{{#Wiki_filter:Vogtle Inspection / Activity Plan 03/01/2006
{{#Wiki_filter:Page 1 of 3      Vogtle 03/02/2006 13:08:32    Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type PS2-EP - EP EXERCISE      3 1, 2 IP 7111401 Exercise Evaluation      03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes   03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification     03/20/2006 03/24/2006 Baseline Inspections EB3 PI&R - PI&R SAMPLE RHR WELD FAILURES     2 1, 2 IP 71152  Identification and Resolution of Problems    06/12/2006 06/16/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS     1 1, 2 IP 7111112B Maintenance Effectiveness    06/19/2006 06/23/2006 Baseline Inspections EB3-HS - HEAT SINK       2 1, 2 IP 7111107B Heat Sink Performance    07/17/2006 07/21/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSPECTION VISIT     1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas    08/28/2006 08/30/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK1     3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas   09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls     09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation   09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification     09/18/2006 09/22/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION      1 1 IP 7111108P Inservice Inspection Activities - PWR   09/25/2006 09/29/2006 Baseline Inspections EB3TI150 - 2515/150 U-1: RPV & VHP NOZZLES     1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 09/25/2006 09/29/2006 Safety Issues EB3SGISI - U1 STEAM GENERATOR ISI     1 1 IP 7111108P Inservice Inspection Activities - PWR   10/02/2006 10/06/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK2    2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas   10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls     10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation   10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification     10/02/2006 10/06/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)     1 1 IP 71111  Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 10/15/2006 10/20/2006 Baseline Inspections PB2-PI&R - BIENNIAL PI&R PROGRAM INSPECTION     4 1, 2 IP 71152B  Identification and Resolution of Problems    01/29/2007 02/02/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems   02/12/2007 02/16/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59     3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments   01/22/2007 01/26/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie Enclosure This report shows only on-site and announced inspection procedure Page 2 of 3      Vogtle 03/02/2006 13:08:32    Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type EB1-MODS - MODIFICATIONS-10CFR50.59      3 1, 2 IP 7111117B Permanent Plant Modifications    01/22/2007 01/26/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION      1 2 IP 7111108P Inservice Inspection Activities - PWR    03/12/2007 03/16/2007 Baseline Inspections EB3TI150 - 2515/150 U-2: RPV & VHP NOZZLES    1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 03/12/2007 03/16/2007 Safety Issues PS2-EP - EP INSP      1 1, 2 IP 7111402 Alert and Notification System Testing    03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing    03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes    03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies  03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 71151  Performance Indicator Verification    03/19/2007 03/23/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI      1 2 IP 7111108P Inservice Inspection Activities - PWR    03/19/2007 03/23/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)    1 2 IP 71111  Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity  04/01/2007 04/06/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION    6 1, 2 IP 7111121 Component Design Bases Inspection    04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection    04/23/2007 04/27/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection     05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection     05/21/2007 05/25/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP      4 1  V23228  VOGTLE/EXAM AT POWER FACILITIES    07/16/2007 07/20/2007 Not Applicable PSB1-RP - RP PUBLIC PRE-INSP VISIT      1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas    07/30/2007 08/01/2007 Baseline Inspections OL EXAM - INITIAL EXAM      4 1 V23228 VOGTLE/EXAM AT POWER FACILITIES     08/06/2007 08/17/2007 Not Applicable PSB1-RP - RP PUBLIC BASELINE INSP     4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas   08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems  08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 71151  Performance Indicator Verification    08/20/2007 08/24/2007 Baseline Inspections EB2-TFP - TFP - INFORMATION TRIP      5 1, 2 IP 7111105T Fire Protection [Triennial]    09/11/2007 09/13/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 3 of 3      Vogtle 03/02/2006 13:08:32    Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit      No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type OL RQ - REQUAL INSPECTION    2 1, 2 IP 7111111B Licensed Operator Requalification Program  09/17/2007 09/21/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/02/2006 13:08:32 Report 22 3 PS2-EP-EP EXERCISE Baseline Inspections 03/20/2006 03/24/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 03/20/2006 03/24/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/20/2006 03/24/2006 1, 2 71151 IP Performance Indicator Verification 2 EB3 PI&R-PI&R SAMPLE RHR WELD FAILURES Baseline Inspections 06/12/2006 06/16/2006 1, 2 71152 IP Identification and Resolution of Problems 1 EB3-MR-MR EFFECTIVENESS Baseline Inspections 06/19/2006 06/23/2006 1, 2 7111112B IP Maintenance Effectiveness 2 EB3-HS-HEAT SINK Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111107B IP Heat Sink Performance 1 PSB1-RP-RP OCCUPATIONAL PRE-INSPECTION VISIT Baseline Inspections 08/28/2006 08/30/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas 3 PSB1-RP-RP OCCUPATIONAL BASELINE WK1 Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/18/2006 09/22/2006 1, 2 71151 IP Performance Indicator Verification 1 EB3-ISI-U1 INSERVICE INSPECTION Baseline Inspections 09/25/2006 09/29/2006 1 7111108P IP Inservice Inspection Activities - PWR 1 EB3TI150-2515/150 U-1: RPV & VHP NOZZLES Safety Issues 09/25/2006 09/29/2006 1 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03-
1 EB3SGISI-U1 STEAM GENERATOR ISI Baseline Inspections 10/02/2006 10/06/2006 1 7111108P IP Inservice Inspection Activities - PWR 2 PSB1-RP-RP OCCUPATIONAL BASELINE WK2 Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/02/2006 10/06/2006 1, 2 71151 IP Performance Indicator Verification 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Baseline Inspections 10/15/2006 10/20/2006 1 71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 4 PB2-PI&R-BIENNIAL PI&R PROGRAM INSPECTION Baseline Inspections 01/29/2007 02/02/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 02/12/2007 02/16/2007 1, 2 71152B IP Identification and Resolution of Problems 3 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Vogtle Inspection / Activity Plan 03/01/2006
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/02/2006 13:08:32 Report 22 3 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111117B IP Permanent Plant Modifications 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007 2 7111108P IP Inservice Inspection Activities - PWR 1 EB3TI150-2515/150 U-2: RPV & VHP NOZZLES Safety Issues 03/12/2007 03/16/2007 2 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03-
1 PS2-EP-EP INSP Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111402 IP A lert and Notification System Testing Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 03/19/2007 03/23/2007 1, 2 71151 IP Performance Indicator Verification 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 03/19/2007 03/23/2007 2 7111108P IP Inservice Inspection Activities - PWR 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Baseline Inspections 04/01/2007 04/06/2007 2 71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 04/23/2007 04/27/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/07/2007 05/11/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111121 IP Component Design Bases Inspection 4 OL PREP-INITIAL EXAM PREP Not Applicable 07/16/2007 07/20/2007 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 1 PSB1-RP-RP PUBLIC PRE-INSP VISIT Baseline Inspections 07/30/2007 08/01/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas 4 OL EXAM-INITIAL EXAM Not Applicable 08/06/2007 08/17/2007 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 4 PSB1-RP-RP PUBLIC BASELINE INSP Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151 IP Performance Indicator Verification 5 EB2-TFP-TFP - INFORMATION TRIP Baseline Inspections 09/11/2007 09/13/2007 1, 2 7111105T IP Fire Protection [Triennial]
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Vogtle Inspection / Activity Plan 03/01/2006
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/02/2006 13:08:32 Report 22 2 OL RQ-REQUAL INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1, 2 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 21:37, 23 November 2019

Inspection/Activity Plan - Vogtle Electric Generating Plant (NRC Inspection Report 05000424-06-001 & 05000425-06-001)
ML060610476
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML060610464 List:
References
IR-06-001
Download: ML060610476 (3)


Text

Page 1 of 3 Vogtle 03/02/2006 13:08:32 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/20/2006 03/24/2006 Baseline Inspections EB3 PI&R - PI&R SAMPLE RHR WELD FAILURES 2 1, 2 IP 71152 Identification and Resolution of Problems 06/12/2006 06/16/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 06/19/2006 06/23/2006 Baseline Inspections EB3-HS - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 07/17/2006 07/21/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/28/2006 08/30/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/25/2006 09/29/2006 Baseline Inspections EB3TI150 - 2515/150 U-1: RPV & VHP NOZZLES 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 09/25/2006 09/29/2006 Safety Issues EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/02/2006 10/06/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/02/2006 10/06/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 10/15/2006 10/20/2006 Baseline Inspections PB2-PI&R - BIENNIAL PI&R PROGRAM INSPECTION 4 1, 2 IP 71152B Identification and Resolution of Problems 01/29/2007 02/02/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/12/2007 02/16/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/22/2007 01/26/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie Enclosure This report shows only on-site and announced inspection procedure Page 2 of 3 Vogtle 03/02/2006 13:08:32 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111117B Permanent Plant Modifications 01/22/2007 01/26/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/12/2007 03/16/2007 Baseline Inspections EB3TI150 - 2515/150 U-2: RPV & VHP NOZZLES 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 03/12/2007 03/16/2007 Safety Issues PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/19/2007 03/23/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/01/2007 04/06/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 04/23/2007 04/27/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 05/21/2007 05/25/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 4 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 07/16/2007 07/20/2007 Not Applicable PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/30/2007 08/01/2007 Baseline Inspections OL EXAM - INITIAL EXAM 4 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 08/06/2007 08/17/2007 Not Applicable PSB1-RP - RP PUBLIC BASELINE INSP 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/20/2007 08/24/2007 Baseline Inspections EB2-TFP - TFP - INFORMATION TRIP 5 1, 2 IP 7111105T Fire Protection [Triennial] 09/11/2007 09/13/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 3 of 3 Vogtle 03/02/2006 13:08:32 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 09/17/2007 09/21/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.