{{#Wiki_filter:June 22, 2007Mr. Barry S. AllenSite Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097
{{#Wiki_filter:June 22, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097


==SUBJECT:==
==SUBJECT:==
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OFAMENDMENT RE: SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVES (TAC NO. MD3898)
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVES (TAC NO. MD3898)


==Dear Mr. Allen:==
==Dear Mr. Allen:==


The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosedAmendment No. 145 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. This amendment revises the Technical Specifications (TSs) in response to your application dated December 29, 2006.This amendment modifies the TS requirements for scram discharge volume vent and drainvalves.A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in theCommission's next biweekly Federal Register notice.Sincerely,/RA/Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-440
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 145 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. This amendment revises the Technical Specifications (TSs) in response to your application dated December 29, 2006.
This amendment modifies the TS requirements for scram discharge volume vent and drain valves.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
                                            /RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 145 to NPF-58         2. Safety Evaluationcc w/encls: See next page June 22, 2007Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081
: 1. Amendment No. 145 to NPF-58
: 2. Safety Evaluation cc w/encls: See next page
 
June 22, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081


==SUBJECT:==
==SUBJECT:==
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OFAMENDMENT RE: SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVES (TAC NO. MD3898)
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVES (TAC NO. MD3898)


==Dear Mr. Allen:==
==Dear Mr. Allen:==


The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosedAmendment No. 145 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. This amendment revises the Technical Specifications (TSs) in response to your application dated December 29, 2006.This amendment modifies the TS requirements for scram discharge volume vent and drainvalves.A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in theCommission's next biweekly Federal Register notice.Sincerely,/RA/Thomas J. Wengert, Project ManagerPlant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-440
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 145 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. This amendment revises the Technical Specifications (TSs) in response to your application dated December 29, 2006.
This amendment modifies the TS requirements for scram discharge volume vent and drain valves.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
                                            /RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 145 to NPF-58                     2. Safety EvaluationDISTRIBUTION
: 1. Amendment No. 145 to NPF-58
:PUBLICLPL3-2 R/FRidsNrrPMTWengertRidsNrrDirsItsb RidsOgcRpRidsNrrLAEWhittRidsRgn3MailCenterRidsNrrDorlLpl3-2 RidsAcrsAcnwMailCenterRidsNrrDorlDprGHill (2)Package Accession Number: ML071450238Amendment Accession Number: ML071450234 TS Accession Number: ML*See SE dated**NLOOFFICELPL3-2/PMLPL3-2/LADIRS/ITSB*OGC**LPL3-2/BCNAMETWengertEWhittTKobetzBKlukanRGibbsDATE6/22/07 6/22/07   2/20/07 6/11/07 6/22/07OFFICIAL RECORD COPY Perry Nuclear Power Plant, Unit No. 1 cc:David W. Jenkins, AttorneyFirstEnergy CorporationMail Stop A-GO-1576 South Main StreetAkron, OH 44308Resident Inspector's OfficeU.S. Nuclear Regulatory CommissionP.O. Box 331Perry, OH 44081-0331Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission2443 Warrenville Road, Suite 210Lisle, IL 60532-4531Sue HiattOCRE Interim Representative8275 MunsonMentor, OH 44060Manager, Site Regulatory ComplianceFirstEnergy Nuclear Operating CompanyPerry Nuclear Power PlantMail Stop A-PY-A200P.O. Box 97, 10 Center RoadPerry, OH 44081-0097Mayor, Village of North PerryNorth Perry Village Hall4449 Lockwood RoadNorth Perry Village, OH 44081Donna Owens, DirectorOhio Department of CommerceDivision of Industrial ComplianceBureau of Operations & Maintenance6606 Tussing RoadP.O. Box 4009Reynoldsburg, OH 43068-9009Carol O'Claire, Chief, Radiological BranchOhio Emergency Management Agency2855 West Dublin Granville RoadColumbus, OH 43235-7150Mayor, Village of PerryP.O. Box 100Perry, OH 44081-0100 Dennis ClumRadiological Assistance Section SupervisorBureau of Radiation ProtectionOhio Department of HealthP.O. Box 118Columbus, OH  43266-0118Zack A. Clayton DERROhio Environmental Protection AgencyATTN:  Mr. Zack A. ClaytonP.O. Box 1049Columbus, OH  43266-0149ChairmanPerry Township Board of Trustees3750 Center Road, Box 65Perry, OH  44081Daniel Z. FisherTransportation DepartmentPublic Utilities Commission180 East Broad StreetColumbus, OH  43215-3793 James H. LashSenior Vice President of Operations and  Chief Operating OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH  44308Director, Fleet Regulatory AffairsFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH  44308Joseph J. HaganPresident and Chief Nuclear OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH  44308 Perry Nuclear Power Plant, Unit No. 1 cc:
: 2. Safety Evaluation DISTRIBUTION:
Danny L. Pace Senior Vice President, Fleet EngineeringFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Jeannie M. RinckelVice President, Fleet OversightFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Manager, Fleet LicensingFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH 44308Richard AndersonVice President, Nuclear SupportFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308 FIRSTENERGY NUCLEAR OPERATING COMPANYFIRSTENERGY NUCLEAR GENERATION CORP.OHIO EDISON COMPANYDOCKET NO. 50-440PERRY NUCLEAR POWER PLANT, UNIT NO. 1AMENDMENT TO FACILITY OPERATING LICENSEAmendment No. 145 License No. NPF-581.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for license filed by FirstEnergy Nuclear Operating Company,et al., (the licensee) dated December 29, 2006, complies with the standards andrequirements of the Atomic Energy Act of 1954, as amended (the Act), and theCommission's rules and regulations set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of thepublic, and (ii) that such activities will be conducted in compliance with theCommission's regulations;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; andE.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied.2.Accordingly, the license is amended by changes to the Technical Specifications asindicated in the attachment to this license amendment, and paragraph 2.C.(2) of FacilityOperating License No. NPF-58 is hereby amended to read as follows: (2)Technical SpecificationsThe Technical Specifications contained in Appendix A and the EnvironmentalProtection Plan contained in Appendix B, as revised through Amendment No. 145 are hereby incorporated into this license. FENOC shall operate thefacility in accordance with the Technical Specifications and the EnvironmentalProtection Plan.3.This license amendment is effective as of its date of its issuance and shall beimplemented within 90 days of the date of issuance.FOR THE NUCLEAR REGULATORY COMMISSION/RA/Russell Gibbs, ChiefPlant Licensing Branch III-2Division of Operating Reactor LicensingOffice of Nuclear Reactor Regulation
PUBLIC                LPL3-2 R/F            RidsNrrPMTWengert            RidsNrrDirsItsb RidsOgcRp              RidsNrrLAEWhitt      RidsRgn3MailCenter          RidsNrrDorlLpl3-2 RidsAcrsAcnwMailCenter                      RidsNrrDorlDpr              GHill (2)
Package Accession Number: ML071450238 Amendment Accession Number: ML071450234 TS Accession Number: ML                             *See SE dated       **NLO OFFICE LPL3-2/PM            LPL3-2/LA        DIRS/ITSB*       OGC**         LPL3-2/BC NAME TWengert              EWhitt          TKobetz          BKlukan        RGibbs DATE      6/22/07           6/22/07           2/20/07       6/11/07         6/22/07 OFFICIAL RECORD COPY
 
Perry Nuclear Power Plant, Unit No. 1 cc:
David W. Jenkins, Attorney                Dennis Clum FirstEnergy Corporation                    Radiological Assistance Section Supervisor Mail Stop A-GO-15                          Bureau of Radiation Protection 76 South Main Street                      Ohio Department of Health Akron, OH 44308                            P.O. Box 118 Columbus, OH 43266-0118 Resident Inspector's Office U.S. Nuclear Regulatory Commission        Zack A. Clayton P.O. Box 331                              DERR Perry, OH 44081-0331                      Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Regional Administrator, Region III        P.O. Box 1049 U.S. Nuclear Regulatory Commission        Columbus, OH 43266-0149 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4531                      Chairman Perry Township Board of Trustees Sue Hiatt                                  3750 Center Road, Box 65 OCRE Interim Representative                Perry, OH 44081 8275 Munson Mentor, OH 44060                          Daniel Z. Fisher Transportation Department Manager, Site Regulatory Compliance        Public Utilities Commission FirstEnergy Nuclear Operating Company      180 East Broad Street Perry Nuclear Power Plant                  Columbus, OH 43215-3793 Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road                James H. Lash Perry, OH 44081-0097                      Senior Vice President of Operations and Chief Operating Officer Mayor, Village of North Perry              FirstEnergy Nuclear Operating Company North Perry Village Hall                  Mail Stop A-GO-14 4449 Lockwood Road                        76 South Main Street North Perry Village, OH 44081              Akron, OH 44308 Donna Owens, Director                      Director, Fleet Regulatory Affairs Ohio Department of Commerce                FirstEnergy Nuclear Operating Company Division of Industrial Compliance          Mail Stop A-GO-2 Bureau of Operations & Maintenance        76 South Main Street 6606 Tussing Road                          Akron, OH 44308 P.O. Box 4009 Reynoldsburg, OH 43068-9009                Joseph J. Hagan President and Chief Nuclear Officer Carol OClaire, Chief, Radiological Branch FirstEnergy Nuclear Operating Company Ohio Emergency Management Agency          Mail Stop A-GO-14 2855 West Dublin Granville Road            76 South Main Street Columbus, OH 43235-7150                    Akron, OH 44308 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100
 
Perry Nuclear Power Plant, Unit No. 1 cc:
Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
 
FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.
OHIO EDISON COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 145 License No. NPF-58
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A.     The application for license filed by FirstEnergy Nuclear Operating Company, et al., (the licensee) dated December 29, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.     The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.     There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.     The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.     The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:
 
(2)     Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 145 are hereby incorporated into this license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
: 3.     This license amendment is effective as of its date of its issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /RA/
Russell Gibbs, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Technical   Specifications and Facility Operating LicenseDate of Issuance: June 22, 2007 ATTACHMENT TO LICENSE AMENDMENT NO. 145FACILITY OPERATING LICENSE NO. NPF-58DOCKET NO. 50-440Replace the following pages of the Facility Operating License and Appendix A TechnicalSpecifications with the attached revised pages. The revised pages are identified byamendment number and contain marginal lines indicating the areas of change. Remove               InsertLicense NPF-58License NPF-58Page 4Page 4
Changes to the Technical Specifications and Facility Operating License Date of Issuance: June 22, 2007
 
ATTACHMENT TO LICENSE AMENDMENT NO. 145 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following pages of the Facility Operating License and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove                       Insert License NPF-58              License NPF-58 Page 4                       Page 4 TS                          TS 3.1-24                      3.1-24
 
renewal. Such sale and leaseback transactions are subject to the representations and conditions set forth in the above mentioned application of January 23, 1987, as supplemented on March 3, 1987, as well as the letter of the Director of the Office of Nuclear Reactor Regulation dated March 16, 1987, consenting to such transactions. Specifically, a lessor and anyone else who may acquire an interest under these transactions are prohibited from exercising directly or indirectly any control over the licenses of PNPP Unit 1. For purposes of this condition the limitations of 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and any successor in interest to that lessor as long as the license for PNPP Unit 1 remains in effect; these financial transactions shall have no effect on the license for the Perry Nuclear facility throughout the term of the license.
(b)  Further, the licensees are also required to notify the NRC in writing prior to any change in: (i) the terms or conditions of any lease agreements executed as part of these transactions; (ii) the PNPP Operating Agreement; (iii) the existing property insurance coverage for PNPP Unit 1; and (iv) any action by a lessor or others that may have an adverse effect on the safe operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now and hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)  Maximum Power Level FENOC is authorized to operate the facility at reactor core power levels not in excess of 3758 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2)  Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 145, are hereby incorporated into the license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)  Antitrust Conditions
: a. FirstEnergy Nuclear Generation Corp. and Ohio Edison Company Amendment No. 145
 
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 145 TO FACILITY OPERATING LICENSE NO. NPF-58 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.
OHIO EDISON COMPANY PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-440
 
==1.0  INTRODUCTION==
 
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated December 29, 2006, FirstEnergy Nuclear Operating Company, et al. (the licensee) requested changes to the technical specifications (TSs) for the Perry Nuclear Power Plant (PNPP), Unit No. 1. The proposed changes would revise the TS requirements for scram discharge volume vent and drain valves. Specifically the proposed changes would revise the required action within TS 3.1.8, ?Scram Discharge Volume (SDV) Vent and Drain Valves for the condition of having one or more SDV vent or drain lines with one valve inoperable. These changes are based on Technical Specifications Task Force (TSTF) Change Traveler No. 404 (TSTF-404),
?Scram Discharge Volume Vent and Drain Valves Revision 0, that has been approved generically for Boiling Water Reactor 6 (BWR/6) Standard Technical Specifications (STS),
contained in NUREG-1434, Standard Technical Specifications General Electric Plants, BWR/6 Specifications, Revision 2. A notice announcing the availability of this proposed TS change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on April 15, 2003 (68 FR 18294).
 
==2.0  REGULATORY EVALUATION==
 
NRC regulations and review standards such as Appendix A, ?General Design Criteria for Nuclear Power Plants, to Title 10 of the Code of Federal Regulation (CFR) Part 50, include specific requirements for reactor protection and reactivity control systems. The reactor protection systems for BWRs use a hydraulic system to insert control rods into the reactor core.
During an actuation of the reactor protection system (a scram), water is exhausted from the control rod drive mechanisms to the SDVs. Proper maintenance and operation of the SDVs in terms of instrumentation and limiting water volumes are essential for assuring the reliability of the reactor protection system (see NRC Bulletin 80-17, ?Failure of Control Rods to Insert During A Scram at a BWR, related Orders to specific facilities, and information provided in plant final safety analysis reports and TS Bases). Maintaining the SDVs to ensure that accumulated water does not hamper or slow the insertion of control rods requires vent and drain valves. The vent and drain valves isolate during a scram to limit the amount of coolant discharged so that adequate core cooling is maintained and offsite doses remain within regulatory limits.
Enclosure 2
 
Specific license requirements for SDV vent and drain valves are defined in TS 3.1.8. The existing Limiting Condition for Operation (LCO) 3.1.8, requires that each SDV vent and drain valve be operable. The operability of all SDV vent and drain valves ensures that the SDV vent and drain valves will close during a scram to contain reactor water discharged to the SDV piping. Since the vent and drain lines are provided with two valves in series, the single failure of one valve in the open position will not impair the isolation function of the system. Additionally, the valves are required to open on scram reset and during plant operation to control the amount of water accumulating in the SDV.
If one or more SDV vent and drain lines have a single valve that is inoperable, the existing required action is to restore the valve(s) to operable status within 7 days. If an inoperable valve is not restored to operable status, a plant shutdown to MODE 3 is required within 12 hours. If one or more SDV vent or drain lines have both valves inoperable, the associated line must be isolated within 8 hours. In this condition, the plant is allowed to operate indefinitely. A note associated with the required action clarifies that the valves may be opened under administrative controls to allow draining of the SDV. The existing SDV vent and drain valve required actions are inconsistent in that, although the operational and safety concerns are similar for having one or both valves in a line being inoperable, the actions for a single inoperable valve do not allow for the isolation of the line and administrative controls to support the draining of the SDV.
The proposed change would revise the required actions to be more consistent with the safety significance of one inoperable valve in a SDV line versus two inoperable valves in an SDV line.
 
==3.0    TECHNICAL EVALUATION==
 
3.1    Proposed TS Change The proposed changes to TS 3.1.8 are:
: 1. Required Action A.1 is revised from restoring the single inoperable SDV vent and drain valve in one or more SDV vent and drain lines to operable status to isolating the associated line.
: 2. The Note to Required Action B.1, which allows an isolated line to be unisolated under administrative controls for the purpose of draining and venting the SDV, is moved to a note that applies to both Conditions A (single inoperable valve) and B (both valves inoperable).
3.2    NRC Staff Evaluation With one SDV vent or drain valve inoperable in one or more lines, the isolation function would be maintained since the redundant valve in the affected line would perform its safety function of isolating the SDV. The current ACTION statement allows 7 days to repair the inoperable valve; the proposed change would allow for the isolation of the affected line and continue operation. If the affected line is not isolated within the 7-day time period (or the inoperable valve is not restored), the licensee would then be required to proceed to MODE 3 in the next 12 hours.
Maintaining the 7-day Completion Time is acceptable because of the low probability of the concurrent events of a scram within the 7 days of the Completion Time and a failure of the redundant valve(s). Alternately, if the inoperable valve was initially closed, there would be ample time and a warning available to drain the SDV before an automatic scram would occur due to SDV high level.


TS TS3.1-243.1-24  renewal. Such sale and leaseback transactions are subject to the representationsand conditions set forth in the above mentioned application of January 23, 1987,as supplemented on March 3, 1987, as well as the letter of the Director of theOffice of Nuclear Reactor Regulation dated March 16, 1987, consenting to suchtransactions. Specifically, a lessor and anyone else who may acquire an interestunder these transactions are prohibited from exercising directly or indirectly anycontrol over the licenses of PNPP Unit 1. For purposes of this condition thelimitations of 10 CFR 50.81, as now in effect and as may be subsequentlyamended, are fully applicable to the lessor and any successor in interest to thatlessor as long as the license for PNPP Unit 1 remains in effect; these financialtransactions shall have no effect on the license for the Perry Nuclear facilitythroughout the term of the license.  (b)Further, the licensees are also required to notify the NRC in writing prior to anychange in:  (i) the terms or conditions of any lease agreements executed as part ofthese transactions; (ii) the PNPP Operating Agreement; (iii) the existing propertyinsurance coverage for PNPP Unit 1; and (iv) any action by a lessor or others thatmay have an adverse effect on the safe operation of the facility.C.This license shall be deemed to contain and is subject to the conditions specified inthe Commission's regulations set forth in 10 CFR Chapter I and is subject to allapplicable provisions of the Act and to the rules, regulations, and orders of theCommission now and hereafter in effect; and is subject to the additional conditionsspecified or incorporated below:(1)Maximum Power LevelFENOC is authorized to operate the facility at reactor core power levels not inexcess of 3758 megawatts thermal (100% power) in accordance with the conditionsspecified herein.(2)Technical SpecificationsThe Technical Specifications contained in Appendix A and the EnvironmentalProtection Plan contained in Appendix B, as revised through Amendment No. 145,are hereby incorporated into the license. FENOC shall operate the facility inaccordance with the Technical Specifications and the Environmental Protection Plan.(3)Antitrust Conditionsa. FirstEnergy Nuclear Generation Corp. and Ohio Edison CompanyAmendment No. 145    SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TO AMENDMENT NO. 145 TO FACILITY OPERATING LICENSE NO. NPF-58FIRSTENERGY NUCLEAR OPERATING COMPANYFIRSTENERGY NUCLEAR GENERATION CORP.OHIO EDISON COMPANYPERRY NUCLEAR POWER PLANT, UNIT NO. 1DOCKET NO. 50-44
The allowance to administratively open a line that is isolated to comply with the actions (to permit draining and venting the SDV) is allowed by existing Required Action B.1. This allowance is being moved to apply to all ACTIONS based on the change proposed to Action A.
This would allow any accumulated water in the line to be drained, to preclude a reactor scram on SDV high level. A reactor scram is initiated if the SDV water level in the instrument volume exceeds a specified setpoint. The setpoint is chosen so that all control rods are inserted before the SDV has insufficient volume to accept a full scram. Regarding the isolation of the SDV, the remaining operable SDV vent and drain valve(s) would close automatically on a scram signal to isolate the lines. Or, if both valves in a line were inoperable (and opened under this provision),
the reactor coolant release could be terminated by resetting the scram from the control room, or by manually closing the valves. Resetting the scram automatically closes the scram outlet valves, isolating the control rod drive discharge path to the SDV.
3.3  Technical Evaluation Conclusion Based on the low probability of an event occurring during the defined Completion Time associated with this condition, the subsequent isolation of the affected lines, and the ability to open and drain the lines before an automatic scram due to SDV high water level, the proposed change maintains the necessary safety features and is therefore acceptable to the NRC staff.
The change to TS 3.1.8 requires that the licensee revise the discussion in the associated Bases section. Although the licensees application included possible wording for the revised Bases discussion for TS 3.1.8, the licensee will formally address the change to the Bases in accordance with the Bases Control Program or its administrative procedure for revising Bases.
The NRC staff does not believe that the Bases change will require prior NRC approval when evaluated against the criteria of 10 CFR 50.59, Changes, tests, and experiments, and, therefore, agrees that the revision of the Bases to TS 3.1.8 should be addressed separately from this amendment and should be included in a future update of the TS Bases in accordance with the bases Control Program and the licensees administrative controls.


==01.0INTRODUCTION==
==4.0  STATE CONSULTATION==
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) datedDecember 29, 2006, FirstEnergy Nuclear Operating Company, et al. (the licensee) requestedchanges to the technical specifications (TSs) for the Perry Nuclear Power Plant (PNPP), UnitNo. 1. The proposed changes would revise the TS requirements for scram discharge volumevent and drain valves. Specifically the proposed changes would revise the required actionwithin TS 3.1.8, ?Scram Discharge Volume (SDV) Vent and Drain Valves" for the condition ofhaving one or more SDV vent or drain lines with one valve inoperable. These changes arebased on Technical Specifications Task Force (TSTF) Change Traveler No. 404 (TSTF-404),?Scram Discharge Volume Vent and Drain Valves" Revision 0, that has been approvedgenerically for Boiling Water Reactor 6 (BWR/6) Standard Technical Specifications (STS),contained in NUREG-1434, "Standard Technical Specifications General Electric Plants, BWR/6Specifications," Revision 2. A notice announcing the availability of this proposed TS changeusing the consolidated line item improvement process (CLIIP) was published in the FederalRegister on April 15, 2003 (68 FR 18294).


==2.0REGULATORY EVALUATION==
In accordance with the Commissions regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.
NRC regulations and review standards such as Appendix A, ?General Design Criteria forNuclear Power Plants," to Title 10 of the Code of Federal Regulation (CFR) Part 50, includespecific requirements for reactor protection and reactivity control systems. The reactorprotection systems for BWRs use a hydraulic system to insert control rods into the reactor core. During an actuation of the reactor protection system (a scram), water is exhausted from thecontrol rod drive mechanisms to the SDVs. Proper maintenance and operation of the SDVs interms of instrumentation and limiting water volumes are essential for assuring the reliability ofthe reactor protection system (see NRC Bulletin 80-17, ?Failure of Control Rods to Insert DuringA Scram at a BWR," related Orders to specific facilities, and information provided in plant finalsafety analysis reports and TS Bases). Maintaining the SDVs to ensure that accumulated waterdoes not hamper or slow the insertion of control rods requires vent and drain valves. The ventand drain valves isolate during a scram to limit the amount of coolant discharged so thatadequate core cooling is maintained and offsite doses remain within regulatory limits. Specific license requirements for SDV vent and drain valves are defined in TS 3.1.8. Theexisting Limiting Condition for Operation (LCO) 3.1.8, requires that each SDV vent and drainvalve be operable. The operability of all SDV vent and drain valves ensures that the SDV ventand drain valves will close during a scram to contain reactor water discharged to the SDVpiping. Since the vent and drain lines are provided with two valves in series, the single failure ofone valve in the open position will not impair the isolation function of the system. Additionally,the valves are required to open on scram reset and during plant operation to control the amountof water accumulating in the SDV.If one or more SDV vent and drain lines have a single valve that is inoperable, the existingrequired action is to restore the valve(s) to operable status within 7 days. If an inoperable valveis not restored to operable status, a plant shutdown to MODE 3 is required within 12 hours. Ifone or more SDV vent or drain lines have both valves inoperable, the associated line must beisolated within 8 hours. In this condition, the plant is allowed to operate indefinitely. A noteassociated with the required action clarifies that the valves may be opened under administrativecontrols to allow draining of the SDV. The existing SDV vent and drain valve required actionsare inconsistent in that, although the operational and safety concerns are similar for having oneor both valves in a line being inoperable, the actions for a single inoperable valve do not allowfor the isolation of the line and administrative controls to support the draining of the SDV.The proposed change would revise the required actions to be more consistent with the safetysignificance of one inoperable valve in a SDV line versus two inoperable valves in an SDV line.


==3.0TECHNICAL EVALUATION==
==5.0  ENVIRONMENTAL CONSIDERATION==
3.1Proposed TS ChangeThe proposed changes to TS 3.1.8 are:1.Required Action A.1 is revised from restoring the single inoperable SDV vent anddrain valve in one or more SDV vent and drain lines to operable status to isolatingthe associated line.2.The Note to Required Action B.1, which allows an isolated line to be unisolatedunder administrative controls for the purpose of draining and venting the SDV, ismoved to a note that applies to both Conditions A (single inoperable valve) and B(both valves inoperable).3.2NRC Staff EvaluationWith one SDV vent or drain valve inoperable in one or more lines, the isolation function wouldbe maintained since the redundant valve in the affected line would perform its safety function ofisolating the SDV. The current ACTION statement allows 7 days to repair the inoperable valve;the proposed change would allow for the isolation of the affected line and continue operation. Ifthe affected line is not isolated within the 7-day time period (or the inoperable valve is notrestored), the licensee would then be required to proceed to MODE 3 in the next 12 hours. Maintaining the 7-day Completion Time is acceptable because of the low probability of theconcurrent events of a scram within the 7 days of the Completion Time and a failure of the redundant valve(s). Alternately, if the inoperable valve was initially closed, there would beample time and a warning available to drain the SDV before an automatic scram wouldoccur due to SDV high level. The allowance to administratively open a line that is isolated to comply with the actions (topermit draining and venting the SDV) is allowed by existing Required Action B.1. Thisallowance is being moved to apply to all ACTIONS based on the change proposed to Action A. This would allow any accumulated water in the line to be drained, to preclude a reactor scramon SDV high level. A reactor scram is initiated if the SDV water level in the instrument volumeexceeds a specified setpoint. The setpoint is chosen so that all control rods are inserted beforethe SDV has insufficient volume to accept a full scram. Regarding the isolation of the SDV, theremaining operable SDV vent and drain valve(s) would close automatically on a scram signal toisolate the lines. Or, if both valves in a line were inoperable (and opened under this provision),the reactor coolant release could be terminated by resetting the scram from the control room, orby manually closing the valves. Resetting the scram automatically closes the scram outletvalves, isolating the control rod drive discharge path to the SDV.3.3Technical Evaluation ConclusionBased on the low probability of an event occurring during the defined Completion Timeassociated with this condition, the subsequent isolation of the affected lines, and the ability toopen and drain the lines before an automatic scram due to SDV high water level, the proposedchange maintains the necessary safety features and is therefore acceptable to the NRC staff. The change to TS 3.1.8 requires that the licensee revise the discussion in the associated Basessection. Although the licensee's application included possible wording for the revised Basesdiscussion for TS 3.1.8, the licensee will formally address the change to the Bases inaccordance with the Bases Control Program or its administrative procedure for revising Bases. The NRC staff does not believe that the Bases change will require prior NRC approval whenevaluated against the criteria of 10 CFR 50.59, "Changes, tests, and experiments," and,therefore, agrees that the revision of the Bases to TS 3.1.8 should be addressed separatelyfrom this amendment and should be included in a future update of the TS Bases in accordancewith the bases Control Program and the licensee's administrative controls. 


==4.0 STATE CONSULTATION==
This amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluent that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that this amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 11388; March 13, 2007). Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
In accordance with the Commission's regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.


==5.0 ENVIRONMENTAL CONSIDERATION==
==6.0   CONCLUSION==
This amendment changes a requirement with respect to installation or use of a facilitycomponent located within the restricted area as defined in 10 CFR Part 20. The NRC staff hasdetermined that the amendment involves no significant increase in the amounts, and nosignificant change in the types, of any effluent that may be released offsite and that there is nosignificant increase in individual or cumulative occupational radiation exposure. TheCommission has previously issued a proposed finding that this amendment involves nosignificant hazards consideration and there has been no public comment on such finding (72 FR 11388; March 13, 2007). Accordingly, this amendment meets the eligibility criteria forcategorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), noenvironmental impact statement or environmental assessment need be prepared in connectionwith the issuance of this amendment.   


==6.0 CONCLUSION==
The NRC staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
The NRC staff has concluded, based on the considerations discussed above, that: (1) there isreasonable assurance that the health and safety of the public will not be endangered byoperation in the proposed manner, (2) such activities will be conducted in compliance with theCommission's regulations, and (3) the issuance of this amendment will not be inimical to thecommon defense and security or to the health and safety of the public.Principal Contributor: T. Wertz Date: June 22, 2007}}
Principal Contributor: T. Wertz Date: June 22, 2007}}

Latest revision as of 06:54, 23 November 2019

Issuance of License Amendment 145 Scram Discharge Volume Vent and Drain Valves
ML071450234
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/22/2007
From: Thomas Wengert
NRC/NRR/ADRO/DORL/LPLIII-2
To: Allen B
FirstEnergy Nuclear Operating Co
Wengert, Thomas NRR/DORL 415-4037
Shared Package
ML071450238 List:
References
TAC MD3898
Download: ML071450234 (15)


Text

June 22, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVES (TAC NO. MD3898)

Dear Mr. Allen:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 145 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. This amendment revises the Technical Specifications (TSs) in response to your application dated December 29, 2006.

This amendment modifies the TS requirements for scram discharge volume vent and drain valves.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.

Sincerely,

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosures:

1. Amendment No. 145 to NPF-58
2. Safety Evaluation cc w/encls: See next page

June 22, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVES (TAC NO. MD3898)

Dear Mr. Allen:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 145 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. This amendment revises the Technical Specifications (TSs) in response to your application dated December 29, 2006.

This amendment modifies the TS requirements for scram discharge volume vent and drain valves.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.

Sincerely,

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosures:

1. Amendment No. 145 to NPF-58
2. Safety Evaluation DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsNrrPMTWengert RidsNrrDirsItsb RidsOgcRp RidsNrrLAEWhitt RidsRgn3MailCenter RidsNrrDorlLpl3-2 RidsAcrsAcnwMailCenter RidsNrrDorlDpr GHill (2)

Package Accession Number: ML071450238 Amendment Accession Number: ML071450234 TS Accession Number: ML *See SE dated **NLO OFFICE LPL3-2/PM LPL3-2/LA DIRS/ITSB* OGC** LPL3-2/BC NAME TWengert EWhitt TKobetz BKlukan RGibbs DATE 6/22/07 6/22/07 2/20/07 6/11/07 6/22/07 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit No. 1 cc:

David W. Jenkins, Attorney Dennis Clum FirstEnergy Corporation Radiological Assistance Section Supervisor Mail Stop A-GO-15 Bureau of Radiation Protection 76 South Main Street Ohio Department of Health Akron, OH 44308 P.O. Box 118 Columbus, OH 43266-0118 Resident Inspector's Office U.S. Nuclear Regulatory Commission Zack A. Clayton P.O. Box 331 DERR Perry, OH 44081-0331 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Regional Administrator, Region III P.O. Box 1049 U.S. Nuclear Regulatory Commission Columbus, OH 43266-0149 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4531 Chairman Perry Township Board of Trustees Sue Hiatt 3750 Center Road, Box 65 OCRE Interim Representative Perry, OH 44081 8275 Munson Mentor, OH 44060 Daniel Z. Fisher Transportation Department Manager, Site Regulatory Compliance Public Utilities Commission FirstEnergy Nuclear Operating Company 180 East Broad Street Perry Nuclear Power Plant Columbus, OH 43215-3793 Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road James H. Lash Perry, OH 44081-0097 Senior Vice President of Operations and Chief Operating Officer Mayor, Village of North Perry FirstEnergy Nuclear Operating Company North Perry Village Hall Mail Stop A-GO-14 4449 Lockwood Road 76 South Main Street North Perry Village, OH 44081 Akron, OH 44308 Donna Owens, Director Director, Fleet Regulatory Affairs Ohio Department of Commerce FirstEnergy Nuclear Operating Company Division of Industrial Compliance Mail Stop A-GO-2 Bureau of Operations & Maintenance 76 South Main Street 6606 Tussing Road Akron, OH 44308 P.O. Box 4009 Reynoldsburg, OH 43068-9009 Joseph J. Hagan President and Chief Nuclear Officer Carol OClaire, Chief, Radiological Branch FirstEnergy Nuclear Operating Company Ohio Emergency Management Agency Mail Stop A-GO-14 2855 West Dublin Granville Road 76 South Main Street Columbus, OH 43235-7150 Akron, OH 44308 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100

Perry Nuclear Power Plant, Unit No. 1 cc:

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.

OHIO EDISON COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 145 License No. NPF-58

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for license filed by FirstEnergy Nuclear Operating Company, et al., (the licensee) dated December 29, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 145 are hereby incorporated into this license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of its date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Russell Gibbs, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Facility Operating License Date of Issuance: June 22, 2007

ATTACHMENT TO LICENSE AMENDMENT NO. 145 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following pages of the Facility Operating License and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-58 License NPF-58 Page 4 Page 4 TS TS 3.1-24 3.1-24

renewal. Such sale and leaseback transactions are subject to the representations and conditions set forth in the above mentioned application of January 23, 1987, as supplemented on March 3, 1987, as well as the letter of the Director of the Office of Nuclear Reactor Regulation dated March 16, 1987, consenting to such transactions. Specifically, a lessor and anyone else who may acquire an interest under these transactions are prohibited from exercising directly or indirectly any control over the licenses of PNPP Unit 1. For purposes of this condition the limitations of 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and any successor in interest to that lessor as long as the license for PNPP Unit 1 remains in effect; these financial transactions shall have no effect on the license for the Perry Nuclear facility throughout the term of the license.

(b) Further, the licensees are also required to notify the NRC in writing prior to any change in: (i) the terms or conditions of any lease agreements executed as part of these transactions; (ii) the PNPP Operating Agreement; (iii) the existing property insurance coverage for PNPP Unit 1; and (iv) any action by a lessor or others that may have an adverse effect on the safe operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now and hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level FENOC is authorized to operate the facility at reactor core power levels not in excess of 3758 megawatts thermal (100% power) in accordance with the conditions specified herein.

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 145, are hereby incorporated into the license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Antitrust Conditions

a. FirstEnergy Nuclear Generation Corp. and Ohio Edison Company Amendment No. 145

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 145 TO FACILITY OPERATING LICENSE NO. NPF-58 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.

OHIO EDISON COMPANY PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-440

1.0 INTRODUCTION

By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated December 29, 2006, FirstEnergy Nuclear Operating Company, et al. (the licensee) requested changes to the technical specifications (TSs) for the Perry Nuclear Power Plant (PNPP), Unit No. 1. The proposed changes would revise the TS requirements for scram discharge volume vent and drain valves. Specifically the proposed changes would revise the required action within TS 3.1.8, ?Scram Discharge Volume (SDV) Vent and Drain Valves for the condition of having one or more SDV vent or drain lines with one valve inoperable. These changes are based on Technical Specifications Task Force (TSTF) Change Traveler No. 404 (TSTF-404),

?Scram Discharge Volume Vent and Drain Valves Revision 0, that has been approved generically for Boiling Water Reactor 6 (BWR/6) Standard Technical Specifications (STS),

contained in NUREG-1434, Standard Technical Specifications General Electric Plants, BWR/6 Specifications, Revision 2. A notice announcing the availability of this proposed TS change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on April 15, 2003 (68 FR 18294).

2.0 REGULATORY EVALUATION

NRC regulations and review standards such as Appendix A, ?General Design Criteria for Nuclear Power Plants, to Title 10 of the Code of Federal Regulation (CFR) Part 50, include specific requirements for reactor protection and reactivity control systems. The reactor protection systems for BWRs use a hydraulic system to insert control rods into the reactor core.

During an actuation of the reactor protection system (a scram), water is exhausted from the control rod drive mechanisms to the SDVs. Proper maintenance and operation of the SDVs in terms of instrumentation and limiting water volumes are essential for assuring the reliability of the reactor protection system (see NRC Bulletin 80-17, ?Failure of Control Rods to Insert During A Scram at a BWR, related Orders to specific facilities, and information provided in plant final safety analysis reports and TS Bases). Maintaining the SDVs to ensure that accumulated water does not hamper or slow the insertion of control rods requires vent and drain valves. The vent and drain valves isolate during a scram to limit the amount of coolant discharged so that adequate core cooling is maintained and offsite doses remain within regulatory limits.

Enclosure 2

Specific license requirements for SDV vent and drain valves are defined in TS 3.1.8. The existing Limiting Condition for Operation (LCO) 3.1.8, requires that each SDV vent and drain valve be operable. The operability of all SDV vent and drain valves ensures that the SDV vent and drain valves will close during a scram to contain reactor water discharged to the SDV piping. Since the vent and drain lines are provided with two valves in series, the single failure of one valve in the open position will not impair the isolation function of the system. Additionally, the valves are required to open on scram reset and during plant operation to control the amount of water accumulating in the SDV.

If one or more SDV vent and drain lines have a single valve that is inoperable, the existing required action is to restore the valve(s) to operable status within 7 days. If an inoperable valve is not restored to operable status, a plant shutdown to MODE 3 is required within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If one or more SDV vent or drain lines have both valves inoperable, the associated line must be isolated within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. In this condition, the plant is allowed to operate indefinitely. A note associated with the required action clarifies that the valves may be opened under administrative controls to allow draining of the SDV. The existing SDV vent and drain valve required actions are inconsistent in that, although the operational and safety concerns are similar for having one or both valves in a line being inoperable, the actions for a single inoperable valve do not allow for the isolation of the line and administrative controls to support the draining of the SDV.

The proposed change would revise the required actions to be more consistent with the safety significance of one inoperable valve in a SDV line versus two inoperable valves in an SDV line.

3.0 TECHNICAL EVALUATION

3.1 Proposed TS Change The proposed changes to TS 3.1.8 are:

1. Required Action A.1 is revised from restoring the single inoperable SDV vent and drain valve in one or more SDV vent and drain lines to operable status to isolating the associated line.
2. The Note to Required Action B.1, which allows an isolated line to be unisolated under administrative controls for the purpose of draining and venting the SDV, is moved to a note that applies to both Conditions A (single inoperable valve) and B (both valves inoperable).

3.2 NRC Staff Evaluation With one SDV vent or drain valve inoperable in one or more lines, the isolation function would be maintained since the redundant valve in the affected line would perform its safety function of isolating the SDV. The current ACTION statement allows 7 days to repair the inoperable valve; the proposed change would allow for the isolation of the affected line and continue operation. If the affected line is not isolated within the 7-day time period (or the inoperable valve is not restored), the licensee would then be required to proceed to MODE 3 in the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Maintaining the 7-day Completion Time is acceptable because of the low probability of the concurrent events of a scram within the 7 days of the Completion Time and a failure of the redundant valve(s). Alternately, if the inoperable valve was initially closed, there would be ample time and a warning available to drain the SDV before an automatic scram would occur due to SDV high level.

The allowance to administratively open a line that is isolated to comply with the actions (to permit draining and venting the SDV) is allowed by existing Required Action B.1. This allowance is being moved to apply to all ACTIONS based on the change proposed to Action A.

This would allow any accumulated water in the line to be drained, to preclude a reactor scram on SDV high level. A reactor scram is initiated if the SDV water level in the instrument volume exceeds a specified setpoint. The setpoint is chosen so that all control rods are inserted before the SDV has insufficient volume to accept a full scram. Regarding the isolation of the SDV, the remaining operable SDV vent and drain valve(s) would close automatically on a scram signal to isolate the lines. Or, if both valves in a line were inoperable (and opened under this provision),

the reactor coolant release could be terminated by resetting the scram from the control room, or by manually closing the valves. Resetting the scram automatically closes the scram outlet valves, isolating the control rod drive discharge path to the SDV.

3.3 Technical Evaluation Conclusion Based on the low probability of an event occurring during the defined Completion Time associated with this condition, the subsequent isolation of the affected lines, and the ability to open and drain the lines before an automatic scram due to SDV high water level, the proposed change maintains the necessary safety features and is therefore acceptable to the NRC staff.

The change to TS 3.1.8 requires that the licensee revise the discussion in the associated Bases section. Although the licensees application included possible wording for the revised Bases discussion for TS 3.1.8, the licensee will formally address the change to the Bases in accordance with the Bases Control Program or its administrative procedure for revising Bases.

The NRC staff does not believe that the Bases change will require prior NRC approval when evaluated against the criteria of 10 CFR 50.59, Changes, tests, and experiments, and, therefore, agrees that the revision of the Bases to TS 3.1.8 should be addressed separately from this amendment and should be included in a future update of the TS Bases in accordance with the bases Control Program and the licensees administrative controls.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

This amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluent that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that this amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 11388; March 13, 2007). Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.

6.0 CONCLUSION

The NRC staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: T. Wertz Date: June 22, 2007