{{#Wiki_filter:October 16, 2006Richard Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station
{{#Wiki_filter:ber 16, 2006


P.O. Box 128 San Clemente, CA 92674-0128SUBJECT:SAN ONOFRE NUCLEAR GENERATING STATION - NRC RADIATIONSAFETY TEAM INSPECTION REPORT 05000361/2006014;
==SUBJECT:==
SAN ONOFRE NUCLEAR GENERATING STATION - NRC RADIATION SAFETY TEAM INSPECTION REPORT 05000361/2006014; 05000362/2006014


05000362/2006014
==Dear Mr. Rosenblum:==
On September 15, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your San Onofre Nuclear Generating Station, Units 2 and 3 facility. The enclosed report documents the inspection findings, which were discussed at the conclusion of the inspection with Mr. A. Scherer, Manager, Nuclear Regulatory Affairs, and other members of your staff.


==Dear Mr. Rosenblum:==
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
On September 15, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed aninspection at your San Onofre Nuclear Generating Station, Units 2 and 3 facility. The enclosedreport documents the inspection findings, which were discussed at the conclusion of the inspection with Mr. A. Scherer, Manager, Nuclear Regulatory Affairs, and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.


The team reviewed selected procedures and records, observed activities, and interviewed personnel. Specifically, the team evaluated the inspection areas within the Radiation ProtectionStrategic Performance Area that are scheduled for review every two years. These areas are:*Radiation Monitoring Instrumentation
The team reviewed selected procedures and records, observed activities, and interviewed personnel. Specifically, the team evaluated the inspection areas within the Radiation Protection Strategic Performance Area that are scheduled for review every two years. These areas are:
*Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
* Radiation Monitoring Instrumentation
*Radioactive Material Processing and Transportation  
* Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
*Radiological Environmental Monitoring Program and Radioactive Material ControlProgram On the basis of the results of this inspection, no findings of significance were identified.
* Radioactive Material Processing and Transportation
* Radiological Environmental Monitoring Program and Radioactive Material Control Program On the basis of the results of this inspection, no findings of significance were identified.


Southern California Edison Company-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be made available electronically for public inspectionin the NRC Public Document Room or from the Publicly Available Records (PARS) com ponentof NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Southern California Edison Company -2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Sincerely,
/RA/Michael P. Shannon, ChiefPlant Support Branch Division of Reactor SafetyDockets: 50-361 50-362 Licenses: NPF-10 NPF-15
/RA/
Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-361 50-362 Licenses: NPF-10 NPF-15


===Enclosure:===
===Enclosure:===
NRC Inspection Report 05000361/2006014; 5000362/2006014 w/attachment: Supplemental Information
NRC Inspection Report 05000361/2006014; 5000362/2006014 w/attachment: Supplemental Information


REGION IV Dockets:50-361, 50-362Licenses:NPF-10, NPF-15 Report:05000361/2006014 and 5000362/2006014 Licensee:Southern California Edison Co. (SCE)
REGION IV==
Facility:San Onofre Nuclear Generating Station, Units 2 and 3Location:5000 S. Pacific Coast Hwy. San Clemente, California Dates:September 11-15, 2006 Inspectors:Larry Ricketson, P.E., Senior Health Physicist, Plant Support Branch Louis Carson II, Senior Health Physicist, Plant Support Branch Gilbert Guerra, Health Physicist, Plant Support Branch Donald Stearns, Health Physicist, Plant Support BranchApproved By:Michael P. Shannon, Chief, Plant Support BranchDivision of Reactor Safety Enclosure-2-
Dockets: 50-361, 50-362 Licenses: NPF-10, NPF-15 Report: 05000361/2006014 and 5000362/2006014 Licensee: Southern California Edison Co. (SCE)
Facility: San Onofre Nuclear Generating Station, Units 2 and 3 Location: 5000 S. Pacific Coast Hwy.
 
San Clemente, California Dates: September 11-15, 2006 Inspectors: Larry Ricketson, P.E., Senior Health Physicist, Plant Support Branch Louis Carson II, Senior Health Physicist, Plant Support Branch Gilbert Guerra, Health Physicist, Plant Support Branch Donald Stearns, Health Physicist, Plant Support Branch Approved By: Michael P. Shannon, Chief, Plant Support Branch Division of Reactor Safety Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR05000361/2006014, 05000362/2006014; 09/11/06 - 09/15/06; San Onofre NuclearGenerating Station, Units 2 & 3 ; Radiation Safety TeamThe report covered a five-day period of inspection on site by a team of four region-based healthphysics inspectors. A.
IR05000361/2006014, 05000362/2006014; 09/11/06 - 09/15/06; San Onofre Nuclear
 
Generating Station, Units 2 & 3 ; Radiation Safety Team The report covered a five-day period of inspection on site by a team of four region-based health physics inspectors.


===NRC-Identified and Self-Revealing Findings===
===NRC-Identified and Self-Revealing Findings===
No findings of significance were identified.
No findings of significance were identified.


===B.Licensee Identified Violations===
===Licensee Identified Violations===
None


Enclosure-3-
None


=REPORT DETAILS=
=REPORT DETAILS=
2.RADIATION SAFETY Cornerstones: Occupational Radiation Safety [OS] and Public Radiation Safety [PS]2OS3Radiation Monitoring Instrumentation and Protective Equipment (71121.03)
 
==RADIATION SAFETY==
Cornerstones: Occupational Radiation Safety [OS] and Public Radiation Safety [PS]
2OS3 Radiation Monitoring Instrumentation and Protective Equipment (71121.03)


====a. Inspection Scope====
====a. Inspection Scope====
This area was inspected to determine the accuracy and operability of radiation monitoringinstruments that are used for the protection of occupational workers and the adequacy ofthe program to provide self-contained breathing apparatus (SCBA) to workers. The team used the requirements in 10 CFR Part 20 and the licensee's procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed:*Calibration of area radiation monitors associated with transient high and very highradiation areas and post-accident monitors used for remote emergency assessment*Calibration of portable radiation detection instrumentation, electronic alarmingdosimetry, and continuous air monitors used for job coverage *Calibration of whole body counting equipment and radiation detection instrumentsutilized for personnel and material release from the radiologically controlled area *Self-assessments, audits, and Licensee Event Reports
This area was inspected to determine the accuracy and operability of radiation monitoring instruments that are used for the protection of occupational workers and the adequacy of the program to provide self-contained breathing apparatus (SCBA) to workers. The team used the requirements in 10 CFR Part 20 and the licensees procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed:
*Corrective action program reports since the last inspection
* Calibration of area radiation monitors associated with transient high and very high radiation areas and post-accident monitors used for remote emergency assessment
*Licensee action in cases of repetitive deficiencies or significant individualdeficiencies*Calibration expiration and source response check currency on radiation detectioninstruments staged for use *The licensee's capability for refilling and transporting SCBA air bottles to and fromthe control room and operations support center during emergency conditions, status of SCBA staged and ready for use in the plant and associated surveillancerecords, and personnel qualification and training *Qualification documentation for onsite personnel designated to performmaintenance on the vendor-designated vital components, and the vital component maintenance records for SCBA units The inspectors completed 9 of the required 9 samples.
* Calibration of portable radiation detection instrumentation, electronic alarming dosimetry, and continuous air monitors used for job coverage
* Calibration of whole body counting equipment and radiation detection instruments utilized for personnel and material release from the radiologically controlled area
* Self-assessments, audits, and Licensee Event Reports
* Corrective action program reports since the last inspection
* Licensee action in cases of repetitive deficiencies or significant individual deficiencies
* Calibration expiration and source response check currency on radiation detection instruments staged for use
* The licensees capability for refilling and transporting SCBA air bottles to and from the control room and operations support center during emergency conditions, status of SCBA staged and ready for use in the plant and associated surveillance records, and personnel qualification and training
* Qualification documentation for onsite personnel designated to perform maintenance on the vendor-designated vital components, and the vital component maintenance records for SCBA units The inspectors completed 9 of the required 9 samples.


-4-
====b. Findings====
No findings of significance were identified.


====b. Findings====
2PS1 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems (71122.01)
No findings of significance were identified.2PS1Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems (71122.01)


====a. Inspection Scope====
====a. Inspection Scope====
This area was inspected to ensure that the gaseous and liquid effluent processingsystems are maintained so that radiological releases are properly mitigated, monitored,and evaluated with respect to public exposure. The team used the requirements in 10 CFR Part 20, 10 CFR Part 50 Appendices A and I, the Offsite Dose Calculation Manual, and the licensee's procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed: *Radiological effluent release reports since the last inspection, changes to theOffsite Dose Calculation Manual, radiation monitor setpoint calculation methodology, anomalous sampling results, effluent radiological occurrence performance indicator incidents, program for identifying contaminated spills andleakage and the licensee's process for control and assessment, self-assessments, audits, and licensee event reports *Gaseous and liquid release system component configurations *Routine processing, sample collection, sample analysis, and release of radioactivegaseous effluent; and radioactive liquid and gaseous effluent release permits and dose projections to members of the public *Abnormal releases  
This area was inspected to ensure that the gaseous and liquid effluent processing systems are maintained so that radiological releases are properly mitigated, monitored, and evaluated with respect to public exposure. The team used the requirements in 10 CFR Part 20, 10 CFR Part 50 Appendices A and I, the Offsite Dose Calculation Manual, and the licensees procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed:
*The licensee's understanding of the location and construction of undergroundpipes and tanks and storage pools that contain radioactive contaminated liquids;the technical bases for onsite monitoring, the licensee's capabilities of detectingspills or leaks and identifying groundwater radiological contamination both on siteand beyond the owner-controlled area *Changes made by the licensee to the Offsite Dose Calculation Manual, the liquidor gaseous radioactive wast e system design, procedures, or operation since thelast inspection *Monthly, quarterly, and annual dose calculations  
* Radiological effluent release reports since the last inspection, changes to the Offsite Dose Calculation Manual, radiation monitor setpoint calculation methodology, anomalous sampling results, effluent radiological occurrence performance indicator incidents, program for identifying contaminated spills and leakage and the licensee's process for control and assessment, self-assessments, audits, and licensee event reports
*Surveillance test results involving air cleaning systems and stack or vent flow rates*Instrument calibrations of discharge effluent radiation monitors and flowmeasurement devices, effluent monitori ng system modifications, effluent radiationmonitor alarm setpoint values, and counting room instrumentation calibration and quality control
* Gaseous and liquid release system component configurations
-5-*Interlaboratory comparison program results *Licensee event reports, special reports, audits, self-assessments and correctiveaction reports performed since the last inspection The inspector completed 11 of the required 11 samples.
* Routine processing, sample collection, sample analysis, and release of radioactive gaseous effluent; and radioactive liquid and gaseous effluent release permits and dose projections to members of the public
* Abnormal releases
* The licensee's understanding of the location and construction of underground pipes and tanks and storage pools that contain radioactive contaminated liquids; the technical bases for onsite monitoring, the licensee's capabilities of detecting spills or leaks and identifying groundwater radiological contamination both on site and beyond the owner-controlled area
* Changes made by the licensee to the Offsite Dose Calculation Manual, the liquid or gaseous radioactive waste system design, procedures, or operation since the last inspection
* Monthly, quarterly, and annual dose calculations
* Surveillance test results involving air cleaning systems and stack or vent flow rates
* Instrument calibrations of discharge effluent radiation monitors and flow measurement devices, effluent monitoring system modifications, effluent radiation monitor alarm setpoint values, and counting room instrumentation calibration and quality control
* Interlaboratory comparison program results
* Licensee event reports, special reports, audits, self-assessments and corrective action reports performed since the last inspection The inspector completed 11 of the required 11 samples.


====b. Findings====
====b. Findings====
No findings of significance were identified.2PS2Radioactive Material Processing and Transportation (71122.02)
No findings of significance were identified.
 
2PS2 Radioactive Material Processing and Transportation (71122.02)


====a. Inspection Scope====
====a. Inspection Scope====
This area was inspected to verify that the licensee's radioactive material processing andtransportation program complies with the requirements of 10 CFR Parts 20, 61, and 71 and Department of Transportation regulations contained in 49 CFR Parts 171-180. The team interviewed licensee personnel and reviewed:*The radioactive waste system description, recent radiological effluent releasereports, and the scope of the licensee's audit program *Liquid and solid radioactive waste processing systems configurations, the statusand control of any radioactive waste process equipment that is not operational or is abandoned in place, changes made to the radioactive waste processi ng systemssince the last inspection, and current processes for transferring radioactive waste resin and sludge discharges*Radio-chemical sample analysis results for radioactive waste streams and use ofscaling factors and calculations to account for difficult-to-measure radionuclides *Shipment packaging, surveying, labeling, marking, placarding, vehicle checking,driver instructing, and disposal manifesting *Shipping records for non-excepted package shipments  
This area was inspected to verify that the licensees radioactive material processing and transportation program complies with the requirements of 10 CFR Parts 20, 61, and 71 and Department of Transportation regulations contained in 49 CFR Parts 171-180. The team interviewed licensee personnel and reviewed:
*Licensee event reports, special reports, audits, state agency reports,self-assessments and corrective action reports performed since the last inspection The inspectors completed 6 of the required 6 samples.
* The radioactive waste system description, recent radiological effluent release reports, and the scope of the licensees audit program
* Liquid and solid radioactive waste processing systems configurations, the status and control of any radioactive waste process equipment that is not operational or is abandoned in place, changes made to the radioactive waste processing systems since the last inspection, and current processes for transferring radioactive waste resin and sludge discharges
* Radio-chemical sample analysis results for radioactive waste streams and use of scaling factors and calculations to account for difficult-to-measure radionuclides
* Shipment packaging, surveying, labeling, marking, placarding, vehicle checking, driver instructing, and disposal manifesting
* Shipping records for non-excepted package shipments
* Licensee event reports, special reports, audits, state agency reports, self-assessments and corrective action reports performed since the last inspection The inspectors completed 6 of the required 6 samples.


====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.


-6-2PS3Radiological Environmental Monitoring Program (REMP) and Radioactive Material ControlProgram (71122.03)
2PS3 Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program (71122.03)


====a. Inspection Scope====
====a. Inspection Scope====
This area was inspected to ensure that the REMP verifies the impact of radioactiveeffluent releases to the environment and sufficiently validates the integrity of theradioactive gaseous and liquid effluent release program; and that the licensee's surveys and controls are adequate to prevent the inadvertent release of licensed materials into the public domain. The team used the requirements in 10 CFR Part 20, Appendix I of 10 CFR Part 50, the Offsite Dose Calculation Manual, and the licensee's procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed: *Annual environmental monitoring reports and licensee event reports  
This area was inspected to ensure that the REMP verifies the impact of radioactive effluent releases to the environment and sufficiently validates the integrity of the radioactive gaseous and liquid effluent release program; and that the licensees surveys and controls are adequate to prevent the inadvertent release of licensed materials into the public domain. The team used the requirements in 10 CFR Part 20, Appendix I of 10 CFR Part 50, the Offsite Dose Calculation Manual, and the licensees procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed:
*Selected air sampling and thermoluminescence dosimeter monitoring stations  
* Annual environmental monitoring reports and licensee event reports
*Collection and preparation of environmental samples  
* Selected air sampling and thermoluminescence dosimeter monitoring stations
*Operability, calibration, and maintenance of meteorological instruments *Each event documented in the Annual Environmental Monitoring Report whichinvolved a missed sample, inoperable sampler, lost thermoluminescence dosimeter, or anomalous measurement *Significant changes made by the licensee to the Offsite Dose Calculation Manualas the result of changes to the land census or sampler station modifications since the last inspection *Calibration and maintenance records for air samplers, composite water samplers,and environmental sample radiation measurement instrumentation, quality controlprogram, interlaboratory comparison program results, and vendor audits *Locations where the licensee monitors potentially contaminated material leavingthe radiological controlled area [or controlled access area] and the methods usedfor control, survey, and release from these areas *Type of radiation monitoring instrumentation used to monitor items released,survey and release criteria of potentially contaminated material, radiation detection sensitivities, procedural guidance, and material release records *Licensee event reports, special reports, audits, self-assessments and correctiveaction reports performed since the last inspection The inspectors completed 10 of the required 10 samples.
* Collection and preparation of environmental samples
* Operability, calibration, and maintenance of meteorological instruments
* Each event documented in the Annual Environmental Monitoring Report which involved a missed sample, inoperable sampler, lost thermoluminescence dosimeter, or anomalous measurement
* Significant changes made by the licensee to the Offsite Dose Calculation Manual as the result of changes to the land census or sampler station modifications since the last inspection
* Calibration and maintenance records for air samplers, composite water samplers, and environmental sample radiation measurement instrumentation, quality control program, interlaboratory comparison program results, and vendor audits
* Locations where the licensee monitors potentially contaminated material leaving the radiological controlled area [or controlled access area] and the methods used for control, survey, and release from these areas
* Type of radiation monitoring instrumentation used to monitor items released, survey and release criteria of potentially contaminated material, radiation detection sensitivities, procedural guidance, and material release records
* Licensee event reports, special reports, audits, self-assessments and corrective action reports performed since the last inspection The inspectors completed 10 of the required 10 samples.


-7-
====b. Findings====
No findings of significance were identified.


====b. Findings====
==OTHER ACTIVITIES==
No findings of significance were identified.4.OTHER ACTIVITIES 4OA2Problem Identification and Resolution
{{a|4OA2}}
==4OA2 Problem Identification and Resolution==


====a. Inspection Scope====
====a. Inspection Scope====
The team evaluated the effectiveness of the licensee's problem identification andresolution process with respect to the following inspection areas:*Radiation Monitoring Instrumentation (Section 2OS3)
The team evaluated the effectiveness of the licensees problem identification and resolution process with respect to the following inspection areas:
*Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems (Section 2PS1)*Radioactive Material Processing and Transportation (Section 2PS2)
* Radiation Monitoring Instrumentation (Section 2OS3)
*Radiological Environmental Monitoring Program and Radioactive Material ControlProgram (Section 2PS3)
* Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems (Section 2PS1)
* Radioactive Material Processing and Transportation (Section 2PS2)
* Radiological Environmental Monitoring Program and Radioactive Material Control Program (Section 2PS3)


====a. Findings and Observations====
====a. Findings and Observations====
No findings of significance were identified.4OA6Management MeetingsExit Meeting SummaryOn September 15, 2006, the team presented the inspection results to Mr. A. Scherer,Manager, Nuclear Regulatory Affairs, and other members of the staff who acknowledged the findings. The team confirmed that proprietary information was not provided or examined during the inspection.ATTACHMENT:
No findings of significance were identified.
 
{{a|4OA6}}
==4OA6 Management Meetings==
 
===Exit Meeting Summary===
 
On September 15, 2006, the team presented the inspection results to Mr. A. Scherer, Manager, Nuclear Regulatory Affairs, and other members of the staff who acknowledged the findings. The team confirmed that proprietary information was not provided or examined during the inspection.
 
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
Licensee
Licensee
: [[contact::B. Ashbrook]], Manager, Environmental Protection
: [[contact::B. Ashbrook]], Manager, Environmental Protection
Line 113: Line 167:
: [[contact::D. Dick]], Effluent Supervisor, Chemistry
: [[contact::D. Dick]], Effluent Supervisor, Chemistry
: [[contact::P. Elliott]], Supervisor, Health Physics
: [[contact::P. Elliott]], Supervisor, Health Physics
: [[contact::M. Farmer]], Health Physics  
: [[contact::M. Farmer]], Health Physics
: [[contact::A. Gray]], General Foreman, Radioactive Materials Control Group
: [[contact::A. Gray]], General Foreman, Radioactive Materials Control Group
: [[contact::N. Hansen]], Environmental Technical Specialist
: [[contact::N. Hansen]], Environmental Technical Specialist
Line 121: Line 175:
: [[contact::M. Johnson]], Manager, Environmental
: [[contact::M. Johnson]], Manager, Environmental
: [[contact::M. Lewis]], Supervisor, Health Physics
: [[contact::M. Lewis]], Supervisor, Health Physics
: [[contact::F. Liu]], Maintenance Engineering  
: [[contact::F. Liu]], Maintenance Engineering
: [[contact::A. Scherer]], Manager, Nuclear Regulatory Affairs
: [[contact::A. Scherer]], Manager, Nuclear Regulatory Affairs
: [[contact::J. Scott]], Health Physics Engineer, Nuclear Regulatory Affairs
: [[contact::J. Scott]], Health Physics Engineer, Nuclear Regulatory Affairs
: [[contact::L. Villalobos]], Technician, Health Physics  
: [[contact::L. Villalobos]], Technician, Health Physics
: [[contact::D. Wert]], Technician, Health Physics
: [[contact::D. Wert]], Technician, Health Physics
NRC
NRC
: [[contact::C. Osterholtz]], Senior Resident Inspector
: [[contact::C. Osterholtz]], Senior Resident Inspector
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==


===Opened===
===Opened===
NoneOpened and Closed During this InspectionNone
 
None Opened and Closed During this Inspection None
 
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
==Section 2OS3: ==
 
: Radiation Monitoring Instrumentation and Protective EquipmentCorrective Action Documents
}}
}}

Revision as of 14:07, 23 November 2019

IR 05000361-06-014, 05000362-06-014; Southern California Edison Co; 09/11/06 - 09/15/06; San Onofre Nuclear Generating Station, Units 2 & 3; Radiation Safety Team
ML062890441
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/16/2006
From: Shannon M
Plant Support Branch Region IV
To: Rosenblum R
Southern California Edison Co
References
IR-06-014
Download: ML062890441 (18)


Text

ber 16, 2006

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION - NRC RADIATION SAFETY TEAM INSPECTION REPORT 05000361/2006014; 05000362/2006014

Dear Mr. Rosenblum:

On September 15, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your San Onofre Nuclear Generating Station, Units 2 and 3 facility. The enclosed report documents the inspection findings, which were discussed at the conclusion of the inspection with Mr. A. Scherer, Manager, Nuclear Regulatory Affairs, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The team reviewed selected procedures and records, observed activities, and interviewed personnel. Specifically, the team evaluated the inspection areas within the Radiation Protection Strategic Performance Area that are scheduled for review every two years. These areas are:

  • Radiation Monitoring Instrumentation
  • Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
  • Radioactive Material Processing and Transportation
  • Radiological Environmental Monitoring Program and Radioactive Material Control Program On the basis of the results of this inspection, no findings of significance were identified.

Southern California Edison Company -2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-361 50-362 Licenses: NPF-10 NPF-15

Enclosure:

NRC Inspection Report 05000361/2006014; 5000362/2006014 w/attachment: Supplemental Information

REGION IV==

Dockets: 50-361, 50-362 Licenses: NPF-10, NPF-15 Report: 05000361/2006014 and 5000362/2006014 Licensee: Southern California Edison Co. (SCE)

Facility: San Onofre Nuclear Generating Station, Units 2 and 3 Location: 5000 S. Pacific Coast Hwy.

San Clemente, California Dates: September 11-15, 2006 Inspectors: Larry Ricketson, P.E., Senior Health Physicist, Plant Support Branch Louis Carson II, Senior Health Physicist, Plant Support Branch Gilbert Guerra, Health Physicist, Plant Support Branch Donald Stearns, Health Physicist, Plant Support Branch Approved By: Michael P. Shannon, Chief, Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY OF FINDINGS

IR05000361/2006014, 05000362/2006014; 09/11/06 - 09/15/06; San Onofre Nuclear

Generating Station, Units 2 & 3 ; Radiation Safety Team The report covered a five-day period of inspection on site by a team of four region-based health physics inspectors.

NRC-Identified and Self-Revealing Findings

No findings of significance were identified.

Licensee Identified Violations

None

REPORT DETAILS

RADIATION SAFETY

Cornerstones: Occupational Radiation Safety [OS] and Public Radiation Safety [PS]

2OS3 Radiation Monitoring Instrumentation and Protective Equipment (71121.03)

a. Inspection Scope

This area was inspected to determine the accuracy and operability of radiation monitoring instruments that are used for the protection of occupational workers and the adequacy of the program to provide self-contained breathing apparatus (SCBA) to workers. The team used the requirements in 10 CFR Part 20 and the licensees procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed:

  • Calibration of area radiation monitors associated with transient high and very high radiation areas and post-accident monitors used for remote emergency assessment
  • Calibration of portable radiation detection instrumentation, electronic alarming dosimetry, and continuous air monitors used for job coverage
  • Calibration of whole body counting equipment and radiation detection instruments utilized for personnel and material release from the radiologically controlled area
  • Self-assessments, audits, and Licensee Event Reports
  • Corrective action program reports since the last inspection
  • Licensee action in cases of repetitive deficiencies or significant individual deficiencies
  • Calibration expiration and source response check currency on radiation detection instruments staged for use
  • The licensees capability for refilling and transporting SCBA air bottles to and from the control room and operations support center during emergency conditions, status of SCBA staged and ready for use in the plant and associated surveillance records, and personnel qualification and training
  • Qualification documentation for onsite personnel designated to perform maintenance on the vendor-designated vital components, and the vital component maintenance records for SCBA units The inspectors completed 9 of the required 9 samples.

b. Findings

No findings of significance were identified.

2PS1 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems (71122.01)

a. Inspection Scope

This area was inspected to ensure that the gaseous and liquid effluent processing systems are maintained so that radiological releases are properly mitigated, monitored, and evaluated with respect to public exposure. The team used the requirements in 10 CFR Part 20, 10 CFR Part 50 Appendices A and I, the Offsite Dose Calculation Manual, and the licensees procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed:

  • Radiological effluent release reports since the last inspection, changes to the Offsite Dose Calculation Manual, radiation monitor setpoint calculation methodology, anomalous sampling results, effluent radiological occurrence performance indicator incidents, program for identifying contaminated spills and leakage and the licensee's process for control and assessment, self-assessments, audits, and licensee event reports
  • Gaseous and liquid release system component configurations
  • Routine processing, sample collection, sample analysis, and release of radioactive gaseous effluent; and radioactive liquid and gaseous effluent release permits and dose projections to members of the public
  • Abnormal releases
  • The licensee's understanding of the location and construction of underground pipes and tanks and storage pools that contain radioactive contaminated liquids; the technical bases for onsite monitoring, the licensee's capabilities of detecting spills or leaks and identifying groundwater radiological contamination both on site and beyond the owner-controlled area
  • Changes made by the licensee to the Offsite Dose Calculation Manual, the liquid or gaseous radioactive waste system design, procedures, or operation since the last inspection
  • Monthly, quarterly, and annual dose calculations
  • Surveillance test results involving air cleaning systems and stack or vent flow rates
  • Instrument calibrations of discharge effluent radiation monitors and flow measurement devices, effluent monitoring system modifications, effluent radiation monitor alarm setpoint values, and counting room instrumentation calibration and quality control
  • Interlaboratory comparison program results
  • Licensee event reports, special reports, audits, self-assessments and corrective action reports performed since the last inspection The inspector completed 11 of the required 11 samples.

b. Findings

No findings of significance were identified.

2PS2 Radioactive Material Processing and Transportation (71122.02)

a. Inspection Scope

This area was inspected to verify that the licensees radioactive material processing and transportation program complies with the requirements of 10 CFR Parts 20, 61, and 71 and Department of Transportation regulations contained in 49 CFR Parts 171-180. The team interviewed licensee personnel and reviewed:

  • The radioactive waste system description, recent radiological effluent release reports, and the scope of the licensees audit program
  • Liquid and solid radioactive waste processing systems configurations, the status and control of any radioactive waste process equipment that is not operational or is abandoned in place, changes made to the radioactive waste processing systems since the last inspection, and current processes for transferring radioactive waste resin and sludge discharges
  • Radio-chemical sample analysis results for radioactive waste streams and use of scaling factors and calculations to account for difficult-to-measure radionuclides
  • Shipment packaging, surveying, labeling, marking, placarding, vehicle checking, driver instructing, and disposal manifesting
  • Shipping records for non-excepted package shipments
  • Licensee event reports, special reports, audits, state agency reports, self-assessments and corrective action reports performed since the last inspection The inspectors completed 6 of the required 6 samples.

b. Findings

No findings of significance were identified.

2PS3 Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program (71122.03)

a. Inspection Scope

This area was inspected to ensure that the REMP verifies the impact of radioactive effluent releases to the environment and sufficiently validates the integrity of the radioactive gaseous and liquid effluent release program; and that the licensees surveys and controls are adequate to prevent the inadvertent release of licensed materials into the public domain. The team used the requirements in 10 CFR Part 20, Appendix I of 10 CFR Part 50, the Offsite Dose Calculation Manual, and the licensees procedures required by technical specifications as criteria for determining compliance. The team interviewed licensee personnel and reviewed:

  • Annual environmental monitoring reports and licensee event reports
  • Selected air sampling and thermoluminescence dosimeter monitoring stations
  • Collection and preparation of environmental samples
  • Operability, calibration, and maintenance of meteorological instruments
  • Each event documented in the Annual Environmental Monitoring Report which involved a missed sample, inoperable sampler, lost thermoluminescence dosimeter, or anomalous measurement
  • Significant changes made by the licensee to the Offsite Dose Calculation Manual as the result of changes to the land census or sampler station modifications since the last inspection
  • Calibration and maintenance records for air samplers, composite water samplers, and environmental sample radiation measurement instrumentation, quality control program, interlaboratory comparison program results, and vendor audits
  • Locations where the licensee monitors potentially contaminated material leaving the radiological controlled area [or controlled access area] and the methods used for control, survey, and release from these areas
  • Type of radiation monitoring instrumentation used to monitor items released, survey and release criteria of potentially contaminated material, radiation detection sensitivities, procedural guidance, and material release records
  • Licensee event reports, special reports, audits, self-assessments and corrective action reports performed since the last inspection The inspectors completed 10 of the required 10 samples.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

4OA2 Problem Identification and Resolution

a. Inspection Scope

The team evaluated the effectiveness of the licensees problem identification and resolution process with respect to the following inspection areas:

  • Radiation Monitoring Instrumentation (Section 2OS3)
  • Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems (Section 2PS1)
  • Radioactive Material Processing and Transportation (Section 2PS2)
  • Radiological Environmental Monitoring Program and Radioactive Material Control Program (Section 2PS3)

a. Findings and Observations

No findings of significance were identified.

4OA6 Management Meetings

Exit Meeting Summary

On September 15, 2006, the team presented the inspection results to Mr. A. Scherer, Manager, Nuclear Regulatory Affairs, and other members of the staff who acknowledged the findings. The team confirmed that proprietary information was not provided or examined during the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

B. Ashbrook, Manager, Environmental Protection
K. Belford, Health Physics
M. Chandler, Technical Specialist
D. Dick, Effluent Supervisor, Chemistry
P. Elliott, Supervisor, Health Physics
M. Farmer, Health Physics
A. Gray, General Foreman, Radioactive Materials Control Group
N. Hansen, Environmental Technical Specialist
C. Hays, Supervisor, Computer Engineering
M. Hunter, Auditor
J. Hurlocker, Supervisor, Shipping/Receiving/REMS
M. Johnson, Manager, Environmental
M. Lewis, Supervisor, Health Physics
F. Liu, Maintenance Engineering
A. Scherer, Manager, Nuclear Regulatory Affairs
J. Scott, Health Physics Engineer, Nuclear Regulatory Affairs
L. Villalobos, Technician, Health Physics
D. Wert, Technician, Health Physics

NRC

C. Osterholtz, Senior Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None Opened and Closed During this Inspection None

LIST OF DOCUMENTS REVIEWED