakage from the tube-to-tubesheet joints to 0.2 gpm per SG under the most limiting design-basis accident conditions, namely, MSLB. That is, the inspection distances required by this proposal (10.6 inches in the hot leg and 11.0 inches in the cold leg) were determined based on ensuring the leakage from flaws within the tubesheet region would contribute no more than 0.2 gpm to the total leakage under MSLB conditions. The 0.2 gpm contribution to the accident-induced leakage from tubes remaining in service according to the C* methodology is below the overall plant-specific leakage limit of 0.5 gpm per SG.
The licensees method for determining the amount of leakage from flaws within the tubesheet region depends on whether the flaws are located within the C* distance or below the C*
distance. For flaws located within the C* distance, no leakage is anticipated since the proposed TSs state that all degradation in this region will be plugged on detection. As a result, the only flaws expected within the C* distance would either be newly initiated or undetected (e.g., below the threshold of detection). These flaws typically do not grow, in one operating cycle, to the extent that they would leak during post-accident conditions. Although no leakage is expected from flaws within the C* distance, the licensee, in letter dated August 15, 2006, committed to assess potential leakage from such flaws as part of their assessments.
Since the C* methodology does not require inspections below the C* distance, there is a potential that flaws which could leak will exist below this elevation in each tubesheet region. As a result, the licensee developed a methodology for determining the amount of accident-induced primary-to-secondary leakage from flaws in this region of the tubesheet. This methodology and the NRC staffs review of this methodology are discussed below.
The amount of leakage from flaws below the inspection distance depends on the number of flaws, the locations of the flaws, and the severity of the flaws. The methodology developed by the licensee assumes that every tube has a 360-degree circumferential, 100-percent through-wall flaw (i.e., a tube sever) at the bottom of the C* inspection distance in both the hot-leg and cold-leg tubesheet regions. The assumed number of 9,300 tubes per SG is greater than the number of inservice tubes, and therefore conservative with respect to leakage. Given past plant-specific and industry operating experience, the staff considers the assumption that all tubes contain circumferential, through-wall flaws at the C* distance to be conservative.
The staff also considers the assumption of only one flaw per tube acceptable. Leakage from flaws in the lower half of the tubesheet would not be expected to contribute significantly to leakage given (1) the length of the tube-to-tubesheet crevice, (2) tubesheet bow in the lower region of the tubesheet tends to increase the resistance to leakage (since tubesheet bow in the lower region of the tubesheet tends to make most holes contract rather than dilate), and (3) the amount of leakage from the portion of the tube within the tubesheet region will predominantly be a function of the flaw nearest the top of the tubesheet (i.e., at 10.6 or 11.0 inches) below the top of the tubesheet as assumed by the licensee).
Assuming flaws are present below the C* distance, the licensees methodology determined the amount of leakage from the flaws left in service with the C* criteria using a combination of laboratory leak test data and analysis. Leak tests were performed on 0.75-inch outside diameter Alloy 600 mill annealed tube samples expanded into an 8-inch thick carbon steel collar to represent SG tubes explosively expanded into tubesheet holes. Two different carbon steel collar hole finishes were tested to simulate two different CE tubesheet manufacturing techniques. The drilled collar hole specimens were used to represent CE gun-drilled (rough bore) tubesheets, such as those at SONGS 2 and 3, and the drilled and reamed collar hole specimens were used to represent CE tubesheets fabricated with a bore trepanning association process (smooth bore). The tubes were expanded into the full length of the simulated tubesheets (collars) using the standard CE explosive fabrication method. Portions of the tubes were then removed using electronic discharge machining (EDM) to produce tube-to-simulated tubesheet engagement lengths ranging from 1 inch to 5.5 inches. Leak rates through a 360-degree EDM generated tube flaw is expected to be greater than leakage from a service-induced, through-wall, stress-corrosion crack. Multiple leak tests were performed on each sample to provide data at various tube-to-tubesheet joint lengths and at different test temperatures.
Given the laboratory leak rate data obtained at elevated temperatures (i.e., 600 degrees Fahrenheit), the licensees leakage methodology calculates the necessary C* inspection length using several relationships developed in WCAP-16208. The inspection length (uncorrected joint length) required to not exceed 0.2 gpm SG leakage was determined using the relationship between tube-to-tubesheet joint length and leak rate developed from the leak rate tests. This inspection length was then analytically corrected assuming the limiting MSLB conditions, when tubesheet bow and accompanying tubesheet hole dilation effects are maximum. A final (corrected) inspection length was established that accounted for tubesheet hole dilation effects and uncertainty related to NDE probe axial position. This methodology uses the load at first slip (rather than the maximum load or load at first move).
The licensee discussed the effect of the postulated C* leakage on the margin between accident-induced leakage and operational leakage. Since the SONGS 2 and 3 accident-induced leakage limits are 0.5 gpm, and the C* methodology assumes accident-induced leakage of 0.2 gpm, the leakage from all sources other than C*
implementation can be no more than 0.3 gpm. The operational (TS) leakage limit is 0.1 gpm.
Since an operational leakage source may leak at a higher rate under accident conditions than under normal operating conditions, it may be necessary to keep the observed operational leakage below the operational leakage limit to ensure the accident-induced leakage limit is not exceeded during an accident. The licensee has margin between the accident-induced and operational leakage limits such that this issue should be manageable.
During its review of the licensees leakage methodology, the staff noted some inconsistencies in the leak rate data and potential uncertainties introduced into the data. These include:
The leak rate response to increasing differential pressure was not consistent between the room temperature leak rate tests at the Westinghouse Windsor facility and the Westinghouse Science and Technology Division (STD) facility. For example, in some cases the leak rate increased with increasing differential pressure and in other cases the leak rate was constant or decreased with increasing differential pressure. The leak rates in the STD tests appeared to consistently increase with increasing differential pressure.
Although earlier testing in support of the W* methodology showed leak rates decreased as temperature increased (from room temperature to operating temperatures), operating temperature leak rates in the C* tests were greater than the corresponding room temperature leak rates in many cases. Similarly, the W* tests indicated the leak rate was relatively independent of the differential pressure and the C* tests indicated that the leak rate increases with differential pressure.
Leak tests in support of the C* methodology were conducted at two facilities with different test techniques and different leak rate measurement techniques. Since initial tests of samples at the STD facilities yielded leak rates that were significantly less than the last comparable leak rates measured at the Windsor facility, an all volatile water treatment (AVT) was applied to some of the test samples. Leak rate tests performed after the AVT treatment resulted in an increase in the leak rate, suggesting oxides developed in and partially blocked the tube-to-collar crevices either during earlier tests or during post-test handling at the first facility (Windsor). No destructive examination was performed to characterize these crevices during testing or at the completion of testing. Almost all of the room temperature leak rates measured at the Windsor facility are greater than the leak rate measured at STD (for the same specimen).
The leak rate was higher in the heatup phase than in the cooldown phase for some specimens while the opposite trend occurred in other specimens.
The leak rate data were determined to be independent of the tubesheet hole roughness (rough bore or smooth bore) whereas the resistance to tube pullout is dependent on the tubesheet hole roughness (the smoother bore tubesheet holes are less resistant to tube pullout).
Multiple tests were performed on the same specimen. These multiple tests included both room temperature and elevated temperature tests along with tests of various crevice lengths. The initial tests may have introduced deposits into the crevice that could have restricted the leak rate in subsequent tests.
The leak rate decreased with time for the C* tests. This trend was not always observed in similar tests performed for tubes hydraulically expanded into a tubesheet collar (i.e.,
H* tests).
The determination that the EDM process had no effect on obstructing the leak path was based on one specimen (albeit at several locations within that specimen).
The tube and collar temperatures were not monitored during the welding and cutting of the specimens, introducing uncertainty on whether the joint loosened or whether oxides could have formed in the crevice.
The surface finish of the specimens was not measured, introducing uncertainty about whether the surface finish of the specimens is comparable to that in the field.
In addition to the above, the staff notes that (1) the inspection distance associated with leakage was determined from the correlation of joint length to the load at first slip rather than from a correlation of joint length to the load at first move, and (2) the test data indicate the leak rate at some lower temperatures (e.g., 460 degrees Fahrenheit) may be greater than the leak rate at 600 degrees Fahrenheit.
Since the leak rate through a flaw in a tube within the tubesheet is a complex function of several factors, it is reasonable to expect some inconsistencies in the data. These factors include the trapping of corrosion products between the tube and tubesheet, the formation of oxides before and during the occurrence of leakage, the deposition of boric acid in the crevice after leakage initiates, viscosity of the fluid, contact pressure, the tube and the tubesheets response to changing temperature conditions (e.g., tube cooling quicker than tubesheet), tubesheet hole asperities, and extrusion of the tube into the asperities during the initial explansion process. As a result, even though the staff noted some inconsistencies and potential uncertainties in the leak rate data, the staff considers the leakage methodology acceptable for the following reasons:
The licensee will perform inspections and repair all service-induced degradation to a minimum depth below the TTS (or expansion transition) of 10.6 inches in the hot-leg region and 11.0 inches in the cold-leg region.
The tubesheet hole dilation model is based on the most dilated hole in the tubesheet.
No credit is taken for the significant reduction in total leakage that would be realized by applying less dilation to the other radial positions of the tubesheet, such as near the periphery and near the stay cylinder.
The licensee assumes all tubes remaining in service contain a 360-degree circumferential, 100-percent through-wall flaw (i.e., a tube sever) at the bottom of the C*
distance. This assumption is conservative given industry inspection results within the tubesheet region.
EDM slits used to simulate circumferential cracks for the leak rate tests are wider and restrict flow less than service-related stress corrosion cracks. In addition, the accumulation of sludge and corrosion products at the secondary face of the SONGS 2 and 3 SG tube-to-tubesheet joint is expected to restrict flow more than the leak test samples.
Flaws postulated below the C* distance are assumed to be leaking although industry operating experience has demonstrated negligible leakage under normal operating conditions, even when cracks are located in the expansion transition zone near the top of the tubesheet.
No credit is taken for corrosion in the tubesheet joint, which would be expected to at least partially block the leak path and significantly reduce the total leak rate.
In summary, the NRC staff concludes that the proposed tube-to-tubesheet joint length (or inspection distance) is acceptable to ensure that the amount of accident-induced leakage from undetected flaws below the C* distance (i.e., the inspection distance) will be limited to a small fraction of the accident-induced leakage limit.
3.5 Reporting Requirements Under the reporting requirements of TS 5.7.2 for SONGS 2 and 3, the licensee is required to submit specific information to the NRC within 180 days after the reactor coolant system reenters Mode 4 following an SG tube inspection. These reporting requirements include the location, orientation (if linear), and measured size (if available) of service-induced indications, including those found in the tubesheet region. These reports will permit the staff to verify that the operating experience continues to be conservative relative to the assumptions made in the amendment. As a result, the staff concludes the TS reporting requirements are acceptable.
3.6 Summary The staff concludes the licensees proposed methodology for assessing structural and leakage integrity for flaws in the tubesheet region is acceptable. Therefore, the staff concludes that the licensees proposal to limit the extent of tube inspections in the hot-leg and cold-leg tubesheet regions, and to repair all degradation detected in the region of the tubesheet required to be inspected is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the California State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published December 6, 2005 (70 FR 72676). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: G. Makar Date: November 9, 2006
March 2006 San Onofre Nuclear Generating Station Units 2 and 3 cc:
Mr. Daniel P. Breig Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA 92674-0128 Mr. Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Mr. David Spath, Chief Division of Drinking Water and Environmental Management P. O. Box 942732 Sacramento, CA 94234-7320 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Mark L. Parsons Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Mr. Gary L. Nolff Assistant Director - Resources City of Riverside 3900 Main Street Riverside, CA 92522 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Michael R. Olson San Diego Gas & Electric Company 8315 Century Park Ct. CP21G San Diego, CA 92123-1548 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission Post Office Box 4329 San Clemente, CA 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 Mr. James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814 Mr. Ray Waldo, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128 Mr. Brian Katz Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128
March 2006 San Onofre Nuclear Generating Station Units 2 and 3 cc:
Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899 Mr. A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128