| issue date = 02/17/2010
| issue date = 02/17/2010
| title = Cover Letter for IR Fermi 2 Nuclear Power Station - NRC ISFSI Security Inspection Report 0500034/2010405(DNMS)
| title = Cover Letter for IR Fermi 2 Nuclear Power Station - NRC ISFSI Security Inspection Report 0500034/2010405(DNMS)
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DNMS
| author affiliation = NRC/RGN-III/DNMS
| addressee name = Davis J M
| addressee name = Davis J
| addressee affiliation = Detroit Edison
| addressee affiliation = Detroit Edison
| docket = 05000341, 07200071
| docket = 05000341, 07200071
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Official Use Only Security-Related Information UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 Official Use Only
{{#Wiki_filter:Official Use Only Security-Related Information UNITED STATES NUCLEAR REGULATORY COMMISSION
- Security-Related Information 1 February 17, 2010


Mr. Jack Senior Vice President and  
==REGION III==
 
2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 17, 2010 Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166 SUBJECT: FERMI 2 NUCLEAR POWER STATION - NRC ISFSI SECURITY INSPECTION REPORT 05000341/2010405(DNMS)
Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC  
 
6400 North Dixie Highway Newport, MI 48166
 
SUBJECT: FERMI 2 NUCLEAR POWER STATION - NRC ISFSI SECURITY INSPECTION REPORT 05000341/2010405(DNMS)


==Dear Mr. Davis:==
==Dear Mr. Davis:==
On January 27, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection of the Independent Spent Fuel Storage Installation (ISFSI) at the Fermi 2 Nuclear Power Station (NPS), Newport, Michigan. The purpose of the inspection was to evaluate whether the protection of the ISFSI was in compliance with the Fermi 2 Physical Security Plan (PSP) and the NRC Order EA-09-072, "Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Fermi Power Plant Independent Spent Fuel Storage Installation," dated April 7, 2009. In addition, the inspectors verified the location of your instrument calibrators, and determined whether their use and storage was conducted safely and in accordance with 10 CFR Part 20 requirements. At the conclusion of the on-site inspection on January 27, 2010, the inspector discussed the inspection findings with members of your security and radiation protection staff.
On January 27, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection of the Independent Spent Fuel Storage Installation (ISFSI) at the Fermi 2 Nuclear Power Station (NPS), Newport, Michigan. The purpose of the inspection was to evaluate whether the protection of the ISFSI was in compliance with the Fermi 2 Physical Security Plan (PSP) and the NRC Order EA-09-072, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Fermi Power Plant Independent Spent Fuel Storage Installation, dated April 7, 2009. In addition, the inspectors verified the location of your instrument calibrators, and determined whether their use and storage was conducted safely and in accordance with 10 CFR Part 20 requirements. At the conclusion of the on-site inspection on January 27, 2010, the inspector discussed the inspection findings with members of your security and radiation protection staff.


Based on the results of this inspection, no findings of significance were identified.
Based on the results of this inspection, no findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.


Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.


Official Use Only Security-Related Information Official Use Only Security-Related Information We will gladly discuss any questions you may have regarding this inspection.
Official Use Only - Security-Related Information
 
Sincerely,/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch
 
Docket No. 050-00341, 072-00071 License No. NPF-43, General License (ISFSI)
 
===Enclosure:===
IR 05000341/2010405 (DNMS) (Non Public)


cc w/encl: M. Finley, Security Manager, Fermi 2 NPS J. Slaback, Licensing Engineer, Fermi 2 NPS T. Strong, State Liaison Officer, State of Michigan
Official Use Only Security-Related Information We will gladly discuss any questions you may have regarding this inspection.


cc w/o encl: Distribution via ListServ
Sincerely,
/RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00341, 072-00071 License No. NPF-43, General License (ISFSI)
Enclosure:
IR 05000341/2010405 (DNMS) (Non Public)
cc w/encl: M. Finley, Security Manager, Fermi 2 NPS J. Slaback, Licensing Engineer, Fermi 2 NPS T. Strong, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ Official Use Only Security-Related Information
}}
}}

Latest revision as of 21:38, 13 November 2019

Cover Letter for IR Fermi 2 Nuclear Power Station - NRC ISFSI Security Inspection Report 0500034/2010405(DNMS)
ML100540590
Person / Time
Site: Fermi, 07200071, 05000034  DTE Energy icon.png
Issue date: 02/17/2010
From: Christine Lipa
Division of Nuclear Materials Safety III
To: Jennifer Davis
Detroit Edison
References
EA-09-072, IR-10-405
Download: ML100540590 (2)


Text

Official Use Only Security-Related Information UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 17, 2010 Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166 SUBJECT: FERMI 2 NUCLEAR POWER STATION - NRC ISFSI SECURITY INSPECTION REPORT 05000341/2010405(DNMS)

Dear Mr. Davis:

On January 27, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection of the Independent Spent Fuel Storage Installation (ISFSI) at the Fermi 2 Nuclear Power Station (NPS), Newport, Michigan. The purpose of the inspection was to evaluate whether the protection of the ISFSI was in compliance with the Fermi 2 Physical Security Plan (PSP) and the NRC Order EA-09-072, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Fermi Power Plant Independent Spent Fuel Storage Installation, dated April 7, 2009. In addition, the inspectors verified the location of your instrument calibrators, and determined whether their use and storage was conducted safely and in accordance with 10 CFR Part 20 requirements. At the conclusion of the on-site inspection on January 27, 2010, the inspector discussed the inspection findings with members of your security and radiation protection staff.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.

1 Official Use Only - Security-Related Information

Official Use Only Security-Related Information We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00341, 072-00071 License No. NPF-43, General License (ISFSI)

Enclosure:

IR 05000341/2010405 (DNMS) (Non Public)

cc w/encl: M. Finley, Security Manager, Fermi 2 NPS J. Slaback, Licensing Engineer, Fermi 2 NPS T. Strong, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ Official Use Only Security-Related Information