(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML103050273 | | | number = ML103050273 |
| | issue date = 11/02/2010 | | | issue date = 11/02/2010 |
| | title = Surry Power Station, Units 1 & 2, Correction to Amendment Regarding Technical Specification Revisions Related to the Measurement Uncertainty Recapture (Mur) Power Uprate | | | title = Correction to Amendment Regarding Technical Specification Revisions Related to the Measurement Uncertainty Recapture (Mur) Power Uprate |
| | author name = Cotton K R | | | author name = Cotton K |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Heacock D | | | addressee name = Heacock D |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 November 2, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SURRY POWER STATION, UNIT NOS. 1 AND 2, CORRECTION TO AMENDMENTS REGARDING TECHNICAL SPECIFICATION REVISIONS RELATED TO THE MEASUREMENT UNCERTAINTY RECAPTURE (MUR) POWER UPRATE (TAC NOS. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 2, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
| ME3293 AND ME3294) | | |
| | ==SUBJECT:== |
| | SURRY POWER STATION, UNIT NOS. 1 AND 2, CORRECTION TO AMENDMENTS REGARDING TECHNICAL SPECIFICATION REVISIONS RELATED TO THE MEASUREMENT UNCERTAINTY RECAPTURE (MUR) |
| | POWER UPRATE (TAC NOS. ME3293 AND ME3294) |
|
| |
|
| ==Dear Mr. Heacock:== | | ==Dear Mr. Heacock:== |
| The U.S. Nuclear Regulatory Commission issued the Amendment No. 269 to Renewed Facility Operating License No. DPR-32 and Amendment No. 268 to Renewed Facility Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively on September 24, 2010. The amendments changed the Technical Specifications in response to your application dated January 27, 2010 1 , as supplemented by letters dated February 4 2 and April 29 3 , 2010. The amendments consisted of an approximate 1.6 percent MUR that increased the rated thermal power from 2546 megawatts thermal (MWt) to 2587 MWt. The License Condition T, Item 16, for Surry Units 1 and 2, respectively, were incorrect. | | |
| Enclosed are the corrected updated license pages for Amendment No. 269 to Renewed Facility Operating License No. DPR-32 and Amendment No. 268 to Renewed Facility Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. | | The U.S. Nuclear Regulatory Commission issued the Amendment No. 269 to Renewed Facility Operating License No. DPR-32 and Amendment No. 268 to Renewed Facility Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively on September 24, 2010. |
| 1 VEPCO letter to NRC, Agency Document Access Management System (ADAMS) Accession No. MLl00320264 2 VEPCO letter to NRC, ADAMS Accession No. ML 1 00480781 3 VEPCO letterto NRC, ADAMS Accession No. MLl01200269 D. Heacock -2 If you have any questions, please feel free to contact me at 301-415-1438. | | The amendments changed the Technical Specifications in response to your application dated January 27, 2010 1 , as supplemented by letters dated February 4 2 and April 29 3 , 2010. |
| Sincerely, Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | The amendments consisted of an approximate 1.6 percent MUR that increased the rated thermal power from 2546 megawatts thermal (MWt) to 2587 MWt. |
| | The License Condition T, Item 16, for Surry Units 1 and 2, respectively, were incorrect. Enclosed are the corrected updated license pages for Amendment No. 269 to Renewed Facility Operating License No. DPR-32 and Amendment No. 268 to Renewed Facility Operating License No. |
| | DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. |
| | 1 VEPCO letter to NRC, Agency Document Access Management System (ADAMS) Accession No. MLl00320264 2 VEPCO letter to NRC, ADAMS Accession No. ML100480781 3 VEPCO letterto NRC, ADAMS Accession No. MLl01200269 |
| | |
| | D. Heacock -2 If you have any questions, please feel free to contact me at 301-415-1438. |
| | Sincerely, Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| | As stated Docket Nos. 50-280 and 50-281 cc w/encl: Distribution via Listserv |
|
| |
|
| As stated Docket Nos. 50-280 and 50-281 cc w/encl: Distribution via Listserv
| | -9 |
| -9(Continued)
| | : 1. (Continued) |
| : 16. For the applicable UFSAR Chapter 14 events, Surry 1 will re-analyze the transient consistent with VEPCO's NRC-approved reload design methodology in VEP-FRD-42, Rev. 2.1-A. If NRC review is deemed necessary pursuant to the requirements of 10 CFR 50.59, the accident analyses will be submitted to the NRC for review prior to operation at the uprate power level. These commitments apply to the following Surry 1 UFSAR Chapter 14 DNBR analyses that were analyzed at 2546 MWt consistent with the Statistical DNBR Evaluation Methodology in VEP-NE-2-A: | | : 16. For the applicable UFSAR Chapter 14 Prior to operating above 2546 MWt events, Surry 1 will re-analyze the (98.4% RP). |
| * Section 14.2.7 -Excessive Heat Removal due to Feedwater System Malfunctions (Full Power Feedwater Temperature Reduction case only); | | transient consistent with VEPCO's NRC-approved reload design methodology in VEP-FRD-42, Rev. |
| * Section 14.2.8 -Excessive Load Increase Incident; | | 2.1-A. |
| * Section 14.2.9 -Loss of Reactor Coolant Flow; and | | If NRC review is deemed necessary pursuant to the requirements of 10 CFR 50.59, the accident analyses will be submitted to the NRC for review prior to operation at the uprate power level. |
| * Section 14.2.10 -Loss of External Electrical Load Prior to operating above 2546 MWt (98.4% RP). This renewed license is effective as of the date of issuance and shall expire at midnight on May 25, 2032. FOR THE NUCLEAR REGULATORY COMMISSION Original signed by: Samuel J. Collins, Director Office of Nuclear Reactor Regulation | | These commitments apply to the following Surry 1 UFSAR Chapter 14 DNBR analyses that were analyzed at 2546 MWt consistent with the Statistical DNBR Evaluation Methodology in VEP-NE-2-A: |
| | * Section 14.2.7 - Excessive Heat Removal due to Feedwater System Malfunctions (Full Power Feedwater Temperature Reduction case only); |
| | * Section 14.2.8 - Excessive Load Increase Incident; |
| | * Section 14.2.9 - Loss of Reactor Coolant Flow; and |
| | * Section 14.2.10 - Loss of External Electrical Load |
| | : 4. This renewed license is effective as of the date of issuance and shall expire at midnight on May 25, 2032. |
| | FOR THE NUCLEAR REGULATORY COMMISSION Original signed by: |
| | Samuel J. Collins, Director Office of Nuclear Reactor Regulation |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| | Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License No. DPR-32 Amendment No. 269 |
|
| |
|
| Appendix A, Technical Specifications Date of Issuance:
| | -9 |
| March 20, 2003 Renewed License No. DPR-32 Amendment No. 269
| | : 1. (Continued) |
| -9 1. (Continued)
| | : 16. For the applicable UFSAR Chapter 14 events, Prior to operating above 2546 Surry 2 will re-analyze the transient consistent MWt (98.4% RP). |
| : 16. For the applicable UFSAR Chapter 14 events, Surry 2 will re-analyze the transient consistent with VEPCO's NRC-approved reload design methodology in VEP-FRD-42, Rev. 2.1-A. Prior to operating above 2546 MWt (98.4% RP). If NRC review is deemed necessary pursuant to the requirements of 10 CFR 50.59, the accident analyses will be submitted to the NRC for review prior to operation at the uprate power level. These commitments apply to the following Surry 2 UFSAR Chapter 14 DNBR analyses that were analyzed at 2546 MWt consistent with the Statistical DNBR Evaluation Methodology in VEP-NE-2-A: | | with VEPCO's NRC-approved reload design methodology in VEP-FRD-42, Rev. 2.1-A. |
| * Section 14.2.7 -Excessive Heat Removal due to Feedwater System Malfunctions (Full Power Feedwater Temperature Reduction case only); | | If NRC review is deemed necessary pursuant to the requirements of 10 CFR 50.59, the accident analyses will be submitted to the NRC for review prior to operation at the uprate power level. These commitments apply to the following Surry 2 UFSAR Chapter 14 DNBR analyses that were analyzed at 2546 MWt consistent with the Statistical DNBR Evaluation Methodology in VEP-NE-2-A: |
| * Section 14.2.8 -Excessive Load Increase Incident; | | * Section 14.2.7 - Excessive Heat Removal due to Feedwater System Malfunctions (Full Power Feedwater Temperature Reduction case only); |
| * Section 14.2.9 -Loss of Reactor Coolant Flow; and | | * Section 14.2.8 - Excessive Load Increase Incident; |
| * Section 14.2.10 -Loss of External Electrical Load This renewed license is effective as of the date of issuance and shall expire at midnight on January 29, 2033. FOR THE NUCLEAR REGULATORY COMMISSION Original signed by: Samuel J. Collins, Director Office of Nuclear Reactor Regulation | | * Section 14.2.9 - Loss of Reactor Coolant Flow; and |
| | * Section 14.2.10 - Loss of External Electrical Load |
| | : 4. This renewed license is effective as of the date of issuance and shall expire at midnight on January 29, 2033. |
| | FOR THE NUCLEAR REGULATORY COMMISSION Original signed by: |
| | Samuel J. Collins, Director Office of Nuclear Reactor Regulation |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| | Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License l\lo. DPR-37 Amendment No. 268 |
|
| |
|
| Appendix A, Technical Specifications Date of Issuance:
| | D. Heacock -2 If you have any questions, please feel free to contact me at 301-415-1438. |
| March 20, 2003 Renewed License l\lo. DPR-37 Amendment No. 268 D. Heacock -2 If you have any questions, please feel free to contact me at 301-415-1438.
| | Sincerely, IRA! |
| Sincerely, IRA! Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
| As stated Docket Nos. 50-280 and 50-281 cc w/encl: Distribution via Listserv DISTRIBUTION: | | As stated Docket Nos. 50-280 and 50-281 cc w/encl: Distribution via Listserv DISTRIBUTION: |
| RidsNrrLAMO'Brien Resource RidsNrrDirsitsb PUBLIC LPL2-1 R/F RidsOgcResource RidsRgn2MailCenter Resource RidsNrrDorlLpl2-1 (GKulesa) | | RidsNrrLAMO'Brien Resource RidsNrrDirsitsb PUBLIC LPL2-1 R/F RidsOgcResource RidsRgn2MailCenter Resource RidsNrrDorlLpl2-1 (GKulesa) |
| RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource RidsNrrPMKCotton (hard copy) ADAMS Accession No""" ML 103050273 OFFICE NRR/LPL2-1/PM NRRlLPL2-1/LA NRR/LPL2-1/BC NAME KCotton MOBrien (SRohrer for) GKulesa DATE 11/2/10 11/1/10 11/2/10 OFFICIAL RECORD COpy}} | | RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource RidsNrrPMKCotton (hard copy) |
| | ADAMS Accession No""" ML103050273 OFFICE NRR/LPL2-1/PM NRRlLPL2-1/LA NRR/LPL2-1/BC NAME KCotton MOBrien (SRohrer for) GKulesa DATE 11/2/10 11/1/10 11/2/10 OFFICIAL RECORD COpy}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML1006103302010-03-0404 March 2010 Acceptance of Requested Licensing Action Regarding Measurement Uncertainty Recapture Power Uprate. Project stage: Acceptance Review ML1030502732010-11-0202 November 2010 Correction to Amendment Regarding Technical Specification Revisions Related to the Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: Other 2010-11-02
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] Category:Technical Specifications
MONTHYEARML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML22300A1882022-10-27027 October 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Response to Request for Additional Information ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML21106A2792021-05-0404 May 2021 Technical Specifications ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML14148A2352014-07-0303 July 2014 Issuance of Amendment to Extend the Containment Type a and Type C Leak Rate Test Frequency ML13260A2502013-09-0909 September 2013 Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specifications 4.17 to Snubber Program - Supplement ML12279A2822012-09-26026 September 2012 Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers ML12222A3402012-07-31031 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12109A2702012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML12081A0162012-03-14014 March 2012 Supplemental Response to Request for Additional Information Related to License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML1106602302011-03-0404 March 2011 Supplemental Information &Typed TS Pages for Proposed License Amendment Request Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirement to Licensee Controlled Program (Adoption of TSTF-425, Rev 3) ML1035502062010-12-16016 December 2010 Proposed Technical Specification Change Temporary Alternate Repair Criteria for Steam Generator Tube Repair for Unit 2 ML1030502732010-11-0202 November 2010 Correction to Amendment Regarding Technical Specification Revisions Related to the Measurement Uncertainty Recapture (Mur) Power Uprate ML1027203442010-09-28028 September 2010 Attachment 2 to Email Regarding Typed Page 2.3-2 for Surry Dnbcolr LAR ML1013106042010-05-0606 May 2010 License Amendment Request Revised Cumulative Core Burnup Applicability Limit for Heatup and Cooldown Curves, Low Temperature Overpressure Protection System Setpoint, and Ltops Enable Temperature ML1001405592010-02-26026 February 2010 License Amendment, Correction of Technical Specification Table 3.7.1 Operator Action 3.b ML0929606162009-10-16016 October 2009 Proposed License Amendment Request Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and Addition of COLR References ML0910401472009-04-13013 April 2009 Proposed License Amendment Request Correction to Technical Specification Table 3.7-1 Operator Action 3.b ML0822500262008-09-17017 September 2008 Units, 1 and 2, Tech Spec Pages for Amendments 261 and 261 Regarding the Revision to Various Setting Limits and the Overtemperature T/Overpower T Time Constants ML0817506992008-07-0707 July 2008 Tech Spec Pages for Amendments 260 & 260 Regarding Control Room Habitability ML0814200442008-06-17017 June 2008 Tech Spec Pages for Amendments 259 and 259, Regarding the Increase of Maximum Service Water Temperature Limit from 95 F to 100 F ML0813401152008-05-16016 May 2008 Technical Specifications - Issuance of Exigent Amendment Regarding Interim Alternate Criteria for Steam Generator Tube Repair ML0810800442008-04-14014 April 2008 Proposed License Amendment Request, Interim Alternate Repair Criteria (Iarc) for Steam Generator (SG) Tube Repair ML0810211952008-04-11011 April 2008 Proposed License Amendment Request Revised Setting Limits and Overtemperature T/Overpower T Time Constants Response to Request for Additional Information (RAI) ML0809402872008-04-0202 April 2008 Proposed License Amendment Request Revision of Technical Specifications Design Features ML0802401202008-01-23023 January 2008 Tech Spec Pages for Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water Piping ML0735505992007-12-19019 December 2007 Units, 1 and 2, Tech Spec Pages for Amendments 257 and 256 Regarding Increase in Lead Rod Average Burnup Limit ML0733212712007-11-28028 November 2007 Proposed Additional Technical Specifications Change, Operable Definition Modification for Air Handling Units While in Temporary 45-day Allowed Outage Times to Perform Required Surveillances ML0732306102007-11-15015 November 2007 Technical Specifications for Surry, Units 1 and 2, Issuance of Amendments Use of Gothic Code for Recirculation Spray System Exigent Circumstances ML0729004772007-10-15015 October 2007 Technical Specifications, Revised Technical Specification Surveillance Requirement for the Inspection of the Containment Recirculation Sump (Tac Nos. MD3168 and MD3169) ML0724906142007-09-0606 September 2007 Technical Specifications, Issuance of Amendments Regarding Use of Westinghouse Best-Estimate Large Break Loss-of-Coolant (TAC Nos. MD3609 & MD3610) ML0723300982007-08-20020 August 2007 Proposed License Amendment Request Control Room Habitability Supplemental Response ML0719703012007-07-13013 July 2007 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Control Room Habitability ML0712402632007-05-0303 May 2007 Technical Specifications, Issuance of Amendments Regarding Missed Surveillance Requirements TSTF-358 (TAC Nos. MD4206 & MD4207) ML0709200372007-03-29029 March 2007 Tech Spec Pages for Amendments 251 and 250 Regarding Steam Generator Tube Integrity ML0703201782007-01-31031 January 2007 Proposed Technical Specifications Change Missed Surveillance Requirements ML0701906552007-01-19019 January 2007 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity Response to Request for Additional Information ML0630000242006-10-12012 October 2006 Tech Spec Pages for Amendments 250 and 249 Regarding Implementation of Generic Safety Issue 191 ML0627702082006-10-0303 October 2006 Proposed License Amendment Request Containment Sump Inspection Surveillance ML0622301142006-08-10010 August 2006 Technical Specifications, Issuance of Amendments Regarding Change to Exclusion Area Boundary, MC8315 & MC8316 2024-05-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 2, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT NOS. 1 AND 2, CORRECTION TO AMENDMENTS REGARDING TECHNICAL SPECIFICATION REVISIONS RELATED TO THE MEASUREMENT UNCERTAINTY RECAPTURE (MUR)
POWER UPRATE (TAC NOS. ME3293 AND ME3294)
Dear Mr. Heacock:
The U.S. Nuclear Regulatory Commission issued the Amendment No. 269 to Renewed Facility Operating License No. DPR-32 and Amendment No. 268 to Renewed Facility Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively on September 24, 2010.
The amendments changed the Technical Specifications in response to your application dated January 27, 2010 1 , as supplemented by letters dated February 4 2 and April 29 3 , 2010.
The amendments consisted of an approximate 1.6 percent MUR that increased the rated thermal power from 2546 megawatts thermal (MWt) to 2587 MWt.
The License Condition T, Item 16, for Surry Units 1 and 2, respectively, were incorrect. Enclosed are the corrected updated license pages for Amendment No. 269 to Renewed Facility Operating License No. DPR-32 and Amendment No. 268 to Renewed Facility Operating License No.
DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively.
1 VEPCO letter to NRC, Agency Document Access Management System (ADAMS) Accession No. MLl00320264 2 VEPCO letter to NRC, ADAMS Accession No. ML100480781 3 VEPCO letterto NRC, ADAMS Accession No. MLl01200269
D. Heacock -2 If you have any questions, please feel free to contact me at 301-415-1438.
Sincerely, Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Enclosure:
As stated Docket Nos. 50-280 and 50-281 cc w/encl: Distribution via Listserv
-9
- 1. (Continued)
- 16. For the applicable UFSAR Chapter 14 Prior to operating above 2546 MWt events, Surry 1 will re-analyze the (98.4% RP).
transient consistent with VEPCO's NRC-approved reload design methodology in VEP-FRD-42, Rev.
2.1-A.
If NRC review is deemed necessary pursuant to the requirements of 10 CFR 50.59, the accident analyses will be submitted to the NRC for review prior to operation at the uprate power level.
These commitments apply to the following Surry 1 UFSAR Chapter 14 DNBR analyses that were analyzed at 2546 MWt consistent with the Statistical DNBR Evaluation Methodology in VEP-NE-2-A:
- Section 14.2.7 - Excessive Heat Removal due to Feedwater System Malfunctions (Full Power Feedwater Temperature Reduction case only);
- Section 14.2.8 - Excessive Load Increase Incident;
- Section 14.2.10 - Loss of External Electrical Load
- 4. This renewed license is effective as of the date of issuance and shall expire at midnight on May 25, 2032.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
Samuel J. Collins, Director Office of Nuclear Reactor Regulation
Attachment:
Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License No. DPR-32 Amendment No. 269
-9
- 1. (Continued)
- 16. For the applicable UFSAR Chapter 14 events, Prior to operating above 2546 Surry 2 will re-analyze the transient consistent MWt (98.4% RP).
with VEPCO's NRC-approved reload design methodology in VEP-FRD-42, Rev. 2.1-A.
If NRC review is deemed necessary pursuant to the requirements of 10 CFR 50.59, the accident analyses will be submitted to the NRC for review prior to operation at the uprate power level. These commitments apply to the following Surry 2 UFSAR Chapter 14 DNBR analyses that were analyzed at 2546 MWt consistent with the Statistical DNBR Evaluation Methodology in VEP-NE-2-A:
- Section 14.2.7 - Excessive Heat Removal due to Feedwater System Malfunctions (Full Power Feedwater Temperature Reduction case only);
- Section 14.2.8 - Excessive Load Increase Incident;
- Section 14.2.10 - Loss of External Electrical Load
- 4. This renewed license is effective as of the date of issuance and shall expire at midnight on January 29, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
Samuel J. Collins, Director Office of Nuclear Reactor Regulation
Attachment:
Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License l\lo. DPR-37 Amendment No. 268
D. Heacock -2 If you have any questions, please feel free to contact me at 301-415-1438.
Sincerely, IRA!
Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Enclosure:
As stated Docket Nos. 50-280 and 50-281 cc w/encl: Distribution via Listserv DISTRIBUTION:
RidsNrrLAMO'Brien Resource RidsNrrDirsitsb PUBLIC LPL2-1 R/F RidsOgcResource RidsRgn2MailCenter Resource RidsNrrDorlLpl2-1 (GKulesa)
RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource RidsNrrPMKCotton (hard copy)
ADAMS Accession No""" ML103050273 OFFICE NRR/LPL2-1/PM NRRlLPL2-1/LA NRR/LPL2-1/BC NAME KCotton MOBrien (SRohrer for) GKulesa DATE 11/2/10 11/1/10 11/2/10 OFFICIAL RECORD COpy