ML090630615: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML090630615
| number = ML090630615
| issue date = 03/04/2009
| issue date = 03/04/2009
| title = Turkey Point Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010
| title = Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB3
| author affiliation = NRC/RGN-II/DRP/RPB3
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 03/04/2009 07:17:44 Report 22 03/01/2009
{{#Wiki_filter:Page 1 of 2                                                                               Turkey Point 03/04/2009     07:17:44                                                         Inspection / Activity Plan Report 22                                                                       03/01/2009 - 06/30/2010 Unit         Planned Dates                                                                                                                           No. of Staff Number        Start     End     Inspection Activity                                                             Title                                   on Site OL EXAM       - INITIAL EXAM WEEK 2                                                                                           5 3     03/02/2009   03/06/2009     V23299              TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES EB3ISI       - UNIT 3 INSERVICE INSPECTION                                                                                   1 3     03/23/2009   03/27/2009   IP 7111108P            Inservice Inspection Activities - PWR OL EXAM       - INITIAL EXAM PREP                                                                                             4 3     07/27/2009   07/31/2009     V23313              TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                                                         4 3     08/17/2009   08/21/2009     V23313              TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 2                                                                                         5 3     08/31/2009   09/04/2009     V23313              TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES PSB1-RP       - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)                                                                       2 3, 4   10/26/2009  10/30/2009  IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4  10/26/2009   10/30/2009   IP 7112101              Access Control to Radiologically Significant Areas 3, 4  10/26/2009   10/30/2009   IP 7112102              ALARA Planning and Controls 3, 4  10/26/2009   10/30/2009   IP 7112202              Radioactive Material Processing and Transportation 3, 4  10/26/2009   10/30/2009   IP 71151                Performance Indicator Verification EB3ISI       - UNIT 4 INSERVICE INSPECTION                                                                                   1 4   11/02/2009   11/06/2009   IP 7111108P            Inservice Inspection Activities - PWR EB3SGISI     - UNIT 4 STEAM GENERATOR ISI                                                                                   1 4   11/09/2009   11/13/2009   IP 7111108P            Inservice Inspection Activities - PWR PSB1-RP       - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)                                                                       2 3, 4   11/09/2009  11/13/2009  IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4  11/09/2009   11/13/2009   IP 7112101              Access Control to Radiologically Significant Areas 3, 4  11/09/2009   11/13/2009   IP 7112102              ALARA Planning and Controls 3, 4  11/09/2009   11/13/2009   IP 7112202              Radioactive Material Processing and Transportation EB1-MODS - MODIFICATIONS -10CFR50.59                                                                                         3 3, 4   11/30/2009  12/04/2009  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3, 4  12/14/2009   12/18/2009   IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications TFPI 805     - TFPI                                                                                                         5 3, 4   01/25/2010   01/29/2010   IP 7111105T            Fire Protection [Triennial]
-06/30/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Turkey Point OL EXAM-INITIAL EXAM WEEK 2 5   3 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES V23299 03/02/2009 03/06/2009 EB3ISI-UNIT 3 INSERVICE INSPECTION 1   3 IP Inservice Inspection Activities - PWR 7111108P 03/23/2009 03/27/2009 OL EXAM-INITIAL EXAM PREP 4   3 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES V23313 07/27/2009 07/31/2009 OL EXAM-INITIAL EXAM - WEEK 1 4   3 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES V23313 08/17/2009 08/21/2009 OL EXAM-INITIAL EXAM - WEEK 2 5   3 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES V23313 08/31/2009 09/04/2009 PSB1-RP-RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2   3, 4 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 10/26/2009 10/30/2009 3, 4 IP A ccess Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 3, 4 IP A LARA Planning and Controls 7112102 10/26/2009 10/30/2009 3, 4 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 3, 4 IP Performance Indicator Verification 71151 10/26/2009 10/30/2009 EB3ISI-UNIT 4 INSERVICE INSPECTION 1     4 IP Inservice Inspection Activities - PWR 7111108P 11/02/2009 11/06/2009 EB3SGISI-UNIT 4 STEAM GENERATOR ISI 1     4 IP Inservice Inspection Activities - PWR 7111108P 11/09/2009 11/13/2009 PSB1-RP-RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2   3, 4 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 11/09/2009 11/13/2009 3, 4 IP A ccess Control to Radiologically Significant Areas 7112101 11/09/2009 11/13/2009 3, 4 IP A LARA Planning and Controls 7112102 11/09/2009 11/13/2009 3, 4 IP Radioactive Material Processing and Transportation 7112202 11/09/2009 11/13/2009 EB1-MODS-MODIFICATIONS -10CFR50.59 3   3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 11/30/2009 12/04/2009 3, 4 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 12/14/2009 12/18/2009 TFPI 805-TFPI 5   3, 4 IP Fire Protection [Triennial]
3, 4  02/08/2010   02/12/2010   IP 7111105T            Fire Protection [Triennial]
7111105T 01/25/2010 01/29/2010 3, 4 IP Fire Protection [Triennial]
OL RQ         - REQUAL INSPECTION                                                                                             2 3, 4   01/11/2010   01/15/2010   IP 7111111B            Licensed Operator Requalification Program PSB1-RP       - RP PUBLIC RADIATION PROTECTION                                                                               3 3, 4   01/11/2010   01/15/2010   IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
7111105T 02/08/2010 02/12/2010 OL RQ-REQUAL INSPECTION 2   3, 4 IP Licensed Operator Requalification Program 7111111B 01/11/2010 01/15/2010 PSB1-RP-RP PUBLIC RADIATION PROTECTION 3   3, 4 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 01/11/2010 01/15/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 03/04/2009 07:17:44 Report 22 03/01/2009
Enclosure
-06/30/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Turkey Point PSB1-RP-RP PUBLIC RADIATION PROTECTION 3   3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 01/11/2010 01/15/2010 3, 4 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 01/11/2010 01/15/2010 3, 4 IP Performance Indicator Verification 71151 01/11/2010 01/15/2010 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1   3, 4 IP A lert and Notification System Testing 7111402 02/15/2010 02/19/2010 3, 4 IP Emergency Response Organization Augmentation Testing 7111403 02/15/2010 02/19/2010 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/15/2010 02/19/2010 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/15/2010 02/19/2010 3, 4 IP Performance Indicator Verification 71151 02/15/2010 02/19/2010 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.}}
Page 2 of 2                                                                           Turkey Point 03/04/2009     07:17:44                                                       Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit         Planned Dates                                                                                                                               No. of Staff Number        Start     End     Inspection Activity                                                         Title                                         on Site PSB1-RP       - RP PUBLIC RADIATION PROTECTION                                                                                   3 3, 4   01/11/2010  01/15/2010  IP 7112201            Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3, 4  01/11/2010   01/15/2010   IP 7112203            Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3, 4  01/11/2010   01/15/2010   IP 71151              Performance Indicator Verification PSB1EP       - EMERGENCY PREPAREDNESS INSPECTION                                                                               1 3, 4   02/15/2010  02/19/2010  IP 7111402            Alert and Notification System Testing 3, 4  02/15/2010   02/19/2010   IP 7111403            Emergency Response Organization Augmentation Testing 3, 4  02/15/2010   02/19/2010   IP 7111404            Emergency Action Level and Emergency Plan Changes 3, 4  02/15/2010   02/19/2010   IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4  02/15/2010   02/19/2010   IP 71151              Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure}}

Latest revision as of 08:30, 14 November 2019

Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010
ML090630615
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/04/2009
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML090630606 List:
References
IR-09-001
Download: ML090630615 (2)


Text

Page 1 of 2 Turkey Point 03/04/2009 07:17:44 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM WEEK 2 5 3 03/02/2009 03/06/2009 V23299 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES EB3ISI - UNIT 3 INSERVICE INSPECTION 1 3 03/23/2009 03/27/2009 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM PREP 4 3 07/27/2009 07/31/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 3 08/17/2009 08/21/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 5 3 08/31/2009 09/04/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 3, 4 10/26/2009 10/30/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4 10/26/2009 10/30/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 10/26/2009 10/30/2009 IP 7112102 ALARA Planning and Controls 3, 4 10/26/2009 10/30/2009 IP 7112202 Radioactive Material Processing and Transportation 3, 4 10/26/2009 10/30/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 4 INSERVICE INSPECTION 1 4 11/02/2009 11/06/2009 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 4 STEAM GENERATOR ISI 1 4 11/09/2009 11/13/2009 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2 3, 4 11/09/2009 11/13/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4 11/09/2009 11/13/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 11/09/2009 11/13/2009 IP 7112102 ALARA Planning and Controls 3, 4 11/09/2009 11/13/2009 IP 7112202 Radioactive Material Processing and Transportation EB1-MODS - MODIFICATIONS -10CFR50.59 3 3, 4 11/30/2009 12/04/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3, 4 12/14/2009 12/18/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications TFPI 805 - TFPI 5 3, 4 01/25/2010 01/29/2010 IP 7111105T Fire Protection [Triennial]

3, 4 02/08/2010 02/12/2010 IP 7111105T Fire Protection [Triennial]

OL RQ - REQUAL INSPECTION 2 3, 4 01/11/2010 01/15/2010 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 3, 4 01/11/2010 01/15/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Turkey Point 03/04/2009 07:17:44 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 3, 4 01/11/2010 01/15/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3, 4 01/11/2010 01/15/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3, 4 01/11/2010 01/15/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3, 4 02/15/2010 02/19/2010 IP 7111402 Alert and Notification System Testing 3, 4 02/15/2010 02/19/2010 IP 7111403 Emergency Response Organization Augmentation Testing 3, 4 02/15/2010 02/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/15/2010 02/19/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/15/2010 02/19/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure