ML090630615: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML090630615 | | number = ML090630615 | ||
| issue date = 03/04/2009 | | issue date = 03/04/2009 | ||
| title = | | title = Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010 | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II/DRP/RPB3 | | author affiliation = NRC/RGN-II/DRP/RPB3 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Page 1 of 2 Turkey Point 03/04/2009 07:17:44 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM WEEK 2 5 3 03/02/2009 03/06/2009 V23299 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES EB3ISI - UNIT 3 INSERVICE INSPECTION 1 3 03/23/2009 03/27/2009 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM PREP 4 3 07/27/2009 07/31/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 3 08/17/2009 08/21/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 5 3 08/31/2009 09/04/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 3, 4 10/26/2009 10/30/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4 10/26/2009 10/30/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 10/26/2009 10/30/2009 IP 7112102 ALARA Planning and Controls 3, 4 10/26/2009 10/30/2009 IP 7112202 Radioactive Material Processing and Transportation 3, 4 10/26/2009 10/30/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 4 INSERVICE INSPECTION 1 4 11/02/2009 11/06/2009 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 4 STEAM GENERATOR ISI 1 4 11/09/2009 11/13/2009 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2 3, 4 11/09/2009 11/13/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4 11/09/2009 11/13/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 11/09/2009 11/13/2009 IP 7112102 ALARA Planning and Controls 3, 4 11/09/2009 11/13/2009 IP 7112202 Radioactive Material Processing and Transportation EB1-MODS - MODIFICATIONS -10CFR50.59 3 3, 4 11/30/2009 12/04/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3, 4 12/14/2009 12/18/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications TFPI 805 - TFPI 5 3, 4 01/25/2010 01/29/2010 IP 7111105T Fire Protection [Triennial] | ||
-06/30/2010 Unit | 3, 4 02/08/2010 02/12/2010 IP 7111105T Fire Protection [Triennial] | ||
OL RQ - REQUAL INSPECTION 2 3, 4 01/11/2010 01/15/2010 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 3, 4 01/11/2010 01/15/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Enclosure | |||
-06/30/2010 Unit | |||
This report shows only on-site and announced inspection procedures.}} | Page 2 of 2 Turkey Point 03/04/2009 07:17:44 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 3, 4 01/11/2010 01/15/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3, 4 01/11/2010 01/15/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3, 4 01/11/2010 01/15/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3, 4 02/15/2010 02/19/2010 IP 7111402 Alert and Notification System Testing 3, 4 02/15/2010 02/19/2010 IP 7111403 Emergency Response Organization Augmentation Testing 3, 4 02/15/2010 02/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/15/2010 02/19/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/15/2010 02/19/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures. | |||
Enclosure}} |
Latest revision as of 08:30, 14 November 2019
ML090630615 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/04/2009 |
From: | NRC/RGN-II/DRP/RPB3 |
To: | |
Shared Package | |
ML090630606 | List: |
References | |
IR-09-001 | |
Download: ML090630615 (2) | |
Text
Page 1 of 2 Turkey Point 03/04/2009 07:17:44 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM WEEK 2 5 3 03/02/2009 03/06/2009 V23299 TURKEY POINT/FEBRUARY 2009 EXAM AT POWER FACILITIES EB3ISI - UNIT 3 INSERVICE INSPECTION 1 3 03/23/2009 03/27/2009 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM PREP 4 3 07/27/2009 07/31/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 3 08/17/2009 08/21/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 5 3 08/31/2009 09/04/2009 V23313 TURKEY POINT/AUGUST 2009 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 3, 4 10/26/2009 10/30/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4 10/26/2009 10/30/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 10/26/2009 10/30/2009 IP 7112102 ALARA Planning and Controls 3, 4 10/26/2009 10/30/2009 IP 7112202 Radioactive Material Processing and Transportation 3, 4 10/26/2009 10/30/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 4 INSERVICE INSPECTION 1 4 11/02/2009 11/06/2009 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 4 STEAM GENERATOR ISI 1 4 11/09/2009 11/13/2009 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2 3, 4 11/09/2009 11/13/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 3, 4 11/09/2009 11/13/2009 IP 7112101 Access Control to Radiologically Significant Areas 3, 4 11/09/2009 11/13/2009 IP 7112102 ALARA Planning and Controls 3, 4 11/09/2009 11/13/2009 IP 7112202 Radioactive Material Processing and Transportation EB1-MODS - MODIFICATIONS -10CFR50.59 3 3, 4 11/30/2009 12/04/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3, 4 12/14/2009 12/18/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications TFPI 805 - TFPI 5 3, 4 01/25/2010 01/29/2010 IP 7111105T Fire Protection [Triennial]
3, 4 02/08/2010 02/12/2010 IP 7111105T Fire Protection [Triennial]
OL RQ - REQUAL INSPECTION 2 3, 4 01/11/2010 01/15/2010 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 3, 4 01/11/2010 01/15/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 Turkey Point 03/04/2009 07:17:44 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 3, 4 01/11/2010 01/15/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 3, 4 01/11/2010 01/15/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3, 4 01/11/2010 01/15/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3, 4 02/15/2010 02/19/2010 IP 7111402 Alert and Notification System Testing 3, 4 02/15/2010 02/19/2010 IP 7111403 Emergency Response Organization Augmentation Testing 3, 4 02/15/2010 02/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/15/2010 02/19/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3, 4 02/15/2010 02/19/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure