{{#Wiki_filter:NMP2  JPM #S-1 1 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE  
{{#Wiki_filter:Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Place RCS HPU Subloop In Service And Reset FCV Lockout                   Revision: NRC 2008 Task Number: N2-202001-01001 N2-202001-01023 Approvals:
 
NA EXAMINATION SECURITY General Supervisor             Date                   General Supervisor                     Date Operations Training (Designee)                         Operations (Designee)
Title: Place RCS HPU Subloop In Service And Reset FCV Lockout           Revision: NRC 2008 Task Number: N2-202001-01001 N2-202001-01023 Approvals:  
NA EXAMINATION SECURITY Configuration Control          Date Performer:                            (RO/SRO)
 
Trainer/Evaluator:
NA EXAMINATION SECURITY General Supervisor Date   General Supervisor   Date Operations Training (Designee)   Operations (Designee)  
Evaluation Method:      X        Perform                      Simulate Evaluation Location:        Plant                  X Simulator Expected Completion Time: 15 minutes          Time Critical Task: NO          Alternate Path Task:
NO Start Time:                    Stop Time:                    Completion Time:
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:                                                    Date:
NMP2 JPM #S-1                                    1                                  October 2008


NA EXAMINATION SECURITY Configuration Control  Date Performer:    (RO/SRO)  Trainer/Evaluator:
Recommended Start Location:
Evaluation Method:    X  Perform              Simulate Evaluation Location:          Plant        X  Simulator Expected Completion Time: 15 minutes  Time Critical Task: NO Alternate Path Task: NO Start Time:    Stop Time:  Completion Time:
JPM Overall Rating:  Pass  Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
Evaluator Signature:      Date:
NMP2  JPM #S-1 2 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Simulator Simulator Set-up:
: 1. Reset to IC 181 Directions to Operators:
: 1. Reset to IC 181 Directions to Operators:
Line 42: Line 41:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
: 3.      During Training JPM:
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.


==References:==
==References:==
: 1. N2-OP-29, Rev 12, Sect. E.1.0 2. NUREG K/A 202002 A4.02 Tools and Equipment:
: 1. N2-OP-29, Rev 12, Sect. E.1.0
: 1. None Task Standard:
: 2. NUREG K/A 202002 A4.02 Tools and Equipment:
Hydraulic Power Unit "A" has been placed in service with Subloop 2 is in "LEAD" operation. FCV A motion inhibit is reset and all P602 annunciators associated with FCV A are clear.  
: 1. None Task Standard:
Hydraulic Power Unit A has been placed in service with Subloop 2 is in LEAD operation. FCV A motion inhibit is reset and all P602 annunciators associated with FCV A are clear.
NMP2 JPM #S-1                                      2                                  October 2008


NMP2  JPM #S-2 3 October 2008 Initial Conditions:
Initial Conditions:
: 1. The plant is operating at rated power. 2. Recirc FCV HPU "A" tripped due to a hot oil condition 1 hour ago. 3. HPU "A" hot oil condition is now cleared, oil temperature is 100
: 1. The plant is operating at rated power.
°F and the HPU is ready to be placed in service. 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
: 2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour ago.
Initiating cue:  
: 3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service.
"(Operator's name), Place HPU "ASubloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0."
: 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
 
Initiating cue:
Performance Steps Standard Grade   1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
(Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0.
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-29 obtained. Precautions & limitations reviewed & section E.1.0 referenced. Sat/Unsat      3. NOTE: The LOOP A(B) HYDR FLUID OUTSIDE ISOL valves may be closed, to reduce flow control valve from drifting closed during an HPU/Control System failure. They can be left closed until after their HPU is restored to operation.  
Performance Steps                                     Standard                                   Grade
 
: 1. Provide repeat back of initiating cue.             Proper communications used for          Sat/Unsat Evaluator Acknowledge repeat back                   repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
CAUTION: IF a standby HPU Subloop remains pressurized (greater than 500 psig) when removed from service and is restarted without the other subloop in operation, this could cause RECIRC FCV motion. This should be avoided. Reviews Note and Caution Sat/Unsat      4. For the HPU being started, perform the following:
: 2. Obtain a copy of the reference procedure           N2-OP-29 obtained. Precautions &         Sat/Unsat and review/utilize the correct section.            limitations reviewed & section E.1.0 referenced.
* IF any of the following conditions exist, isolate 2RCS*SOV65A(B), Reviews Procedure Step Sat/Unsat NMP2 JPM #S-2 4 October 2008 Performance Steps Standard Grade  2RCS*SOV66A(B), 2RCS*SOV67A(B),
: 3.       NOTE:                                       Reviews Note and Caution                Sat/Unsat The LOOP A(B) HYDR FLUID OUTSIDE ISOL valves may be closed, to reduce flow control valve from drifting closed during an HPU/Control System failure. They can be left closed until after their HPU is restored to operation.
2RCS*SOV68A(B), for the affected HPU by taking the LOOP A(B) HYDR FLUID OUTSIDE ISOL switch to CLOSE:  o Unexpected pressure (greater than 400 psig) WHILE the subloop is in standby o Associated solenoid valve 2RCS-SOV106A(B) OR 2RCS- SOV107A(B) is known to be sticking partially open OR is NOT able to be over-ridden WHILE the solenoid coils are de-energized o It is known that EITHER "OPERATE" OR "ISOLATE" coil is burned out o FUSE BLOWN indicator is lit on the Modicon I/O module inside panel 2CEC-PNL634 at any of the following:
CAUTION:
Subloop A1 - MTBA-2, west panel, left column, 2nd from top (total of 8)  Subloop A2 - MTBA-10, west panel, right column, 2nd from top (total of 8)  Subloop B1 - MTBB-2, east panel, left column, 2nd from top (total of 8)  Subloop B2 - MTBB-10, east panel, right column,2nd from top (total of 8)
IF a standby HPU Subloop remains pressurized (greater than 500 psig) when removed from service and is restarted without the other subloop in operation, this could cause RECIRC FCV motion. This should be avoided.
: 4.       For the HPU being started, perform the     Reviews Procedure Step                  Sat/Unsat following:
* IF any of the following conditions exist, isolate 2RCS*SOV65A(B),
NMP2 JPM #S-2                                     3                              October 2008


Performance Steps                                  Standard              Grade 2RCS*SOV66A(B), 2RCS*SOV67A(B),
2RCS*SOV68A(B), for the affected HPU by taking the LOOP A(B) HYDR FLUID OUTSIDE ISOL switch to CLOSE:
o  Unexpected pressure (greater than 400 psig) WHILE the subloop is in standby o  Associated solenoid valve 2RCS-SOV106A(B) OR 2RCS-SOV107A(B) is known to be sticking partially open OR is NOT able to be over-ridden WHILE the solenoid coils are de-energized o  It is known that EITHER OPERATE OR ISOLATE coil is burned out o  FUSE BLOWN indicator is lit on the Modicon I/O module inside panel 2CEC-PNL634 at any of the following:
Subloop A1 - MTBA-2, west panel, left column, 2nd from top (total of 8)
Subloop A2 - MTBA-10, west panel, right column, 2nd from top (total of 8)
Subloop B1 - MTBB-2, east panel, left column, 2nd from top (total of 8)
Subloop B2 - MTBB-10, east panel, right column,2nd from top (total of 8)
Cue: Valves were previously closed. None of these conditions currently exist
Cue: Valves were previously closed. None of these conditions currently exist
: 5. IF the HPU has been idle for less than 2 hours OR controls on the HPU have NOT been repositioned since the last shutdown, perform the following:  
: 5. IF the HPU has been idle for less than 2 hours OR controls on the HPU have NOT been repositioned since the last shutdown, perform the following:
 
NMP2 JPM #S-2                                   4          October 2008
NMP2 JPM #S-2 5 October 2008 Performance Steps Standard Grade Cue/Note: Initial Conditions state that one hour has elapsed
: a. Verify open 2RCS-V2011A(B) AND V2011C(D), Return Filter Isolation.


Performance Steps                                Standard                                      Grade Cue/Note: Initial Conditions state that one hour has elapsed
: a. Verify open 2RCS-V2011A(B) AND            Dispatches operator to verify local          Sat/Unsat V2011C(D), Return Filter Isolation.      valve positions.
Cue: 2RCS-V2011A and V2011C are open.
Cue: 2RCS-V2011A and V2011C are open.
: b. Continue at Step E.1.14.  
: b. Continue at Step E.1.14.                 Continues to step E.1.14                     Sat/Unsat
 
: 6. At 2CEC-PNL634 (South), Rack 1 for       Verifies red indicating lights are NOT lit  Sat/Unsat HPU A AND Rack 2 for HPU B, NEST 5, CARD 1, (R/C/L, labeled B35-K686A(B)) verify the red indicating lights for Channel 1 and 2 are NOT lit.
Dispatches operator to verify local valve positions.
 
Continues to step E.1.14  
 
Sat/Unsat  
 
Sat/Unsat      6. At 2CEC-PNL634 (South), Rack 1 for HPU A AND Rack 2 for HPU B, NEST 5, CARD 1, (R/C/L, labeled B35- K686A(B)) verify the red indicating lights for Channel 1 and 2 are NOT lit.  
 
IF lit depress the reset pushbuttons.
IF lit depress the reset pushbuttons.
Cue: Red indicating lights for Channel 1 and 2 are extinguished.
Cue: Red indicating lights for Channel 1 and 2 are extinguished.
Verifies red indicating lights are NOT lit Sat/Unsat
: 7. Momentarily depress BOTH READY           Depresses BOTH READY pushbuttons            Pass/Fail pushbuttons Verify the following:
: 7. Momentarily depress BOTH READY pushbuttons Verify the following:
o   READY light illuminates.         Verifies lights and annunciator              Sat/Unsat o   MAINTENANCE light extinguishes.
o READY light illuminates.
o   Annunciator 602103(104),
o MAINTENANCE light extinguishes.
RECIRC FCV A(B) BACKUP HYDR INOPERABLE clears.
o Annunciator 602103(104), RECIRC FCV A(B) BACKUP HYDR INOPERABLE clears.
: 8. Unless isolated per Step E.1.1.1 verify   At P602, opens valves using LOOP A          Pass/Fail the following valves open:               HYDR FLUID OUTSIDE ISOL switch.
Depresses BOTH READY pushbuttons
Observes green closed lights o   2RCS*SOV65A(B)                   extinguish and the red open lights are o   2RCS*SOV66A(B)                   lit for the four outside isolation valves.
 
o   2RCS*SOV67A(B) o   2RCS*SOV68A(B)
Verifies lights and annunciator Pass/Fail
Note: Not isolated per E1.1.1 NMP2 JPM #S-2                                5                                  October 2008
 
Sat/Unsat      8. Unless isolated per Step E.1.1.1 verify the following valves open:
o 2RCS*SOV65A(B) o 2RCS*SOV66A(B) o 2RCS*SOV67A(B) o 2RCS*SOV68A(B)
Note: Not isolated per E1.1.1 At P602, opens valves using LOOP A HYDR FLUID OUTSIDE ISOL switch. Observes green "closed" lights extinguish and the red "open" lights are lit for the four outside isolation valves. Pass/Fail


NMP2  JPM #S-2 6 October 2008 Performance Steps Standard Grade 9. NOTE: Step 1.17 does not apply if I&C is to use the Standby Unit (SBU) at 2CEC-PNL634 to reduce % SERVO ERROR to zero or have verified that the signal to the servo valve is approximately zero.
Performance Steps                                   Standard                                 Grade
: 9.     NOTE: Step 1.17 does not apply if I&C       Reads Note                              Sat/Unsat is to use the Standby Unit (SBU) at 2CEC-PNL634 to reduce % SERVO ERROR to zero or have verified that the signal to the servo valve is approximately zero.
Cue: If asked, I&C will NOT be using SBU to reduce % SERVO ERROR.
Cue: If asked, I&C will NOT be using SBU to reduce % SERVO ERROR.
 
Using 2RCS-HC1603A(B), RECIRC               At P602, Reduces % SERVO ERROR          Pass/Fail LOOP A(B) FLOW CONTROL at                   to ZERO using Loop A controller 2CEC*PNL602, reduce % SERVO ERROR to zero.
Using 2RCS-HC1603A(B), RECIRC LOOP A(B) FLOW CONTROL at 2CEC*PNL602, reduce % SERVO ERROR to zero.
NOTE: Failure to zero the % SERVO ERROR will result in an unplanned reactivity transient, as the FCV opens.
NOTE: Failure to zero the % SERVO ERROR will result in an unplanned reactivity transient, as the FCV opens.
Reads Note
: 10. Decide which subloop is to control the     Depresses PUMP/FAN MTR RUN              Pass/Fail actuator AND depress its PUMP/FAN           pushbutton for HPU A, Subloop 2 MTR RUN pushbutton.
 
Verify the following:                       Verifies indications                    Sat/Unsat
At P602, Reduces % SERVO ERROR to ZERO using Loop A controller Sat/Unsat
 
Pass/Fail
: 10. Decide which subloop is to control the actuator AND depress its PUMP/FAN MTR RUN pushbutton.  
 
Verify the following:
* PUMP/FAN MTR STOP light extinguishes.
* PUMP/FAN MTR STOP light extinguishes.
* PUMP/FAN MTR RUN light illuminates.
* PUMP/FAN MTR RUN light illuminates.
Line 116: Line 111:
* PRESSURIZED light illuminates OR 2RCS-PI1001A(B)-1(2) locally indicates 1850-1950 psi.
* PRESSURIZED light illuminates OR 2RCS-PI1001A(B)-1(2) locally indicates 1850-1950 psi.
* Annunciator 602101(102), RECIRC FCV A(B) HYDRAULICS INOPERABLE clears.
* Annunciator 602101(102), RECIRC FCV A(B) HYDRAULICS INOPERABLE clears.
Depresses PUMP/FAN MTR RUN pushbutton for HPU "A", Subloop 2  
: 11. At 2CEC*PNL602, verify:
NMP2 JPM #S-2                                   6                              October 2008


Verifies indications Pass/Fail
Performance Steps                                 Standard                                     Grade
 
* Annunciator 602111(112), RECIRC         Verifies annunciators clear, with the      Sat/Unsat FCV A(B) HYDRAULICS MAINT             exception of 602105 REQD cleared.
Sat/Unsat          11. At 2CEC*PNL602, verify:
 
NMP2  JPM #S-2 7 October 2008 Performance Steps Standard Grade
* Annunciator 602111(112), RECIRC FCV A(B) HYDRAULICS MAINT REQ'D cleared.
* Annunciator 602103(104), RECIRC FCV A(B) BACK UP HYDR INOPERABLE cleared.
* Annunciator 602103(104), RECIRC FCV A(B) BACK UP HYDR INOPERABLE cleared.
* Annunciator 602127(128), DRYWELL HIGH PRESSURE SWITCH A(B) TEST POSITION cleared.
* Annunciator 602127(128),
* Annunciator 602133(134), DRYWELL HIGH PRESSURE SYSTEM A(B) INTERLOCK cleared.
DRYWELL HIGH PRESSURE SWITCH A(B) TEST POSITION cleared.
* Annunciator 602133(134),
DRYWELL HIGH PRESSURE SYSTEM A(B) INTERLOCK cleared.
* Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT, in alarm condition.
* Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT, in alarm condition.
Verifies annunciators clear, with the exception of 602105 Sat/Unsat    12. Depress the applicable FCV MOTION INHIBIT RESET pushbutton at 2CEC*PNL602:
: 12. Depress the applicable FCV MOTION         Depresses FCV MOTION INHIBIT              Pass/Fail INHIBIT RESET pushbutton at               RESET pushbutton 2CEC*PNL602:
Verify the following:
Verify the following:                     Verifies light illuminated and            Sat/Unsat annunciator clear
* LEAD subloop OPERATIONAL light illuminated
* LEAD subloop OPERATIONAL light illuminated
* Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT extinguishes.
* Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT extinguishes.
Depresses FCV MOTION INHIBIT RESET  pushbutton Verifies light illuminated and annunciator clear
: 13. Report completion.                        Report completion.                        Sat/Unsat TERMINATING CUE: Hydraulic Power Unit A Subloop 2 is in operation and FCV A motion inhibit is reset with all annunciators associated with FCV A cleared.
RECORD STOP TIME NMP2 JPM #S-2                                  7                                October 2008


Pass/Fail Sat/Unsat    13. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Hydraulic Power Unit "A" Subloop 2 is in "operation" and FCV A motion inhibit is reset with all annunciators associated with FCV A cleared.
Initial Conditions:
RECORD STOP TIME 
: 1. The plant is operating at rated power.
: 2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour ago.
: 3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service.
: 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
Initiating cue:
(Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0.
NMP2 JPM #S-2                                  8                                October 2008


NMP2  JPM #S-2 8 October 2008 Initial Conditions:
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shifting Feedwater Pumps at Power65% power when 2 pumps are in service Revision:
: 1. The plant is operating at rated power. 2. Recirc FCV HPU "A" tripped due to a hot oil condition 1 hour ago. 3. HPU "A" hot oil condition is now cleared, oil temperature is 100
NRC 2008 Task Number: N2-259001-01004 Approvals:
°F and the HPU is ready to be placed in service. 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
NA EXAMINATION SECURITY General Supervisor             Date                   General Supervisor Date Operations Training (Designee)                         Operations (Designee)
Initiating cue:
NA EXAMINATION SECURITY Configuration Control         Date Performer:                             (RO/SRO)
"(Operator's name), Place HPU "A"  Subloop 2 in operation and reset the flow control valve  lockup per N2-OP-29, Section E.1.0."
Trainer/Evaluator:
 
Evaluation Method:      X        Perform                      Simulate Evaluation Location:        Plant                  X Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO          Alternate Path Task:
NMP2  JPM #S-2 9 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shifting Feedwater Pumps at Power65% power when 2 pumps are in service Revision:  
YES Start Time:                    Stop Time:                    Completion Time:
 
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
NRC 2008 Task Number: N2-259001-01004 Approvals:  
Comments:
 
NMP2 JPM #S-2                                    9                                  October 2008
NA EXAMINATION SECURITY General Supervisor Date   General Supervisor   Date Operations Training (Designee)   Operations (Designee)  
 
NA EXAMINATION SECURITY Configuration Control Date  
 
Performer:   (RO/SRO) Trainer/Evaluator:  


Evaluation Method:     X  Perform              Simulate  Evaluation Location:          Plant        X  Simulator Expected Completion Time: 20 minutes  Time Critical Task: NO Alternate Path Task:  
Evaluator Signature:   Date:
NMP2 JPM #S-2      10      October 2008


YES  Start Time:    Stop Time:  Completion Time:
Recommended Start Location:
JPM Overall Rating:  Pass  Fail
 
NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
NMP2  JPM #S-2 10 October 2008 Evaluator Signature:      Date:
NMP2  JPM #S-2 11 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Simulator Simulator Set-up:
: 2. Reset to IC ????-182 3. 65% Power with malfunction FW10C preset.  
: 2. Reset to IC ????-182
 
: 3. 65% Power with malfunction FW10C preset.
Directions to Operators:
Directions to Operators:
Read Before Every JPM Performance:
Read Before Every JPM Performance:
Line 174: Line 164:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
: 3.     During Training JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
* No other verification shall be demonstrated.


==References:==
==References:==
: 3. N2-OP-3, Rev 21, Sect. F.13.0 4. NUREG K/A 259001 A4.02 3.7 Tools and Equipment:
: 3. N2-OP-3, Rev 21, Sect. F.13.0
: 1. None Task Standard:
: 4. NUREG K/A 259001 A4.02 3.7 Tools and Equipment:
NMP2 JPM #S-2 12 October 2008 "C" Feedwater Pump is in service and level is under control in the normal band via MANUAL controller operation. "A" Feedwater Pump is secured with LV10A in manual and closed.
: 1. None Task Standard:
NMP2 JPM #S-2                                       11                                October 2008


NMP2 2008 JPM #S-3 13 October 2008 Initial Conditions:
C Feedwater Pump is in service and level is under control in the normal band via MANUAL controller operation. A Feedwater Pump is secured with LV10A in manual and closed.
: 5. The plant is operating at 65% power. 6. "C" Feedwater Pump "C" is ready to be placed in service. 7. Pre-start checks are complete.
NMP2 JPM #S-2                                  12                              October 2008


Initiating cue:  
Initial Conditions:
"(Operator's name), Place "C" Feedwater Pump in service, and rRemove "A" Feedwater Pump "A" from service and place Feedwater Pump "C" in service, IAW N, per N2-OP-3, Section F.13.0".  
: 5. The plant is operating at 65% power.
: 6. C Feedwater Pump C is ready to be placed in service.
: 7. Pre-start checks are complete.
Initiating cue:
(Operators name), Place C Feedwater Pump in service, and rRemove A Feedwater Pump A from service and place Feedwater Pump C in service, IAW N, per N2-OP-3, Section F.13.0.
Performance Steps                                    Standard                                    Grade
: 1. Provide repeat back of initiating cue.            Proper communications used for            Sat/Unsat Evaluator Acknowledge repeat back                repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
: 2. Obtain a copy of the reference procedure          N2-OP-3 obtained. Precautions &            Sat/Unsat and review/utilize the correct section.          limitations reviewed & section F.13.0 referenced.
: 3.        NOTES:                                      Reads notes. Obtains Key 18              Sat/Unsat
: 1. All actions in this Subsection are performed at 2CEC*PNL851 and PNL603 unless otherwise noted.
: 2. Shifting Feedwater Pumps will be performed at approximately 65% power by securing one pump and starting the standby.
: 3. IF re-starting 2FWS-P1A (B,C) from operating temperatures (D.4.0), Electrical Maintenance should perform an inspection of windings at first opportunity.
: 4. Feedwater minimum flow setpoint will be lowered to 4 Kgpm for all three Feedwater Pumps and then restored to 8 Kgpm after pump swap(s) are complete.
: 5. Fourth Point Heater Drain Pumps may remain pumping forward during this evolution if NMP2 2008 JPM #S-3                                13                                October 2008


Performance Steps Standard Grade   1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
Performance Steps                                   Standard                                   Grade feedwater heater level controllers are stable at 65%
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-3 obtained. Precautions & limitations reviewed & section F.13.0 referenced. Sat/Unsat    3. NOTES:
power, with the permission of the Shift Manager.
: 1. All actions in this Subsection are  performed at 2CEC*PNL851    and PNL603 unless otherwise noted. 2. Shifting Feedwater Pumps will  be performed at approximately  65% power by securing one    pump and starting the standby.
: 6.     Steps 13.1 AND 13.2 may be performed simultaneously.
: 3. IF re-starting 2FWS-P1A (B,C)  from operating temperatures  (D.4.0), Electrical Maintenance  should perform an inspection of  windings at first opportunity. 4. Feedwater minimum flow    setpoint will be lowered to 4 Kgpm for all three Feedwater  Pumps and then restored to 8  Kgpm after pump swap(s) are  complete. 5. Fourth Point Heater Drain Pumps may remain pumping    forward during this evolution if Reads notes. Obtains Key 18 Sat/Unsat NMP2 2008 JPM #S-3 14 October 2008 Performance Steps Standard Grade  feedwater heater level   controllers are stable at 65%
: 7.     The following step requires key
power, with the permission of   the Shift Manager. 6. Steps 13.1 AND 13.2     may be performed     simultaneously.
                # 18 from the SM key locker.
: 7. The following step requires key   # 18 from the SM key locker.
CAUTION Throughout this section if a plant casualty occurs such that Feedwater Pumps will remain on minimum flow for greater than 15 minutes, Reactor Power should be immediately reduced below 55% AND Feedwater Pump minimum flow should be returned to 8 Kgpm on all three Feedwater Pumps.
CAUTION Throughout this section if a plant casualty occurs such that Feedwater Pumps will remain on minimum flow for greater than 15 minutes, Reactor Power should be immediately reduced below 55% AND Feedwater Pump minimum flow should be returned to 8 Kgpm on all three Feedwater Pumps.
: 4. Adjust ALL three Feedwater Pump minimum flow valve setpoints as follows:  
: 4.       Adjust ALL three Feedwater Pump           Dispatches operator to Aadjust s          Pass/Fail minimum flow valve setpoints as           setpoints of all 3 minimum flow valves. Sat/Unsat follows:
 
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68A, RX FD WTR P1A RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68A, RX FD WTR P1A RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68B, RX FD WTR P1B RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68B, RX FD WTR P1B RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68C, RX FD WTR P1C RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68C, RX FD WTR P1C RECIRC controller, to 4 Kgpm. CUE: Min flow valve setpoints for all three feedwater pumps are set at 4 Kgpm.
CUE: Min flow valve setpoints for all three feedwater pumps are set at 4 Kgpm.
Dispatches operator to Aadjust s setpoints of all 3 minimum flow valves.
: 5.      Perform pre-start checks locally for the   Reviews step                              Sat/Unsat associated Feedwater pump to be started ONLY per step F.13.2.1 through F.13.2.7.
Pass/FailSat/Unsat       5. Perform pre-start checks locally for the associated Feedwater pump to be started ONLY per step F.13.2.1 through F.13.2.7.
NOTE: Pre-Start checks are complete NMP2 2008 JPM #S-3                               14                                October 2008
NOTE: Pre-Start checks are complete Reviews step Sat/Unsat NMP2 2008 JPM #S-3 15 October 2008 Performance Steps Standard Grade    6. Using N2-OP-101D, verify Reactor  power has been reduced  65%. NOTE: Power is at 65%. Rated MWth is 3467 and 65% power is 2253 MWth.
Reviews step and determines power is at 65% Sat/Unsat    7. Secure one of the two operating  Feedwater Pumps 2FWS-P1A (B,C) as follows:
Depress Manual (M) pushbutton on  2FWS-LV10A (B,C) controller. 


DURING this evolution, verify that the remaining level control valve 2FWS- LV10B (C,A) maintains desired water level.  
Performance Steps                                Standard                                  Grade
: 6. Using N2-OP-101D, verify Reactor          Reviews step and determines power is    Sat/Unsat power has been reduced  65%.              at 65%
NOTE: Power is at 65%. Rated MWth is 3467 and 65% power is 2253 MWth.
: 7. Secure one of the two operating Feedwater Pumps 2FWS-P1A (B,C) as follows:
Depress Manual (M) pushbutton on          Depresses M pushbutton on 2FWS-          Pass/Fail 2FWS-LV10A (B,C) controller.              LV10A controller 2FWS-HIC1010A and yellow M light is lit.
DURING this evolution, verify that the     Verifies remaining LCV maintains level  Sat/Unsat remaining level control valve 2FWS-       on an on-going basis during evolution.
LV10B (C,A) maintains desired water level.
: 8. Slowly close 2FWS-LV10A (B,C) to the      Locates Using 2FWS-HIC1010A slow        Pass/Fail 2 to 4% valve position by using the slow  detent close PBpushbutton and ,
CLOSE detent pushbutton on 2FWS-          depresses until about 2-4% shown.
LV10A (B,C) controller.
: 9. Close 2FWS-LV10A (B,C) to the 0%          Using 2FWS-HIC1010A fast detent          Pass/Fail valve position by depressing the fast      close pushbutton, Locates fast close CLOSE detent pushbutton on 2FWS-          PB and depresses until 0% shown.
LV10A (B,C) controller.
: 10. Secure 2FWS-P1A (B,C), REACTOR            Places FW Pump A in green flagged      Pass/Fail FW PMP 1A (B,C), by placing its control    position switch to Normal-After-STOP (Green flagged).
: 11. Verify 2FWL-P2A (B,C), AUX LUBE            Determines Aux Lube Oil Pump starts      Sat/Unsat OIL PMP 2A (B,C), auto starts.            by observing AUX LUBE OIL PMP 2A red light ON.
: 12. Confirm 2FWR-FV2A (B,C), REACTOR          Determines valve closes by observing    Sat/Unsat FD P1A (B,C) RECIRC VLV, closes            REACTOR FD P1A RECIRC VLV immediately.                              POSN meter indication goes to 0%
VALVE POSITION.
NMP2 2008 JPM #S-3                            15                                October 2008


Depresses M pushbutton on 2FWS-LV10A controller 2FWS-HIC1010A and yellow M light is lit.
Performance Steps                                Standard                                  Grade
 
: 13. At 2FWS-P1A (B,C), place the Auxiliary    Dispatches operator to Pplaces Aux       Pass/Fail Lube Oil Pump control switch 2FWL-       Lube Oil Pump control switch to         Sat/Unsat LCS752 (753, 754) to START AND           START, determines pump remains verify 2FWL-P2A (B,C) remains             running running.
Verifies remaining LCV maintains level on an on-going basis during evolution.  
 
Pass/Fail
 
Sat/Unsat      8. Slowly close 2FWS-LV10A (B,C) to the 2 to 4% valve position by using the slow  CLOSE detent pushbutton on 2FWS- LV10A (B,C) controller.
 
Locates Using 2FWS-HIC1010A slow detent close PBpushbutton and , depresses until about 2-4% shown. Pass/Fail       9. Close 2FWS-LV10A (B,C) to the 0%  valve position by depressing the fast CLOSE detent pushbutton on 2FWS- LV10A (B,C) controller.
Using 2FWS-HIC1010A fast detent close pushbutton, Locates fast close PB and depresses until 0% shown. Pass/Fail
: 10. Secure 2FWS-P1A (B,C), REACTOR  FW PMP 1A (B,C), by placing its control switch to Normal-After-STOP (Green  flagged).
Places FW Pump "A" in green flagged position Pass/Fail      11. Verify 2FWL-P2A (B,C), AUX LUBE  OIL PMP 2A (B,C), auto starts.
Determines Aux Lube Oil Pump starts by observing AUX LUBE OIL PMP 2A red light ON. Sat/Unsat      12. Confirm 2FWR-FV2A (B,C), REACTOR  FD P1A (B,C) RECIRC VLV, closes  immediately.
Determines valve closes by observing REACTOR FD P1A RECIRC VLV POSN meter indication goes to 0% VALVE POSITION. Sat/Unsat NMP2 2008 JPM #S-3 16 October 2008 Performance Steps Standard Grade      13. At 2FWS-P1A (B,C), place the Auxiliary  Lube Oil Pump control switch 2FWL-LCS752 (753, 754) to START AND verify 2FWL-P2A (B,C) remains running.
BOOTH OPERATOR: Activate remote to start aux oil pump.
BOOTH OPERATOR: Activate remote to start aux oil pump.
Dispatches operator to Pplaces Aux Lube Oil Pump control switch to START, determines pump remains running Pass/FailSat/Unsat      14. IF 2FWS-P1A (B,C) is being placed in standby, open 2FWS-V25A (B,C) FD WTR PUMP 1A (B,C) WRMUP LN ISOLATION.
: 14. IF 2FWS-P1A (B,C) is being placed in     Dispatches operator to Oopen s          Pass/Fail standby, open 2FWS-V25A (B,C) FD         warmup line isolation.                  Sat/Unsat WTR PUMP 1A (B,C) WRMUP LN ISOLATION.
CUE: If directed, report 2FWS-V25A is open.
CUE: If directed, report 2FWS-V25A is open.
Dispatches operator to Oopen s warmup line isolation.
: 15. NOTE: The following step requires key     Determines step is N/A
Pass/FailSat/Unsat      15. NOTE: The following step requires key # 18 from the SM key locker.
        # 18 from the SM key locker.
IF the plant will remain at 65 % power for more than a shift, adjust ALL Feedwater Pump minimum flow valve setpoints as follows:
IF the plant will remain at 65 % power for more than a shift, adjust ALL Feedwater Pump minimum flow valve setpoints as follows:
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 8 k gpm.
CUE: The Unit plant will remain at 65%
CUE: The Unit plant will remain at 65%
power for LESS than a shift. Determines step is N/A        16. NOTE: The following step will be performed prior to starting the standby feed pump. Determines Step is N/A NMP2 2008 JPM #S-3 17 October 2008 Performance Steps Standard Grade  Perform Feedwater Pump Warmup for the pump being started per subsection  F.14.0. CUE: Another Operator has performed the warmup
power for LESS than a shift.
: 16. NOTE: The following step will be         Determines Step is N/A performed prior to starting the standby feed pump.
NMP2 2008 JPM #S-3                             16                                October 2008


NOTE: Min flow valve setpoints are at 4 Kgpm from previous steps.
Performance Steps                              Standard                                    Grade Perform Feedwater Pump Warmup for the pump being started per subsection F.14.0.
: 17. Adjust ALL three Feedwater Pump minimum flow valve setpoints as follows:
CUE: Another Operator has performed the warmup NOTE: Min flow valve setpoints are at 4 Kgpm from previous steps.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 4 k gpm.
: 17. Adjust ALL three Feedwater Pump         Adjusts all 3 controllers                  Pass/Fail minimum flow valve setpoints as                                                   Sat/Unsat follows:
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 4 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 4 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 4 k gpm.  
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 4 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 4 k gpm.
: 18. Start the stand by Feedwater Pump                                                  Pass/Fail 2FWS-P1A (B,C) as follows:
Verify open 2FWS-MOV47A (B,C),          Verifies Discharge Block Valve is open    Sat/Unsat REACTOR FW PMP 1A (B,C) DISCH          by observing REACTOR FW PMP 1C BLOCK VLV.                              DISCH BLOCK VLV FWS-MOV47C red light is ON and green light is OFF.
: 19. IF applicable, verify open 2FWS-V103A  Determines valve is openstep is NA,        Sat/Unsat (B), FEEDWATER PUMP 1A (B) LOW          since Feedwater Pump C is being FLOW LINE ISOL.                        started.
NMP2 2008 JPM #S-3                          17                                  October 2008


Adjusts all 3 controllers Pass/FailSat/Unsat       18. Start the stand by Feedwater Pump 2FWS-P1A (B,C) as follows:
Performance Steps                                Standard                                    Grade
: 20. IF required, start the standby            Determines three Condensate Pumps          Sat/Unsat Condensate pump by placing 2CNM-          running.
P1A (B,C) control switch in Normal-After-START (Red-flagged).
Note: NOT required, since all Condensate Pumps are running.
: 21. Verify sufficient Condensate Iron          Determines sufficient Condensate Iron      Sat/Unsat Prefilters are in service to support the  Prefilters are in service maximum expected Condensate System flow rate. Refer to N2-OP-5A, Attachment 1.
CUE: If asked, Ssufficient Iron Prefilters are in service
: 22. NOTE: Nine Condensate                      Dispatches operator to determine at        Sat/Unsat Demineralizers in service is the          least eight demineralizers are in preferred lineup in the next step.        service.
Verify at least eight Condensate Demineralizers are in service in accordance with N2-OP-5.
CUE: 8Nine demineralizers are in service
: 23. IF all three Heater Drain pumps are        Determines step is N/A because heater      Sat/Unsat NOT pumping forward, start the            drain pumps are pumping forward.
standby Condensate Booster pump as follows:
Using 2CNM-PI39A (B,C), locally confirm condensate booster pump suction pressure is > 150 psig.
Start 2CNM-P2A (B,C), CONDENSATE BOOSTER PMP 2A (B,C), by placing the control switch to Normal-After-START (Red-flagged).
At 2CNM-P2A (B,C), place the Auxiliary Lube Oil Pump control switch 2CNO-LCS706 (707, 708) to AUTO AND verify 2CNO-P2A (B,C) stops.
NMP2 2008 JPM #S-3                            18                                  October 2008


Verify open 2FWS-MOV47A (B,C),  REACTOR FW PMP 1A (B,C) DISCH  BLOCK VLV.
Performance Steps                                   Standard                                   Grade CUE: Heater Drain Pumps are pumping forward
 
: 24. For the Feedwater pump to be started,       Determines that controller 2FWS-HIC-    Pass/Fail verify the level controllers are in Manual   1010C is in manual by observing          Sat/Unsat (M) AND valve positions are at 0%           yellow M light is lit and % VALVE open.                                        POSITION metervalve position i indicates 0.
Verifies Discharge Block Valve is open by observing REACTOR FW PMP 1C DISCH BLOCK VLV FWS-MOV47C red light is ON and green light is OFF. Pass/Fail
: 25. CAUTION                                     Reviews Caution                          Sat/Unsat The next two steps shall be performed concurrently.
 
IF feedwater pump suction pressure drops to 220 psig, start the third Condensate Booster pump if NOT already operating.
Sat/Unsat      19. IF applicable, verify open 2FWS-V103A  (B), FEEDWATER PUMP 1A (B) LOW  FLOW LINE ISOL.
: 26. NOTE: IF 2FWS-P1C is selected to             NOTE: Since 2FWS-P1B is to be left start, the preferable power supply is       running, the preferable power supply from 2NPS-SWG003 if 2FWS-P1A will           for 2FWS-P1C is 2NPS-SWG001.
 
be left running, or 2NPS-SWG001 if 2FWS-P1B is to be left running.
Determines valve is openstep is NA, since Feedwater Pump C is being started. Sat/Unsat NMP2 2008 JPM #S-3 18 October 2008 Performance Steps Standard Grade   20. IF required, start the standby  Condensate pump by placing 2CNM- P1A (B,C) control switch in Normal-After-START (Red-flagged).
Start 2FWS-P1A (B,C) REACTOR FD             Rotates control switch REACTOR FW        Pass/Fail P1A (B,C), by placing the control switch     PMP 1C FROM BUS 001 FWS-P1C to to Normal-After-Start (red flagged).         red flagged position.
Note: NOT required, since all Condensate Pumps are running.
: 27. Confirm 2FWR-FV2A (B,C), REACTOR             Determines valve starts to              Sat/Unsat FD P1A (B,C) RECIRC VLV, starts to           openDetermines valve starts to open open.                                        by observing REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION.
 
: 28. WHEN 2FWR-FV2A (B,C) is  15%               When REACTOR FD P1C RECIRC              Sat/Unsat open, confirm 2FWS-P1A (B,C) starts.         VLV POSN meter indication goes past 15% VALVE POSITION, observe pump start by observing red light and ammeter FWS-P1C BUS 001 CURRENT indication.Verifies valve position and pump start NMP2 2008 JPM #S-3                               19                                October 2008
Determines three Condensate Pumps running. Sat/Unsat      21. Verify sufficient Condensate Iron  Prefilters are in service to support the  maximum expected Condensate System flow rate. Refer to N2-OP-5A,  Attachment 1.
CUE: If asked, Ssufficient Iron Prefilters are in service
 
Determines sufficient Condensate Iron Prefilters are in service Sat/Unsat      22. NOTE: Nine Condensate  Demineralizers in service is the  preferred lineup in the next step.
 
Verify at least eight Condensate  Demineralizers are in service in  accordance with N2-OP-5.
CUE: 8Nine demineralizers are in service
 
Dispatches operator to determine at least eight demineralizers are in service. Sat/Unsat      23. IF all three Heater Drain pumps are  NOT pumping forward, start the standby Condensate Booster pump as  follows:
Using 2CNM-PI39A (B,C), locally  confirm condensate booster pump suction pressure is > 150 psig.
Start 2CNM-P2A (B,C), CONDENSATE  BOOSTER PMP 2A (B,C), by placing  the control switch to Normal-After-START (Red-flagged).
At 2CNM-P2A (B,C), place the Auxiliary  Lube Oil Pump control switch 2CNO- LCS706 (707, 708) to AUTO AND verify  2CNO-P2A (B,C) stops. Determines step is N/A because heater drain pumps are pumping forward. Sat/Unsat NMP2 2008 JPM #S-3 19 October 2008 Performance Steps Standard Grade  CUE: Heater Drain Pumps are pumping forward
: 24. For the Feedwater pump to be started, verify the level controllers are in Manual (M) AND valve positions are at 0%
open. Determines that controller 2FWS-HIC-1010C is in manual by observing yellow M light is lit and % VALVE POSITION metervalve position i indicates 0.
Pass/FailSat/Unsat      25. CAUTION The next two steps shall be performed concurrently.
IF feedwater pump suction pressure drops to 220 psig, start the third Condensate Booster pump if NOT already operating.
Reviews Caution Sat/Unsat      26. NOTE: IF 2FWS-P1C is selected to start, the preferable power supply is from 2NPS-SWG003 if 2FWS-P1A will be left running, or 2NPS-SWG001 if 2FWS-P1B is to be left running.
Start 2FWS-P1A (B,C) REACTOR FD P1A (B,C), by placing the control switch to Normal-After-Start (red flagged).
NOTE: Since 2FWS-P1B is to be left running, the preferable power supply for 2FWS-P1C is 2NPS-SWG001.
Rotates control switch REACTOR FW PMP 1C FROM BUS 001 FWS-P1C to red flagged position.  
 
Pass/Fail
: 27. Confirm 2FWR-FV2A (B,C), REACTOR FD P1A (B,C) RECIRC VLV, starts to open. Determines valve starts to openDetermines valve starts to open by observing REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION. Sat/Unsat      28. WHEN 2FWR-FV2A (B,C) is  15% open, confirm 2FWS-P1A (B,C) starts.
When REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION, observe pump start by observing red light and ammeter FWS-P1C BUS 001 CURRENT indication.Verifies valve position and pump start Sat/Unsat NMP2 2008 JPM #S-3 20 October 2008 Performance Steps Standard Grade 29. Using 2CNM-FI68A (B,C), RX FD WTR  P1A (B,C) FLOW meter, confirm 2FWS-P1A (B,C) flow is approximately  4000 gpm.
Determines flow on 2CNM-FI68C, RX FD WTR P1C FLOW meter is about 4000 gpm Sat/Unsat      30. NOTES:  1. The following two steps are performed locally at the associated  Feedwater pump just started.
: 2. The feedwater pump may be loaded  as 2FWS-V25A (B,C) is shut.
 
Place the Auxiliary Lube Oil Pump  control switch 2FWL-LCS752 (753,  754) to AUTO AND verify 2FWL-P2A  (B,C) stops.
 
Reviews notes
 
Places Aux Lube Oil Pump Control Switch in AUTO and verifies pump stops 
 
Pass/FailSat/Unsat      31. Close 2FWS-V25A (B,C), FD WTR  PUMP 1A (B,C) WRMUP LN  ISOLATION.


Performance Steps                                  Standard                                  Grade
: 29. Using 2CNM-FI68A (B,C), RX FD WTR          Determines flow on 2CNM-FI68C, RX      Sat/Unsat P1A (B,C) FLOW meter, confirm              FD WTR P1C FLOW meter is about 2FWS-P1A (B,C) flow is approximately        4000 gpm 4000 gpm.
: 30. NOTES:                                      Reviews notes
: 1. The following two steps are performed locally at the associated Feedwater pump just started.
: 2. The feedwater pump may be loaded as 2FWS-V25A (B,C) is shut.
Place the Auxiliary Lube Oil Pump          Places Aux Lube Oil Pump Control        Pass/Fail control switch 2FWL-LCS752 (753,            Switch in AUTO and verifies pump        Sat/Unsat 754) to AUTO AND verify 2FWL-P2A            stops (B,C) stops.
: 31. Close 2FWS-V25A (B,C), FD WTR              Dispatches operator to Ccloses          Pass/Fail PUMP 1A (B,C) WRMUP LN                      warmup line isolation.                  Sat/Unsat ISOLATION.
CUE: If asked, report 2FWS-V25C is closed.
CUE: If asked, report 2FWS-V25C is closed.
Dispatches operator to Ccloses warmup line isolation. Pass/FailSat/Unsat NOTES:   1. When opening 2FWS-LV10A (B,C) from a fully shut position, the initial 2 seconds of valve open signal serve only to "wake up" the control circuit computer with no additional action. Pressing the valve open push button for an additional 10 seconds in manual slow detent (2% position per second) serves to take the control circuit from the minus (-) 20% position to the 0% position PRIOR to any actual valve position indicator movement taking place.
NOTES:                                      Reviews Notes and Caution              Sat/Unsat
: 2. Once the LV10 valve circuitry reaches the 0% position, the first 1.5% to 2% of the valve stroke, as indicated by the position indicator, is used to release the seating force held Reviews Notes and Caution Sat/Unsat NMP2 2008 JPM #S-3 21 October 2008 Performance Steps Standard Grade  by the compression of the SB spring. Therefore, the valve stem will not be lifted to establish flow until  approximately 2% valve indication is  reached. Reactor water level should be  closely monitored during this evolution.
: 1. When opening 2FWS-LV10A (B,C) from a fully shut position, the initial 2 seconds of valve open signal serve only to wake up the control circuit computer with no additional action.
Pressing the valve open push button for an additional 10 seconds in manual slow detent (2% position per second) serves to take the control circuit from the minus (-) 20% position to the 0% position PRIOR to any actual valve position indicator movement taking place.
: 2. Once the LV10 valve circuitry reaches the 0% position, the first 1.5% to 2% of the valve stroke, as indicated by the position indicator, is used to release the seating force held NMP2 2008 JPM #S-3                             20                              October 2008


CAUTION   The fast detent position (20% position per second) should NOT be used to take the control circuit from the minus (-
Performance Steps                                  Standard                                    Grade by the compression of the SB spring.
-) 20% to 0% position as the LV10 will likely open beyond the desired position as the valve can only physically open at 6% per second, and will continue to open once the operator releases the open pushbutton if the demand signal is beyond the 0% position until valve position "catches up" to the circuit controller demand.
Therefore, the valve stem will not be lifted to establish flow until approximately 2% valve indication is reached. Reactor water level should be closely monitored during this evolution.
: 32. Throttle open 2FWS-LV10A (B,C), Feedwater Pump 1A (B,C) Level Control Valve, by using the OPEN detent pushbutton on 2FWS-LV10A (B,C) controller.
CAUTION The fast detent position (20% position per second) should NOT be used to take the control circuit from the minus (-
Throttles LCV by depressing the OPEN pushbuttonOPEN detent pushbutton for controller 2FWS-HIC-1010C and observes % VALVE POSITION meter. Pass/Fail      33. Verify 2FWS-LV10B (C,A) closes gradually as 2FWS-LV10A (B,C) slowly opens.
      -) 20% to 0% position as the LV10 will likely open beyond the desired position as the valve can only physically open at 6% per second, and will continue to open once the operator releases the open pushbutton if the demand signal is beyond the 0% position until valve position catches up to the circuit controller demand.
Determines valve is closing by observing % VALVE POSITION meter for 2FWS-LV10B. Sat/Unsat      34. Continue to slowly open 2FWS-LV10A (B,C) UNTIL the input signal (vertical) AND output signal (horizontal) read the same on 2FWS-LV10A (B,C) controller.
: 32. Throttle open 2FWS-LV10A (B,C),             Throttles LCV by depressing the OPEN      Pass/Fail Feedwater Pump 1A (B,C) Level               pushbuttonOPEN detent pushbutton Control Valve, by using the OPEN             for controller 2FWS-HIC-1010C and detent pushbutton on 2FWS-LV10A             observes % VALVE POSITION meter.
Adjusts position using  2FWS-HIC-1010C until vertical and horizontal signals are equal. Pass/Fail      35. Place 2FWS-LV10A (B,C) in Auto by momentarily depressing the Auto (A) pushbutton on 2FWS-LV10A (B,C) controller.
(B,C) controller.
Booth Operator: Insert MMalfunction (or preset) FW10C is preset and when AUTO Depresses 2FWS-HIC-1010C AUTO pushbutton and observe green AUTO light is lit. Pass/Fail NMP2 2008 JPM #S-3 22 October 2008 Performance Steps Standard Grade pushbutton is depressed, the malfunction becomes effective causing LV10C to go full open.
: 33. Verify 2FWS-LV10B (C,A) closes               Determines valve is closing by            Sat/Unsat gradually as 2FWS-LV10A (B,C)               observing % VALVE POSITION meter slowly opens.                                for 2FWS-LV10B.
As FWS-LV10C opens due to failure, FW flow and RPV water level will rise. Annunciator 603139 REACTOR WATER LEVEL HIGH/LOW alarms. 
: 34. Continue to slowly open 2FWS-LV10A           Adjusts position using 2FWS-HIC-          Pass/Fail (B,C) UNTIL the input signal (vertical)     1010C until vertical and horizontal AND output signal (horizontal) read the     signals are equal.
same on 2FWS-LV10A (B,C) controller.
: 35. Place 2FWS-LV10A (B,C) in Auto by           Depresses 2FWS-HIC-1010C AUTO            Pass/Fail momentarily depressing the                   pushbutton and observe green AUTO Auto (A) pushbutton on 2FWS-LV10A           light is lit.
(B,C) controller.
Booth Operator: Insert MMalfunction (or preset) FW10C is preset and when AUTO NMP2 2008 JPM #S-3                               21                                October 2008


Observe and report 2FWS-LV10C is opening unexpectedly. Sat/Unsat 36. Auto controller fails requiring manual control Recognizes controller failure and takes returns 2FWS-HIC-1010C to manual control using controller pushbutton IAW per N2-SOP-6 and stabilize RPV level to avoid Level 3 and Level 8 protective functions. Pass/Fail    37. Report status to CRS Status reported Sat/Unsat TERMINATING CUE: JPM is complete when level is being controlled manually in the normal band (between the low and high water level alarm setpoints).
Performance Steps                              Standard                                    Grade pushbutton is depressed, the malfunction becomes effective causing LV10C to go full open.
RECORD STOP TIME
As FWS-LV10C opens due to failure, FW flow      Observe and report 2FWS-LV10C is         Sat/Unsat and RPV water level will rise. Annunciator      opening unexpectedly.
603139 REACTOR WATER LEVEL HIGH/LOW alarms.
: 36. Auto controller fails requiring manual   Recognizes controller failure and takes   Pass/Fail control                                  returns 2FWS-HIC-1010C to manual control using controller pushbutton IAW per N2-SOP-6 and stabilize RPV level to avoid Level 3 and Level 8 protective functions.
: 37. Report status to CRS                     Status reported                           Sat/Unsat TERMINATING CUE: JPM is complete when level is being controlled manually in the normal band (between the low and high water level alarm setpoints).
RECORD STOP TIME NMP2 2008 JPM #S-3                          22                                October 2008


NMP2 2008 JPM #S-3 23 October 2008 Initial Conditions:
Initial Conditions:
: 1. The plant is operating at 65% power. 2. "C" Feedwater Pump is ready to be placed in service. 3. Pre-start checks are complete.  
: 1. The plant is operating at 65% power.
: 2. C Feedwater Pump is ready to be placed in service.
: 3. Pre-start checks are complete.
Initiating cue:
(Operators name), Remove Feedwater Pump A from service and place Feedwater Pump C in service, per N2-OP-3, Section F.13.0Place C Feedwater Pump in service, and remove A Feedwater Pump from service, IAW N2-OP-3, Section 13.0 NMP2 2008 JPM #S-3                            23                              October 2008


Initiating cue:
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title:   Initiate RCIC and Respond To Overspeed Trip (Alternate)                   Revision: NRC 2008 Task Number: N2-217000-01048 Approvals:
"(Operator's name), Remove Feedwater Pump "A" from service and place Feedwater Pump "C" in service, per N2-OP-3, Section F.13.0Place "C" Feedwater Pump in service, and remove "A" Feedwater Pump from service, IAW N2-OP-3, Section 13.0"
NA EXAMINATION SECURITY General Supervisor                 Date           General Supervisor                         Date Operations Training (Designee)                     Operations (Designee)
 
NA EXAMINATION SECURITY Configuration Control             Date Performer:                                 (RO/SRO)
NMP2 2008 JPM #S-3 24 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate RCIC and Respond To Overspeed Trip (Alternate) Revision: NRC 2008 Task Number: N2-217000-01048 Approvals:  
 
NA EXAMINATION SECURITY General Supervisor Date General Supervisor   Date Operations Training (Designee)   Operations (Designee)  
 
NA EXAMINATION SECURITY Configuration Control Date  
 
Performer:   (RO/SRO)
Trainer/Evaluator:
Trainer/Evaluator:
Evaluation Method:     X Perform             Simulate Evaluation Location:         Plant         X   Simulator  
Evaluation Method:     X Perform                 Simulate Evaluation Location:         Plant           X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO                   Alternate Path Task: YES Start Time:                       Stop Time:                       Completion Time:
 
JPM Overall Rating:               Pass           Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: YES  
Comments:
 
Evaluator Signature:                                                          Date:
Start Time:   Stop Time:   Completion Time:
NMP2 2008 JPM #S-3                                    24                                      October 2008
 
JPM Overall Rating: Pass Fail  
 
NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.  
 
Comments:  


Evaluator Signature:      Date:
Recommended Start Location:
NMP2 2008 JPM #S-3 25 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Simulator Simulator Set-up:
: 1. Reset to IC 183 Post Scram 2. Set remote RC01, RCIC Mech OS Trip to actuate when zarctum1 (RCIC speed) > 0.5 (3000 rpm) Directions to Operators:
: 1. Reset to IC 183 Post Scram
Read Before Every JPM Performance:  
: 2. Set remote RC01, RCIC Mech OS Trip to actuate when zarctum1 (RCIC speed) > 0.5 (3000 rpm)
 
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
Read Before Each Evaluated JPM Performance:
Line 342: Line 343:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
: 3.      During Training JPM:
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.


==References:==
==References:==
: 1. N2-OP-35 2. N2-ARP-01 601305
: 1. N2-OP-35
: 2. N2-ARP-01 601305
: 3. NUREG K/A 217000 A4.02 Tools and Equipment:
: 3. NUREG K/A 217000 A4.02 Tools and Equipment:
: 1. None Task Standard: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
: 1. None Task Standard:
RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
NMP2 2008 JPM #S-3                                  25                                  October 2008


NMP2 2008 JPM #S-3 26 October 2008 Initial Conditions: 1. The plant has experienced a reactor scram and loss of feedwater. 2. N2-EOP-RPV is being implemented.
Initial Conditions:
Initiating cue: "(Operator's name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches". Performance Steps Standard Grade   1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
: 1. The plant has experienced a reactor scram and loss of feedwater.
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-EOP-HC-2 Attachment 5, Automatic RCIC Injection is obtained/referenced. Sat/Unsat
: 2. N2-EOP-RPV is being implemented.
: 3. ARM and DEPRESS RCIC MANUAL INITIATION pushbutton. ARM and DEPRESS RCIC MANUAL INITIATION pushbutton. Pass/Fail    4. Verify system startup  
Initiating cue:
 
(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches.
When 2ICS*MOV120 Steam Admission Valve opens, turbine speed and pump discharge pressure rise.
Performance Steps                                   Standard                                 Grade
When turbine speed exceeds 3000 RPM, 2ICS*MOV150 Trip Throttle Valve closes due to unexpected overspeed trip. GLAND SEAL SYSTEM AIR COMPRESSOR starts. Red light ON. Green light OFF.
: 1.     Provide repeat back of initiating cue.       Proper communications used for        Sat/Unsat Evaluator Acknowledge repeat back             repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
ICS*MOV116 Cooling Water MOV opens. Red light ON. Green light OFF. ICS*MOV120 Steam opens. Red light ON. Green light OFF.
: 2.     Obtain a copy of the reference             N2-EOP-HC-2 Attachment 5,             Sat/Unsat procedure and review/utilize the correct      Automatic RCIC Injection is section.                                      obtained/referenced.
ICS*MOV126 opens. Red light ON. Green light OFF.
: 3.     ARM and DEPRESS RCIC MANUAL                 ARM and DEPRESS RCIC                 Pass/Fail INITIATION pushbutton.                        MANUAL INITIATION pushbutton.
Sat/Unsat Sat/Unsat
: 4.     Verify system startup                       GLAND SEAL SYSTEM AIR                 Sat/Unsat COMPRESSOR starts. Red light ON. Green light OFF.
 
ICS*MOV116 Cooling Water MOV         Sat/Unsat opens. Red light ON. Green light OFF.
Sat/Unsat Sat/Unsat
When 2ICS*MOV120 Steam Admission Valve opens, turbine speed and pump discharge                ICS*MOV120 Steam opens. Red           Sat/Unsat pressure rise.                                          light ON. Green light OFF.
: 5. Observes RCIC Turbine trip Cue: When informed of RCIC Turbine trip, instruct candidate to "Reset the RCIC Turbine from P601 and reestablish injection to the RPV"  Observes Annunciators 601305 lit.
When turbine speed exceeds 3000 RPM,                  ICS*MOV126 opens. Red light ON.       Sat/Unsat 2ICS*MOV150 Trip Throttle Valve closes due              Green light OFF.
Observes TURBINE TRIPPED amber postage stamp lit.
to unexpected overspeed trip.
Recognizes RCIC Turbine tripped Reports RCIC Turbine Tripped to SM  Sat/Unsat Sat/Unsat  
: 5.     Observes RCIC Turbine trip                   Observes Annunciators 601305 lit. Sat/Unsat Observes TURBINE TRIPPED              Sat/Unsat Cue: When informed of RCIC Turbine                 amber postage stamp lit.
trip, instruct candidate to Reset the RCIC Turbine from P601 and reestablish           Recognizes RCIC Turbine tripped      Sat/Unsat injection to the RPV Reports RCIC Turbine Tripped to       Sat/Unsat SM NMP2 2008 JPM #S-3                                26                              October 2008


Sat/Unsat Sat/Unsat NMP2 2008 JPM #S-3 27 October 2008 Performance Steps Standard Grade     Cue: If directed to investigate, report overspeed trip mechanism is tripped.
Performance Steps                                   Standard                                   Grade Cue: If directed to investigate, report           Dispatches operator to RCIC Room        Sat/Unsat overspeed trip mechanism is tripped.               to investigate.
Dispatches operator to RCIC Room to investigate.
: 6. Reset ICS*MOV150 at P601 per N2-OP-35 H.1.0, RCIC Turbine Reset.
Sat/Unsat    6. Reset ICS*MOV150 at P601 per N2-OP-35 H.1.0, RCIC Turbine Reset.
: 7. Verify cause is understood and                 Verify cause is understood and          Sat/Unsat corrected.                                      corrected.
: 7. Verify cause is understood and corrected.
: 8. Places ICS*MOV150 switch to CLOSED             Places ICS*MOV150 switch to            Pass/Fail until BOTH valve positions indicate             CLOSED until BOTH valve valve is closed                                 positions indicate valve is closed.(P601)
: 8. Places ICS*MOV150 switch to CLOSED until BOTH valve positions indicate valve is closed
Observes ICS*MOV150 Green          Sat/Unsat light ON (P601 Apron)
: 9. Verify turbine speed is less than 3500 RPM.
Observes ICS*MOV150 Red            Sat/Unsat light OFF (P601 Apron)
: 10. IF RCIC turbine tripped on overspeed OR was locally tripped. Locally reset trip mechanism. BOOTH OPERATOR: REMOTE RC01 to RESET.
Observes Trip/Throttle valve      Sat/Unsat Green light ON (P601 verical)
Observes Trip/Throttle valve      Sat/Unsat Red light OFF (P601 vertical)
: 9. Verify turbine speed is less than 3500        Verify turbine speed is less than      Sat/Unsat RPM.                                            3500 RPM.
: 10. IF RCIC turbine tripped on overspeed           Directs operator to locally reset the  Sat/Unsat OR was locally tripped. Locally reset trip     overspeed trip mechanism.
mechanism.
BOOTH OPERATOR: REMOTE RC01 to RESET.
CUE: Report trip mechanism is reset.
CUE: Report trip mechanism is reset.
Verify cause is understood and corrected.
Places ICS*MOV150 switch to CLOSED until BOTH valve positions indicate valve is closed.(P601)
Observes ICS*MOV150 Green light ON (P601 Apron)
Observes ICS*MOV150 Red light OFF (P601 Apron)
Observes Trip/Throttle valve Green light ON (P601 verical)
Observes Trip/Throttle valve Red light OFF (P601 vertical)
Verify turbine speed is less than 3500 RPM.
Directs operator to locally reset the overspeed trip mechanism. Sat/Unsat
Pass/Fail
Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat
Sat/Unsat
Sat/Unsat
: 11. IF an initiation signal is sealed in, perform the following:
: 11. IF an initiation signal is sealed in, perform the following:
: a. Throttle open ICS*MOV150 Places ICS*MOV150 switch to OPEN (P601)
: a. Throttle open ICS*MOV150                   Places ICS*MOV150 switch to           Pass/Fail OPEN (P601)
Pass/Fail
NMP2 2008 JPM #S-3                                27                                October 2008


NMP2 2008 JPM #S-3 28 October 2008 Performance Steps Standard Grade Observes ICS*MOV150 Green light OFF (P601 Apron)
Performance Steps                               Standard                                   Grade Observes ICS*MOV150 Green           Sat/Unsat light OFF (P601 Apron)
Observes ICS*MOV150 Red light ON (P601 Apron)
Observes ICS*MOV150 Red           Sat/Unsat light ON (P601 Apron)
Observes Trip/Throttle valve Green light OFF (P601 verical)
Observes Trip/Throttle valve       Sat/Unsat Green light OFF (P601 verical)
Observes Trip/Throttle valve Red light ON (P601 vertical) Sat/Unsat  
Observes Trip/Throttle valve       Sat/Unsat Red light ON (P601 vertical)
: b. At 2ICS*MOV150, verify proper            Directs operator to verify proper      Sat/Unsat latching of the latch lever and trip      latching.
hook.
CUE: Report trip mechanism is properly latched.
: c. Verify RCIC restarts                    Observe turbine speed and pump          Sat/Unsat discharge pressure are rising.
: 12. Establish RPV Injection                    Places ICS*MOV126 switch to            Pass/Fail OPEN (P601)
When RCIC flow is > 220 gpm,            Sat/Unsat observe ICS*MOV143 Min Flow closes.
When RCIC discharge pressure >          Sat/Unsat reactor pressure, ICS*MOV156 and 157 Injection Check Valves open.
RCIC Injection controlled at 600 gpm.                                    Sat/Unsat
: 13. Report completion.                          Report RCIC injecting.                  Sat/Unsat TERMINATING CUE: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
RECORD STOP TIME NMP2 2008 JPM #S-3                            28                                October 2008


Sat/Unsat Sat/Unsat
Initial Conditions:
: 1. The plant has experienced a reactor scram and loss of feedwater.
: 2. N2-EOP-RPV is being implemented.
Initiating cue:
(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches.
NMP2 JPM #S-4                      29                    October 2008


Sat/Unsat
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shift RBCLCW and TBCLCW Pumps                                      Revision: NRC 2008 Task Number: N2-SOP-14-01001 Approvals:
: b. At 2ICS*MOV150, verify proper latching of the latch lever and trip hook. CUE: Report trip mechanism is properly latched.
NA EXAMINATION SECURITY General Supervisor              Date                  General Supervisor Date Operations Training (Designee)                        Operations (Designee)
Directs operator to verify proper latching. Sat/Unsat    c. Verify RCIC restarts  Observe turbine speed and pump discharge pressure are rising. Sat/Unsat    12. Establish RPV Injection  Places ICS*MOV126 switch to OPEN (P601)
NA EXAMINATION SECURITY Configuration Control          Date Performer:                            (RO/SRO)
When RCIC flow is > 220 gpm, observe ICS*MOV143 Min Flow closes. When RCIC discharge pressure > reactor pressure, ICS*MOV156 and 157 Injection Check Valves open.
Trainer/Evaluator:
RCIC Injection controlled at 600 gpm. Pass/Fail Sat/Unsat Sat/Unsat
Evaluation Method:      X        Perform              Simulate Evaluation Location:        Plant                  X Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO          Alternate Path Task:
YES Start Time:                    Stop Time:                    Completion Time:
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-4                                    30                                  October 2008


Sat/Unsat 13. Report completion. Report RCIC injecting. Sat/Unsat TERMINATING CUE: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
Evaluator Signature:    Date:
RECORD STOP TIME 
NMP2 JPM #S-4      31      October 2008


NMP2  JPM #S-4 29 October 2008 Initial Conditions:
Recommended Start Location:
: 1. The plant has experienced a reactor scram and loss of feedwater. 2. N2-EOP-RPV is being implemented.
Initiating cue:
"(Operator's name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches".
 
NMP2  JPM #S-4 30 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
 
Title: Shift RBCLCW and TBCLCW Pumps    Revision: NRC 2008 Task Number: N2-SOP-14-01001 Approvals:
 
NA EXAMINATION SECURITY General Supervisor  Date  General Supervisor  Date Operations Training (Designee)  Operations (Designee)
 
NA EXAMINATION SECURITY Configuration Control  Date
 
Performer:    (RO/SRO)  Trainer/Evaluator:
Evaluation Method:    X  Perform              Simulate  Evaluation Location:          Plant        X  Simulator Expected Completion Time: 20 minutes  Time Critical Task: NO Alternate Path Task:
YES Start Time:    Stop Time:  Completion Time:
JPM Overall Rating:  Pass  Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
NMP2  JPM #S-4 31 October 2008 Evaluator Signature:      Date:
NMP2  JPM #S-4 32 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Simulator Simulator Set-up:
: 4. Reset to IC 184 5. Remote CW-27 103.9 oF, triggered from stopping CCS-P1A Directions to Operators:
: 4. Reset to IC 184
: 5. Remote CW-27 103.9oF, triggered from stopping CCS-P1A Directions to Operators:
Read Before Every JPM Performance:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Line 445: Line 438:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
: 3.      During Training JPM:
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.


==References:==
==References:==
: 5. N2-OP-13, Rev 07 6. N2-OP-14, Rev 05 7. ARP 601244
: 5. N2-OP-13, Rev 07
: 6. N2-OP-14, Rev 05
: 7. ARP 601244
: 8. NUREG K/A 400000 A4.01 Tools and Equipment:
: 8. NUREG K/A 400000 A4.01 Tools and Equipment:
: 1. None NMP2 JPM #S-4 33 October 2008 Task Standard:
: 1. None NMP2 JPM #S-4                                       32                                October 2008
 
Task Standard:
RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
NMP2 JPM #S-5 34 October 2008 Initial Conditions:
NMP2 JPM #S-4                        33                              October 2008
 
Initial Conditions:
: 8. The plant is operating at full power.
: 8. The plant is operating at full power.
Initiating cue:  
Initiating cue:
"(Operator's name), shift running RBCLCW Pumps from "A" to "C", then shift running TBCLCW Pumps from "A" to "C" to support equipment rotation".  
(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation.
 
Performance Steps                                   Standard                                     Grade
Performance Steps Standard Grade   1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
: 1. Provide repeat back of initiating cue.           Proper communications used for            Sat/Unsat Evaluator Acknowledge repeat back               repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-13 & N2-OP-14 obtained. Precautions & limitations reviewed Sat/Unsat      3. For the Main CCP pump to be started, verify the pump casing is free of air as follows:  
: 2. Obtain a copy of the reference procedure         N2-OP-13 & N2-OP-14 obtained.             Sat/Unsat and review/utilize the correct section.        Precautions & limitations reviewed
 
: 3.       For the Main CCP pump to be started,       Ensures checked by local operator          Sat/Unsat verify the pump casing is free of air as follows:
Uncap AND throttle open 2CCP-V195 (V196, V197), P1A (B,C) VENT. WHEN a steady stream of water is observed, close AND recap 2CCP-V195 (V196, V197). CUE: Checked by local operator Ensures checked by local operator Sat/Unsat      4. For the Main CCP pump to be started, at panel 2CEC*P601, start 2CCP-P1A (B,C), PMP 1A (B,C), by placing control switch in Normal-After-START (red flagged).  
Uncap AND throttle open 2CCP-V195 (V196, V197), P1A (B,C) VENT. WHEN a steady stream of water is observed, close AND recap 2CCP-V195 (V196, V197).
 
CUE: Checked by local operator
Note: The applicant will check board indications for amps and discharge pressure Places control switch in red flagged position Pass/Fail      5. Confirm normal operating indications in accordance with Subsection F.1.0.
: 4.       For the Main CCP pump to be started,       Places control switch in red flagged      Pass/Fail at panel 2CEC*P601, start 2CCP-P1A         position (B,C), PMP 1A (B,C), by placing control switch in Normal-After-START (red flagged).
Ensures checked by local operator Sat/Unsat NMP2  JPM #S-5 35 October 2008 Performance Steps Standard Grade CUE: Local indications are normal
Note: The applicant will check board indications for amps and discharge pressure
: 6. At 2CEC*PNL601, secure 2CCP-P1A  (B,C), PMP 1A (B,C), by placing control  switch in Normal-After-STOP. (Green  flagged)
: 5.       Confirm normal operating indications in   Ensures checked by local operator         Sat/Unsat accordance with Subsection F.1.0.
Places control switch in green flagged position Pass/Fail      7. IF required, place 2CCP-P1A (B,C)  control switch in PULL TO LOCK.
NMP2 JPM #S-5                                     34                                October 2008
May request required status Sat/Unsat      8. Confirm normal operating indications in  accordance with Subsection F.1.0.  
 
CUE:  Another operator will check local indications Ensures local checks are made Sat/Unsat    Examiner Note:  The applicant will now refer to N2-OP-14 for TBCLCW operations NOTES:    1. CCS system flow of greater than  8000 gpm requires more than one heat  exchanger in service.
: 2. Actions in this Subsection are  performed at 2CEC*PNL601 unless  otherwise specified.
: 9. IF time permits, perform the following:
Dispatch an Operator to the pump to perform prestart inspection AND  observe pump during start.
For the pump to be started, close  2CCS-V303A(B,C), TBCLC PUMP 1A(B,C) STOP CHECK.
CUE: Pre-start checks complete; the stop-check valve is CLOSED Dispatched operator or determines task has been performed Sat/Unsat NMP2 JPM #S-5 36 October 2008 Performance Steps Standard Grade 10. Start 2CCS-P1A(B,C), PMP 1A(B,C), by  placing the control switch to Normal-After-START (red flagged).
Places control switch in red flagged position Pass/Fail      11. Slowly open 2CCS-V303A(B,C).
CUE: Valve has been opened Directs local operator to open valve Sat/Unsat      12. Confirm normal operating indications in  accordance with Subsection F.1.0.
 
CUE: Local indications are normal Ensures checked by local operator Sat/Unsat      13. NOTES:
: 1. Actions in this Subsection are  performed at 2CEC*PNL601 unless  otherwise specified.
: 2. CCS Pump runout is 8,500 gpm. If  system flow is greater than 8,000 gpm  for one pump operations or 16,000 gpm for two pump operations, then  starting an additional pump increases  the probability of damaging tube  vibrations in the CCS heat exchangers. Three CCS pump operation shall be avoided unless shifting of pumps is  required.
Confirm the CCS pump is NOT required  for CCS System flow as follows:
 
Computer Point CCSFA01              Number of Running Pumps 1,000 - 8,200 GPM    1 8,200 - 16,400 GPM    2 Checks indications Sat/Unsat      14. NOTE: 2CCS-V303A (B,C) is located at  2CCS-P1A (B,C) on TB Elev 250 Southwest.
Close 2CCS-V303A (B,C), TBCLC  PUMP 1A (B,C) STOP CHECK.


Cue: Valve is closed Directs a local operator to close valve Sat/Unsat  
Performance Steps                                Standard                                    Grade CUE: Local indications are normal
: 6. At 2CEC*PNL601, secure 2CCP-P1A          Places control switch in green flagged    Pass/Fail (B,C), PMP 1A (B,C), by placing control  position switch in Normal-After-STOP. (Green flagged)
: 7. IF required, place 2CCP-P1A (B,C)        May request required status              Sat/Unsat control switch in PULL TO LOCK.
: 8. Confirm normal operating indications in  Ensures local checks are made            Sat/Unsat accordance with Subsection F.1.0.
CUE: Another operator will check local indications Examiner Note: The applicant will now refer to N2-OP-14 for TBCLCW operations NOTES:
: 1. CCS system flow of greater than 8000 gpm requires more than one heat exchanger in service.
: 2. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
: 9. IF time permits, perform the following:  Dispatched operator or determines        Sat/Unsat task has been performed Dispatch an Operator to the pump to perform prestart inspection AND observe pump during start.
For the pump to be started, close 2CCS-V303A(B,C), TBCLC PUMP 1A(B,C) STOP CHECK.
CUE: Pre-start checks complete; the stop-check valve is CLOSED NMP2 JPM #S-5                                35                              October 2008


NMP2  JPM #S-5 37 October 2008 Performance Steps Standard Grade 15. Secure 2CCS-P1A (B,C), PMP 1A (B,C), by placing the control switch in Normal-After-STOP. (Green flagged)
Performance Steps                                       Standard                                     Grade
Booth Operator: Malfunction to fail temperature controller  REMOTE CW-27 103.9 oF when CCS-P1A is stopped. Places control switch in green flagged position Pass/Fail
: 10.       Start 2CCS-P1A(B,C), PMP 1A(B,C), by         Places control switch in red flagged      Pass/Fail placing the control switch to Normal-         position After-START (red flagged).
: 16. IF required, place 2CCS-P1A (B,C) control switch in PULL TO LOCK.
: 11.       Slowly open 2CCS-V303A(B,C).                 Directs local operator to open valve      Sat/Unsat CUE: Valve has been opened
May request required status of control switch Sat/Unsat
: 12.       Confirm normal operating indications in       Ensures checked by local operator          Sat/Unsat accordance with Subsection F.1.0.
: 17. Confirm normal operating indications for  the running CCS Pump(s) in accordance with Subsection F.1.0.
CUE: Local indications are normal
Ensures checked by local operator Sat/Unsat     Examiner Note: Applicant will respond to annunciator 601244 and Computer Point CCSTC04 for TBCLCW HX DISCH TEMP
: 13.      NOTES:                                        Checks indications                        Sat/Unsat
: 18. Determines temp controller is failed and  refers to ARP 601244 Determines ARP 601244 actions apply Sat/Unsat       19. Places 2CCS-TIK104 in "M" Manual Places controller TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104 in "M" Manual by depressing M button. Pass/Fail      20. Manually controls temperature Adjusts temperature downward to approximately 85
: 1. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
°F (80 to 95), indicated on TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104 Pass/Fail    21. Report status to CRS
: 2. CCS Pump runout is 8,500 gpm. If system flow is greater than 8,000 gpm for one pump operations or 16,000 gpm for two pump operations, then starting an additional pump increases the probability of damaging tube vibrations in the CCS heat exchangers.
Three CCS pump operation shall be avoided unless shifting of pumps is required.
Confirm the CCS pump is NOT required for CCS System flow as follows:
Computer Point CCSFA01        Number of Running Pumps 1,000 - 8,200 GPM                          1 8,200 - 16,400 GPM                          2
: 14.       NOTE: 2CCS-V303A (B,C) is located at          Directs a local operator to close valve    Sat/Unsat 2CCS-P1A (B,C) on TB Elev 250 Southwest.
Close 2CCS-V303A (B,C), TBCLC PUMP 1A (B,C) STOP CHECK.
Cue: Valve is closed NMP2 JPM #S-5                                        36                                October 2008


Report status. Sat/Unsat TERMINATING CUE: RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
Performance Steps                                Standard                                    Grade
RECORD STOP TIME
: 15. Secure 2CCS-P1A (B,C), PMP 1A              Places control switch in green flagged    Pass/Fail (B,C), by placing the control switch in    position Normal-After-STOP. (Green flagged)
Booth Operator: Malfunction to fail temperature controller REMOTE CW-27 103.9oF when CCS-P1A is stopped.
: 16. IF required, place 2CCS-P1A (B,C)          May request required status of control    Sat/Unsat control switch in PULL TO LOCK.            switch
: 17. Confirm normal operating indications for  Ensures checked by local operator        Sat/Unsat the running CCS Pump(s) in accordance with Subsection F.1.0.
Examiner Note: Applicant will respond to annunciator 601244 and Computer Point CCSTC04 for TBCLCW HX DISCH TEMP
: 18. Determines temp controller is failed and  Determines ARP 601244 actions apply      Sat/Unsat refers to ARP 601244
: 19. Places 2CCS-TIK104 in M Manual          Places controller TBCLC HEAT              Pass/Fail EXCHANGER TEMP CONTROLLER 2CCS-TIK104 in M Manual by depressing M button.
: 20. Manually controls temperature              Adjusts temperature downward to          Pass/Fail approximately 85°F (80 to 95),
indicated on TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104
: 21. Report status to CRS                      Report status.                           Sat/Unsat TERMINATING CUE: RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
RECORD STOP TIME NMP2 JPM #S-5                                  37                              October 2008


NMP2  JPM #S-5 38 October 2008 Initial Conditions:
Initial Conditions:
: 1. The plant is operating at full power.
: 1. The plant is operating at full power.
Initiating cue:  
Initiating cue:
"(Operator's name), shift running RBCLCW Pumps from "A" to "C", then shift running TBCLCW Pumps from "A" to "C" to support equipment rotation".  
(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation.
NMP2 JPM #S-5                                38                            October 2008


NMP2  JPM #S-5 39 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Depressurize the RPV to the Main Condenser   Revision: NRC 2008  
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Depressurize the RPV to the Main Condenser                         Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor              Date                  General Supervisor Date Operations Training (Designee)                        Operations (Designee)
NA EXAMINATION SECURITY Configuration Control          Date Performer:                            (RO/SRO)
Trainer/Evaluator:
Evaluation Method:      X        Perform              Simulate Evaluation Location:        Plant                  X Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO          Alternate Path Task:
YES Start Time:                    Stop Time:                    Completion Time:
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-5                                    39                                  October 2008


Task Number:
Evaluator Signature:    Date:
Approvals:
NMP2 JPM #S-5      40      October 2008


NA EXAMINATION SECURITY General Supervisor  Date  General Supervisor  Date Operations Training (Designee)  Operations (Designee)
Recommended Start Location:
 
NA EXAMINATION SECURITY Configuration Control  Date Performer:    (RO/SRO)  Trainer/Evaluator:
Evaluation Method:    X  Perform              Simulate Evaluation Location:          Plant        X  Simulator Expected Completion Time: 20 minutes  Time Critical Task: NO Alternate Path Task:
YES Start Time:    Stop Time:  Completion Time:
JPM Overall Rating:  Pass  Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
NMP2  JPM #S-5 40 October 2008 Evaluator Signature:      Date:
NMP2  JPM #S-5 41 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Simulator Simulator Set-up:
: 6. Reset to IC 185 7. Malfunction MS-13 "MSIV Isolation Failure"
: 6. Reset to IC 185
 
: 7. Malfunction MS-13 MSIV Isolation Failure Directions to Operators:
Directions to Operators:
Read Before Every JPM Performance:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Line 533: Line 541:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
: 3.     During Training JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
* No other verification shall be demonstrated.


==References:==
==References:==
: 9. EOP-6 Attachment 18 10. NUREG K/A 239001 A4.09 Tools and Equipment:
: 9. EOP-6 Attachment 18
: 1. None Task Standard:
: 10. NUREG K/A 239001 A4.09 Tools and Equipment:
NMP2 JPM #S-5 42 October 2008 RPV is depressurizing to Main Condenser using Bypass Valves or Drain valves NMP2 2008 ML083650061.doc          43          October 2008 Initial Conditions:
: 1. None Task Standard:
: 9. A LOCA has occurred and an RPV Blowdown was required 10. Only 5 SRVs could be opened 11. EOP-6, Attachment 18 is in progress.
NMP2 JPM #S-5                                       41                                October 2008


Initiating cue:
RPV is depressurizing to Main Condenser using Bypass Valves or Drain valves NMP2 JPM #S-5                              42                              October 2008
"(Operator's name), Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser Performance Steps Standard Grade    1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. EOP-6, Attachment 18 obtained. Sat/Unsat      3. IF a LOCA signal is present OR expected, using PA235 key, place the  following LOCA override switches to  OVERRIDE: (2CEC*PNL851)
LOCA OVERRIDE VLV IAS*SOV166


LOCA OVERRIDE VLV IAS*SOV184 Annunciators 601517 and 601519 alarms when switches are placed in OVERRIDE.
Initial Conditions:
Determines LOCA is present.
: 9. A LOCA has occurred and an RPV Blowdown was required
Using key, places switch in OVERRIDE Using key, places switch in OVERRIDE Sat/Unsat Sat/Unsat  
: 10. Only 5 SRVs could be opened
: 11. EOP-6, Attachment 18 is in progress.
Initiating cue:
(Operators name), Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser Performance Steps                                Standard                                Grade
: 1. Provide repeat back of initiating cue.        Proper communications used for        Sat/Unsat Evaluator Acknowledge repeat back            repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
: 2. Obtain a copy of the reference procedure      EOP-6, Attachment 18 obtained.        Sat/Unsat and review/utilize the correct section.
: 3.        IF a LOCA signal is present OR          Determines LOCA is present.           Sat/Unsat expected, using PA235 key, place the following LOCA override switches to OVERRIDE: (2CEC*PNL851)
LOCA OVERRIDE VLV IAS*SOV166            Using key, places switch in           Sat/Unsat OVERRIDE LOCA OVERRIDE VLV IAS*SOV184            Using key, places switch in           Sat/Unsat OVERRIDE Annunciators 601517 and 601519 alarms when switches are placed in OVERRIDE.
: 4.        Verify open the following valves (2CEC*PNL851)
IAS*SOV166, PRIMARY CNTMT              Open IAS*SON166 and observe red        Sat/Unsat OUTBD ISOL VLV TO SRV                  light ON and green light OFF.
IAS*SOV184, PRIMARY CNTMT INBD          Open IAS*SON184 and observe red        Sat/Unsat ISOL VLV TO SRV                        light ON and green light OFF.
NMP2 2008 ML083650061.doc      43      October 2008


Sat/Unsat
Performance Steps                               Standard                                 Grade
: 4. Verify open the following valves  (2CEC*PNL851)
: 5. Record differential pressure across the   Determines differential pressure is    Sat/Unsat MSIVs using C33-R605 on                   within 150 psid.
 
2CEC*PNL603 AND one or more of the following Trip Units:
IAS*SOV166, PRIMARY CNTMT  OUTBD ISOL VLV TO SRV IAS*SOV184, PRIMARY CNTMT INBD  ISOL VLV TO SRV
B22-N676A, STM LINE PRESS LO (2CEC*PNL609)
 
B22-N676C, STM LINE PRESS LO (2CEC*PNL609)
Open IAS*SON166 and observe red light ON and green light OFF.
B22-N676B, STM LINE PRESS LO (2CEC*PNL611)
Open IAS*SON184 and observe red light ON and green light OFF.
B22-N676D, STM LINE PRESS LO (2CEC*PNL611)
 
Sat/Unsat Sat/Unsat NMP2 2008 ML083650061.doc          44          October 2008 Performance Steps Standard Grade   5. Record differential pressure across the MSIVs using C33-R605 on 2CEC*PNL603 AND one or more of the following Trip Units:
B22-N676A, STM LINE PRESS LO (2CEC*PNL609)  
 
B22-N676C, STM LINE PRESS LO (2CEC*PNL609)
B22-N676B, STM LINE PRESS LO (2CEC*PNL611)  
 
B22-N676D, STM LINE PRESS LO (2CEC*PNL611)
Note: PNL609 trip units are not within the scope of simulation.
Note: PNL609 trip units are not within the scope of simulation.
CUE: Differential Pressure is <150 psid Determines differential pressure is within 150 psid. Sat/Unsat      6. IF differential pressure across the MSIVs is > 150 psid, open at least one pair of MSIVs by performing N2-OP-1, Section H.4.0 AND THEN continue at Step 3.1.7 N/A, differential pressure across the MSIVs is < 150 psid Determines step is N/A, based on differential pressure. Sat/Unsat      7. IF differential pressure across the MSIVs is < 150 psid, open at least one pair of MSIVs as follows:
CUE: Differential Pressure is <150 psid
N/A, a pair of MSIVs will be opened per N2-OP-1, Section H.4.0  
: 6. IF differential pressure across the       Determines step is N/A, based on      Sat/Unsat MSIVs is > 150 psid, open at least one   differential pressure.
 
pair of MSIVs by performing N2-OP-1, Section H.4.0 AND THEN continue at Step 3.1.7 N/A, differential pressure across the MSIVs is < 150 psid
Verify MSIV isolation signals reset by performing the following: (2CEC*PNL602)  
: 7. IF differential pressure across the MSIVs is < 150 psid, open at least one pair of MSIVs as follows:
 
N/A, a pair of MSIVs will be opened per N2-OP-1, Section H.4.0 Verify MSIV isolation signals reset by performing the following:
Place control switches for the following  to CLOSE:
(2CEC*PNL602)
Place control switches for the following  Places all eight MSIV control switches Sat\Unsat to CLOSE:                                 in CLOSE
* MSS*AOV6A, MSIV
* MSS*AOV6A, MSIV
* MSS*AOV6B, MSIV  
* MSS*AOV6B, MSIV NMP2 2008 ML083650061.doc      44        October 2008


Places all eight MSIV control switches in CLOSE Sat\Unsat NMP2 2008 ML083650061.doc          45          October 2008 Performance Steps Standard Grade
Performance Steps                               Standard                                 Grade
* MSS*AOV6C, MSIV
* MSS*AOV6C, MSIV
* MSS*AOV6D, MSIV
* MSS*AOV6D, MSIV
Line 584: Line 595:
* MSS*AOV7B, MSIV
* MSS*AOV7B, MSIV
* MSS*AOV7C, MSIV
* MSS*AOV7C, MSIV
* MSS*AOV7D, MSIV     Booth Operator: Insert malfunction MS-13 when MSIVs are closed
* MSS*AOV7D, MSIV Booth Operator: Insert malfunction MS-13 when MSIVs are closed
: 8. Depress pushbutton B22H-S33, INBD ISOL LOGIC RESET Depresses pushbutton Sat\Unsat
: 8. Depress pushbutton B22H-S33, INBD       Depresses pushbutton                   Sat\Unsat ISOL LOGIC RESET
: 9. Depress pushbutton B22H-S32, OUTBD ISOL LOGIC RESET Depresses pushbutton Sat\Unsat       10. Open one pair of MSIVs as follows: (2CEC*PNL602)  
: 9. Depress pushbutton B22H-S32,             Depresses pushbutton                   Sat\Unsat OUTBD ISOL LOGIC RESET
 
: 10. Open one pair of MSIVs as follows:       Places control switches for one pair of Sat/Unsat (2CEC*PNL602)                           MSIVs to AUTO. MSIVs will not open Place the control switch for ANY outboard MSIV to AUTO Place the control switch for the corresponding inboard MSIV to AUTO.
Place the control switch for ANY outboard MSIV to AUTO Place the control switch for the corresponding inboard MSIV to AUTO.  
Examiner Note: Applicant must continue in procedure because MSIVs will not open
 
: 11. IF a pair of MSIVs can NOT be opened, align steam line drains to depressurize the RPV as follows:
Examiner Note: Applicant must continue in procedure because MSIVs will not open Places control switches for one pair of MSIVs to AUTO. MSIVs will not open Sat/Unsat
N/A, a pair of MSIVs are open Verify open MSS*MOV207, INSIDE           Opens MSS*MOV207 and observe red        Pass/Fail MSIVS UPSTREAM DRAIN VLV.               light ON and green light OFF.
: 11. IF a pair of MSIVs can NOT be opened, align steam line drains to depressurize the RPV as follows:
(2CEC-PNL824)
N/A, a pair of MSIVs are open  
Verify open MSS*MOV111, MAIN STM LINE DRAIN ISOL VLV.                     Opens MSS*MOV111 and observe red        Pass/Fail (2CEC*PNL602)                           light ON and green light OFF.
 
NMP2 2008 ML083650061.doc      45      October 2008
Verify open MSS*MOV207, INSIDE MSIVS UPSTREAM DRAIN VLV. (2CEC-PNL824)  
 
Verify open MSS*MOV111, MAIN STM LINE DRAIN ISOL VLV. (2CEC*PNL602)  


Opens MSS*MOV207 and observe red light ON and green light OFF.  
Performance Steps                              Standard                              Grade
: 12. NOTE: A CAT 60 key may be required for entry to 2EHS*MCC102.
Place 2EHS*MCC102-7A,                    Directs operator to locally close  Sat/Unsat 2MSS*MOV112 MAIN STEAM LINE              2EHS*MCC102-7A AND place alarm DRAIN OUTBD to ON (Aux Bay-North        circuit to enable.
El 240)
BOOTH OPERATOR: Enter Remote MS05B, 2MSS*MOV112 APP R CKT BKR, CLOSE CUE: Report the breaker is closed and alarm circuit is enabled.
Place 2EHS*MCC102-7A, ALARM CIRCUIT control switch to ENABLE Verify open 2MSS*MOV112                  Open 2MSS*MOV112 and observe red    Pass/Fail (2CEC*PNL602)                            light ON and green light OFF.
Verify open MSS-MOV187, MAIN STM                                            Pass/Fail LINE PRESS EQL/WARMING                  Open 2MSS-MOV187 and observe red (2CEC*PNL602)                            light ON and green light OFF.
: 13. Using BYPASS VALVE OPENING              Depresses and holds to attempt to  Pass/Fail/
JACK SELECTOR, depress AND hold          open bypasses                      NA the INCREASE pushbutton UNTIL bypass valves are full open (2CEC*PNL851)
N/A, Turbine Bypass Valves will NOT open
: 14. IF Bypass Valves are unavailable, verify Performs if bypass valves would not Pass/Fail/
open as many of the following            open                                NA steam line drains as possible to depressurize the RPV to the condenser:
N/A, Turbine Bypass Valves are available Open Turbine Stop Valve Drains (2CEC-PNL824):
MSS-MOV21A, TURBINE STOP VLV MSV3 DRAIN VLV NMP2 2008 ML083650061.doc      46      October 2008


Opens MSS*MOV111 and observe red light ON and green light OFF.  
Performance Steps                            Standard                                Grade MSS-MOV21B, TURBINE STOP VLV MSV4 DRAIN VLV MSS-MOV21C, TURBINE STOP VLV MSV1 DRAIN VLV MSS-MOV21D, TURBINE STOP VLV MSV2 DRAIN VLV Examiner Note: Step only performed if bypass valves could not be opened.
Degrading vacuum may have caused closure
: 15. Open MSS-MOV147, TURBINE              Performs if bypass valves did not open Pass/Fail/
CONTROL VLVS DRAIN VLV                                                      NA (2CEC-PNL824)
: 16. Open Main Steam Line Drains (2CEC-    Performs if bypass valves did not open Pass/Fail/
PNL824):                                                                    NA MSS-AOV191, MAIN STM LINE HEADER DRAIN VLV MSS-AOV194, MAIN STM LINE HEADER DRAIN VLV MSS-AOV203, MAIN STM LINE HEADER DRAIN VLV MSS-AOV205, MAIN STM LINE HEADER DRAIN VLV MSS-AOV209, MAIN STM LINE HEADER DRAIN VLV MSS-AOV87A MSL A LOW POINT DRAIN VALVE MSS-AOV87B MSL B LOW POINT DRAIN VALVE MSS-AOV87C MSL C LOW POINT DRAIN VALVE MSS-AOV87D MSL D LOW POINT DRAIN VALVE NMP2 2008 ML083650061.doc      47      October 2008


Pass/Fail
Performance Steps                           Standard                                 Grade MSS-AOV88A MSL DRAIN HEADER ISOL VALVE MSS-A0V88B MSL DRAIN HEADER ISOL VALVE
 
: 17. Open MSL Drain Orifice Bypass (2CEC- Performs if bypass valves did not open Pass/Fail/
Pass/Fail
PNL824):                                                                   NA MSS-AOV85A, MAIN STM LINE DRAIN VLV MSS-AOV85B, MAIN STM LINE DRAIN VLV MSS-AOV85C, MAIN STM LINE DRAIN VLV MSS-AOV85D, MAIN STM LINE DRAIN VLV TERMINATING CUE: RPV is depressurizing to Main Condenser via Bypass valves or Drain valves RECORD STOP TIME NMP2 2008 ML083650061.doc     48      October 2008
 
NMP2 2008 ML083650061.doc          46          October 2008 Performance Steps Standard Grade    12. NOTE: A CAT 60 key may be required  for entry to 2EHS*MCC102.
 
Place 2EHS*MCC102-7A,  2MSS*MOV112 MAIN STEAM LINE  DRAIN OUTBD to ON (Aux Bay-North  El 240)  BOOTH OPERATOR: Enter Remote MS05B, 2MSS*MOV112 APP R CKT BKR, CLOSE
 
CUE: Report the breaker is closed and alarm circuit is enabled.
 
Place 2EHS*MCC102-7A, ALARM  CIRCUIT control switch to ENABLE Verify open 2MSS*MOV112 (2CEC*PNL602)
Verify open MSS-MOV187, MAIN STM  LINE PRESS EQL/WARMING  (2CEC*PNL602)
 
Directs operator to locally close 2EHS*MCC102-7A AND place alarm circuit to enable.
 
Open 2MSS*MOV112 and observe red light ON and green light OFF.
Open 2MSS-MOV187 and observe red light ON and green light OFF.
 
Sat/Unsat
 
Pass/Fail Pass/Fail      13. Using BYPASS VALVE OPENING  JACK SELECTOR, depress AND hold  the INCREASE pushbutton UNTIL  bypass valves are full open (2CEC*PNL851)
N/A, Turbine Bypass Valves will NOT  open  Depresses and holds to attempt to open bypasses Pass/Fail/NA      14. IF Bypass Valves are unavailable, verify  open as many of the following  steam line drains as possible to depressurize the RPV to the condenser:
N/A, Turbine Bypass Valves are  available
 
Open Turbine Stop Valve Drains  (2CEC-PNL824):
MSS-MOV21A, TURBINE STOP VLV  MSV3 DRAIN VLV Performs if bypass valves would not open Pass/Fail/NA NMP2 2008 ML083650061.doc          47          October 2008 Performance Steps Standard Grade  MSS-MOV21B, TURBINE STOP VLV  MSV4 DRAIN VLV 
 
MSS-MOV21C, TURBINE STOP VLV  MSV1 DRAIN VLV MSS-MOV21D, TURBINE STOP VLV MSV2 DRAIN VLV Examiner Note: Step only performed if bypass valves could not be opened. Degrading vacuum may have caused closure
: 15. Open MSS-MOV147, TURBINE  CONTROL VLVS DRAIN VLV  (2CEC-PNL824)
Performs if bypass valves did not open Pass/Fail/NA          16. Open Main Steam Line Drains (2CEC- PNL824):
 
MSS-AOV191, MAIN STM LINE  HEADER DRAIN VLV MSS-AOV194, MAIN STM LINE  HEADER DRAIN VLV
 
MSS-AOV203, MAIN STM LINE  HEADER DRAIN VLV MSS-AOV205, MAIN STM LINE  HEADER DRAIN VLV
 
MSS-AOV209, MAIN STM LINE  HEADER DRAIN VLV MSS-AOV87A MSL A LOW POINT DRAIN VALVE MSS-AOV87B MSL B LOW POINT  DRAIN VALVE
 
MSS-AOV87C MSL C LOW POINT  DRAIN VALVE MSS-AOV87D MSL D LOW POINT  DRAIN VALVE
 
Performs if bypass valves did not open Pass/Fail/
NA NMP2 2008 ML083650061.doc          48          October 2008 Performance Steps Standard Grade MSS-AOV88A MSL DRAIN HEADER ISOL VALVE  
 
MSS-A0V88B MSL DRAIN HEADER ISOL VALVE
: 17. Open MSL Drain Orifice Bypass (2CEC-PNL824):
MSS-AOV85A, MAIN STM LINE DRAIN VLV MSS-AOV85B, MAIN STM LINE DRAIN VLV   MSS-AOV85C, MAIN STM LINE DRAIN VLV MSS-AOV85D, MAIN STM LINE DRAIN VLV Performs if bypass valves did not open Pass/Fail/
NA      TERMINATING CUE: RPV is depressurizing to Main Condenser via Bypass valves or Drain valves   RECORD STOP TIME
 
NMP2 2008 ML083650061.doc         49          October 2008 Initial Conditions:
: 12. A LOCA has occurred and an RPV Blowdown was required 13. Only 5 SRVs could be opened 14. N2-EOP-6, Attachment 18 is in progress.


Initial Conditions:
: 12. A LOCA has occurred and an RPV Blowdown was required
: 13. Only 5 SRVs could be opened
: 14. N2-EOP-6, Attachment 18 is in progress.
Initiating cue:
Initiating cue:
Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser  
Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser NMP2 2008 ML083650061.doc      49      October 2008


NMP2 2008 ML083650061.doc          50          October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Energize Reserve Station Transformer 1B and NPS-SWG003. Revision: NRC 2008 Task Number: N2-262000-01002, N2-SOP-03-01001  
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Energize Reserve Station Transformer 1B and NPS-SWG003.                 Revision: NRC 2008 Task Number: N2-262000-01002, N2-SOP-03-01001 Approvals:
 
NA EXAMINATION SECURITY General Supervisor             Date                   General Supervisor Date Operations Training (Designee)                         Operations (Designee)
Approvals:
NA EXAMINATION SECURITY Configuration Control         Date Performer:                            (RO/SRO)
NA EXAMINATION SECURITY General Supervisor Date   General Supervisor   Date Operations Training (Designee)   Operations (Designee)
Trainer/Evaluator:
NA EXAMINATION SECURITY Configuration Control Date  
Evaluation Method:      X        Perform              Simulate Evaluation Location:        Plant                  X Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO      Alternate Path Task: NO Start Time:                    Stop Time:                    Completion Time:
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:                                                    Date:
NMP2 2008 ML083650061.doc            50      October 2008


Performer:    (RO/SRO)  Trainer/Evaluator:
Recommended Start Location:
Evaluation Method:    X  Perform              Simulate  Evaluation Location:          Plant        X  Simulator
 
Expected Completion Time: 20 minutes  Time Critical Task: NO    Alternate Path Task: NO Start Time:    Stop Time:  Completion Time:
JPM Overall Rating:  Pass  Fail
 
NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
Evaluator Signature:      Date:
NMP2 2008 ML083650061.doc          51          October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Simulator Simulator Set-up:
Reset to IC 186 Directions to Operators:
Reset to IC 186 Directions to Operators:
Line 681: Line 659:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
: 3.      During Training JPM:
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.


==References:==
==References:==
Line 690: Line 670:
: 1. None Task Standard:
: 1. None Task Standard:
Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
NMP2 2008 ML083650061.doc         52          October 2008  
NMP2 2008 ML083650061.doc           51      October 2008


NMP2 2008 ML083650061.doc         53          October 2008 Initial Conditions: 3. The plant experienced a Loss of Line 6. 4. The plant was manually scrammed. 5. Immediate and Subsequent Actions of N2-SOP-3 are complete. 6. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete. 7. Power has been restored to Line 6 and Power Control has verified its reliability.
NMP2 2008 ML083650061.doc 52 October 2008 Initial Conditions:
: 3. The plant experienced a Loss of Line 6.
: 4. The plant was manually scrammed.
: 5. Immediate and Subsequent Actions of N2-SOP-3 are complete.
: 6. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
: 7. Power has been restored to Line 6 and Power Control has verified its reliability.
: 8. Ask the operator for any questions.
: 8. Ask the operator for any questions.
Initiating cue: " (Operator's name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3. Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3."
Initiating cue:
Performance Steps Standard Grade   12. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
(Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.
: 13. Obtain a copy of the reference procedure and review/utilize the correct section. N2-SOP-3 obtained. Precautions & Limitations are reviewed and Attachment 1 Section 1.7 referenced. Sat/Unsat    14. Review Attachment 1 Section 1.7 Power Restoration to determine applicable Attachment to Energize Reserve Transformer 1B  Per step 1.7.2, determines performance of Attachment 6 is required. Sat/Unsat    4. At Panel 808 (CB 288'), verify reset 86-2SPRY01 (RES STA SER XFMR 1B PRIM PROT LO RELAY).
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3.
 
Performance Steps                                 Standard                               Grade
Cue: If asked, inform the candidate that 86-SPRY01 is reset. Verifies 86 device is reset Sat/Unsat
: 12. Provide repeat back of initiating cue.           Proper communications used for    Sat/Unsat Evaluator Acknowledge repeat back                 repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
: 5. At Panel 809 (CB 288'), verify reset 86-2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY).
: 13. Obtain a copy of the reference procedure       N2-SOP-3 obtained. Precautions &     Sat/Unsat and review/utilize the correct section.          Limitations are reviewed and Attachment 1 Section 1.7 referenced.
Cue: If asked, inform the candidate that 86-SPRZ08 is reset. Verifies 86 device is reset Sat/Unsat
: 14. Review Attachment 1 Section 1.7 Power             Per step 1.7.2, determines         Sat/Unsat Restoration to determine applicable              performance of Attachment 6 is Attachment to Energize Reserve                    required.
: 6. Determine step 6.2 is N/A Marks N/A block for step 6.2 Sat/Unsat
Transformer 1B
: 7. Determine section 6.3 is applicable Carries out the actions of section 6.3 Sat/Unsat NMP2 2008 ML083650061.doc         54          October 2008 Performance Steps Standard Grade    8. Close MDS2 - (115 KV MOD SWITCH 63) LINE 6. Places MDS2 control switch to CLOSE  Observes MDS2 red light - ON  Observes MDS2 green light - OFF Pass/Fail Sat/Unsat  Sat/Unsat
: 4. At Panel 808 (CB 288'), verify reset 86-           Verifies 86 device is reset        Sat/Unsat 2SPRY01 (RES STA SER XFMR 1B PRIM PROT LO RELAY).
: 9. Close MDS4 - (115 KV CIRCUIT SWITCHER CKT SWITCH 38).
Cue: If asked, inform the candidate that 86-SPRY01 is reset.
Places MDS4 control switch from PULL-TO-LOCK to NORMAL-AFTER-OPEN  Places MDS4 control switch to CLOSE  Observes MDS4 red light - ON  Observes MDS4 green light - OFF Pass/Fail Pass/Fail Sat/Unsat Sat/Unsat  The following annunciators clear with no required action:  852421 "MOT Operator CKT      2YUC-MDS4"  852435 "RES STA SER XFMER 1B Loss of Voltage"
: 5. At Panel 809 (CB 288'), verify reset 86-           Verifies 86 device is reset        Sat/Unsat 2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY).
: 10. IF required, place in Normal-After-Trip 2NPS-SWG003-1. Places 3-1 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 3-1 green light - ON Pass/Fail Sat/Unsat
Cue: If asked, inform the candidate that 86-SPRZ08 is reset.
: 11. Return to Attachment 1 Section 1.7. Per step 1.7.8, determines performance of Attachment 7 is required. Sat/Unsat    12. Step 7.1 Prerequisites
: 6. Determine step 6.2 is N/A                         Marks N/A block for step 6.2       Sat/Unsat
: 7. Determine section 6.3 is applicable               Carries out the actions of section Sat/Unsat 6.3 NMP2 2008 ML083650061.doc         53      October 2008


Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed      12. Determines section 7.2 is applicable  Carries out the actions of section 7.2 Sat/Unsat    13. Place 3-14 in Pull-to-Lock. Places 3-14 control switch in PULL-TO-LOCK  Observes 3-14 green/red lights - OFF Pass/Fail Sat/Unsat The following annunciator clears with no required action: 852560 "13.8KV Bus NPS003 ACB      3-1/14/16 Auto Trip/FTC
Performance Steps                              Standard                                Grade
: 14. Place the SYNC switch to ON (SYNCHRONIZE RES STA SVCE XFMR 1B). Rotates the SYNC switch to ON Pass/Fail NMP2 2008 ML083650061.doc          55          October 2008 Performance Steps Standard Grade  15. Close 3-1. Rotates 3-1 control switch to CLOSE Observes 3-1 red light - ON Observes 3-1 green light - OFF Pass/Fail Sat/Unsat Sat/Unsat  Numerous annuciators clear. Numerous annunciators alarm. Numerous annunciators reflash. None of these requires action.
: 8. Close MDS2 - (115 KV MOD SWITCH 63)            Places MDS2 control switch to      Pass/Fail LINE 6.                                        CLOSE Observes MDS2 red light - ON        Sat/Unsat Observes MDS2 green light - OFF     Sat/Unsat
: 16. Place the SYNC switch to OFF. Rotates the SYNC switch to OFF Pass/Fail
: 9. Close MDS4 - (115 KV CIRCUIT                    Places MDS4 control switch from    Pass/Fail SWITCHER CKT SWITCH 38).                       PULL-TO-LOCK to NORMAL-AFTER-OPEN Places MDS4 control switch to         Pass/Fail CLOSE Observes MDS4 red light - ON         Sat/Unsat Observes MDS4 green light - OFF       Sat/Unsat The following annunciators clear with no required action:
: 17. Close 13-6. Rotates 13-6 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 13-6 green light - ON Rotates 13-6 control switch to CLOSE  Observes 13-6 red light - ON  Observes 13-6 green light - OFF Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat  The following annunciator clears with no required action:  852527 "4KV Bus NNS 013 Undervoltage"
852421 MOT Operator CKT 2YUC-MDS4 852435 RES STA SER XFMER 1B Loss of Voltage
: 18. Return to Attachment 1 Section 1.7. Per step 1.7.10, determines performance of Attachment 9 is required. Sat/Unsat    19. Step 9.1 Prerequisites Cue: If asked, 9.1.4 lockout is verified reset. Step 9.1, Prerequisites, are completed
: 10. IF required, place in Normal-After-Trip        Places 3-1 control switch from      Pass/Fail 2NPS-SWG003-1.                                 PULL-TO-LOCK to NORMAL-AFTER-TRIP.
: 20. Determines section 9.2 is applicable Carries out the actions of section 7.2 Sat/Unsat    21. Verify closed 3-6. Rotates 3-6 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 3-6 green light - ON Rotates 3-6 control switch to CLOSE  Observes 3-6 red light - ON Observes 3-6 green light - OFF Pass/Fail  
Observes 3-1 green light - ON       Sat/Unsat
: 11. Return to Attachment 1 Section 1.7.           Per step 1.7.8, determines         Sat/Unsat performance of Attachment 7 is required.
: 12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed
: 12. Determines section 7.2 is applicable           Carries out the actions of section Sat/Unsat 7.2
: 13. Place 3-14 in Pull-to-Lock.                   Places 3-14 control switch in PULL- Pass/Fail TO-LOCK Observes 3-14 green/red lights -     Sat/Unsat OFF The following annunciator clears with no required action:
852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC
: 14. Place the SYNC switch to ON                   Rotates the SYNC switch to ON       Pass/Fail (SYNCHRONIZE RES STA SVCE XFMR 1B).
NMP2 2008 ML083650061.doc      54      October 2008


Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat
Performance Steps                                Standard                                Grade
: 22. Close 15-3 Rotates 15-3 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 15-3 green light - ON Rotates 15-3 control switch to CLOSE Pass/Fail Sat/Unsat Pass/Fail  
: 15. Close 3-1.                                      Rotates 3-1 control switch to      Pass/Fail CLOSE Observes 3-1 red light - ON          Sat/Unsat Observes 3-1 green light - OFF      Sat/Unsat Numerous annuciators clear.
Numerous annunciators alarm.
Numerous annunciators reflash. None of these requires action.
: 16. Place the SYNC switch to OFF.                  Rotates the SYNC switch to OFF    Pass/Fail
: 17. Close 13-6.                                    Rotates 13-6 control switch from  Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.
Observes 13-6 green light - ON      Sat/Unsat Rotates 13-6 control switch to      Pass/Fail CLOSE Observes 13-6 red light - ON        Sat/Unsat Observes 13-6 green light - OFF      Sat/Unsat The following annunciator clears with no required action:
852527 4KV Bus NNS 013 Undervoltage
: 18. Return to Attachment 1 Section 1.7.            Per step 1.7.10, determines        Sat/Unsat performance of Attachment 9 is required.
: 19. Step 9.1 Prerequisites Cue: If asked, 9.1.4 lockout is verified reset.
Step 9.1, Prerequisites, are completed
: 20. Determines section 9.2 is applicable            Carries out the actions of section Sat/Unsat 7.2
: 21. Verify closed 3-6.                              Rotates 3-6 control switch from    Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.
Observes 3-6 green light - ON      Sat/Unsat Rotates 3-6 control switch to      Pass/Fail CLOSE Observes 3-6 red light - ON        Sat/Unsat Observes 3-6 green light - OFF    Sat/Unsat
: 22. Close 15-3                                     Rotates 15-3 control switch from   Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.
Observes 15-3 green light - ON     Sat/Unsat Rotates 15-3 control switch to     Pass/Fail CLOSE NMP2 2008 ML083650061.doc      55      October 2008


NMP2 2008 ML083650061.doc          56          October 2008 Performance Steps Standard Grade Observes 15-3 red light - ON Observes 15-3 green light - OFF Sat/Unsat Sat/Unsat
Performance Steps                               Standard                           Grade Observes 15-3 red light - ON   Sat/Unsat Observes 15-3 green light - OFF Sat/Unsat
: 23. Reports that Reserve Station Transformer 1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B Cue: Acknowledge report.
: 23. Reports that Reserve Station Transformer 1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B Cue: Acknowledge report.
TERMINATING CUE: Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
TERMINATING CUE: Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
RECORD STOP TIME
RECORD STOP TIME NMP2 2008 ML083650061.doc      56    October 2008


NMP2  JPM #S-7 57 October 2008 Initial Conditions:
Initial Conditions:
: 1. The plant experienced a Loss of Line 6. 2. The plant was manually scrammed. 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
: 1. The plant experienced a Loss of Line 6.
: 5. Power has been restored to Line 6 and Power Control has verified its reliability. 6. Ask the operator for any questions.
: 2. The plant was manually scrammed.
: 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
: 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
: 5. Power has been restored to Line 6 and Power Control has verified its reliability.
: 6. Ask the operator for any questions.
Initiating cue:
Initiating cue:
RO- " (Operator's name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.7 Power Restoration."
RO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.7 Power Restoration.
NMP2 JPM #S-7                                    57                              October 2008


NMP2  JPM #S-7 58 October 2008 Initial Conditions:
Initial Conditions:
: 1. The plant experienced a Loss of Line 6. 2. The plant was manually scrammed. 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
: 1. The plant experienced a Loss of Line 6.
: 5. Power has been restored to Line 6 and Power Control has verified its reliability. 6. Ask the operator for any questions.
: 2. The plant was manually scrammed.
Initiating cue: " (Operator's name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.
: 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3."
: 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
Candidate: Direct ALL communications and announcements       through the JPM Evaluator, first.
: 5. Power has been restored to Line 6 and Power Control has verified its reliability.
: 6. Ask the operator for any questions.
Initiating cue:
(Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3.
Candidate:       Direct ALL communications and announcements through the JPM Evaluator, first.
NMP2 JPM #S-7                                    58                              October 2008


NMP2  JPM #S-7 59 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate Suppression Chamber Cooling And Spray using RHS "A"      Revision: NRC 2008  
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate Suppression Chamber Cooling And Spray using RHS A             Revision: NRC 2008 Task Number: N2-205000-01013 Approvals:
 
NA EXAMINATION SECURITY General Supervisor             Date                   General Supervisor Date Operations Training (Designee)                         Operations (Designee)
Task Number: N2-205000-01013 Approvals:  
NA EXAMINATION SECURITY Configuration Control          Date Performer:                            (RO/SRO)
 
Trainer/Evaluator:
NA EXAMINATION SECURITY General Supervisor Date   General Supervisor   Date Operations Training (Designee)   Operations (Designee)  
Evaluation Method:      X        Perform              Simulate Evaluation Location:        Plant                  X Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO          Alternate Path Task:
NO Start Time:                    Stop Time:                    Completion Time:
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-7                                    59                                  October 2008


NA EXAMINATION SECURITY Configuration Control  Date Performer:    (RO/SRO)  Trainer/Evaluator:
Evaluator Signature:    Date:
Evaluation Method:    X  Perform              Simulate Evaluation Location:          Plant        X  Simulator Expected Completion Time: 20 minutes  Time Critical Task: NO Alternate Path Task: NO Start Time:    Stop Time:  Completion Time:
NMP2 JPM #S-7      60      October 2008
JPM Overall Rating:  Pass  Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:


NMP2  JPM #S-7 60 October 2008 Evaluator Signature:      Date:
Recommended Start Location:
NMP2  JPM #S-7 61 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Simulator Simulator Set-up:
: 8. Reset to IC 187 Directions to Operators:
: 8. Reset to IC 187 Directions to Operators:
Line 759: Line 777:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
: 3.     During Training JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
* No other verification shall be demonstrated.


==References:==
==References:==
: 11. EOP-6 Attachment 22 12. NUREG K/A 226001 A4.01 Tools and Equipment:
: 11. EOP-6 Attachment 22
: 1. None Task Standard:  
: 12. NUREG K/A 226001 A4.01 Tools and Equipment:
: 1. None Task Standard:
NMP2 JPM #S-7                                      61                                October 2008


NMP2  JPM #S-7 62 October 2008 Suppression Pool Cooling & Spray initiated using RHS "A" NMP2 JPM #P-1 63 October 2008 Initial Conditions:
Suppression Pool Cooling & Spray initiated using RHS A NMP2 JPM #S-7                                62        October 2008
: 15. A Small Break LOCA has occurred. 16. Primary Containment Control EOP has been entered.


Initiating cue:  
Initial Conditions:
 
: 15. A Small Break LOCA has occurred.
"(Operator's name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22".  
: 16. Primary Containment Control EOP has been entered.
 
Initiating cue:
Performance Steps Standard Grade   1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
(Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22.
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. EOP-6, Attachment 22 obtained. Step 3.1 identified Sat/Unsat      3. Start Suppression Chamber Spray:  
Performance Steps                                   Standard                                 Grade
 
: 1. Provide repeat back of initiating cue.           Proper communications used for          Sat/Unsat Evaluator Acknowledge repeat back               repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
N/A, Suppression Chamber Spray is NOT required IF Drywell Sprays are required concurrently with Suppression Chamber Sprays, perform Subsection 3.2 N/A, Drywell Spray is NOT required  
: 2. Obtain a copy of the reference procedure         EOP-6, Attachment 22 obtained. Step     Sat/Unsat and review/utilize the correct section.        3.1 identified
 
: 3.       Start Suppression Chamber Spray:
Suppression Chamber Spray using RHS A. (2CEC*PNL601)
N/A, Suppression Chamber Spray is         Determines Suppression Chamber          Sat/Unsat NOT required                              Spray is required IF Drywell Sprays are required concurrently with Suppression Chamber Sprays, perform Subsection 3.2 N/A, Drywell Spray is NOT required         Determines step N/A Suppression Chamber Spray using           Determines step to be used RHS A. (2CEC*PNL601)
N/A, RHS A will NOT be used  
N/A, RHS A will NOT be used
 
: 4.       IF a LOCA signal is present AND           Determines bypass not required          Sat/Unsat suppression chamber spray                 because DWP is >1.68 psig.
Determines Suppression Chamber Spray is required
operation is directed WITH drywell pressure less than 1.68 psig, perform the following to bypass the high drywell pressure interlock for 2RHS*MOV33A:
 
NMP2 JPM #P-1                                     63                            October 2008
Determines step N/A
 
Determines step to be used
 
Sat/Unsat
: 4. IF a LOCA signal is present AND suppression chamber spray operation is directed WITH drywell pressure less than 1.68 psig, perform the following to bypass the high drywell pressure interlock for 2RHS*MOV33A:
Determines bypass not required because DWP is >1.68 psig. Sat/Unsat NMP2 JPM #P-1 64 October 2008 Performance Steps Standard Grade  N/A, high drywell pressure interlock will NOT be bypassed NOTE: A L660 key may be needed to  gain entry to 2CEC*PNL629.


Remove relay E12A-K108A in 2CEC*PNL629, Bay B (Figure 22-4)
Performance Steps                                  Standard                                    Grade N/A, high drywell pressure interlock will NOT be bypassed NOTE: A L660 key may be needed to gain entry to 2CEC*PNL629.
Install EOP Jumper #42 on terminal points BBB-49 AND AA-119 in 2CEC*PNL629, Bay B (Figure 22-4)
Remove relay E12A-K108A in 2CEC*PNL629, Bay B (Figure 22-4)
Install EOP Jumper #42 on terminal points BBB-49 AND AA-119 in 2CEC*PNL629, Bay B (Figure 22-4)
Deliver relay E12A-K108A to SM
Deliver relay E12A-K108A to SM
: 5. NOTE: Verifying SWP*MOV90A open may be delayed until after sprays are in service. This step is NOT sequence critical.
: 5. NOTE: Verifying SWP*MOV90A open may be delayed until after sprays are in service. This step is NOT sequence critical.
Verify open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR  INLET VLV Open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR INLET VLV       Pass/Fail/NA      6. Verify closed AND IF possible overridden, RHS*MOV24A, LPCI A INJECTION VLV Failure to override injection valve closed can result in pump runout, if the valve auto opens with FV38A open during Suppression Pool Cooling operation.
Verify open SWP*MOV90A, HEAT               Open SWP*MOV90A, HEAT                     Pass/Fail/
Determines valve is closed by green light ON and red light OFF indication.
EXCHANGER 1A, SVCE WTR                      EXCHANGER 1A, SVCE WTR INLET             NA INLET VLV                                  VLV
 
: 6. Verify closed AND IF possible               Determines valve is closed by green      Sat/Unsat overridden, RHS*MOV24A, LPCI A             light ON and red light OFF indication.
Places control switch to CLOSE to obtain the amber override light lit. Sat/Unsat Pass/Fail
INJECTION VLV Failure to override injection valve         Places control switch to CLOSE to        Pass/Fail closed can result in pump runout, if       obtain the amber override light lit.
: 7. Verify running RHS*P1A, PMP 1A Determines pump is running by red light ON, green light OFF OR motor amps indication. Sat/Unsat
the valve auto opens with FV38A open during Suppression Pool Cooling operation.
: 8. IF operation in Containment Spray mode AND a trip of 2RHS*P1A occurs, perform emergency refill per Section 3.3 Determines step N/A Sat/Unsat 9. Open RHS*MOV33A, OUTLET TO Open RHS*MOV33A, OUTLET TO Pass/Fail NMP2 JPM #P-1 65 October 2008 Performance Steps Standard Grade  SUPPR POOL SPRAY SUPPR POOL SPRAY    10. Verify 450 gpm on SUPPR SPRAY  HEADER FLOW. (2RHS*FI64A)
: 7. Verify running RHS*P1A, PMP 1A             Determines pump is running by red         Sat/Unsat light ON, green light OFF OR motor amps indication.
Determines flow is acceptable Sat/Unsat    11. IF Suppression Pool Cooling is directed,  throttle open RHS*FV38A, RETURN TO SUPPR POOL COOLING to  establish a flow of approximately 7450  gpm (E12-R603A)
: 8. IF operation in Containment Spray           Determines step N/A                      Sat/Unsat mode AND a trip of 2RHS*P1A occurs, perform emergency refill per Section 3.3
N/A, Suppression Pool Cooling was NOT directed Throttle open RHS*FV38A, RETURN TO SUPPR POOL COOLING to attain desired flow rate (7400 to 7500 gpm). Pass/Fail    12. Verify RHS*MOV4A, PMP 1A MINIMUM  FLOW VLV position as follows:
: 9. Open RHS*MOV33A, OUTLET TO                 Open RHS*MOV33A, OUTLET TO               Pass/Fail NMP2 JPM #P-1                                   64                              October 2008
 
IF RHS A is in Suppression Pool  Cooling/Spray, verify closed  2RHS*MOV4A OR  IF RHS A is in Suppression Chamber  Spray ONLY, verify open RHS*MOV4A
 
Verifies RHS*MOV4A, PMP 1A MINIMUM FLOW VLV valve is closed by green light ON and red light OFF indication. Sat/Unsat    13. Verify open SWP*MOV90A, HEAT  EXCHANGER 1A, SVCE WTR  INLET VLV


Verify open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR INLET VLV by red light ON and green light OFF indication.
Performance Steps                                Standard                                  Grade SUPPR POOL SPRAY                          SUPPR POOL SPRAY
: 10. Verify 450 gpm on SUPPR SPRAY            Determines flow is acceptable            Sat/Unsat HEADER FLOW. (2RHS*FI64A)
: 11. IF Suppression Pool Cooling is directed,  Throttle open RHS*FV38A, RETURN          Pass/Fail throttle open RHS*FV38A, RETURN            TO SUPPR POOL COOLING to attain TO SUPPR POOL COOLING to                  desired flow rate (7400 to 7500 gpm).
establish a flow of approximately 7450 gpm (E12-R603A)
N/A, Suppression Pool Cooling was NOT directed
: 12. Verify RHS*MOV4A, PMP 1A MINIMUM Verifies RHS*MOV4A, PMP 1A                        Sat/Unsat FLOW VLV position as follows:              MINIMUM FLOW VLV valve is closed by green light ON and red light OFF IF RHS A is in Suppression Pool            indication.
Cooling/Spray, verify closed 2RHS*MOV4A OR IF RHS A is in Suppression Chamber Spray ONLY, verify open RHS*MOV4A
: 13. Verify open SWP*MOV90A, HEAT               Verify open SWP*MOV90A, HEAT            Pass/Fail/
EXCHANGER 1A, SVCE WTR                    EXCHANGER 1A, SVCE WTR INLET             NA INLET VLV                                  VLV by red light ON and green light OFF indication.
If valve was previously opened, this is not a critical step.
If valve was previously opened, this is not a critical step.
Pass/Fail/NA    14. NOTE: Post LOCA, in order to supply greater than 2000 gpm SWP to RHR Heat Exchangers with less than 5 SWP pumps in service it may be necessary to isolate Turbine Bldg. loads IAW N2-OP-31 Section H.12.0.
: 14. NOTE: Post LOCA, in order to supply greater than 2000 gpm SWP to RHR Heat Exchangers with less than 5 SWP pumps in service it may be necessary to isolate Turbine Bldg. loads IAW N2-OP-31 Section H.12.0.
Throttle open SWP*MOV33A, HEAT EXCHANGER 1A SVCE WTR OUTLET VLV to establish Service Water flow to RHR Heat Exchanger 1A NOT to exceed 7400 gpm. (E12-R602A)  
Throttle open SWP*MOV33A, HEAT             Throttles open SWP*MOV33A, HEAT          Pass/Fail EXCHANGER 1A SVCE WTR OUTLET               EXCHANGER 1A SVCE WTR VLV to establish Service Water flow to     OUTLET VLV and verifies flow remains RHR Heat Exchanger 1A NOT to               less than 7400 GPM exceed 7400 gpm. (E12-R602A)
NMP2 JPM #P-1                                  65                              October 2008


Throttles open SWP*MOV33A, HEAT EXCHANGER 1A SVCE WTR OUTLET VLV and verifies flow remains less than 7400 GPM
Performance Steps                                Standard                                Grade
: 15. NOTE: 2RHS*MOV8A is interlocked in the open position for 10 minutes following a Division I ECCS initiation.
WHEN possible, close RHS*MOV8A,          If possible, close RHS*MOV8A, HEAT     Sat/Unsat/
HEAT EXCHANGER 1A INLET                  EXCHANGER 1A INLET BYPASS VLV          NA BYPASS VLV                               OR determines step is N/A
: 16. Report completion.                        Report completion.                    Sat/Unsat TERMINATING CUE: Suppression Pool Cooling and Spray is in operation RECORD STOP TIME NMP2 JPM #P-1                                66                            October 2008


Pass/Fail
Initial Conditions:
: 1. A Small Break LOCA has occurred.
: 2. Primary Containment Control EOP has been entered.
Initiating cue:
(Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22.
NMP2 JPM #P-1                              67                            October 2008


NMP2  JPM #P-1 66 October 2008 Performance Steps Standard Grade 15. NOTE: 2RHS*MOV8A is interlocked in  the open position for 10 minutes following a Division I ECCS initiation.
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Align Service Water to SFC Heat Exchanger 1A                      Revision: NRC 2008 Task Number:
WHEN possible, close RHS*MOV8A,  HEAT EXCHANGER 1A INLET  BYPASS VLV
Approvals:
 
NA EXAMINATION SECURITY General Supervisor              Date                  General Supervisor Date Operations Training (Designee)                        Operations (Designee)
If possible, close RHS*MOV8A, HEAT EXCHANGER 1A INLET BYPASS VLVOR determines step is N/A
NA EXAMINATION SECURITY Configuration Control          Date Performer:                            (RO/SRO)
 
Trainer/Evaluator:
Sat/Unsat/
Evaluation Method:              Perform          X Simulate Evaluation Location:    X   Plant                  Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO          Alternate Path Task:
NA   16. Report completion. Report completion. Sat/Unsat    TERMINATING CUE: Suppression Pool Cooling and Spray is in operation RECORD STOP TIME 
NO Start Time:                    Stop Time:                    Completion Time:
 
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
NMP2 JPM #P-1 67 October 2008 Initial Conditions:
Comments:
: 1. A Small Break LOCA has occurred. 2. Primary Containment Control EOP has been entered.
NMP2 JPM #P-1                                     68                                  October 2008
 
Initiating cue:


"(Operator's name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22".
Evaluator Signature:    Date:
NMP2 JPM #P-1      69      October 2008


NMP2  JPM #P-1 68 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Recommended Start Location:
 
Plant Simulator Set-up:
Title: Align Service Water to SFC Heat Exchanger 1A  Revision: NRC 2008 Task Number:
: 9. NA Directions to Operators:
Approvals:
 
NA EXAMINATION SECURITY General Supervisor  Date  General Supervisor  Date Operations Training (Designee)  Operations (Designee)
 
NA EXAMINATION SECURITY Configuration Control  Date
 
Performer:    (RO/SRO)  Trainer/Evaluator:
Evaluation Method:      Perform      X  Simulate  Evaluation Location:    X    Plant            Simulator Expected Completion Time: 20 minutes  Time Critical Task: NO Alternate Path Task: NO Start Time:    Stop Time:  Completion Time:
JPM Overall Rating:  Pass  Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
NMP2  JPM #P-1 69 October 2008 Evaluator Signature:      Date:
NMP2  JPM #P-1 70 October 2008 Recommended Start Location:
Plant   Simulator Set-up:
: 9. NA   Directions to Operators:
Read Before Every JPM Performance:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Line 859: Line 872:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
: 3.     During Training JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
* No other verification shall be demonstrated.


==References:==
==References:==
: 13. N2-SOP-38, Rev 04 14. NUREG K/A 233000 K1.02 Tools and Equipment:
: 13. N2-SOP-38, Rev 04
: 1. None Task Standard:  
: 14. NUREG K/A 233000 K1.02 Tools and Equipment:
: 1. None Task Standard:
NMP2 JPM #P-1                                      70                                October 2008


NMP2  JPM #P-1 71 October 2008 Service Water is aligned to SFC 1A NMP2 JPM #P-2 72 October 2008 Initial Conditions:
Service Water is aligned to SFC 1A NMP2 JPM #P-1                      71 October 2008
: 17. The Control Room has been evacuated 18. A loss of Spent Fuel Pool Cooling has occurred


Initiating cue:  
Initial Conditions:
 
: 17. The Control Room has been evacuated
"(Operator's name), Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, ".
: 18. A loss of Spent Fuel Pool Cooling has occurred Initiating cue:
Performance Steps Standard Grade   1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
(Operators name), Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5.
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-SOP-38 obtained. Sat/Unsat       3. Obtain SM permission to supply Service Water Cooling to SFC Heat Exchanger 1A  
Performance Steps                                 Standard                                 Grade
 
: 1. Provide repeat back of initiating cue.         Proper communications used for          Sat/Unsat Evaluator Acknowledge repeat back             repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
UNLESS directed otherwise by the SM, verify Chemistry has sampled (C1) the CCP system AND sample results meet SPDES AND ODCM requirements for discharge  
: 2. Obtain a copy of the reference procedure       N2-SOP-38 obtained.                     Sat/Unsat and review/utilize the correct section.
 
: 3.       Obtain SM permission to supply Service   Requests SM permission                  Sat/Unsat Water Cooling to SFC Heat Exchanger 1A UNLESS directed otherwise by the SM, verify Chemistry has sampled (C1) the CCP system AND sample results meet SPDES AND ODCM requirements for discharge N/A, the SM directs sampling to be performed later CUE: SM has granted permission and Chemistry sample is satisfactory
N/A, the SM directs sampling to be performed later CUE: SM has granted permission and Chemistry sample is satisfactory Requests SM permission Sat/Unsat      4. In the Division I Switchgear Room, place the following breakers in OFF:
: 4.       In the Division I Switchgear Room, place the following breakers in OFF:
2EHS*MCC103-4A, CL LOOP CLG WTR TO SFP CLG HE A SPLY V 2CCP*MOV14A 2EHS*MCC103-4B, CL LOOP CLG WTR FR SFP CLG HE A RTN V 2CCP*MOV18A Locates breaker and places in OFF
2EHS*MCC103-4A, CL LOOP CLG             Locates breaker and places in OFF      Pass/Fail WTR TO SFP CLG HE A SPLY V 2CCP*MOV14A 2EHS*MCC103-4B, CL LOOP CLG             Locates breaker and places in OFF      Pass/Fail WTR FR SFP CLG HE A RTN V 2CCP*MOV18A NMP2 JPM #P-2                                   72                            October 2008
 
Locates breaker and places in OFF Pass/Fail
 
Pass/Fail NMP2 JPM #P-2 73 October 2008 Performance Steps Standard Grade      5. In North Aux Bay Elev 240, place the  following breakers in OFF:
 
2EHS*MCC102-2A, SWP TO SPENT  FUEL POOL HE 2SWP*MOV17A 2EHS*MCC102-2B, SWP FROM SPENT FUEL POOL HE  2SWP*MOV18A
 
Locates breaker and places in OFF Locates breaker and places in OFF
 
Pass/Fail Pass/Fail
: 6. NOTE: 2CCP*MOV14A and MOV18A  are located on RB Elev 215 outside the  2SFC*E1A Room.
Manually close the following valves:
 
2CCP*MOV14A, SFC HEAT  EXCHANGER RBCLC INLET 2CCP*MOV18A, SFC HEAT  EXCHANGER RBCLC OUTLET
 
Locates and closes valve Locates and closes valve
 
Pass/Fail Pass/Fail      7. NOTE: 2SWP*MOV17A and MOV18A  are located on RB Elev 196 by the  North stairwell.


Performance Steps                                Standard                                    Grade
: 5.      In North Aux Bay Elev 240, place the following breakers in OFF:
2EHS*MCC102-2A, SWP TO SPENT            Locates breaker and places in OFF        Pass/Fail FUEL POOL HE 2SWP*MOV17A 2EHS*MCC102-2B, SWP FROM                Locates breaker and places in OFF        Pass/Fail SPENT FUEL POOL HE 2SWP*MOV18A
: 6.      NOTE: 2CCP*MOV14A and MOV18A are located on RB Elev 215 outside the 2SFC*E1A Room.
Manually close the following valves:
2CCP*MOV14A, SFC HEAT                    Locates and closes valve                  Pass/Fail EXCHANGER RBCLC INLET 2CCP*MOV18A, SFC HEAT                    Locates and closes valve                  Pass/Fail EXCHANGER RBCLC OUTLET
: 7.      NOTE: 2SWP*MOV17A and MOV18A are located on RB Elev 196 by the North stairwell.
Manually open the following valves:
Manually open the following valves:
2SWP*MOV17A, SFC HEAT EXCHANGER SERVICE WTR INLET  
2SWP*MOV17A, SFC HEAT                   Locates and manually opens valve          Pass/Fail EXCHANGER SERVICE WTR INLET 2SWP*MOV18A, SFC HEAT                    Locates and manually opens valve          Pass/Fail EXCHANGER SERVICE WTR OUTLET
: 8.      Throttle 2CCP*V12, SFC HX 1A            Throttles valve while monitoring          Pass/Fail OUTLET ISOL, to maintain Spent Fuel      temperatures until desired range is Pool temperature 80 - 100&deg;oF            reached until desired temperature is reached CUE/NOTE: The applicant should state that temperature can be monitored at_______.
Provide feedback that the appropriate temperature has been reached once satisfied that the appropriate location to monitor NMP2 JPM #P-2                                73                              October 2008


2SWP*MOV18A, SFC HEAT  EXCHANGER SERVICE WTR  OUTLET Locates and manually opens valve
Performance Steps                          Standard                                Grade temperature has been determined
: 9. IF not previously done, contact      Requests Chemistry provide sample      Sat/Unsat Chemistry to sample the CCP System AND determine if sample meets requirements for discharge Examiner Note: JPM may be terminated at this point TERMINATING CUE: Service Water is providing cooling to SFC Heat Exchanger 1A RECORD STOP TIME NMP2 JPM #P-2                            74                            October 2008


Locates and manually opens valve
Initial Conditions:
: 1. The Control Room has been evacuated
: 2. A loss of Spent Fuel Pool cooling has occurred Initiating cue:
Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5 NMP2 JPM #P-2                                75                        October 2008


Pass/Fail  
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Isolating An HCU With Cooling Water Flow                          Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor              Date                  General Supervisor Date Operations Training (Designee)                        Operations (Designee)
NA EXAMINATION SECURITY Configuration Control          Date Performer:                            (RO/SRO)
Trainer/Evaluator:
Evaluation Method:              Perform            X    Simulate Evaluation Location:      X  Plant                    Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO          Alternate Path Task:
NO Start Time:                    Stop Time:                    Completion Time:
JPM Overall Rating:            Pass           Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-2                                    76                                  October 2008


Pass/Fail      8. Throttle 2CCP*V12, SFC HX 1A  OUTLET ISOL, to maintain Spent Fuel  Pool temperature 80 - 100&deg; o F  CUE/NOTE: The applicant should state that temperature can be monitored at_______. Provide feedback that the appropriate temperature has been reached once satisfied that the appropriate location to monitor Throttles valve while monitoring temperatures until desired range is reached until desired temperature is reached Pass/Fail NMP2 JPM #P-2 74 October 2008 Performance Steps Standard Grade temperature has been determined
Evaluator Signature:    Date:
: 9. IF not previously done, contact  Chemistry to sample the CCP System  AND determine if sample meets  requirements for discharge Examiner Note:  JPM may be terminated at this point Requests Chemistry provide sample Sat/Unsat      TERMINATING CUE:  Service Water is providing cooling to SFC Heat Exchanger 1A RECORD STOP TIME 
NMP2 JPM #P-2       77      October 2008


NMP2  JPM #P-2 75 October 2008 Initial Conditions:
Recommended Start Location:
: 1. The Control Room has been evacuated 2. A loss of Spent Fuel Pool cooling has occurred
Plant Simulator Set-up:
 
: 10. NA Directions to Operators:
Initiating cue:
 
Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5
 
NMP2  JPM #P-2 76 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Isolating An HCU With Cooling Water Flow  Revision: NRC 2008
 
Task Number:
Approvals:
 
NA EXAMINATION SECURITY General Supervisor  Date  General Supervisor  Date Operations Training (Designee)  Operations (Designee)
 
NA EXAMINATION SECURITY Configuration Control  Date Performer:    (RO/SRO)  Trainer/Evaluator:
Evaluation Method:    Perform      X      Simulate Evaluation Location:      X    Plant            Simulator Expected Completion Time: 20 minutes  Time Critical Task: NO Alternate Path Task: NO Start Time:    Stop Time:  Completion Time:
JPM Overall Rating:  Pass  Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
NMP2  JPM #P-2 77 October 2008 Evaluator Signature:      Date:
NMP2  JPM #P-2 78 October 2008 Recommended Start Location:
Plant   Simulator Set-up:
: 10. NA   Directions to Operators:
Read Before Every JPM Performance:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Line 942: Line 942:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
: 3.     During Training JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
* No other verification shall be demonstrated.


==References:==
==References:==
: 15. N2-OP-30, Rev 14 16. NUREG K/A 201001 A1.06 Tools and Equipment:
: 15. N2-OP-30, Rev 14
: 1. None Task Standard:  
: 16. NUREG K/A 201001 A1.06 Tools and Equipment:
: 1. None Task Standard:
NMP2 JPM #P-2                                      78                                October 2008
 
HCU 34-23 is isolated with cooling water maintained.
NMP2 JPM #P-2                              79        October 2008


NMP2  JPM #P-2 79 October 2008 HCU 34-23 is isolated with cooling water maintained.
Initial Conditions:
NMP2  JPM #P-3 80 October 2008 Initial Conditions:
: 19. HCU 34-23 was declared inoperable and must be isolated for maintenance.
: 19. HCU 34-23 was declared inoperable and must be isolated for maintenance.
Initiating cue:  
Initiating cue:
"(Operator's name), Isolate HCU 34-23 WITH cooling water per N2-OP-30".
(Operators name), Isolate HCU 34-23 WITH cooling water per N2-OP-30.
Performance Steps Standard Grade   1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
Performance Steps                                   Standard                                   Grade
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-30 obtained. Section F.8.2 identified for use Sat/Unsat      3. IF an RDS Pump is in service, verify 79 HCUs are isolated.
: 1. Provide repeat back of initiating cue.           Proper communications used for          Sat/Unsat Evaluator Acknowledge repeat back             repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
CUE: NO other HCUs are isolated Determines criteria is met Sat/Unsat
: 2. Obtain a copy of the reference procedure         N2-OP-30 obtained. Section F.8.2         Sat/Unsat and review/utilize the correct section.        identified for use
: 4. Close 2RDS*V101, (34-23) Insert Isolation.
: 3.       IF an RDS Pump is in service, verify     Determines criteria is met              Sat/Unsat 79 HCUs are isolated.
 
CUE: NO other HCUs are isolated
Locates and closes valve Pass/Fail       5. Close 2RDS*V102, (34-23) Withdraw Isolation.
: 4.       Close 2RDS*V101, (34-23) Insert           Locates and closes valve                 Pass/Fail Isolation.
Locates and closes valve Pass/Fail       6. Close 2RDS-V113, (34-23) Charging Water Isolation.
: 5.       Close 2RDS*V102, (34-23) Withdraw         Locates and closes valve                 Pass/Fail Isolation.
Locates and closes valve Pass/Fail       7. CAUTION Rx water will drain out of 2RDS*V107 if a Reactor Scram occurs.  
: 6.       Close 2RDS-V113, (34-23) Charging         Locates and closes valve                 Pass/Fail Water Isolation.
 
: 7.       CAUTION                                   Locates and attaches drain line          Sat/Unsat Rx water will drain out of 2RDS*V107 if a Reactor Scram occurs.
ATTACH drain line to HCU at 2RDS*V107, (34-23) Accumulator Locates and attaches drain line Sat/Unsat NMP2 JPM #P-3 81 October 2008 Performance Steps Standard Grade  Drain AND route to floor/equipment  drain. (Lubricant use N/A for Swagelok Fittings)
ATTACH drain line to HCU at 2RDS*V107, (34-23) Accumulator NMP2 JPM #P-3                                   80                              October 2008
: 8. Slowly open 2RDS*V107 (34-23) to  depressurize accumulator.
Opens valve and observes accumulator pressure lowering Pass/Fail      9. Close 2RDS*V107 (34-23).
Locates and closes valve Pass/Fail      10. Open 2RDS*V107 (34-23) one turn.
Locates and opens valve Pass/Fail      11. Close 2RDS-V103, (34-23) Drive  Water Isolation.
Locates and closes valve Pass/Fail
: 12. Close 2RDS-V105, (34-23) Exhaust  Water Isolation.


Locates and closes valve Pass/Fail
Performance Steps                                Standard                                  Grade Drain AND route to floor/equipment drain. (Lubricant use N/A for Swagelok Fittings)
: 13. Open 2RDS*V101, (34-23) Insert Isolation.  
: 8. Slowly open 2RDS*V107 (34-23) to          Opens valve and observes                Pass/Fail depressurize accumulator.                accumulator pressure lowering
: 9. Close 2RDS*V107 (34-23).                  Locates and closes valve                Pass/Fail
: 10. Open 2RDS*V107 (34-23) one turn.          Locates and opens valve                Pass/Fail
: 11. Close 2RDS-V103, (34-23) Drive            Locates and closes valve               Pass/Fail Water Isolation.
: 12. Close 2RDS-V105, (34-23) Exhaust          Locates and closes valve                Pass/Fail Water Isolation.
: 13. Open 2RDS*V101, (34-23) Insert           Locates and opens valve                Pass/Fail Isolation.
: 14. If the HCU is to have maintenance OR      Locates and closes valve                Pass/Fail is to be out of service for an extended period of time perform the following:
Close 2RDS*V111, (34-23) Gas Accumulator Charging Valve.
: 15. Using two wrenches, slowly loosen        Loosens and removes cap from            Sat/Unsat AND    remove the cap from connector P6.        connector
: 16. Connect nitrogen charging rig.            Connects rig                            Sat/Unsat NMP2 JPM #P-3                                81                            October 2008


Locates and opens valve Pass/Fail      14. If the HCU is to have maintenance OR  is to be out of service for an  extended period of time perform the following:
Performance Steps                                 Standard                             Grade
Close 2RDS*V111, (34-23) Gas  Accumulator Charging Valve.
: 17. Open 2RDS*V111, (34-23) AND,               Locates and opens valve            Pass/Fail utilizing the nitrogen charging rig vent valve, slowly bleed off nitrogen.
Locates and closes valve Pass/Fail      15. Using two wrenches, slowly loosen AND  remove the cap from connector P6.
: 18. Verify Nitrogen pressure on the           Verifies pressure is 0            Sat/Unsat accumulator pressure gauge is at 0 psig.
Loosens and removes cap from connector Sat/Unsat      16. Connect nitrogen charging rig.
: 19. Disconnect charging rig.                   Disconnects rig                   Sat/Unsat
Connects rig  Sat/Unsat NMP2  JPM #P-3 82 October 2008 Performance Steps Standard Grade 17. Open 2RDS*V111, (34-23) AND, utilizing the nitrogen charging rig vent valve, slowly bleed off nitrogen.
: 20. NOTE: While torquing cap, use a           Reinstalls Cap                    Sat/Unsat wrench on P6 connector to prevent connector movement at instrument block.
Locates and opens valve Pass/Fail      18. Verify Nitrogen pressure on the accumulator pressure gauge is at 0 psig.
Apply thin coat of Nickel NEVER SEEZ on P6 connector threads, THEN reinstall the cap AND torque the cap to 150-200 in-lbs.
Verifies pressure is 0 Sat/Unsat      19. Disconnect charging rig.
TERMINATING CUE: HCU 34-23 is isolated with cooling water maintained and charging rig has been disconnected.
Disconnects rig Sat/Unsat       20. NOTE: While torquing cap, use a wrench on P6 connector to prevent connector movement at instrument block. Apply thin coat of Nickel NEVER SEEZ on P6 connector threads, THEN reinstall the cap AND torque the cap to 150-200 in-lbs.
RECORD STOP TIME NMP2 JPM #P-3                                  82                        October 2008
Reinstalls Cap Sat/Unsat      TERMINATING CUE: HCU 34-23 is isolated with cooling water maintained and charging rig has been disconnected.
RECORD STOP TIME


NMP2  JPM #P-3 83 October 2008 Initial Conditions:
Initial Conditions:
: 1. HCU 34-23 was declared inoperable and must be isolated for maintenance.
: 1. HCU 34-23 was declared inoperable and must be isolated for maintenance.
Initiating cue:
Initiating cue:
Isolate HCU 34-23 WITH cooling water per N2-OP-30  
Isolate HCU 34-23 WITH cooling water per N2-OP-30 NMP2 JPM #P-3                              83                            October 2008


NMP2  JPM #P-3 84 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Off Gas Recovery After Automatic Shutdown   Revision: NRC 2008  
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Off Gas Recovery After Automatic Shutdown                         Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor              Date                  General Supervisor Date Operations Training (Designee)                        Operations (Designee)
NA EXAMINATION SECURITY Configuration Control          Date Performer:                            (RO/SRO)
Trainer/Evaluator:
Evaluation Method:              Perform            X    Simulate Evaluation Location:      X  Plant                      Simulator Expected Completion Time: 20 minutes          Time Critical Task: NO          Alternate Path Task:
NO Start Time:                    Stop Time:                    Completion Time:
JPM Overall Rating:            Pass          Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-3                                    84                                  October 2008


Task Number:
Evaluator Signature:    Date:
Approvals:
NMP2 JPM #P-3      85      October 2008


NA EXAMINATION SECURITY General Supervisor  Date  General Supervisor  Date Operations Training (Designee)  Operations (Designee)
Recommended Start Location:
 
Plant Simulator Set-up:
NA EXAMINATION SECURITY Configuration Control  Date Performer:    (RO/SRO)  Trainer/Evaluator:
: 11. NA Directions to Operators:
Evaluation Method:      Perform        X      Simulate Evaluation Location:      X    Plant            Simulator Expected Completion Time: 20 minutes  Time Critical Task: NO Alternate Path Task: NO Start Time:    Stop Time:  Completion Time:
JPM Overall Rating:  Pass  Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
 
NMP2  JPM #P-3 85 October 2008 Evaluator Signature:      Date:
NMP2  JPM #P-3 86 October 2008 Recommended Start Location:
Plant   Simulator Set-up:
: 11. NA   Directions to Operators:
Read Before Every JPM Performance:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Line 1,015: Line 1,023:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
Notes to Instructor / Evaluator:
: 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
: 1.     Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
* Self-verification shall be demonstrated. 3. During Training JPM:
: 2.     During Evaluated JPM:
* Self-verification shall be demonstrated.
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.  
: 3.      During Training JPM:
* Self-verification shall be demonstrated.
* No other verification shall be demonstrated.


==References:==
==References:==
: 17. N2-OP-42, Rev 09 18. NUREG K/A 271000 A1.08 Tools and Equipment:
: 17. N2-OP-42, Rev 09
: 1. None Task Standard:  
: 18. NUREG K/A 271000 A1.08 Tools and Equipment:
 
: 1. None Task Standard:
NMP2  JPM #P-3 87 October 2008 Off Gas system operating in a stable manner NMP2 JPM #P-3 88 October 2008 Initial Conditions:
NMP2 JPM #P-3                                       86                                October 2008
: 20. The plant is operating at 30% power. 21. OffGas has automatically shut down 22. Recombiner temperature is 390
&deg;F 23. H2 concentration is 1%
: 24. The Off Gas High Radiation trip has NOT occurred Initiating cue:
"(Operator's name), Recover Off Gas after an automatic shutdown per N2-OP-42, Step H.1.5.4
 
Performance Steps Standard Grade    1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if  necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
: 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-42 obtained. Section 1.0 identified for use Sat/Unsat    Note: Action begins at procedure step 1.5.4
: 3. Reset the Offgas circuits by depressing  AND releasing the following RESET  pushbuttons:
 
RESET RE13A&B red pushbutton RESET SYSTEM A black pushbutton RESET SYSTEM B black pushbutton
 
RESET VAC PUMP VP-1A black  pushbutton RESET VAC PUMP VP-1B black  pushbutton Resets pushbuttons identified Pass/Fail      4. Open 2OFG-LV20A(B), CONDENSER 1A(B) LEVEL CONTROLLER, to allow  process flow to recycle back to the Main Condenser.
Opens level controller Pass/Fail NMP2  JPM #P-3 89 October 2008 Performance Steps Standard Grade      5. Open 2OFG-AOV1A(B), PREHTR  E1A(B) INLET ISOL, by placing the control switch to STARTUP.
Locates and opens valve Pass/Fail      6. Verify open 2OFG-AOV103, OFFGAS  EXHAUST TO MAIN STACK.
Determines valve is open Sat/Unsat      7. NOTE: When both 2OFG-AOV1A and AOV1B are open, 2CCS-MOV45A and  MOV45B will each automatically open  to mid position. If only 2OFG-AOV1A(B)  is open, the associated 2CCS- MOV45A(B) will automatically open fully. The valves are located in the OFG  Bldg El 261' Hallway.
Locally, verify 2CCS-MOV45A(B),  OFFGAS CONDENSER 1A(B)  OUTLET ISOLATION, is in the proper  position.


CUE: Isolation is in the proper position Determines valve in proper position Sat/Unsat      8. Verify one Dryer is in service with its associated valve control switch in  OPEN (2OFG-AOV4A/5A, 4B/5B,  4C/5C). Determines one dryer is in service and associated switch in OPEN Sat/Unsat      9. IF required, start 2OFG-P1A AND P1B,  VACUUM PUMP VP-1A(B).
Off Gas system operating in a stable manner NMP2 JPM #P-3                              87 October 2008
Locates and places control switch in START Pass/Fail      10. WHEN recombination is occurring, as  indicated by OFG Recombiner  temperature rising, place 2OFG- LV20A(B) control switch in AUTO.


CUE: Temperature is slowly rising Determines temperature rising. Places control switch in AUTO Pass/Fail       11. Open 2OFG-AOV11A(B), Places control switch to STARTUP and Pass/Fail NMP2 JPM #P-3 90 October 2008 Performance Steps Standard Grade  CONDENSER 1A(B) OUTLET  ISOLATION, by placing the control switch to STARTUP.
Initial Conditions:
observes valve open      12. WHEN the OFG System stabilizes, perform the following:
: 20. The plant is operating at 30% power.
: 21. OffGas has automatically shut down
: 22. Recombiner temperature is 390&deg;F
: 23. H2 concentration is 1%
: 24. The Off Gas High Radiation trip has NOT occurred Initiating cue:
(Operators name), Recover Off Gas after an automatic shutdown per N2-OP-42, Step H.1.5.4 Performance Steps                                    Standard                                  Grade
: 1. Provide repeat back of initiating cue.            Proper communications used for          Sat/Unsat Evaluator Acknowledge repeat back              repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
: 2. Obtain a copy of the reference procedure          N2-OP-42 obtained. Section 1.0          Sat/Unsat and review/utilize the correct section.        identified for use Note: Action begins at procedure step 1.5.4
: 3.        Reset the Offgas circuits by depressing    Resets pushbuttons identified            Pass/Fail AND releasing the following RESET pushbuttons:
RESET RE13A&B red pushbutton RESET SYSTEM A black pushbutton RESET SYSTEM B black pushbutton RESET VAC PUMP VP-1A black pushbutton RESET VAC PUMP VP-1B black pushbutton
: 4.       Open 2OFG-LV20A(B), CONDENSER              Opens level controller                  Pass/Fail 1A(B) LEVEL CONTROLLER, to allow process flow to recycle back to the Main Condenser.
NMP2 JPM #P-3                                     88                              October 2008


Push the RESET SYSTEM A(B) pushbutton.
Performance Steps                                Standard                                  Grade
Return the Recombiner Train Isolation  AOV control switches to AUTO.  
: 5. Open 2OFG-AOV1A(B), PREHTR                Locates and opens valve                  Pass/Fail E1A(B) INLET ISOL, by placing the control switch to STARTUP.
: 6. Verify open 2OFG-AOV103, OFFGAS            Determines valve is open                Sat/Unsat EXHAUST TO MAIN STACK.
: 7. NOTE: When both 2OFG-AOV1A and            Determines valve in proper position      Sat/Unsat AOV1B are open, 2CCS-MOV45A and MOV45B will each automatically open to mid position. If only 2OFG-AOV1A(B) is open, the associated 2CCS-MOV45A(B) will automatically open fully. The valves are located in the OFG Bldg El 261' Hallway.
Locally, verify 2CCS-MOV45A(B),
OFFGAS CONDENSER 1A(B)
OUTLET ISOLATION, is in the proper position.
CUE: Isolation is in the proper position
: 8. Verify one Dryer is in service with its    Determines one dryer is in service and  Sat/Unsat associated valve control switch in        associated switch in OPEN OPEN (2OFG-AOV4A/5A, 4B/5B, 4C/5C).
: 9. IF required, start 2OFG-P1A AND P1B,      Locates and places control switch in    Pass/Fail VACUUM PUMP VP-1A(B).                      START
: 10. WHEN recombination is occurring, as        Determines temperature rising. Places    Pass/Fail indicated by OFG Recombiner               control switch in AUTO temperature rising, place 2OFG-LV20A(B) control switch in AUTO.
CUE: Temperature is slowly rising
: 11. Open 2OFG-AOV11A(B),                      Places control switch to STARTUP and    Pass/Fail NMP2 JPM #P-3                                  89                              October 2008


CUE: System has stabilized Determines system stable. Locates and pushes SYSTEM RESET button and returns AOV control switches to AUTO Pass/Fail      TERMINATING CUE: When Off Gas system is operating and stable, this JPM is complete RECORD STOP TIME
Performance Steps                              Standard                                  Grade CONDENSER 1A(B) OUTLET                  observes valve open ISOLATION, by placing the control switch to STARTUP.
: 12. WHEN the OFG System stabilizes,        Determines system stable. Locates       Pass/Fail perform the following:                  and pushes SYSTEM RESET button and returns AOV control switches to Push the RESET SYSTEM A(B)              AUTO pushbutton.
Return the Recombiner Train Isolation AOV control switches to AUTO.
CUE: System has stabilized TERMINATING CUE: When Off Gas system is operating and stable, this JPM is complete RECORD STOP TIME NMP2 JPM #P-3                              90                            October 2008


NMP2  JPM #P-3 91 October 2008 Initial Conditions:
Initial Conditions:
: 1. The plant is operating at 30% power. 2. OffGas has automatically shut down 3. Recombiner temperature is 390
: 1. The plant is operating at 30% power.
&deg;F 4. H2 concentration is 1%
: 2. OffGas has automatically shut down
: 5. The Off Gas High Radiation trip has NOT occurred Initiating cue:  
: 3. Recombiner temperature is 390&deg;F
"(Operator's name), Recover Off Gas after an automatic shutdown IAW N2-OP-42, Step 1.5.4}}
: 4. H2 concentration is 1%
: 5. The Off Gas High Radiation trip has NOT occurred Initiating cue:
(Operators name), Recover Off Gas after an automatic shutdown IAW N2-OP-42, Step 1.5.4 NMP2 JPM #P-3                                91                          October 2008}}

Revision as of 11:09, 14 November 2019

Draft - Section B Operating Exam (Folder 2)
ML083650061
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/14/2008
From:
Nine Mile Point
To: D'Antonio J
Operations Branch I
Hansell S
Shared Package
ML082520049 List:
References
50-410/08-303, TAC U01778 50-410/08-303
Download: ML083650061 (91)


Text

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Place RCS HPU Subloop In Service And Reset FCV Lockout Revision: NRC 2008 Task Number: N2-202001-01001 N2-202001-01023 Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task:

NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NMP2 JPM #S-1 1 October 2008

Recommended Start Location:

Simulator Simulator Set-up:

1. Reset to IC 181 Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

1. N2-OP-29, Rev 12, Sect. E.1.0
2. NUREG K/A 202002 A4.02 Tools and Equipment:
1. None Task Standard:

Hydraulic Power Unit A has been placed in service with Subloop 2 is in LEAD operation. FCV A motion inhibit is reset and all P602 annunciators associated with FCV A are clear.

NMP2 JPM #S-1 2 October 2008

Initial Conditions:

1. The plant is operating at rated power.
2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago.
3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service.
4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.

Initiating cue:

(Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure N2-OP-29 obtained. Precautions & Sat/Unsat and review/utilize the correct section. limitations reviewed & section E.1.0 referenced.
3. NOTE: Reviews Note and Caution Sat/Unsat The LOOP A(B) HYDR FLUID OUTSIDE ISOL valves may be closed, to reduce flow control valve from drifting closed during an HPU/Control System failure. They can be left closed until after their HPU is restored to operation.

CAUTION:

IF a standby HPU Subloop remains pressurized (greater than 500 psig) when removed from service and is restarted without the other subloop in operation, this could cause RECIRC FCV motion. This should be avoided.

4. For the HPU being started, perform the Reviews Procedure Step Sat/Unsat following:
  • IF any of the following conditions exist, isolate 2RCS*SOV65A(B),

NMP2 JPM #S-2 3 October 2008

Performance Steps Standard Grade 2RCS*SOV66A(B), 2RCS*SOV67A(B),

2RCS*SOV68A(B), for the affected HPU by taking the LOOP A(B) HYDR FLUID OUTSIDE ISOL switch to CLOSE:

o Unexpected pressure (greater than 400 psig) WHILE the subloop is in standby o Associated solenoid valve 2RCS-SOV106A(B) OR 2RCS-SOV107A(B) is known to be sticking partially open OR is NOT able to be over-ridden WHILE the solenoid coils are de-energized o It is known that EITHER OPERATE OR ISOLATE coil is burned out o FUSE BLOWN indicator is lit on the Modicon I/O module inside panel 2CEC-PNL634 at any of the following:

Subloop A1 - MTBA-2, west panel, left column, 2nd from top (total of 8)

Subloop A2 - MTBA-10, west panel, right column, 2nd from top (total of 8)

Subloop B1 - MTBB-2, east panel, left column, 2nd from top (total of 8)

Subloop B2 - MTBB-10, east panel, right column,2nd from top (total of 8)

Cue: Valves were previously closed. None of these conditions currently exist

5. IF the HPU has been idle for less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OR controls on the HPU have NOT been repositioned since the last shutdown, perform the following:

NMP2 JPM #S-2 4 October 2008

Performance Steps Standard Grade Cue/Note: Initial Conditions state that one hour has elapsed

a. Verify open 2RCS-V2011A(B) AND Dispatches operator to verify local Sat/Unsat V2011C(D), Return Filter Isolation. valve positions.

Cue: 2RCS-V2011A and V2011C are open.

b. Continue at Step E.1.14. Continues to step E.1.14 Sat/Unsat
6. At 2CEC-PNL634 (South), Rack 1 for Verifies red indicating lights are NOT lit Sat/Unsat HPU A AND Rack 2 for HPU B, NEST 5, CARD 1, (R/C/L, labeled B35-K686A(B)) verify the red indicating lights for Channel 1 and 2 are NOT lit.

IF lit depress the reset pushbuttons.

Cue: Red indicating lights for Channel 1 and 2 are extinguished.

7. Momentarily depress BOTH READY Depresses BOTH READY pushbuttons Pass/Fail pushbuttons Verify the following:

o READY light illuminates. Verifies lights and annunciator Sat/Unsat o MAINTENANCE light extinguishes.

o Annunciator 602103(104),

RECIRC FCV A(B) BACKUP HYDR INOPERABLE clears.

8. Unless isolated per Step E.1.1.1 verify At P602, opens valves using LOOP A Pass/Fail the following valves open: HYDR FLUID OUTSIDE ISOL switch.

Observes green closed lights o 2RCS*SOV65A(B) extinguish and the red open lights are o 2RCS*SOV66A(B) lit for the four outside isolation valves.

o 2RCS*SOV67A(B) o 2RCS*SOV68A(B)

Note: Not isolated per E1.1.1 NMP2 JPM #S-2 5 October 2008

Performance Steps Standard Grade

9. NOTE: Step 1.17 does not apply if I&C Reads Note Sat/Unsat is to use the Standby Unit (SBU) at 2CEC-PNL634 to reduce % SERVO ERROR to zero or have verified that the signal to the servo valve is approximately zero.

Cue: If asked, I&C will NOT be using SBU to reduce % SERVO ERROR.

Using 2RCS-HC1603A(B), RECIRC At P602, Reduces % SERVO ERROR Pass/Fail LOOP A(B) FLOW CONTROL at to ZERO using Loop A controller 2CEC*PNL602, reduce % SERVO ERROR to zero.

NOTE: Failure to zero the % SERVO ERROR will result in an unplanned reactivity transient, as the FCV opens.

10. Decide which subloop is to control the Depresses PUMP/FAN MTR RUN Pass/Fail actuator AND depress its PUMP/FAN pushbutton for HPU A, Subloop 2 MTR RUN pushbutton.

Verify the following: Verifies indications Sat/Unsat

  • PUMP/FAN MTR STOP light extinguishes.
  • PUMP/FAN MTR RUN light illuminates.
  • Selected loop LEAD light is illuminated AND other loop LEAD light is extinguished.
11. At 2CEC*PNL602, verify:

NMP2 JPM #S-2 6 October 2008

Performance Steps Standard Grade

  • Annunciator 602111(112), RECIRC Verifies annunciators clear, with the Sat/Unsat FCV A(B) HYDRAULICS MAINT exception of 602105 REQD cleared.

DRYWELL HIGH PRESSURE SWITCH A(B) TEST POSITION cleared.

DRYWELL HIGH PRESSURE SYSTEM A(B) INTERLOCK cleared.

  • Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT, in alarm condition.
12. Depress the applicable FCV MOTION Depresses FCV MOTION INHIBIT Pass/Fail INHIBIT RESET pushbutton at RESET pushbutton 2CEC*PNL602:

Verify the following: Verifies light illuminated and Sat/Unsat annunciator clear

  • LEAD subloop OPERATIONAL light illuminated
13. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Hydraulic Power Unit A Subloop 2 is in operation and FCV A motion inhibit is reset with all annunciators associated with FCV A cleared.

RECORD STOP TIME NMP2 JPM #S-2 7 October 2008

Initial Conditions:

1. The plant is operating at rated power.
2. Recirc FCV HPU A tripped due to a hot oil condition 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago.
3. HPU A hot oil condition is now cleared, oil temperature is 100°F and the HPU is ready to be placed in service.
4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.

Initiating cue:

(Operators name), Place HPU A Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0.

NMP2 JPM #S-2 8 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shifting Feedwater Pumps at Power65% power when 2 pumps are in service Revision:

NRC 2008 Task Number: N2-259001-01004 Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:

YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

NMP2 JPM #S-2 9 October 2008

Evaluator Signature: Date:

NMP2 JPM #S-2 10 October 2008

Recommended Start Location:

Simulator Simulator Set-up:

2. Reset to IC ????-182
3. 65% Power with malfunction FW10C preset.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

3. N2-OP-3, Rev 21, Sect. F.13.0
4. NUREG K/A 259001 A4.02 3.7 Tools and Equipment:
1. None Task Standard:

NMP2 JPM #S-2 11 October 2008

C Feedwater Pump is in service and level is under control in the normal band via MANUAL controller operation. A Feedwater Pump is secured with LV10A in manual and closed.

NMP2 JPM #S-2 12 October 2008

Initial Conditions:

5. The plant is operating at 65% power.
6. C Feedwater Pump C is ready to be placed in service.
7. Pre-start checks are complete.

Initiating cue:

(Operators name), Place C Feedwater Pump in service, and rRemove A Feedwater Pump A from service and place Feedwater Pump C in service, IAW N, per N2-OP-3, Section F.13.0.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure N2-OP-3 obtained. Precautions & Sat/Unsat and review/utilize the correct section. limitations reviewed & section F.13.0 referenced.
3. NOTES: Reads notes. Obtains Key 18 Sat/Unsat
1. All actions in this Subsection are performed at 2CEC*PNL851 and PNL603 unless otherwise noted.
2. Shifting Feedwater Pumps will be performed at approximately 65% power by securing one pump and starting the standby.
3. IF re-starting 2FWS-P1A (B,C) from operating temperatures (D.4.0), Electrical Maintenance should perform an inspection of windings at first opportunity.
4. Feedwater minimum flow setpoint will be lowered to 4 Kgpm for all three Feedwater Pumps and then restored to 8 Kgpm after pump swap(s) are complete.
5. Fourth Point Heater Drain Pumps may remain pumping forward during this evolution if NMP2 2008 JPM #S-3 13 October 2008

Performance Steps Standard Grade feedwater heater level controllers are stable at 65%

power, with the permission of the Shift Manager.

6. Steps 13.1 AND 13.2 may be performed simultaneously.
7. The following step requires key
  1. 18 from the SM key locker.

CAUTION Throughout this section if a plant casualty occurs such that Feedwater Pumps will remain on minimum flow for greater than 15 minutes, Reactor Power should be immediately reduced below 55% AND Feedwater Pump minimum flow should be returned to 8 Kgpm on all three Feedwater Pumps.

4. Adjust ALL three Feedwater Pump Dispatches operator to Aadjust s Pass/Fail minimum flow valve setpoints as setpoints of all 3 minimum flow valves. Sat/Unsat follows:

At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68A, RX FD WTR P1A RECIRC controller, to 4 Kgpm.

At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68B, RX FD WTR P1B RECIRC controller, to 4 Kgpm.

At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68C, RX FD WTR P1C RECIRC controller, to 4 Kgpm.

CUE: Min flow valve setpoints for all three feedwater pumps are set at 4 Kgpm.

5. Perform pre-start checks locally for the Reviews step Sat/Unsat associated Feedwater pump to be started ONLY per step F.13.2.1 through F.13.2.7.

NOTE: Pre-Start checks are complete NMP2 2008 JPM #S-3 14 October 2008

Performance Steps Standard Grade

6. Using N2-OP-101D, verify Reactor Reviews step and determines power is Sat/Unsat power has been reduced 65%. at 65%

NOTE: Power is at 65%. Rated MWth is 3467 and 65% power is 2253 MWth.

7. Secure one of the two operating Feedwater Pumps 2FWS-P1A (B,C) as follows:

Depress Manual (M) pushbutton on Depresses M pushbutton on 2FWS- Pass/Fail 2FWS-LV10A (B,C) controller. LV10A controller 2FWS-HIC1010A and yellow M light is lit.

DURING this evolution, verify that the Verifies remaining LCV maintains level Sat/Unsat remaining level control valve 2FWS- on an on-going basis during evolution.

LV10B (C,A) maintains desired water level.

8. Slowly close 2FWS-LV10A (B,C) to the Locates Using 2FWS-HIC1010A slow Pass/Fail 2 to 4% valve position by using the slow detent close PBpushbutton and ,

CLOSE detent pushbutton on 2FWS- depresses until about 2-4% shown.

LV10A (B,C) controller.

9. Close 2FWS-LV10A (B,C) to the 0% Using 2FWS-HIC1010A fast detent Pass/Fail valve position by depressing the fast close pushbutton, Locates fast close CLOSE detent pushbutton on 2FWS- PB and depresses until 0% shown.

LV10A (B,C) controller.

10. Secure 2FWS-P1A (B,C), REACTOR Places FW Pump A in green flagged Pass/Fail FW PMP 1A (B,C), by placing its control position switch to Normal-After-STOP (Green flagged).
11. Verify 2FWL-P2A (B,C), AUX LUBE Determines Aux Lube Oil Pump starts Sat/Unsat OIL PMP 2A (B,C), auto starts. by observing AUX LUBE OIL PMP 2A red light ON.
12. Confirm 2FWR-FV2A (B,C), REACTOR Determines valve closes by observing Sat/Unsat FD P1A (B,C) RECIRC VLV, closes REACTOR FD P1A RECIRC VLV immediately. POSN meter indication goes to 0%

VALVE POSITION.

NMP2 2008 JPM #S-3 15 October 2008

Performance Steps Standard Grade

13. At 2FWS-P1A (B,C), place the Auxiliary Dispatches operator to Pplaces Aux Pass/Fail Lube Oil Pump control switch 2FWL- Lube Oil Pump control switch to Sat/Unsat LCS752 (753, 754) to START AND START, determines pump remains verify 2FWL-P2A (B,C) remains running running.

BOOTH OPERATOR: Activate remote to start aux oil pump.

14. IF 2FWS-P1A (B,C) is being placed in Dispatches operator to Oopen s Pass/Fail standby, open 2FWS-V25A (B,C) FD warmup line isolation. Sat/Unsat WTR PUMP 1A (B,C) WRMUP LN ISOLATION.

CUE: If directed, report 2FWS-V25A is open.

15. NOTE: The following step requires key Determines step is N/A
  1. 18 from the SM key locker.

IF the plant will remain at 65 % power for more than a shift, adjust ALL Feedwater Pump minimum flow valve setpoints as follows:

At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 8 k gpm.

At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 8 k gpm.

At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 8 k gpm.

CUE: The Unit plant will remain at 65%

power for LESS than a shift.

16. NOTE: The following step will be Determines Step is N/A performed prior to starting the standby feed pump.

NMP2 2008 JPM #S-3 16 October 2008

Performance Steps Standard Grade Perform Feedwater Pump Warmup for the pump being started per subsection F.14.0.

CUE: Another Operator has performed the warmup NOTE: Min flow valve setpoints are at 4 Kgpm from previous steps.

17. Adjust ALL three Feedwater Pump Adjusts all 3 controllers Pass/Fail minimum flow valve setpoints as Sat/Unsat follows:

At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 4 k gpm.

At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 4 k gpm.

At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 4 k gpm.

18. Start the stand by Feedwater Pump Pass/Fail 2FWS-P1A (B,C) as follows:

Verify open 2FWS-MOV47A (B,C), Verifies Discharge Block Valve is open Sat/Unsat REACTOR FW PMP 1A (B,C) DISCH by observing REACTOR FW PMP 1C BLOCK VLV. DISCH BLOCK VLV FWS-MOV47C red light is ON and green light is OFF.

19. IF applicable, verify open 2FWS-V103A Determines valve is openstep is NA, Sat/Unsat (B), FEEDWATER PUMP 1A (B) LOW since Feedwater Pump C is being FLOW LINE ISOL. started.

NMP2 2008 JPM #S-3 17 October 2008

Performance Steps Standard Grade

20. IF required, start the standby Determines three Condensate Pumps Sat/Unsat Condensate pump by placing 2CNM- running.

P1A (B,C) control switch in Normal-After-START (Red-flagged).

Note: NOT required, since all Condensate Pumps are running.

21. Verify sufficient Condensate Iron Determines sufficient Condensate Iron Sat/Unsat Prefilters are in service to support the Prefilters are in service maximum expected Condensate System flow rate. Refer to N2-OP-5A, Attachment 1.

CUE: If asked, Ssufficient Iron Prefilters are in service

22. NOTE: Nine Condensate Dispatches operator to determine at Sat/Unsat Demineralizers in service is the least eight demineralizers are in preferred lineup in the next step. service.

Verify at least eight Condensate Demineralizers are in service in accordance with N2-OP-5.

CUE: 8Nine demineralizers are in service

23. IF all three Heater Drain pumps are Determines step is N/A because heater Sat/Unsat NOT pumping forward, start the drain pumps are pumping forward.

standby Condensate Booster pump as follows:

Using 2CNM-PI39A (B,C), locally confirm condensate booster pump suction pressure is > 150 psig.

Start 2CNM-P2A (B,C), CONDENSATE BOOSTER PMP 2A (B,C), by placing the control switch to Normal-After-START (Red-flagged).

At 2CNM-P2A (B,C), place the Auxiliary Lube Oil Pump control switch 2CNO-LCS706 (707, 708) to AUTO AND verify 2CNO-P2A (B,C) stops.

NMP2 2008 JPM #S-3 18 October 2008

Performance Steps Standard Grade CUE: Heater Drain Pumps are pumping forward

24. For the Feedwater pump to be started, Determines that controller 2FWS-HIC- Pass/Fail verify the level controllers are in Manual 1010C is in manual by observing Sat/Unsat (M) AND valve positions are at 0% yellow M light is lit and % VALVE open. POSITION metervalve position i indicates 0.
25. CAUTION Reviews Caution Sat/Unsat The next two steps shall be performed concurrently.

IF feedwater pump suction pressure drops to 220 psig, start the third Condensate Booster pump if NOT already operating.

26. NOTE: IF 2FWS-P1C is selected to NOTE: Since 2FWS-P1B is to be left start, the preferable power supply is running, the preferable power supply from 2NPS-SWG003 if 2FWS-P1A will for 2FWS-P1C is 2NPS-SWG001.

be left running, or 2NPS-SWG001 if 2FWS-P1B is to be left running.

Start 2FWS-P1A (B,C) REACTOR FD Rotates control switch REACTOR FW Pass/Fail P1A (B,C), by placing the control switch PMP 1C FROM BUS 001 FWS-P1C to to Normal-After-Start (red flagged). red flagged position.

27. Confirm 2FWR-FV2A (B,C), REACTOR Determines valve starts to Sat/Unsat FD P1A (B,C) RECIRC VLV, starts to openDetermines valve starts to open open. by observing REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION.
28. WHEN 2FWR-FV2A (B,C) is 15% When REACTOR FD P1C RECIRC Sat/Unsat open, confirm 2FWS-P1A (B,C) starts. VLV POSN meter indication goes past 15% VALVE POSITION, observe pump start by observing red light and ammeter FWS-P1C BUS 001 CURRENT indication.Verifies valve position and pump start NMP2 2008 JPM #S-3 19 October 2008

Performance Steps Standard Grade

29. Using 2CNM-FI68A (B,C), RX FD WTR Determines flow on 2CNM-FI68C, RX Sat/Unsat P1A (B,C) FLOW meter, confirm FD WTR P1C FLOW meter is about 2FWS-P1A (B,C) flow is approximately 4000 gpm 4000 gpm.
30. NOTES: Reviews notes
1. The following two steps are performed locally at the associated Feedwater pump just started.
2. The feedwater pump may be loaded as 2FWS-V25A (B,C) is shut.

Place the Auxiliary Lube Oil Pump Places Aux Lube Oil Pump Control Pass/Fail control switch 2FWL-LCS752 (753, Switch in AUTO and verifies pump Sat/Unsat 754) to AUTO AND verify 2FWL-P2A stops (B,C) stops.

31. Close 2FWS-V25A (B,C), FD WTR Dispatches operator to Ccloses Pass/Fail PUMP 1A (B,C) WRMUP LN warmup line isolation. Sat/Unsat ISOLATION.

CUE: If asked, report 2FWS-V25C is closed.

NOTES: Reviews Notes and Caution Sat/Unsat

1. When opening 2FWS-LV10A (B,C) from a fully shut position, the initial 2 seconds of valve open signal serve only to wake up the control circuit computer with no additional action.

Pressing the valve open push button for an additional 10 seconds in manual slow detent (2% position per second) serves to take the control circuit from the minus (-) 20% position to the 0% position PRIOR to any actual valve position indicator movement taking place.

2. Once the LV10 valve circuitry reaches the 0% position, the first 1.5% to 2% of the valve stroke, as indicated by the position indicator, is used to release the seating force held NMP2 2008 JPM #S-3 20 October 2008

Performance Steps Standard Grade by the compression of the SB spring.

Therefore, the valve stem will not be lifted to establish flow until approximately 2% valve indication is reached. Reactor water level should be closely monitored during this evolution.

CAUTION The fast detent position (20% position per second) should NOT be used to take the control circuit from the minus (-

-) 20% to 0% position as the LV10 will likely open beyond the desired position as the valve can only physically open at 6% per second, and will continue to open once the operator releases the open pushbutton if the demand signal is beyond the 0% position until valve position catches up to the circuit controller demand.

32. Throttle open 2FWS-LV10A (B,C), Throttles LCV by depressing the OPEN Pass/Fail Feedwater Pump 1A (B,C) Level pushbuttonOPEN detent pushbutton Control Valve, by using the OPEN for controller 2FWS-HIC-1010C and detent pushbutton on 2FWS-LV10A observes % VALVE POSITION meter.

(B,C) controller.

33. Verify 2FWS-LV10B (C,A) closes Determines valve is closing by Sat/Unsat gradually as 2FWS-LV10A (B,C) observing % VALVE POSITION meter slowly opens. for 2FWS-LV10B.
34. Continue to slowly open 2FWS-LV10A Adjusts position using 2FWS-HIC- Pass/Fail (B,C) UNTIL the input signal (vertical) 1010C until vertical and horizontal AND output signal (horizontal) read the signals are equal.

same on 2FWS-LV10A (B,C) controller.

35. Place 2FWS-LV10A (B,C) in Auto by Depresses 2FWS-HIC-1010C AUTO Pass/Fail momentarily depressing the pushbutton and observe green AUTO Auto (A) pushbutton on 2FWS-LV10A light is lit.

(B,C) controller.

Booth Operator: Insert MMalfunction (or preset) FW10C is preset and when AUTO NMP2 2008 JPM #S-3 21 October 2008

Performance Steps Standard Grade pushbutton is depressed, the malfunction becomes effective causing LV10C to go full open.

As FWS-LV10C opens due to failure, FW flow Observe and report 2FWS-LV10C is Sat/Unsat and RPV water level will rise. Annunciator opening unexpectedly.

603139 REACTOR WATER LEVEL HIGH/LOW alarms.

36. Auto controller fails requiring manual Recognizes controller failure and takes Pass/Fail control returns 2FWS-HIC-1010C to manual control using controller pushbutton IAW per N2-SOP-6 and stabilize RPV level to avoid Level 3 and Level 8 protective functions.
37. Report status to CRS Status reported Sat/Unsat TERMINATING CUE: JPM is complete when level is being controlled manually in the normal band (between the low and high water level alarm setpoints).

RECORD STOP TIME NMP2 2008 JPM #S-3 22 October 2008

Initial Conditions:

1. The plant is operating at 65% power.
2. C Feedwater Pump is ready to be placed in service.
3. Pre-start checks are complete.

Initiating cue:

(Operators name), Remove Feedwater Pump A from service and place Feedwater Pump C in service, per N2-OP-3, Section F.13.0Place C Feedwater Pump in service, and remove A Feedwater Pump from service, IAW N2-OP-3, Section 13.0 NMP2 2008 JPM #S-3 23 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate RCIC and Respond To Overspeed Trip (Alternate) Revision: NRC 2008 Task Number: N2-217000-01048 Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NMP2 2008 JPM #S-3 24 October 2008

Recommended Start Location:

Simulator Simulator Set-up:

1. Reset to IC 183 Post Scram
2. Set remote RC01, RCIC Mech OS Trip to actuate when zarctum1 (RCIC speed) > 0.5 (3000 rpm)

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

1. N2-OP-35
2. N2-ARP-01 601305
3. NUREG K/A 217000 A4.02 Tools and Equipment:
1. None Task Standard:

RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.

NMP2 2008 JPM #S-3 25 October 2008

Initial Conditions:

1. The plant has experienced a reactor scram and loss of feedwater.
2. N2-EOP-RPV is being implemented.

Initiating cue:

(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference N2-EOP-HC-2 Attachment 5, Sat/Unsat procedure and review/utilize the correct Automatic RCIC Injection is section. obtained/referenced.
3. ARM and DEPRESS RCIC MANUAL ARM and DEPRESS RCIC Pass/Fail INITIATION pushbutton. MANUAL INITIATION pushbutton.
4. Verify system startup GLAND SEAL SYSTEM AIR Sat/Unsat COMPRESSOR starts. Red light ON. Green light OFF.

ICS*MOV116 Cooling Water MOV Sat/Unsat opens. Red light ON. Green light OFF.

When 2ICS*MOV120 Steam Admission Valve opens, turbine speed and pump discharge ICS*MOV120 Steam opens. Red Sat/Unsat pressure rise. light ON. Green light OFF.

When turbine speed exceeds 3000 RPM, ICS*MOV126 opens. Red light ON. Sat/Unsat 2ICS*MOV150 Trip Throttle Valve closes due Green light OFF.

to unexpected overspeed trip.

5. Observes RCIC Turbine trip Observes Annunciators 601305 lit. Sat/Unsat Observes TURBINE TRIPPED Sat/Unsat Cue: When informed of RCIC Turbine amber postage stamp lit.

trip, instruct candidate to Reset the RCIC Turbine from P601 and reestablish Recognizes RCIC Turbine tripped Sat/Unsat injection to the RPV Reports RCIC Turbine Tripped to Sat/Unsat SM NMP2 2008 JPM #S-3 26 October 2008

Performance Steps Standard Grade Cue: If directed to investigate, report Dispatches operator to RCIC Room Sat/Unsat overspeed trip mechanism is tripped. to investigate.

6. Reset ICS*MOV150 at P601 per N2-OP-35 H.1.0, RCIC Turbine Reset.
7. Verify cause is understood and Verify cause is understood and Sat/Unsat corrected. corrected.
8. Places ICS*MOV150 switch to CLOSED Places ICS*MOV150 switch to Pass/Fail until BOTH valve positions indicate CLOSED until BOTH valve valve is closed positions indicate valve is closed.(P601)

Observes ICS*MOV150 Green Sat/Unsat light ON (P601 Apron)

Observes ICS*MOV150 Red Sat/Unsat light OFF (P601 Apron)

Observes Trip/Throttle valve Sat/Unsat Green light ON (P601 verical)

Observes Trip/Throttle valve Sat/Unsat Red light OFF (P601 vertical)

9. Verify turbine speed is less than 3500 Verify turbine speed is less than Sat/Unsat RPM. 3500 RPM.
10. IF RCIC turbine tripped on overspeed Directs operator to locally reset the Sat/Unsat OR was locally tripped. Locally reset trip overspeed trip mechanism.

mechanism.

BOOTH OPERATOR: REMOTE RC01 to RESET.

CUE: Report trip mechanism is reset.

11. IF an initiation signal is sealed in, perform the following:
a. Throttle open ICS*MOV150 Places ICS*MOV150 switch to Pass/Fail OPEN (P601)

NMP2 2008 JPM #S-3 27 October 2008

Performance Steps Standard Grade Observes ICS*MOV150 Green Sat/Unsat light OFF (P601 Apron)

Observes ICS*MOV150 Red Sat/Unsat light ON (P601 Apron)

Observes Trip/Throttle valve Sat/Unsat Green light OFF (P601 verical)

Observes Trip/Throttle valve Sat/Unsat Red light ON (P601 vertical)

b. At 2ICS*MOV150, verify proper Directs operator to verify proper Sat/Unsat latching of the latch lever and trip latching.

hook.

CUE: Report trip mechanism is properly latched.

c. Verify RCIC restarts Observe turbine speed and pump Sat/Unsat discharge pressure are rising.
12. Establish RPV Injection Places ICS*MOV126 switch to Pass/Fail OPEN (P601)

When RCIC flow is > 220 gpm, Sat/Unsat observe ICS*MOV143 Min Flow closes.

When RCIC discharge pressure > Sat/Unsat reactor pressure, ICS*MOV156 and 157 Injection Check Valves open.

RCIC Injection controlled at 600 gpm. Sat/Unsat

13. Report completion. Report RCIC injecting. Sat/Unsat TERMINATING CUE: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.

RECORD STOP TIME NMP2 2008 JPM #S-3 28 October 2008

Initial Conditions:

1. The plant has experienced a reactor scram and loss of feedwater.
2. N2-EOP-RPV is being implemented.

Initiating cue:

(Operators name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches.

NMP2 JPM #S-4 29 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shift RBCLCW and TBCLCW Pumps Revision: NRC 2008 Task Number: N2-SOP-14-01001 Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:

YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

NMP2 JPM #S-4 30 October 2008

Evaluator Signature: Date:

NMP2 JPM #S-4 31 October 2008

Recommended Start Location:

Simulator Simulator Set-up:

4. Reset to IC 184
5. Remote CW-27 103.9oF, triggered from stopping CCS-P1A Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

5. N2-OP-13, Rev 07
6. N2-OP-14, Rev 05
7. ARP 601244
8. NUREG K/A 400000 A4.01 Tools and Equipment:
1. None NMP2 JPM #S-4 32 October 2008

Task Standard:

RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.

NMP2 JPM #S-4 33 October 2008

Initial Conditions:

8. The plant is operating at full power.

Initiating cue:

(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure N2-OP-13 & N2-OP-14 obtained. Sat/Unsat and review/utilize the correct section. Precautions & limitations reviewed
3. For the Main CCP pump to be started, Ensures checked by local operator Sat/Unsat verify the pump casing is free of air as follows:

Uncap AND throttle open 2CCP-V195 (V196, V197), P1A (B,C) VENT. WHEN a steady stream of water is observed, close AND recap 2CCP-V195 (V196, V197).

CUE: Checked by local operator

4. For the Main CCP pump to be started, Places control switch in red flagged Pass/Fail at panel 2CEC*P601, start 2CCP-P1A position (B,C), PMP 1A (B,C), by placing control switch in Normal-After-START (red flagged).

Note: The applicant will check board indications for amps and discharge pressure

5. Confirm normal operating indications in Ensures checked by local operator Sat/Unsat accordance with Subsection F.1.0.

NMP2 JPM #S-5 34 October 2008

Performance Steps Standard Grade CUE: Local indications are normal

6. At 2CEC*PNL601, secure 2CCP-P1A Places control switch in green flagged Pass/Fail (B,C), PMP 1A (B,C), by placing control position switch in Normal-After-STOP. (Green flagged)
7. IF required, place 2CCP-P1A (B,C) May request required status Sat/Unsat control switch in PULL TO LOCK.
8. Confirm normal operating indications in Ensures local checks are made Sat/Unsat accordance with Subsection F.1.0.

CUE: Another operator will check local indications Examiner Note: The applicant will now refer to N2-OP-14 for TBCLCW operations NOTES:

1. CCS system flow of greater than 8000 gpm requires more than one heat exchanger in service.
2. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
9. IF time permits, perform the following: Dispatched operator or determines Sat/Unsat task has been performed Dispatch an Operator to the pump to perform prestart inspection AND observe pump during start.

For the pump to be started, close 2CCS-V303A(B,C), TBCLC PUMP 1A(B,C) STOP CHECK.

CUE: Pre-start checks complete; the stop-check valve is CLOSED NMP2 JPM #S-5 35 October 2008

Performance Steps Standard Grade

10. Start 2CCS-P1A(B,C), PMP 1A(B,C), by Places control switch in red flagged Pass/Fail placing the control switch to Normal- position After-START (red flagged).
11. Slowly open 2CCS-V303A(B,C). Directs local operator to open valve Sat/Unsat CUE: Valve has been opened
12. Confirm normal operating indications in Ensures checked by local operator Sat/Unsat accordance with Subsection F.1.0.

CUE: Local indications are normal

13. NOTES: Checks indications Sat/Unsat
1. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
2. CCS Pump runout is 8,500 gpm. If system flow is greater than 8,000 gpm for one pump operations or 16,000 gpm for two pump operations, then starting an additional pump increases the probability of damaging tube vibrations in the CCS heat exchangers.

Three CCS pump operation shall be avoided unless shifting of pumps is required.

Confirm the CCS pump is NOT required for CCS System flow as follows:

Computer Point CCSFA01 Number of Running Pumps 1,000 - 8,200 GPM 1 8,200 - 16,400 GPM 2

14. NOTE: 2CCS-V303A (B,C) is located at Directs a local operator to close valve Sat/Unsat 2CCS-P1A (B,C) on TB Elev 250 Southwest.

Close 2CCS-V303A (B,C), TBCLC PUMP 1A (B,C) STOP CHECK.

Cue: Valve is closed NMP2 JPM #S-5 36 October 2008

Performance Steps Standard Grade

15. Secure 2CCS-P1A (B,C), PMP 1A Places control switch in green flagged Pass/Fail (B,C), by placing the control switch in position Normal-After-STOP. (Green flagged)

Booth Operator: Malfunction to fail temperature controller REMOTE CW-27 103.9oF when CCS-P1A is stopped.

16. IF required, place 2CCS-P1A (B,C) May request required status of control Sat/Unsat control switch in PULL TO LOCK. switch
17. Confirm normal operating indications for Ensures checked by local operator Sat/Unsat the running CCS Pump(s) in accordance with Subsection F.1.0.

Examiner Note: Applicant will respond to annunciator 601244 and Computer Point CCSTC04 for TBCLCW HX DISCH TEMP

18. Determines temp controller is failed and Determines ARP 601244 actions apply Sat/Unsat refers to ARP 601244
19. Places 2CCS-TIK104 in M Manual Places controller TBCLC HEAT Pass/Fail EXCHANGER TEMP CONTROLLER 2CCS-TIK104 in M Manual by depressing M button.
20. Manually controls temperature Adjusts temperature downward to Pass/Fail approximately 85°F (80 to 95),

indicated on TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104

21. Report status to CRS Report status. Sat/Unsat TERMINATING CUE: RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.

RECORD STOP TIME NMP2 JPM #S-5 37 October 2008

Initial Conditions:

1. The plant is operating at full power.

Initiating cue:

(Operators name), shift running RBCLCW Pumps from A to C, then shift running TBCLCW Pumps from A to C to support equipment rotation.

NMP2 JPM #S-5 38 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Depressurize the RPV to the Main Condenser Revision: NRC 2008 Task Number:

Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:

YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

NMP2 JPM #S-5 39 October 2008

Evaluator Signature: Date:

NMP2 JPM #S-5 40 October 2008

Recommended Start Location:

Simulator Simulator Set-up:

6. Reset to IC 185
7. Malfunction MS-13 MSIV Isolation Failure Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

9. EOP-6 Attachment 18
10. NUREG K/A 239001 A4.09 Tools and Equipment:
1. None Task Standard:

NMP2 JPM #S-5 41 October 2008

RPV is depressurizing to Main Condenser using Bypass Valves or Drain valves NMP2 JPM #S-5 42 October 2008

Initial Conditions:

9. A LOCA has occurred and an RPV Blowdown was required
10. Only 5 SRVs could be opened
11. EOP-6, Attachment 18 is in progress.

Initiating cue:

(Operators name), Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure EOP-6, Attachment 18 obtained. Sat/Unsat and review/utilize the correct section.
3. IF a LOCA signal is present OR Determines LOCA is present. Sat/Unsat expected, using PA235 key, place the following LOCA override switches to OVERRIDE: (2CEC*PNL851)

LOCA OVERRIDE VLV IAS*SOV166 Using key, places switch in Sat/Unsat OVERRIDE LOCA OVERRIDE VLV IAS*SOV184 Using key, places switch in Sat/Unsat OVERRIDE Annunciators 601517 and 601519 alarms when switches are placed in OVERRIDE.

4. Verify open the following valves (2CEC*PNL851)

IAS*SOV166, PRIMARY CNTMT Open IAS*SON166 and observe red Sat/Unsat OUTBD ISOL VLV TO SRV light ON and green light OFF.

IAS*SOV184, PRIMARY CNTMT INBD Open IAS*SON184 and observe red Sat/Unsat ISOL VLV TO SRV light ON and green light OFF.

NMP2 2008 ML083650061.doc 43 October 2008

Performance Steps Standard Grade

5. Record differential pressure across the Determines differential pressure is Sat/Unsat MSIVs using C33-R605 on within 150 psid.

2CEC*PNL603 AND one or more of the following Trip Units:

B22-N676A, STM LINE PRESS LO (2CEC*PNL609)

B22-N676C, STM LINE PRESS LO (2CEC*PNL609)

B22-N676B, STM LINE PRESS LO (2CEC*PNL611)

B22-N676D, STM LINE PRESS LO (2CEC*PNL611)

Note: PNL609 trip units are not within the scope of simulation.

CUE: Differential Pressure is <150 psid

6. IF differential pressure across the Determines step is N/A, based on Sat/Unsat MSIVs is > 150 psid, open at least one differential pressure.

pair of MSIVs by performing N2-OP-1, Section H.4.0 AND THEN continue at Step 3.1.7 N/A, differential pressure across the MSIVs is < 150 psid

7. IF differential pressure across the MSIVs is < 150 psid, open at least one pair of MSIVs as follows:

N/A, a pair of MSIVs will be opened per N2-OP-1, Section H.4.0 Verify MSIV isolation signals reset by performing the following:

(2CEC*PNL602)

Place control switches for the following Places all eight MSIV control switches Sat\Unsat to CLOSE: in CLOSE

Performance Steps Standard Grade

  • MSS*AOV7D, MSIV Booth Operator: Insert malfunction MS-13 when MSIVs are closed
8. Depress pushbutton B22H-S33, INBD Depresses pushbutton Sat\Unsat ISOL LOGIC RESET
9. Depress pushbutton B22H-S32, Depresses pushbutton Sat\Unsat OUTBD ISOL LOGIC RESET
10. Open one pair of MSIVs as follows: Places control switches for one pair of Sat/Unsat (2CEC*PNL602) MSIVs to AUTO. MSIVs will not open Place the control switch for ANY outboard MSIV to AUTO Place the control switch for the corresponding inboard MSIV to AUTO.

Examiner Note: Applicant must continue in procedure because MSIVs will not open

11. IF a pair of MSIVs can NOT be opened, align steam line drains to depressurize the RPV as follows:

N/A, a pair of MSIVs are open Verify open MSS*MOV207, INSIDE Opens MSS*MOV207 and observe red Pass/Fail MSIVS UPSTREAM DRAIN VLV. light ON and green light OFF.

(2CEC-PNL824)

Verify open MSS*MOV111, MAIN STM LINE DRAIN ISOL VLV. Opens MSS*MOV111 and observe red Pass/Fail (2CEC*PNL602) light ON and green light OFF.

NMP2 2008 ML083650061.doc 45 October 2008

Performance Steps Standard Grade

12. NOTE: A CAT 60 key may be required for entry to 2EHS*MCC102.

Place 2EHS*MCC102-7A, Directs operator to locally close Sat/Unsat 2MSS*MOV112 MAIN STEAM LINE 2EHS*MCC102-7A AND place alarm DRAIN OUTBD to ON (Aux Bay-North circuit to enable.

El 240)

BOOTH OPERATOR: Enter Remote MS05B, 2MSS*MOV112 APP R CKT BKR, CLOSE CUE: Report the breaker is closed and alarm circuit is enabled.

Place 2EHS*MCC102-7A, ALARM CIRCUIT control switch to ENABLE Verify open 2MSS*MOV112 Open 2MSS*MOV112 and observe red Pass/Fail (2CEC*PNL602) light ON and green light OFF.

Verify open MSS-MOV187, MAIN STM Pass/Fail LINE PRESS EQL/WARMING Open 2MSS-MOV187 and observe red (2CEC*PNL602) light ON and green light OFF.

13. Using BYPASS VALVE OPENING Depresses and holds to attempt to Pass/Fail/

JACK SELECTOR, depress AND hold open bypasses NA the INCREASE pushbutton UNTIL bypass valves are full open (2CEC*PNL851)

N/A, Turbine Bypass Valves will NOT open

14. IF Bypass Valves are unavailable, verify Performs if bypass valves would not Pass/Fail/

open as many of the following open NA steam line drains as possible to depressurize the RPV to the condenser:

N/A, Turbine Bypass Valves are available Open Turbine Stop Valve Drains (2CEC-PNL824):

MSS-MOV21A, TURBINE STOP VLV MSV3 DRAIN VLV NMP2 2008 ML083650061.doc 46 October 2008

Performance Steps Standard Grade MSS-MOV21B, TURBINE STOP VLV MSV4 DRAIN VLV MSS-MOV21C, TURBINE STOP VLV MSV1 DRAIN VLV MSS-MOV21D, TURBINE STOP VLV MSV2 DRAIN VLV Examiner Note: Step only performed if bypass valves could not be opened.

Degrading vacuum may have caused closure

15. Open MSS-MOV147, TURBINE Performs if bypass valves did not open Pass/Fail/

CONTROL VLVS DRAIN VLV NA (2CEC-PNL824)

16. Open Main Steam Line Drains (2CEC- Performs if bypass valves did not open Pass/Fail/

PNL824): NA MSS-AOV191, MAIN STM LINE HEADER DRAIN VLV MSS-AOV194, MAIN STM LINE HEADER DRAIN VLV MSS-AOV203, MAIN STM LINE HEADER DRAIN VLV MSS-AOV205, MAIN STM LINE HEADER DRAIN VLV MSS-AOV209, MAIN STM LINE HEADER DRAIN VLV MSS-AOV87A MSL A LOW POINT DRAIN VALVE MSS-AOV87B MSL B LOW POINT DRAIN VALVE MSS-AOV87C MSL C LOW POINT DRAIN VALVE MSS-AOV87D MSL D LOW POINT DRAIN VALVE NMP2 2008 ML083650061.doc 47 October 2008

Performance Steps Standard Grade MSS-AOV88A MSL DRAIN HEADER ISOL VALVE MSS-A0V88B MSL DRAIN HEADER ISOL VALVE

17. Open MSL Drain Orifice Bypass (2CEC- Performs if bypass valves did not open Pass/Fail/

PNL824): NA MSS-AOV85A, MAIN STM LINE DRAIN VLV MSS-AOV85B, MAIN STM LINE DRAIN VLV MSS-AOV85C, MAIN STM LINE DRAIN VLV MSS-AOV85D, MAIN STM LINE DRAIN VLV TERMINATING CUE: RPV is depressurizing to Main Condenser via Bypass valves or Drain valves RECORD STOP TIME NMP2 2008 ML083650061.doc 48 October 2008

Initial Conditions:

12. A LOCA has occurred and an RPV Blowdown was required
13. Only 5 SRVs could be opened
14. N2-EOP-6, Attachment 18 is in progress.

Initiating cue:

Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser NMP2 2008 ML083650061.doc 49 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Energize Reserve Station Transformer 1B and NPS-SWG003. Revision: NRC 2008 Task Number: N2-262000-01002, N2-SOP-03-01001 Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NMP2 2008 ML083650061.doc 50 October 2008

Recommended Start Location:

Simulator Simulator Set-up:

Reset to IC 186 Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

4. N2-SOP-03 Tools and Equipment:
1. None Task Standard:

Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.

NMP2 2008 ML083650061.doc 51 October 2008

NMP2 2008 ML083650061.doc 52 October 2008 Initial Conditions:

3. The plant experienced a Loss of Line 6.
4. The plant was manually scrammed.
5. Immediate and Subsequent Actions of N2-SOP-3 are complete.
6. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
7. Power has been restored to Line 6 and Power Control has verified its reliability.
8. Ask the operator for any questions.

Initiating cue:

(Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.

Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3.

Performance Steps Standard Grade

12. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
13. Obtain a copy of the reference procedure N2-SOP-3 obtained. Precautions & Sat/Unsat and review/utilize the correct section. Limitations are reviewed and Attachment 1 Section 1.7 referenced.
14. Review Attachment 1 Section 1.7 Power Per step 1.7.2, determines Sat/Unsat Restoration to determine applicable performance of Attachment 6 is Attachment to Energize Reserve required.

Transformer 1B

4. At Panel 808 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRY01 (RES STA SER XFMR 1B PRIM PROT LO RELAY).

Cue: If asked, inform the candidate that 86-SPRY01 is reset.

5. At Panel 809 (CB 288'), verify reset 86- Verifies 86 device is reset Sat/Unsat 2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY).

Cue: If asked, inform the candidate that 86-SPRZ08 is reset.

6. Determine step 6.2 is N/A Marks N/A block for step 6.2 Sat/Unsat
7. Determine section 6.3 is applicable Carries out the actions of section Sat/Unsat 6.3 NMP2 2008 ML083650061.doc 53 October 2008

Performance Steps Standard Grade

8. Close MDS2 - (115 KV MOD SWITCH 63) Places MDS2 control switch to Pass/Fail LINE 6. CLOSE Observes MDS2 red light - ON Sat/Unsat Observes MDS2 green light - OFF Sat/Unsat
9. Close MDS4 - (115 KV CIRCUIT Places MDS4 control switch from Pass/Fail SWITCHER CKT SWITCH 38). PULL-TO-LOCK to NORMAL-AFTER-OPEN Places MDS4 control switch to Pass/Fail CLOSE Observes MDS4 red light - ON Sat/Unsat Observes MDS4 green light - OFF Sat/Unsat The following annunciators clear with no required action:

852421 MOT Operator CKT 2YUC-MDS4 852435 RES STA SER XFMER 1B Loss of Voltage

10. IF required, place in Normal-After-Trip Places 3-1 control switch from Pass/Fail 2NPS-SWG003-1. PULL-TO-LOCK to NORMAL-AFTER-TRIP.

Observes 3-1 green light - ON Sat/Unsat

11. Return to Attachment 1 Section 1.7. Per step 1.7.8, determines Sat/Unsat performance of Attachment 7 is required.
12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed
12. Determines section 7.2 is applicable Carries out the actions of section Sat/Unsat 7.2
13. Place 3-14 in Pull-to-Lock. Places 3-14 control switch in PULL- Pass/Fail TO-LOCK Observes 3-14 green/red lights - Sat/Unsat OFF The following annunciator clears with no required action:

852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC

14. Place the SYNC switch to ON Rotates the SYNC switch to ON Pass/Fail (SYNCHRONIZE RES STA SVCE XFMR 1B).

NMP2 2008 ML083650061.doc 54 October 2008

Performance Steps Standard Grade

15. Close 3-1. Rotates 3-1 control switch to Pass/Fail CLOSE Observes 3-1 red light - ON Sat/Unsat Observes 3-1 green light - OFF Sat/Unsat Numerous annuciators clear.

Numerous annunciators alarm.

Numerous annunciators reflash. None of these requires action.

16. Place the SYNC switch to OFF. Rotates the SYNC switch to OFF Pass/Fail
17. Close 13-6. Rotates 13-6 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.

Observes 13-6 green light - ON Sat/Unsat Rotates 13-6 control switch to Pass/Fail CLOSE Observes 13-6 red light - ON Sat/Unsat Observes 13-6 green light - OFF Sat/Unsat The following annunciator clears with no required action:

852527 4KV Bus NNS 013 Undervoltage

18. Return to Attachment 1 Section 1.7. Per step 1.7.10, determines Sat/Unsat performance of Attachment 9 is required.
19. Step 9.1 Prerequisites Cue: If asked, 9.1.4 lockout is verified reset.

Step 9.1, Prerequisites, are completed

20. Determines section 9.2 is applicable Carries out the actions of section Sat/Unsat 7.2
21. Verify closed 3-6. Rotates 3-6 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.

Observes 3-6 green light - ON Sat/Unsat Rotates 3-6 control switch to Pass/Fail CLOSE Observes 3-6 red light - ON Sat/Unsat Observes 3-6 green light - OFF Sat/Unsat

22. Close 15-3 Rotates 15-3 control switch from Pass/Fail PULL-TO-LOCK to NORMAL-AFTER-TRIP.

Observes 15-3 green light - ON Sat/Unsat Rotates 15-3 control switch to Pass/Fail CLOSE NMP2 2008 ML083650061.doc 55 October 2008

Performance Steps Standard Grade Observes 15-3 red light - ON Sat/Unsat Observes 15-3 green light - OFF Sat/Unsat

23. Reports that Reserve Station Transformer 1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B Cue: Acknowledge report.

TERMINATING CUE: Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.

RECORD STOP TIME NMP2 2008 ML083650061.doc 56 October 2008

Initial Conditions:

1. The plant experienced a Loss of Line 6.
2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

RO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.7 Power Restoration.

NMP2 JPM #S-7 57 October 2008

Initial Conditions:

1. The plant experienced a Loss of Line 6.
2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

(Operators name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.

Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NMP2 JPM #S-7 58 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate Suppression Chamber Cooling And Spray using RHS A Revision: NRC 2008 Task Number: N2-205000-01013 Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:

NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

NMP2 JPM #S-7 59 October 2008

Evaluator Signature: Date:

NMP2 JPM #S-7 60 October 2008

Recommended Start Location:

Simulator Simulator Set-up:

8. Reset to IC 187 Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

11. EOP-6 Attachment 22
12. NUREG K/A 226001 A4.01 Tools and Equipment:
1. None Task Standard:

NMP2 JPM #S-7 61 October 2008

Suppression Pool Cooling & Spray initiated using RHS A NMP2 JPM #S-7 62 October 2008

Initial Conditions:

15. A Small Break LOCA has occurred.
16. Primary Containment Control EOP has been entered.

Initiating cue:

(Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure EOP-6, Attachment 22 obtained. Step Sat/Unsat and review/utilize the correct section. 3.1 identified
3. Start Suppression Chamber Spray:

N/A, Suppression Chamber Spray is Determines Suppression Chamber Sat/Unsat NOT required Spray is required IF Drywell Sprays are required concurrently with Suppression Chamber Sprays, perform Subsection 3.2 N/A, Drywell Spray is NOT required Determines step N/A Suppression Chamber Spray using Determines step to be used RHS A. (2CEC*PNL601)

N/A, RHS A will NOT be used

4. IF a LOCA signal is present AND Determines bypass not required Sat/Unsat suppression chamber spray because DWP is >1.68 psig.

operation is directed WITH drywell pressure less than 1.68 psig, perform the following to bypass the high drywell pressure interlock for 2RHS*MOV33A:

NMP2 JPM #P-1 63 October 2008

Performance Steps Standard Grade N/A, high drywell pressure interlock will NOT be bypassed NOTE: A L660 key may be needed to gain entry to 2CEC*PNL629.

Remove relay E12A-K108A in 2CEC*PNL629, Bay B (Figure 22-4)

Install EOP Jumper #42 on terminal points BBB-49 AND AA-119 in 2CEC*PNL629, Bay B (Figure 22-4)

Deliver relay E12A-K108A to SM

5. NOTE: Verifying SWP*MOV90A open may be delayed until after sprays are in service. This step is NOT sequence critical.

Verify open SWP*MOV90A, HEAT Open SWP*MOV90A, HEAT Pass/Fail/

EXCHANGER 1A, SVCE WTR EXCHANGER 1A, SVCE WTR INLET NA INLET VLV VLV

6. Verify closed AND IF possible Determines valve is closed by green Sat/Unsat overridden, RHS*MOV24A, LPCI A light ON and red light OFF indication.

INJECTION VLV Failure to override injection valve Places control switch to CLOSE to Pass/Fail closed can result in pump runout, if obtain the amber override light lit.

the valve auto opens with FV38A open during Suppression Pool Cooling operation.

7. Verify running RHS*P1A, PMP 1A Determines pump is running by red Sat/Unsat light ON, green light OFF OR motor amps indication.
8. IF operation in Containment Spray Determines step N/A Sat/Unsat mode AND a trip of 2RHS*P1A occurs, perform emergency refill per Section 3.3
9. Open RHS*MOV33A, OUTLET TO Open RHS*MOV33A, OUTLET TO Pass/Fail NMP2 JPM #P-1 64 October 2008

Performance Steps Standard Grade SUPPR POOL SPRAY SUPPR POOL SPRAY

10. Verify 450 gpm on SUPPR SPRAY Determines flow is acceptable Sat/Unsat HEADER FLOW. (2RHS*FI64A)
11. IF Suppression Pool Cooling is directed, Throttle open RHS*FV38A, RETURN Pass/Fail throttle open RHS*FV38A, RETURN TO SUPPR POOL COOLING to attain TO SUPPR POOL COOLING to desired flow rate (7400 to 7500 gpm).

establish a flow of approximately 7450 gpm (E12-R603A)

N/A, Suppression Pool Cooling was NOT directed

12. Verify RHS*MOV4A, PMP 1A MINIMUM Verifies RHS*MOV4A, PMP 1A Sat/Unsat FLOW VLV position as follows: MINIMUM FLOW VLV valve is closed by green light ON and red light OFF IF RHS A is in Suppression Pool indication.

Cooling/Spray, verify closed 2RHS*MOV4A OR IF RHS A is in Suppression Chamber Spray ONLY, verify open RHS*MOV4A

13. Verify open SWP*MOV90A, HEAT Verify open SWP*MOV90A, HEAT Pass/Fail/

EXCHANGER 1A, SVCE WTR EXCHANGER 1A, SVCE WTR INLET NA INLET VLV VLV by red light ON and green light OFF indication.

If valve was previously opened, this is not a critical step.

14. NOTE: Post LOCA, in order to supply greater than 2000 gpm SWP to RHR Heat Exchangers with less than 5 SWP pumps in service it may be necessary to isolate Turbine Bldg. loads IAW N2-OP-31 Section H.12.0.

Throttle open SWP*MOV33A, HEAT Throttles open SWP*MOV33A, HEAT Pass/Fail EXCHANGER 1A SVCE WTR OUTLET EXCHANGER 1A SVCE WTR VLV to establish Service Water flow to OUTLET VLV and verifies flow remains RHR Heat Exchanger 1A NOT to less than 7400 GPM exceed 7400 gpm. (E12-R602A)

NMP2 JPM #P-1 65 October 2008

Performance Steps Standard Grade

15. NOTE: 2RHS*MOV8A is interlocked in the open position for 10 minutes following a Division I ECCS initiation.

WHEN possible, close RHS*MOV8A, If possible, close RHS*MOV8A, HEAT Sat/Unsat/

HEAT EXCHANGER 1A INLET EXCHANGER 1A INLET BYPASS VLV NA BYPASS VLV OR determines step is N/A

16. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Suppression Pool Cooling and Spray is in operation RECORD STOP TIME NMP2 JPM #P-1 66 October 2008

Initial Conditions:

1. A Small Break LOCA has occurred.
2. Primary Containment Control EOP has been entered.

Initiating cue:

(Operators name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22.

NMP2 JPM #P-1 67 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Align Service Water to SFC Heat Exchanger 1A Revision: NRC 2008 Task Number:

Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:

NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

NMP2 JPM #P-1 68 October 2008

Evaluator Signature: Date:

NMP2 JPM #P-1 69 October 2008

Recommended Start Location:

Plant Simulator Set-up:

9. NA Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

13. N2-SOP-38, Rev 04
14. NUREG K/A 233000 K1.02 Tools and Equipment:
1. None Task Standard:

NMP2 JPM #P-1 70 October 2008

Service Water is aligned to SFC 1A NMP2 JPM #P-1 71 October 2008

Initial Conditions:

17. The Control Room has been evacuated
18. A loss of Spent Fuel Pool Cooling has occurred Initiating cue:

(Operators name), Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure N2-SOP-38 obtained. Sat/Unsat and review/utilize the correct section.
3. Obtain SM permission to supply Service Requests SM permission Sat/Unsat Water Cooling to SFC Heat Exchanger 1A UNLESS directed otherwise by the SM, verify Chemistry has sampled (C1) the CCP system AND sample results meet SPDES AND ODCM requirements for discharge N/A, the SM directs sampling to be performed later CUE: SM has granted permission and Chemistry sample is satisfactory
4. In the Division I Switchgear Room, place the following breakers in OFF:

2EHS*MCC103-4A, CL LOOP CLG Locates breaker and places in OFF Pass/Fail WTR TO SFP CLG HE A SPLY V 2CCP*MOV14A 2EHS*MCC103-4B, CL LOOP CLG Locates breaker and places in OFF Pass/Fail WTR FR SFP CLG HE A RTN V 2CCP*MOV18A NMP2 JPM #P-2 72 October 2008

Performance Steps Standard Grade

5. In North Aux Bay Elev 240, place the following breakers in OFF:

2EHS*MCC102-2A, SWP TO SPENT Locates breaker and places in OFF Pass/Fail FUEL POOL HE 2SWP*MOV17A 2EHS*MCC102-2B, SWP FROM Locates breaker and places in OFF Pass/Fail SPENT FUEL POOL HE 2SWP*MOV18A

6. NOTE: 2CCP*MOV14A and MOV18A are located on RB Elev 215 outside the 2SFC*E1A Room.

Manually close the following valves:

2CCP*MOV14A, SFC HEAT Locates and closes valve Pass/Fail EXCHANGER RBCLC INLET 2CCP*MOV18A, SFC HEAT Locates and closes valve Pass/Fail EXCHANGER RBCLC OUTLET

7. NOTE: 2SWP*MOV17A and MOV18A are located on RB Elev 196 by the North stairwell.

Manually open the following valves:

2SWP*MOV17A, SFC HEAT Locates and manually opens valve Pass/Fail EXCHANGER SERVICE WTR INLET 2SWP*MOV18A, SFC HEAT Locates and manually opens valve Pass/Fail EXCHANGER SERVICE WTR OUTLET

8. Throttle 2CCP*V12, SFC HX 1A Throttles valve while monitoring Pass/Fail OUTLET ISOL, to maintain Spent Fuel temperatures until desired range is Pool temperature 80 - 100°oF reached until desired temperature is reached CUE/NOTE: The applicant should state that temperature can be monitored at_______.

Provide feedback that the appropriate temperature has been reached once satisfied that the appropriate location to monitor NMP2 JPM #P-2 73 October 2008

Performance Steps Standard Grade temperature has been determined

9. IF not previously done, contact Requests Chemistry provide sample Sat/Unsat Chemistry to sample the CCP System AND determine if sample meets requirements for discharge Examiner Note: JPM may be terminated at this point TERMINATING CUE: Service Water is providing cooling to SFC Heat Exchanger 1A RECORD STOP TIME NMP2 JPM #P-2 74 October 2008

Initial Conditions:

1. The Control Room has been evacuated
2. A loss of Spent Fuel Pool cooling has occurred Initiating cue:

Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5 NMP2 JPM #P-2 75 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Isolating An HCU With Cooling Water Flow Revision: NRC 2008 Task Number:

Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:

NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

NMP2 JPM #P-2 76 October 2008

Evaluator Signature: Date:

NMP2 JPM #P-2 77 October 2008

Recommended Start Location:

Plant Simulator Set-up:

10. NA Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

15. N2-OP-30, Rev 14
16. NUREG K/A 201001 A1.06 Tools and Equipment:
1. None Task Standard:

NMP2 JPM #P-2 78 October 2008

HCU 34-23 is isolated with cooling water maintained.

NMP2 JPM #P-2 79 October 2008

Initial Conditions:

19. HCU 34-23 was declared inoperable and must be isolated for maintenance.

Initiating cue:

(Operators name), Isolate HCU 34-23 WITH cooling water per N2-OP-30.

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure N2-OP-30 obtained. Section F.8.2 Sat/Unsat and review/utilize the correct section. identified for use
3. IF an RDS Pump is in service, verify Determines criteria is met Sat/Unsat 79 HCUs are isolated.

CUE: NO other HCUs are isolated

4. Close 2RDS*V101, (34-23) Insert Locates and closes valve Pass/Fail Isolation.
5. Close 2RDS*V102, (34-23) Withdraw Locates and closes valve Pass/Fail Isolation.
6. Close 2RDS-V113, (34-23) Charging Locates and closes valve Pass/Fail Water Isolation.
7. CAUTION Locates and attaches drain line Sat/Unsat Rx water will drain out of 2RDS*V107 if a Reactor Scram occurs.

ATTACH drain line to HCU at 2RDS*V107, (34-23) Accumulator NMP2 JPM #P-3 80 October 2008

Performance Steps Standard Grade Drain AND route to floor/equipment drain. (Lubricant use N/A for Swagelok Fittings)

8. Slowly open 2RDS*V107 (34-23) to Opens valve and observes Pass/Fail depressurize accumulator. accumulator pressure lowering
9. Close 2RDS*V107 (34-23). Locates and closes valve Pass/Fail
10. Open 2RDS*V107 (34-23) one turn. Locates and opens valve Pass/Fail
11. Close 2RDS-V103, (34-23) Drive Locates and closes valve Pass/Fail Water Isolation.
12. Close 2RDS-V105, (34-23) Exhaust Locates and closes valve Pass/Fail Water Isolation.
13. Open 2RDS*V101, (34-23) Insert Locates and opens valve Pass/Fail Isolation.
14. If the HCU is to have maintenance OR Locates and closes valve Pass/Fail is to be out of service for an extended period of time perform the following:

Close 2RDS*V111, (34-23) Gas Accumulator Charging Valve.

15. Using two wrenches, slowly loosen Loosens and removes cap from Sat/Unsat AND remove the cap from connector P6. connector
16. Connect nitrogen charging rig. Connects rig Sat/Unsat NMP2 JPM #P-3 81 October 2008

Performance Steps Standard Grade

17. Open 2RDS*V111, (34-23) AND, Locates and opens valve Pass/Fail utilizing the nitrogen charging rig vent valve, slowly bleed off nitrogen.
18. Verify Nitrogen pressure on the Verifies pressure is 0 Sat/Unsat accumulator pressure gauge is at 0 psig.
19. Disconnect charging rig. Disconnects rig Sat/Unsat
20. NOTE: While torquing cap, use a Reinstalls Cap Sat/Unsat wrench on P6 connector to prevent connector movement at instrument block.

Apply thin coat of Nickel NEVER SEEZ on P6 connector threads, THEN reinstall the cap AND torque the cap to 150-200 in-lbs.

TERMINATING CUE: HCU 34-23 is isolated with cooling water maintained and charging rig has been disconnected.

RECORD STOP TIME NMP2 JPM #P-3 82 October 2008

Initial Conditions:

1. HCU 34-23 was declared inoperable and must be isolated for maintenance.

Initiating cue:

Isolate HCU 34-23 WITH cooling water per N2-OP-30 NMP2 JPM #P-3 83 October 2008

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Off Gas Recovery After Automatic Shutdown Revision: NRC 2008 Task Number:

Approvals:

NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:

NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

NMP2 JPM #P-3 84 October 2008

Evaluator Signature: Date:

NMP2 JPM #P-3 85 October 2008

Recommended Start Location:

Plant Simulator Set-up:

11. NA Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a *.
2. During Evaluated JPM:
  • Self-verification shall be demonstrated.
3. During Training JPM:
  • Self-verification shall be demonstrated.
  • No other verification shall be demonstrated.

References:

17. N2-OP-42, Rev 09
18. NUREG K/A 271000 A1.08 Tools and Equipment:
1. None Task Standard:

NMP2 JPM #P-3 86 October 2008

Off Gas system operating in a stable manner NMP2 JPM #P-3 87 October 2008

Initial Conditions:

20. The plant is operating at 30% power.
21. OffGas has automatically shut down
22. Recombiner temperature is 390°F
23. H2 concentration is 1%
24. The Off Gas High Radiation trip has NOT occurred Initiating cue:

(Operators name), Recover Off Gas after an automatic shutdown per N2-OP-42, Step H.1.5.4 Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-O1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure N2-OP-42 obtained. Section 1.0 Sat/Unsat and review/utilize the correct section. identified for use Note: Action begins at procedure step 1.5.4
3. Reset the Offgas circuits by depressing Resets pushbuttons identified Pass/Fail AND releasing the following RESET pushbuttons:

RESET RE13A&B red pushbutton RESET SYSTEM A black pushbutton RESET SYSTEM B black pushbutton RESET VAC PUMP VP-1A black pushbutton RESET VAC PUMP VP-1B black pushbutton

4. Open 2OFG-LV20A(B), CONDENSER Opens level controller Pass/Fail 1A(B) LEVEL CONTROLLER, to allow process flow to recycle back to the Main Condenser.

NMP2 JPM #P-3 88 October 2008

Performance Steps Standard Grade

5. Open 2OFG-AOV1A(B), PREHTR Locates and opens valve Pass/Fail E1A(B) INLET ISOL, by placing the control switch to STARTUP.
6. Verify open 2OFG-AOV103, OFFGAS Determines valve is open Sat/Unsat EXHAUST TO MAIN STACK.
7. NOTE: When both 2OFG-AOV1A and Determines valve in proper position Sat/Unsat AOV1B are open, 2CCS-MOV45A and MOV45B will each automatically open to mid position. If only 2OFG-AOV1A(B) is open, the associated 2CCS-MOV45A(B) will automatically open fully. The valves are located in the OFG Bldg El 261' Hallway.

Locally, verify 2CCS-MOV45A(B),

OFFGAS CONDENSER 1A(B)

OUTLET ISOLATION, is in the proper position.

CUE: Isolation is in the proper position

8. Verify one Dryer is in service with its Determines one dryer is in service and Sat/Unsat associated valve control switch in associated switch in OPEN OPEN (2OFG-AOV4A/5A, 4B/5B, 4C/5C).
9. IF required, start 2OFG-P1A AND P1B, Locates and places control switch in Pass/Fail VACUUM PUMP VP-1A(B). START
10. WHEN recombination is occurring, as Determines temperature rising. Places Pass/Fail indicated by OFG Recombiner control switch in AUTO temperature rising, place 2OFG-LV20A(B) control switch in AUTO.

CUE: Temperature is slowly rising

11. Open 2OFG-AOV11A(B), Places control switch to STARTUP and Pass/Fail NMP2 JPM #P-3 89 October 2008

Performance Steps Standard Grade CONDENSER 1A(B) OUTLET observes valve open ISOLATION, by placing the control switch to STARTUP.

12. WHEN the OFG System stabilizes, Determines system stable. Locates Pass/Fail perform the following: and pushes SYSTEM RESET button and returns AOV control switches to Push the RESET SYSTEM A(B) AUTO pushbutton.

Return the Recombiner Train Isolation AOV control switches to AUTO.

CUE: System has stabilized TERMINATING CUE: When Off Gas system is operating and stable, this JPM is complete RECORD STOP TIME NMP2 JPM #P-3 90 October 2008

Initial Conditions:

1. The plant is operating at 30% power.
2. OffGas has automatically shut down
3. Recombiner temperature is 390°F
4. H2 concentration is 1%
5. The Off Gas High Radiation trip has NOT occurred Initiating cue:

(Operators name), Recover Off Gas after an automatic shutdown IAW N2-OP-42, Step 1.5.4 NMP2 JPM #P-3 91 October 2008