ML083190063: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:November 25, 2008 | {{#Wiki_filter:November 25, 2008 Mr. Joseph H. Plona, Assistant Vice President, Nuclear Generation DTE Energy 6400 North Dixie Hwy Newport, MI 48166 | ||
Mr. Joseph H. Plona, Assistant Vice President, Nuclear Generation DTE Energy 6400 North Dixie Hwy Newport, MI 48166 | |||
==SUBJECT:== | ==SUBJECT:== | ||
REPORT OF NOVEMBER 5, 2008 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334) | REPORT OF NOVEMBER 5, 2008 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334) | ||
==Dear Mr. Plona:== | ==Dear Mr. Plona:== | ||
Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor. | Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor. | ||
If you have any questions regarding this letter or the enclosure, please contact me at (301) 415-6721, or by e-mail, to Theodore.smith@nrc.gov. | |||
In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commissions (NRC=s) ARules of Practice for Domestic Licensing Proceedings and Issuance of Orders,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Sincerely, | |||
/RA/ | |||
Theodore Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 050-00016 | |||
==Enclosure:== | |||
Meeting Report | |||
= | |||
= | |||
Mr. Joseph H. Plona, Assistant Vice President, Nuclear Generation DTE Energy 6400 North Dixie Hwy Newport, MI 48166 | |||
==SUBJECT:== | ==SUBJECT:== | ||
REPORT OF NOVEMBER 5, 2008 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334) | REPORT OF NOVEMBER 5, 2008 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334) | ||
==Dear Mr. Plona:== | ==Dear Mr. Plona:== | ||
Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor. | Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor. | ||
If you have any questions regarding this letter or the enclosure, please contact me at (301) 415-6721, or by e-mail, to Theodore.smith@nrc.gov. | |||
If you have any questions regarding this letter or the enclosure, please contact me at (301) 415-6721, or by e-mail, to Theodore.smith@nrc.gov. | In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commissions (NRC=s) ARules of Practice for Domestic Licensing Proceedings and Issuance of Orders,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | ||
Sincerely, Theodore Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 050-00016 | |||
In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory | |||
=s) ARules of Practice for Domestic Licensing Proceedings and Issuance of Orders,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC | |||
=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Sincerely, | |||
Docket No.: | |||
==Enclosure:== | ==Enclosure:== | ||
Meeting Report | Meeting Report Distribution: | ||
LS KMcConnell DOrlando RidsRgn3MailCenter Meeting Attendees via E-mail ML083190068 Office DWMEP DWMEP DWMEP DWMEP Name TSmith SMichonski KOConnell TSmith Date 11/13/08 11/20/08 11/21/08 11/25/08 OFFICIAL RECORD COPY | |||
Distribution: | |||
LS KMcConnell DOrlando RidsRgn3MailCenter | |||
Meeting Attendees via E-mail ML083190068 Office DWMEP DWMEP DWMEP DWMEP Name TSmith SMichonski | |||
MEETING REPORT DATE: November 5, 2008 TIME: 2:00 p.m. Eastern PLACE: Two White Flint North, Room T-3A00 U.S. Nuclear Regulatory Commission Headquarters Rockville, Maryland PURPOSE: To discuss license termination and site decommissioning plans for the Fermi-1 reactor. | |||
ATTENDEES: SEE ATTACHED LIST BACKGROUND: | |||
The Fermi-1 reactor is located at Lagoona Beach, Frenchtown Township, Michigan. The reactor was shutdown in 1972. DTE Energy has been stabilizing the facility by passivating residual sodium and disposing of plant components and systems. DTE Energy is currently planning to submit a license termination plan in mid-2009, and terminate their license in 2012. | |||
DISCUSSION: | |||
The meeting was publicly noticed on October 6, 2008, by posting on the U.S. Nuclear Regulatory Commission (NRC) web site. The meeting began at approximately 2:00 p.m. EST. The following issues were discussed during the meeting: | The meeting was publicly noticed on October 6, 2008, by posting on the U.S. Nuclear Regulatory Commission (NRC) web site. The meeting began at approximately 2:00 p.m. EST. The following issues were discussed during the meeting: | ||
: 1. NRC (Ted Smith) made introductions and an opening statement, including opportunity to provide meeting feedback utilizing NRC Form 659, which was provided. | : 1. NRC (Ted Smith) made introductions and an opening statement, including opportunity to provide meeting feedback utilizing NRC Form 659, which was provided. | ||
: 2. DTE Energy (Lynne Goodman and Martin Erickson) presented the site decommissioning status, characterization methodology, sensitivity analysis, draft Derived Concentration Guideline Levels (DCGLs), and the results of their historical site assessment. | : 2. DTE Energy (Lynne Goodman and Martin Erickson) presented the site decommissioning status, characterization methodology, sensitivity analysis, draft Derived Concentration Guideline Levels (DCGLs), and the results of their historical site assessment. | ||
ACTION ITEMS: | |||
ACTION ITEMS: | NRC agreed to complete its evaluation of the relationship between Fermi-2 license termination evaluations for residual radioactivity remaining onsite from a terminated Fermi-1 license. | ||
DTE agreed to begin providing a monthly project schedule beginning in January 2009, which will reviewed during monthly telephone conferences. | |||
NRC agreed to complete its evaluation of the relationship between Fermi-2 license termination evaluations for residual radioactivity remaining onsite from a terminated Fermi-1 license. | DTE agreed to check on the availability of additional groundwater data and modeling for Fermi-2. | ||
DTE agreed to begin providing a monthly | |||
DTE agreed to check on the availability of additional groundwater data and modeling for | |||
Attachments: | Attachments: | ||
: 1. Meeting Agenda | : 1. Meeting Agenda | ||
: 2. Attendee List | : 2. Attendee List | ||
: 3. DTE Energy Meeting Handout | : 3. DTE Energy Meeting Handout Enclosure | ||
Date | AGENDA Public Meeting - NRC & Fermi-1 Status Report on License Termination and Site Decommissioning Planning Date Time Wednesday November 5, 2008 2:00 p.m. - 4:00 p.m. | ||
Session Time Topic Participants Introductions, clarification of Aground rules@ | |||
2:00 p.m. concerning public portion of meeting and NRC/Fermi-1 opening remarks Fermi-1 staff presentation on 2:15 p.m. decommissioning status, characterization Fermi-1 methodology, sensitivity analysis, draft DCGLs, and historical site assessment. | |||
3:45 p.m. Opportunity for public comment NRC/Public 4:00 p.m. Adjournment Attachment 1 | |||
NAME AFFILIATION Lynne Goodman DTE Martin Erickson DTE Kenneth Lindsey DTE Ted Smith NRC/FSME Christepher McKenney NRC/FSME Matt Meyer NRC/FSME Bruce Watson NRC/FSME Hans Arlt NRC/FSME}} | MEETING ATTENDEES Date: November 5, 2008 Topic: Fermi-1 License Termination Planning NAME AFFILIATION Lynne Goodman DTE Martin Erickson DTE Kenneth Lindsey DTE Ted Smith NRC/FSME Christepher McKenney NRC/FSME Matt Meyer NRC/FSME Bruce Watson NRC/FSME Hans Arlt NRC/FSME Attachment 2}} |
Latest revision as of 11:12, 14 November 2019
ML083190063 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 11/25/2008 |
From: | Tanya Smith NRC/FSME/DWMEP/DURLD/RDB |
To: | Plona J DTE Energy |
Shared Package | |
ML083190068 | List: |
References | |
TAC J00334 | |
Download: ML083190063 (10) | |
Text
November 25, 2008 Mr. Joseph H. Plona, Assistant Vice President, Nuclear Generation DTE Energy 6400 North Dixie Hwy Newport, MI 48166
SUBJECT:
REPORT OF NOVEMBER 5, 2008 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334)
Dear Mr. Plona:
Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor.
If you have any questions regarding this letter or the enclosure, please contact me at (301) 415-6721, or by e-mail, to Theodore.smith@nrc.gov.
In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commissions (NRC=s) ARules of Practice for Domestic Licensing Proceedings and Issuance of Orders,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Theodore Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 050-00016
Enclosure:
Meeting Report
Mr. Joseph H. Plona, Assistant Vice President, Nuclear Generation DTE Energy 6400 North Dixie Hwy Newport, MI 48166
SUBJECT:
REPORT OF NOVEMBER 5, 2008 CATEGORY 1 MEETING, FERMI-1, DOCKET 050-00016 (TAC J00334)
Dear Mr. Plona:
Enclosed is the meeting report for the above referenced meeting. I would like to thank you and your staff for providing an update on the status of the Fermi-1 reactor.
If you have any questions regarding this letter or the enclosure, please contact me at (301) 415-6721, or by e-mail, to Theodore.smith@nrc.gov.
In accordance with 10 CFR 2.390 of the U.S. Nuclear Regulatory Commissions (NRC=s) ARules of Practice for Domestic Licensing Proceedings and Issuance of Orders,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, Theodore Smith, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 050-00016
Enclosure:
Meeting Report Distribution:
LS KMcConnell DOrlando RidsRgn3MailCenter Meeting Attendees via E-mail ML083190068 Office DWMEP DWMEP DWMEP DWMEP Name TSmith SMichonski KOConnell TSmith Date 11/13/08 11/20/08 11/21/08 11/25/08 OFFICIAL RECORD COPY
MEETING REPORT DATE: November 5, 2008 TIME: 2:00 p.m. Eastern PLACE: Two White Flint North, Room T-3A00 U.S. Nuclear Regulatory Commission Headquarters Rockville, Maryland PURPOSE: To discuss license termination and site decommissioning plans for the Fermi-1 reactor.
ATTENDEES: SEE ATTACHED LIST BACKGROUND:
The Fermi-1 reactor is located at Lagoona Beach, Frenchtown Township, Michigan. The reactor was shutdown in 1972. DTE Energy has been stabilizing the facility by passivating residual sodium and disposing of plant components and systems. DTE Energy is currently planning to submit a license termination plan in mid-2009, and terminate their license in 2012.
DISCUSSION:
The meeting was publicly noticed on October 6, 2008, by posting on the U.S. Nuclear Regulatory Commission (NRC) web site. The meeting began at approximately 2:00 p.m. EST. The following issues were discussed during the meeting:
- 1. NRC (Ted Smith) made introductions and an opening statement, including opportunity to provide meeting feedback utilizing NRC Form 659, which was provided.
- 2. DTE Energy (Lynne Goodman and Martin Erickson) presented the site decommissioning status, characterization methodology, sensitivity analysis, draft Derived Concentration Guideline Levels (DCGLs), and the results of their historical site assessment.
ACTION ITEMS:
NRC agreed to complete its evaluation of the relationship between Fermi-2 license termination evaluations for residual radioactivity remaining onsite from a terminated Fermi-1 license.
DTE agreed to begin providing a monthly project schedule beginning in January 2009, which will reviewed during monthly telephone conferences.
DTE agreed to check on the availability of additional groundwater data and modeling for Fermi-2.
Attachments:
- 1. Meeting Agenda
- 2. Attendee List
- 3. DTE Energy Meeting Handout Enclosure
AGENDA Public Meeting - NRC & Fermi-1 Status Report on License Termination and Site Decommissioning Planning Date Time Wednesday November 5, 2008 2:00 p.m. - 4:00 p.m.
Session Time Topic Participants Introductions, clarification of Aground rules@
2:00 p.m. concerning public portion of meeting and NRC/Fermi-1 opening remarks Fermi-1 staff presentation on 2:15 p.m. decommissioning status, characterization Fermi-1 methodology, sensitivity analysis, draft DCGLs, and historical site assessment.
3:45 p.m. Opportunity for public comment NRC/Public 4:00 p.m. Adjournment Attachment 1
MEETING ATTENDEES Date: November 5, 2008 Topic: Fermi-1 License Termination Planning NAME AFFILIATION Lynne Goodman DTE Martin Erickson DTE Kenneth Lindsey DTE Ted Smith NRC/FSME Christepher McKenney NRC/FSME Matt Meyer NRC/FSME Bruce Watson NRC/FSME Hans Arlt NRC/FSME Attachment 2