ML100610136: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/01/2010
| issue date = 03/01/2010
| title = Notification of Individual Examination Results for Applicants on Written Retake Upgrade Examination Conducted on 01/29/10
| title = Notification of Individual Examination Results for Applicants on Written Retake Upgrade Examination Conducted on 01/29/10
| author name = Hansell S L
| author name = Hansell S
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Spence J T
| addressee name = Spence J
| addressee affiliation = Dominion Nuclear Connecticut, Inc
| addressee affiliation = Dominion Nuclear Connecticut, Inc
| docket = 05000336
| docket = 05000336
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 1, 2010 Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 1, 2010 Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
Millstone Nuclear Power Station, Unit 2 Rope Ferry Road, Route 156 Waterford, CT 06385  
Millstone Nuclear Power Station, Unit 2 Rope Ferry Road, Route 156 Waterford, CT 06385


==Dear Mr. Spence:==
==Dear Mr. Spence:==


The purpose of this letter is to inform you of the individual examination results for your applicants on the written retake upgrade examination conducted on January 29, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors.This information is considered "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.  
The purpose of this letter is to inform you of the individual examination results for your applicants on the written retake upgrade examination conducted on January 29, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
 
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, the two individuals who took the examination failed. contains the individual results ES-303-1, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).
As indicated in Enclosure 1, the completed ES-501-2, "Power Plant Licensing Examination Results Summary," the two individuals who took the examination failed.
No licenses were issued.
contains the individual results ES-303-1, "Operator License Examination Report,"
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applicat ions (i.e., NRC Form 398).  
Sincerely,
 
                                                /RA/
No licenses were issued.  
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65
 
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046. Sincerely,       /RA/ Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65  


==Enclosures:==
==Enclosures:==
Line 39: Line 37:


==Enclosures:==
==Enclosures:==
Site Vice President
Site Vice President


Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.
Millstone Nuclear Power Station, Unit 2 Rope Ferry Road, Route 156 Waterford, CT 06385  
Millstone Nuclear Power Station, Unit 2 Rope Ferry Road, Route 156 Waterford, CT 06385


==Dear Mr. Spence:==
==Dear Mr. Spence:==


The purpose of this letter is to inform you of the individual examination results for your applicants on the written retake upgrade examination conducted on January 29, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors.This information is considered "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. As indicated in Enclosure 1, the completed ES-501-2, "Power Plant Licensing Examination Results Summary," the two individuals who took the examination failed.
The purpose of this letter is to inform you of the individual examination results for your applicants on the written retake upgrade examination conducted on January 29, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
Enclosure 2 contains the individual results ES-303-1, "Operator License Examination Report," for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applicat ions (i.e., NRC Form 398). No licenses were issued.
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, the two individuals who took the examination failed. contains the individual results ES-303-1, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046. Sincerely,       /RA/
No licenses were issued.
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65  
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
                                                    /RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65


==Enclosures:==
==Enclosures:==
Line 57: Line 58:
==Enclosures:==
==Enclosures:==
Site Vice President Distribution: w/o enclosures:
Site Vice President Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete:     JD                     (Reviewer
Master Exam File SUNSI Review Complete:         JD             (Reviewer=s Initials)
=s Initials) ADAMS PKG: ML092400035   ADAMS NO.: ML100610136 DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Exam 10-MP2 RTK Jan 10 (U01799)\ExamNotificationLtrRTK.doc After declaring this document AAn Official Agency Record,@ it will without enclosures be released to the Public. OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME CJBixler/CJB JD'Antonio
ADAMS PKG: ML092400035                               ADAMS NO.: ML100610136 DOCUMENT NAME:
/JD SLHansell/SLH DATE 03/01/10 03/01/10 03/01/10 OFFICIAL RECORD COPY}}
G:\DRS\Operations Branch\DANTONIO\Exam 10-MP2 RTK Jan 10 (U01799)\ExamNotificationLtrRTK.doc After declaring this document AAn Official Agency Record,@ it will without enclosures be released to the Public.
OFFICE               RI/DRS/OB             RI/DRS/OB                 RI/DRS/OB NAME                 CJBixler/CJB           JDAntonio/JD             SLHansell/SLH DATE                 03/01/10               03/01/10                 03/01/10 OFFICIAL RECORD COPY}}

Latest revision as of 22:25, 13 November 2019

Notification of Individual Examination Results for Applicants on Written Retake Upgrade Examination Conducted on 01/29/10
ML100610136
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/01/2010
From: Hansell S
Operations Branch I
To: Jane Spence
Dominion Nuclear Connecticut
Hansell S
Shared Package
ML092400035 List:
References
TAC U01799, FOIA/PA-2011-0115
Download: ML100610136 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 1, 2010 Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.

Millstone Nuclear Power Station, Unit 2 Rope Ferry Road, Route 156 Waterford, CT 06385

Dear Mr. Spence:

The purpose of this letter is to inform you of the individual examination results for your applicants on the written retake upgrade examination conducted on January 29, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, the two individuals who took the examination failed. contains the individual results ES-303-1, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).

No licenses were issued.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1, Individual Examination Results Cc w/o

Enclosures:

Site Vice President

Mr. Jeff T. Spence Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.

Millstone Nuclear Power Station, Unit 2 Rope Ferry Road, Route 156 Waterford, CT 06385

Dear Mr. Spence:

The purpose of this letter is to inform you of the individual examination results for your applicants on the written retake upgrade examination conducted on January 29, 2010 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, the two individuals who took the examination failed. contains the individual results ES-303-1, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).

No licenses were issued.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1, Individual Examination Results Cc w/o

Enclosures:

Site Vice President Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: JD (Reviewer=s Initials)

ADAMS PKG: ML092400035 ADAMS NO.: ML100610136 DOCUMENT NAME:

G:\DRS\Operations Branch\DANTONIO\Exam 10-MP2 RTK Jan 10 (U01799)\ExamNotificationLtrRTK.doc After declaring this document AAn Official Agency Record,@ it will without enclosures be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JDAntonio/JD SLHansell/SLH DATE 03/01/10 03/01/10 03/01/10 OFFICIAL RECORD COPY