(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML062280293 | | | number = ML062280293 |
| | issue date = 08/22/2006 | | | issue date = 08/22/2006 |
| | title = Millstone Power Station Unit No. 2 - Framatome Anp, Inc. Request for Withholding Information from Public Disclosure (TAC No. MC6505) | | | title = Framatome Anp, Inc. Request for Withholding Information from Public Disclosure |
| | author name = Nerses V | | | author name = Nerses V |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 | | | author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 |
| | addressee name = Elliott G F | | | addressee name = Elliott G |
| | addressee affiliation = Framatome ANP, Inc | | | addressee affiliation = Framatome ANP, Inc |
| | docket = 05000336 | | | docket = 05000336 |
Line 14: |
Line 14: |
| | page count = 4 | | | page count = 4 |
| | project = TAC:MC6505 | | | project = TAC:MC6505 |
| | stage = Withholding Request | | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1Section 2.790 of 10 CFR was renumbered to 2.390, without substantive change, by rule dated January 14, 2004(69 FR 2182). The rule became effective February 13, 2004, therefore further reference to Section 2.790 in this letter will no longerbe used and instead be replaced by reference to Section 2.390.August 22, 2006Ms. Gayle F. Elliott, M anagerProduct Licensing in Regulatory Affairs Framatome ANP, Inc. | | {{#Wiki_filter:August 22, 2006 Ms. Gayle F. Elliott, Manager Product Licensing in Regulatory Affairs Framatome ANP, Inc. |
| 3315 Old Forest Road PO Box 10935 Lynchburg, VA 24506-0935 | | 3315 Old Forest Road PO Box 10935 Lynchburg, VA 24506-0935 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| FRAMATOME ANP, INC. REQUEST FOR WITHHOLDING INFORMATIONFROM PUBLIC DISCLOSURE (FAB04-1430) FOR MILLSTONE POWER STATION UNIT NO. 2 (TAC NO. MC6505) | | FRAMATOME ANP, INC. REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (FAB04-1430) FOR MILLSTONE POWER STATION UNIT NO. 2 (TAC NO. MC6505) |
|
| |
|
| ==Dear Ms. Elliot:== | | ==Dear Ms. Elliot:== |
|
| |
|
| By Dominion Nuclear Connecticut, Inc. (DNC) letter 04-732 dated December 22, 2004, andFramatome ANP, Inc. (FANP) affidavit dated December 13, 2004 (Attachment 3 to DNC letter04-732), DNC requested that the information contained in the following document be withheldfrom public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR)Section 2.790 1: Selective Implementation of the Alternative Source Term - Fuel Handling AccidentAnalysis: Fuel Assembly, Fuel Rod, and Core Performance Data (Attachment 1 to DNC letter 04-732) A nonproprietary copy of this document (Attachment 2 to DNC letter 04-732), has been placedin the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to theAgencywide Documents Access and Management System Public Electronic Reading Room.As follows, the affidavit contained information demonstrating that the submitted informationshould be considered exempt from mandatory public disclosure: (1)The information is of the type typically held in confidence by FANP, and is in fact soheld. (2)The information was transmitted to the Nuclear Regulatory Commission in confidence. | | By Dominion Nuclear Connecticut, Inc. (DNC) letter 04-732 dated December 22, 2004, and Framatome ANP, Inc. (FANP) affidavit dated December 13, 2004 (Attachment 3 to DNC letter 04-732), DNC requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) |
| (3)The information has not been publically disclosed, nor is it available in public sources. | | Section 2.7901: |
| (4)Public disclosure of the information would be likely to cause substantial harm to thecompetitive position of FANP because it would enhance the ability of competitors todesign, produce, or market a similar product or service without commensurate expenses. | | Selective Implementation of the Alternative Source Term - Fuel Handling Accident Analysis: Fuel Assembly, Fuel Rod, and Core Performance Data (Attachment 1 to DNC letter 04-732) |
| G. Elliott- 2 -We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at (301) 415-1484.Sincerely,/RA by G. Ed Miller for/Victor Nerses, Senior Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-336 cc: See next page G. Elliott- 2 -We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at (301) 415-1484.Sincerely,/RA by G. Ed Miller for/Victor Nerses, Senior Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-336 cc: See next pageDISTRIBUTION
| | A nonproprietary copy of this document (Attachment 2 to DNC letter 04-732), has been placed in the Nuclear Regulatory Commission's (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. |
| :PUBLICRidsNrrPMREnnisRidsOgcMailCenter LPLI-2 R/FRidsNrrPMVNersesRidsAcrsAcnwMailCenter RidsNrrLACRaynorRidsNrrDorlLpl1-2RidsRgn1MailCenterADAMS Accession Number: ML062280293OFFICELPLI-2/PMLPLI-2/LALPLI-2/BC(A) NAMEVNerses:rsa(GMiller for)CRaynorBPooleDATE8/22/068/22/068/22/06OFFICIAL RECORD COPY Millstone Power Station, Unit No. 2 cc:
| | As follows, the affidavit contained information demonstrating that the submitted information should be considered exempt from mandatory public disclosure: |
| Lillian M. Cuoco, EsquireSenior Counsel Dominion Resources Services, Inc.
| | (1) The information is of the type typically held in confidence by FANP, and is in fact so held. |
| Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385Edward L. Wilds, Jr., Ph.D.Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406First SelectmenTown of Waterford 15 Rope Ferry Road Waterford, CT 06385Charles Brinkman, DirectorWashington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852Senior Resident InspectorMillstone Power Stationc/o U.S. Nuclear Regulatory Commission
| | (2) The information was transmitted to the Nuclear Regulatory Commission in confidence. |
| | (3) The information has not been publically disclosed, nor is it available in public sources. |
| | (4) Public disclosure of the information would be likely to cause substantial harm to the competitive position of FANP because it would enhance the ability of competitors to design, produce, or market a similar product or service without commensurate expenses. |
| | 1 Section 2.790 of 10 CFR was renumbered to 2.390, without substantive change, by rule dated January 14, 2004 (69 FR 2182). The rule became effective February 13, 2004, therefore further reference to Section 2.790 in this letter will no longer be used and instead be replaced by reference to Section 2.390. |
|
| |
|
| P.O. Box 513 Niantic, CT 06357Mr. J. Alan PriceSite Vice President Dominion Nuclear Connecticut, Inc.
| | G. Elliott We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385Mr. J. W. "Bill" S heehan Co-Chair NEAC 19 Laurel Crest Drive Waterford, CT 06385Mr. Evan W. WoollacottCo-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070Ms. Nancy Burton147 Cross Highway Redding Ridge, CT 00870Mr. Chris L. FunderburkDirector, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
| | Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711Mr. David W. DodsonLicensing Supervisor Dominion Nuclear Connecticut, Inc.
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385Mr. Joseph Roy, Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at (301) 415-1484. |
| | Sincerely, |
| | /RA by G. Ed Miller for/ |
| | Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page |
|
| |
|
| P.O. Box 426 Ludlow, MA 01056}} | | G. Elliott We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at (301) 415-1484. |
| | Sincerely, |
| | /RA by G. Ed Miller for/ |
| | Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page DISTRIBUTION: |
| | PUBLIC RidsNrrPMREnnis RidsOgcMailCenter LPLI-2 R/F RidsNrrPMVNerses RidsAcrsAcnwMailCenter RidsNrrLACRaynor RidsNrrDorlLpl1-2 RidsRgn1MailCenter ADAMS Accession Number: ML062280293 OFFICE LPLI-2/PM LPLI-2/LA LPLI-2/BC(A) |
| | NAME VNerses:rsa CRaynor BPoole (GMiller for) |
| | DATE 8/22/06 8/22/06 8/22/06 OFFICIAL RECORD COPY |
| | |
| | Millstone Power Station, Unit No. 2 cc: |
| | Lillian M. Cuoco, Esquire Mr. J. W. "Bill" Sheehan Senior Counsel Co-Chair NEAC Dominion Resources Services, Inc. 19 Laurel Crest Drive Building 475, 5th Floor Waterford, CT 06385 Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Edward L. Wilds, Jr., Ph.D. Nuclear Energy Advisory Council Director, Division of Radiation 128 Terry's Plain Road Department of Environmental Protection Simsbury, CT 06070 79 Elm Street Hartford, CT 06106-5127 Ms. Nancy Burton 147 Cross Highway Regional Administrator, Region I Redding Ridge, CT 00870 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Chris L. Funderburk King of Prussia, PA 19406 Director, Nuclear Licensing and Operations Support First Selectmen Dominion Resources Services, Inc. |
| | Town of Waterford Innsbrook Technical Center 15 Rope Ferry Road 5000 Dominion Boulevard Waterford, CT 06385 Glen Allen, VA 23060-6711 Charles Brinkman, Director Mr. David W. Dodson Washington Operations Nuclear Services Licensing Supervisor Westinghouse Electric Company Dominion Nuclear Connecticut, Inc. |
| | 12300 Twinbrook Pkwy, Suite 330 Building 475, 5th Floor Rockville, MD 20852 Rope Ferry Road Waterford, CT 06385 Senior Resident Inspector Millstone Power Station Mr. Joseph Roy, c/o U.S. Nuclear Regulatory Commission Director of Operations P.O. Box 513 Massachusetts Municipal Wholesale Niantic, CT 06357 Electric Company Moody Street Mr. J. Alan Price P.O. Box 426 Site Vice President Ludlow, MA 01056 Dominion Nuclear Connecticut, Inc. |
| | Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] Category:Proprietary Information Review
MONTHYEARML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML21060B5992021-03-11011 March 2021 Request for Withholding Information from Public Disclosure ML18173A1582018-06-29029 June 2018 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 (Holtec) ML16320A2622016-12-0101 December 2016 Request for Withholding Information from Public Disclosure ML16320A2672016-12-0101 December 2016 Request for Withholding Information from Public Disclosure - June 15, 2016 Letter ML16320A2462016-11-16016 November 2016 Request for Withholding Information from Public Disclosure ML16129A0012016-06-0707 June 2016 Request for Withholding Information from Public Disclosure ML16040A2152016-02-24024 February 2016 Request for Withholding Information from Public Disclosure ML13080A3762013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3702013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3062013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13071A1022013-03-13013 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML12258A1502012-09-19019 September 2012 Request for Withholding Information from Public Disclosure for Millstone Powers Station, Unit No. 3 ML1208304582012-04-10010 April 2012 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML1129303472011-10-25025 October 2011 Requesting for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 (TAC Nos. ME5998 - ME6007) ML1116719932011-06-29029 June 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 (TAC No. 5389) ML1103906642011-02-28028 February 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML1021607492010-09-22022 September 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1015405582010-06-11011 June 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0921608802009-08-21021 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 ML0921200942009-08-0404 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 2 ML0913104282009-06-0505 June 2009 Request for Withholding Information from Public Disclosure ML0900705162009-02-0303 February 2009 Request for Withholding Information from Pubic Disclosure Regarding Millstone Power Station, Unit No. 3 ML0823106632008-08-22022 August 2008 Letter Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0803501322008-03-13013 March 2008 Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0732500812007-12-14014 December 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2252), Subject: WCAP-16271-P, Millstone Unit 3 Spent Fuel Pool Criticality Safety Analysis, March 2007 (Proprietary), Date ML0732400982007-11-29029 November 2007 Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 ML0727005452007-10-18018 October 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2296), Subject: NEU-07-128 P-Attachment, Millstone Nuclear Power Station Unit 2 Stretch Power Uprate Program Supplemental ML0720004022007-06-25025 June 2007 Attachment 6, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Application for Withholding Proprietary Information from Public Disclosure ML0622802932006-08-22022 August 2006 Framatome Anp, Inc. Request for Withholding Information from Public Disclosure ML0621903542006-08-0707 August 2006 Withholding Information from Public Disclosure. ML0620005092006-07-25025 July 2006 Request for Withholding Information from Public Disclosure for Stone and Webster ML0618004712006-07-18018 July 2006 Units 2 & 3, Withholding from Public Disclosure, CD-ROM Containing Electronic Gothic Input & Output Files from Benchmark Cases in Sections 4.3, 4.4, 4.5, & 4.6 of TR DOM-NAF-3, Gothic Methodology for Analyzing. ML0534000902006-03-0606 March 2006 Withholding from Public Disclosure, AW-05-2060, Pressurizer Spray Line Weld Repair ML0332304732003-12-15015 December 2003 Withholding Proprietary Information Letter, Request for Withholding Information from Public Disclosure ML0329304432003-11-12012 November 2003 Request for Withholding Information from Public Disclosure ML0319000172003-08-20020 August 2003 Request for Withholding Information from Public Disclosure ML0208706492002-04-11011 April 2002 Request for Withholding Proprietary Information from Public Disclosure (Tac No. MB4655) 2023-08-18
[Table view] |
Text
August 22, 2006 Ms. Gayle F. Elliott, Manager Product Licensing in Regulatory Affairs Framatome ANP, Inc.
3315 Old Forest Road PO Box 10935 Lynchburg, VA 24506-0935
SUBJECT:
FRAMATOME ANP, INC. REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (FAB04-1430) FOR MILLSTONE POWER STATION UNIT NO. 2 (TAC NO. MC6505)
Dear Ms. Elliot:
By Dominion Nuclear Connecticut, Inc. (DNC) letter 04-732 dated December 22, 2004, and Framatome ANP, Inc. (FANP) affidavit dated December 13, 2004 (Attachment 3 to DNC letter 04-732), DNC requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 2.7901:
Selective Implementation of the Alternative Source Term - Fuel Handling Accident Analysis: Fuel Assembly, Fuel Rod, and Core Performance Data (Attachment 1 to DNC letter 04-732)
A nonproprietary copy of this document (Attachment 2 to DNC letter 04-732), has been placed in the Nuclear Regulatory Commission's (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
As follows, the affidavit contained information demonstrating that the submitted information should be considered exempt from mandatory public disclosure:
(1) The information is of the type typically held in confidence by FANP, and is in fact so held.
(2) The information was transmitted to the Nuclear Regulatory Commission in confidence.
(3) The information has not been publically disclosed, nor is it available in public sources.
(4) Public disclosure of the information would be likely to cause substantial harm to the competitive position of FANP because it would enhance the ability of competitors to design, produce, or market a similar product or service without commensurate expenses.
1 Section 2.790 of 10 CFR was renumbered to 2.390, without substantive change, by rule dated January 14, 2004 (69 FR 2182). The rule became effective February 13, 2004, therefore further reference to Section 2.790 in this letter will no longer be used and instead be replaced by reference to Section 2.390.
G. Elliott We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-1484.
Sincerely,
/RA by G. Ed Miller for/
Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page
G. Elliott We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-1484.
Sincerely,
/RA by G. Ed Miller for/
Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrPMREnnis RidsOgcMailCenter LPLI-2 R/F RidsNrrPMVNerses RidsAcrsAcnwMailCenter RidsNrrLACRaynor RidsNrrDorlLpl1-2 RidsRgn1MailCenter ADAMS Accession Number: ML062280293 OFFICE LPLI-2/PM LPLI-2/LA LPLI-2/BC(A)
NAME VNerses:rsa CRaynor BPoole (GMiller for)
DATE 8/22/06 8/22/06 8/22/06 OFFICIAL RECORD COPY
Millstone Power Station, Unit No. 2 cc:
Lillian M. Cuoco, Esquire Mr. J. W. "Bill" Sheehan Senior Counsel Co-Chair NEAC Dominion Resources Services, Inc. 19 Laurel Crest Drive Building 475, 5th Floor Waterford, CT 06385 Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Edward L. Wilds, Jr., Ph.D. Nuclear Energy Advisory Council Director, Division of Radiation 128 Terry's Plain Road Department of Environmental Protection Simsbury, CT 06070 79 Elm Street Hartford, CT 06106-5127 Ms. Nancy Burton 147 Cross Highway Regional Administrator, Region I Redding Ridge, CT 00870 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Chris L. Funderburk King of Prussia, PA 19406 Director, Nuclear Licensing and Operations Support First Selectmen Dominion Resources Services, Inc.
Town of Waterford Innsbrook Technical Center 15 Rope Ferry Road 5000 Dominion Boulevard Waterford, CT 06385 Glen Allen, VA 23060-6711 Charles Brinkman, Director Mr. David W. Dodson Washington Operations Nuclear Services Licensing Supervisor Westinghouse Electric Company Dominion Nuclear Connecticut, Inc.
12300 Twinbrook Pkwy, Suite 330 Building 475, 5th Floor Rockville, MD 20852 Rope Ferry Road Waterford, CT 06385 Senior Resident Inspector Millstone Power Station Mr. Joseph Roy, c/o U.S. Nuclear Regulatory Commission Director of Operations P.O. Box 513 Massachusetts Municipal Wholesale Niantic, CT 06357 Electric Company Moody Street Mr. J. Alan Price P.O. Box 426 Site Vice President Ludlow, MA 01056 Dominion Nuclear Connecticut, Inc.
Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385