|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: David, Marshall Sent: Friday, July 31, 2009 11:43 AM To: patrick.simpson@exeloncorp.com Cc: 'ken.nicely@exeloncorp.com'; 'Lisa.Schofield@exeloncorp.com'; Campbell, Stephen; Casto, Greg; Munro, John; Wilson, George; Elliott, Robert; Mahoney, Michael | | {{#Wiki_filter:From: David, Marshall Sent: Friday, July 31, 2009 11:43 AM To: patrick.simpson@exeloncorp.com Cc: 'ken.nicely@exeloncorp.com'; 'Lisa.Schofield@exeloncorp.com'; Campbell, Stephen; Casto, Greg; Munro, John; Wilson, George; Elliott, Robert; Mahoney, Michael |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70) | | Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70) |
| Pat, By letter dated June 30, 2009, Exelon Generation Company, LLC (the licensee) submitted a license amendment request for Byron Station, Unit Nos.1 and 2 (ADAMS Accession Number ML091831253). The proposed license amendment requests Nuclear Regulatory Commission (NRC) approval to revise Technical Specification 3.7.9, "Ultimate Heat Sink (UHS)," to add additional essential service water (SX) cooling tower fan requirements as a function of SX pump discharge temperature to reflect results of a revised analysis for the UHS. The purpose of this message is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | : Pat, By letter dated June 30, 2009, Exelon Generation Company, LLC (the licensee) submitted a license amendment request for Byron Station, Unit Nos.1 and 2 (ADAMS Accession Number ML091831253). The proposed license amendment requests Nuclear Regulatory Commission (NRC) approval to revise Technical Specification 3.7.9, "Ultimate Heat Sink (UHS)," to add additional essential service water (SX) cooling tower fan requirements as a function of SX pump discharge temperature to reflect results of a revised analysis for the UHS. The purpose of this message is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. |
| | | The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| The NRC staff has reviewed your application and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | | The NRC staff has reviewed your application and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. |
| In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record. | | In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record. |
| Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF03410ABAFAF10B2) | | Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties |
| | |
| | Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF03410ABAFAF10B2) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70) | | Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70) |
| Sent Date: 7/31/2009 11:42:52 AM Received Date: 7/31/2009 11:42:52 AM From: David, Marshall | | Sent Date: 7/31/2009 11:42:52 AM Received Date: 7/31/2009 11:42:52 AM From: David, Marshall Created By: Marshall.David@nrc.gov Recipients: |
| | | patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com) |
| Created By: Marshall.David@nrc.gov | | Tracking Status: None ken.nicely@exeloncorp.com ('ken.nicely@exeloncorp.com') |
| | | Tracking Status: None Lisa.Schofield@exeloncorp.com ('Lisa.Schofield@exeloncorp.com') |
| Recipients: | | Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen) |
| patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com) Tracking Status: None ken.nicely@exeloncorp.com ('ken.nicely@exeloncorp.com') Tracking Status: None Lisa.Schofield@exeloncorp.com ('Lisa.Schofield@exeloncorp.com') Tracking Status: None | | Tracking Status: None Greg.Casto@nrc.gov (Casto, Greg) |
| | |
| Stephen.Campbell@nrc.gov (Campbell, Stephen) Tracking Status: None Greg.Casto@nrc.gov (Casto, Greg) | |
| Tracking Status: None John.Munro@nrc.gov (Munro, John) | | Tracking Status: None John.Munro@nrc.gov (Munro, John) |
| Tracking Status: None George.Wilson@nrc.gov (Wilson, George) | | Tracking Status: None George.Wilson@nrc.gov (Wilson, George) |
| Tracking Status: None Robert.Elliott@nrc.gov (Elliott, Robert) | | Tracking Status: None Robert.Elliott@nrc.gov (Elliott, Robert) |
| Tracking Status: None Michael.Mahoney@nrc.gov (Mahoney, Michael) | | Tracking Status: None Michael.Mahoney@nrc.gov (Mahoney, Michael) |
| Tracking Status: None | | Tracking Status: None Post Office: |
| | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 9368 7/31/2009 Options Expiration Date: |
| Post Office: | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| HQCLSTR01.nrc.gov | |
| | |
| Files Size Date & Time | |
| | |
| MESSAGE 9368 7/31/2009 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Other |
---|
|
|
MONTHYEARRS-09-054, License Amendment Request Regarding Ultimate Heat Sink2009-06-30030 June 2009 License Amendment Request Regarding Ultimate Heat Sink Project stage: Request ML0921203572009-07-31031 July 2009 Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70) Project stage: Other ML0932006512009-12-11011 December 2009 Request for Additional Information Related to License Amendment Regarding Ultimate Heat Sink Project stage: RAI RS-10-020, Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2010-01-25025 January 2010 Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink Project stage: Request ML1013805252010-05-18018 May 2010 Additional RAI for Ultimate Heat Sink License Amendment Request (ME1669-70) Project stage: RAI RS-10-112, Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2010-07-0101 July 2010 Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink Project stage: Request ML1021601902010-08-18018 August 2010 Request for Additional Information Related to License Amendment Regarding Ultimate Heak Sink Project stage: RAI ML1030602892010-11-0202 November 2010 Approved with Comment: Request to Extend the Submittal Date for the Byron UHS RAI Response Project stage: RAI RS-10-184, Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2010-11-0808 November 2010 Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink Project stage: Request ML1035003172010-12-16016 December 2010 Draft NRC RAI Byron Station, Units 1 and 2 - LAR Ultimate Heat Sink Project stage: Draft RAI ML1036205592010-12-28028 December 2010 Request for Additional Information Related to License Amendment Regarding Ultimate Heat Sink Project stage: RAI RS-11-010, Response to Request for Additional Information Related to License Amendment Regarding Ultimate Heat Sink2011-01-31031 January 2011 Response to Request for Additional Information Related to License Amendment Regarding Ultimate Heat Sink Project stage: Response to RAI ML1103413522011-02-14014 February 2011 Request for Additional Information Related to License Amendment Regarding Ultimate Heat Sink Project stage: RAI ML1104505662011-02-15015 February 2011 3/01/2011 Notice of Forthcoming Meeting with Exelon to Discuss Nrc'S Staff'S Review of the Ultimate Head Sink License Amendment Request for the Byron Station, Units 1 and 2 Project stage: Meeting ML1106201482011-03-10010 March 2011 Summary of Meeting with Exelon Generation Company, LLC to Discuss the Request for Additional Information Related to License Amendment Regarding the Ultimate Heat Sink Project stage: RAI RS-11-035, Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2011-03-16016 March 2011 Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink Project stage: Request RS-11-070, Supplement to Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2011-05-0404 May 2011 Supplement to Information Supporting Request for License Amendment Regarding Ultimate Heat Sink Project stage: Supplement ML1113106332011-06-14014 June 2011 Issuance of Amendments Revision of Technical Specification 3.7.9, Ultimate Heat Sink Project stage: Approval 2010-05-18
[Table View] |
Similar Documents at Byron |
---|
Category:E-Mail
MONTHYEARML24298A0202024-10-24024 October 2024 NRR E-mail Capture - Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Relief Request I4R-19 and I4-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24306A0072024-06-26026 June 2024 NRR E-mail Capture - Verbal Relief for Byron, Unit 2, Three Specific Air-operated Valves in the Essential Service Water System (L-2024-LLR-0042) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request – ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application 2024-09-06
[Table view] |
Text
From: David, Marshall Sent: Friday, July 31, 2009 11:43 AM To: patrick.simpson@exeloncorp.com Cc: 'ken.nicely@exeloncorp.com'; 'Lisa.Schofield@exeloncorp.com'; Campbell, Stephen; Casto, Greg; Munro, John; Wilson, George; Elliott, Robert; Mahoney, Michael
Subject:
Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70)
- Pat, By letter dated June 30, 2009, Exelon Generation Company, LLC (the licensee) submitted a license amendment request for Byron Station, Unit Nos.1 and 2 (ADAMS Accession Number ML091831253). The proposed license amendment requests Nuclear Regulatory Commission (NRC) approval to revise Technical Specification 3.7.9, "Ultimate Heat Sink (UHS)," to add additional essential service water (SX) cooling tower fan requirements as a function of SX pump discharge temperature to reflect results of a revised analysis for the UHS. The purpose of this message is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.
Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties
Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF03410ABAFAF10B2)
Subject:
Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70)
Sent Date: 7/31/2009 11:42:52 AM Received Date: 7/31/2009 11:42:52 AM From: David, Marshall Created By: Marshall.David@nrc.gov Recipients:
patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com)
Tracking Status: None ken.nicely@exeloncorp.com ('ken.nicely@exeloncorp.com')
Tracking Status: None Lisa.Schofield@exeloncorp.com ('Lisa.Schofield@exeloncorp.com')
Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen)
Tracking Status: None Greg.Casto@nrc.gov (Casto, Greg)
Tracking Status: None John.Munro@nrc.gov (Munro, John)
Tracking Status: None George.Wilson@nrc.gov (Wilson, George)
Tracking Status: None Robert.Elliott@nrc.gov (Elliott, Robert)
Tracking Status: None Michael.Mahoney@nrc.gov (Mahoney, Michael)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 9368 7/31/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: