ML100640737: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML100640737 | | number = ML100640737 | ||
| issue date = 03/05/2010 | | issue date = 03/05/2010 | ||
| title = | | title = Relief Request VRR-05, Rev. 1, Needs to Be Supplemented | ||
| author name = Tam P | | author name = Tam P | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
| addressee name = Breene T | | addressee name = Breene T, Gadzala J, Sly C | ||
| addressee affiliation = Dominion Energy Kewaunee, Inc | | addressee affiliation = Dominion Energy Kewaunee, Inc | ||
| docket = 05000305 | | docket = 05000305 | ||
| license number = DPR-043 | | license number = DPR-043 | ||
| contact person = Tam P | | contact person = Tam P | ||
| case reference number = TAC ME3352 | | case reference number = TAC ME3352 | ||
| document type = E-Mail | | document type = E-Mail | ||
| page count = 2 | | page count = 2 | ||
| project = TAC:ME3352 | | project = TAC:ME3352 | ||
| stage = | | stage = Other | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Accession No. ML100640737 | {{#Wiki_filter:Accession No. ML100640737 From: Tam, Peter Sent: Friday, March 05, 2010 1:54 PM To: 'Jack Gadzala'; 'Craig D Sly'; 'Thomas L Breene' Cc: McMurtray, Anthony; Farnan, Michael | ||
From: Tam, Peter Sent: Friday, March 05, 2010 1:54 PM To: 'Jack Gadzala'; 'Craig D Sly'; 'Thomas L Breene' Cc: McMurtray, Anthony; Farnan, Michael | |||
==Subject:== | ==Subject:== | ||
Kewaunee - Relief Request VRR-05, Revision 1, Needs to be Supplemented (TAC ME3352) | Kewaunee - Relief Request VRR-05, Revision 1, Needs to be Supplemented (TAC ME3352) | ||
Jack: | Jack: | ||
Relief Request VRR-05, Revision 0, was initially submitted on 1/23/2006 and approved on 3/24/2006, and supplemented with clarifications on 4/20/2006. The authorized alternative approved performing position verification test on valves SI-350A and SI-350B at an interval of 36 months rather than the prescribed 24 months of ISTC-3700. The approved VRR-05, Revision 0, stated that the enclosures require leak testing after completion of position verification test. In addition, the valves will be leakage tested on a refueling outage frequency to ensure valve closure. Revision 1, removes the statement of leakage testing the valves on a refueling outage frequency and replaces the statement with a commitment to leakage test to verify closure to be completed during those refueling outages where local position indication verification is not performed. | |||
(1) | (1) How does this request impact the Kewaunee Appendix J program? | ||
(2) Is the leak test separate from Appendix J test (i.e. does it have different acceptance criteria)? | |||
(3) What is the make and model of the valve? Is the enclosure separate from the valve such that disassembly does not affect valve performance? | |||
(3) | (4) If disassembly of the enclosure does affect valve performance, how is the requirement of ISTC-3310 met? | ||
We need to discuss, in a conference call, the above questions with our reviewer Michael Farnan. This call needs to occur in a rather tight schedule because we are in the acceptance review stage and are subject to the schedular guidance of NRR Office Instruction LIC-109. The sole purpose of this e-mail is to prepare you and others for the requested conference call. This e-mail does not formally request for information, and does not formally convey an NRC staff position. | |||
Peter S. Tam Senior Project Manager (for Kewaunee and Monticello) | |||
We need to discuss, in a conference call, the above questions with our reviewer Michael Farnan. This call needs to occur in a rather tight schedule because we are in the acceptance review stage and are subject to the schedular guidance of NRR Office Instruction LIC-109. The sole purpose of this e-mail is to prepare you and others for the requested conference call. This e-mail does not formally request for information, and does not formally convey an NRC staff position. Peter S. Tam Senior Project Manager (for Kewaunee and Monticello) Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 | Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 | ||
E-mail Properties Mail Envelope Properties () | E-mail Properties Mail Envelope Properties () | ||
==Subject:== | ==Subject:== | ||
Kewaunee - Relief Request VRR-05, Revision 1, Needs to be Supplemented (TAC ME3352) | Kewaunee - Relief Request VRR-05, Revision 1, Needs to be Supplemented (TAC ME3352) | ||
Sent Date: | Sent Date: 03/05/2010 1:36:29 PM Received Date: 03/05/2010 1:53:00 PM From: Tam, Peter Created By: Peter.Tam@nrc.gov Recipients: | ||
Created By: Peter.Tam@nrc.gov | |||
Recipients: | |||
jack.gadzala@dom.com ('Jack Gadzala') | jack.gadzala@dom.com ('Jack Gadzala') | ||
Tracking Status: None craig.d.sly@dom.com ('Craig D Sly') | Tracking Status: None craig.d.sly@dom.com ('Craig D Sly') | ||
Tracking Status: None thomas.l.breene@dom.com ('Thomas L Breene') | Tracking Status: None thomas.l.breene@dom.com ('Thomas L Breene') | ||
Tracking Status: None Anthony.McMurtray@nrc.gov (McMurtray, Anthony) | Tracking Status: None Anthony.McMurtray@nrc.gov (McMurtray, Anthony) | ||
Tracking Status: None | Tracking Status: None Michael.Farnan@nrc.gov (Farnan, Michael) | ||
Tracking Status: None Post Office: | |||
Michael.Farnan@nrc.gov (Farnan, Michael) | Files Size Date & Time MESSAGE 19938 03/05/2010 Options Expiration Date: | ||
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} | |||
Post Office: | |||
Files | |||
MESSAGE | |||
Options Expiration Date: | |||
Priority: | |||
Sensitivity: |
Latest revision as of 22:10, 13 November 2019
ML100640737 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 03/05/2010 |
From: | Tam P Plant Licensing Branch III |
To: | Breene T, Gadzala J, Sly C Dominion Energy Kewaunee |
Tam P | |
References | |
TAC ME3352 | |
Download: ML100640737 (2) | |
Text
Accession No. ML100640737 From: Tam, Peter Sent: Friday, March 05, 2010 1:54 PM To: 'Jack Gadzala'; 'Craig D Sly'; 'Thomas L Breene' Cc: McMurtray, Anthony; Farnan, Michael
Subject:
Kewaunee - Relief Request VRR-05, Revision 1, Needs to be Supplemented (TAC ME3352)
Jack:
Relief Request VRR-05, Revision 0, was initially submitted on 1/23/2006 and approved on 3/24/2006, and supplemented with clarifications on 4/20/2006. The authorized alternative approved performing position verification test on valves SI-350A and SI-350B at an interval of 36 months rather than the prescribed 24 months of ISTC-3700. The approved VRR-05, Revision 0, stated that the enclosures require leak testing after completion of position verification test. In addition, the valves will be leakage tested on a refueling outage frequency to ensure valve closure. Revision 1, removes the statement of leakage testing the valves on a refueling outage frequency and replaces the statement with a commitment to leakage test to verify closure to be completed during those refueling outages where local position indication verification is not performed.
(1) How does this request impact the Kewaunee Appendix J program?
(2) Is the leak test separate from Appendix J test (i.e. does it have different acceptance criteria)?
(3) What is the make and model of the valve? Is the enclosure separate from the valve such that disassembly does not affect valve performance?
(4) If disassembly of the enclosure does affect valve performance, how is the requirement of ISTC-3310 met?
We need to discuss, in a conference call, the above questions with our reviewer Michael Farnan. This call needs to occur in a rather tight schedule because we are in the acceptance review stage and are subject to the schedular guidance of NRR Office Instruction LIC-109. The sole purpose of this e-mail is to prepare you and others for the requested conference call. This e-mail does not formally request for information, and does not formally convey an NRC staff position.
Peter S. Tam Senior Project Manager (for Kewaunee and Monticello)
Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451
E-mail Properties Mail Envelope Properties ()
Subject:
Kewaunee - Relief Request VRR-05, Revision 1, Needs to be Supplemented (TAC ME3352)
Sent Date: 03/05/2010 1:36:29 PM Received Date: 03/05/2010 1:53:00 PM From: Tam, Peter Created By: Peter.Tam@nrc.gov Recipients:
jack.gadzala@dom.com ('Jack Gadzala')
Tracking Status: None craig.d.sly@dom.com ('Craig D Sly')
Tracking Status: None thomas.l.breene@dom.com ('Thomas L Breene')
Tracking Status: None Anthony.McMurtray@nrc.gov (McMurtray, Anthony)
Tracking Status: None Michael.Farnan@nrc.gov (Farnan, Michael)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 19938 03/05/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: