ML072900477

From kanterella
Jump to navigation Jump to search

Technical Specifications, Revised Technical Specification Surveillance Requirement for the Inspection of the Containment Recirculation Sump (Tac Nos. MD3168 and MD3169)
ML072900477
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/15/2007
From: Siva Lingam
NRC/NRR/ADRO/DORL/LPLII-1
To: Christian D
Virginia Electric & Power Co (VEPCO)
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML072690391 List:
References
TAC MD3168, TAC MD3169
Download: ML072900477 (6)


Text

"io W, wd froSm did be deiemedlo canle ind kusbip to go ood T.

apecld hd I ft bh Comubn mgdunlou 10RRut 20, Seoon "0 of 10 CFR Put AO Sem 40A41 of1 OFR Part 40, SoU 5m0.4 mdMau ol1 ORPa&rt1, and Scbn T3 dof 1OP-FR Pad 70; aid bIMU6d bopdlf pmvli ebkofit Ad arind o..

run, regi*daeft . mirad oler d OI b Camuo now or heruaftherb effed; end The bona.Ismhaudid bo peate Bw Wa~d sta4 WIue readto cora p r lee novli rat In w = d 2wga "Wu (**urm4.

B. i, -,

The Tadvicid Snel colonuu. InAppenlkA, A. mvied fhtuwi Af1aidM No. 25 5ahme hf I -d IU wwd 1Com".

The m o e b accdarm vi the Tecldand C. Rflo The kunawesoWhn make.omiinb repada h accordanCe With t11e r"rq itrmne of on Toolic. 1 pedkat=au D. Rlardl The ehfl

  • carskeep fWyilay g wreoInaccrdarce with the requblrelus of the Tedmul .ecdillallns.

E. Deleted byAIDmidIml66 F. Deletedby Amexnwdme71 H. Duleted byAmendreent 2W The m E iwee uhul bpleme iatad maih~n-otai efow h pravilomn of-the-qpprovd be -1.9olopogrom ans disalbed %InU, Updated Final-seletyAraln. uRepo4 wid as peproed intl.r BE dated 8eptember 19, 1979, (aid Supplement. dated May29, 1980, October 9, 1980, 1982, tNovember ,1982.

l Jau*ary 17,--1098-,Febra 2--5, 1988, and Renewed icense No .R-32 Amendment No_,

.30 E. Pummnl to the Act and 10 CFR PNos380 and 70, to possew, but not separat*,such byproduct specia nl.r malo arMal as may be produced by 'Oe operation of the facity.

.3., Tis ne i mnse shall be deemed to cWAnta md Issu Jc IQft condits

-pScle"bd the--fb OiCnla-mgulaaeus:

on -10CM-lPt-20, - - - -

Scton 3034 of 10 OFR Pal 80, Sedian 40A1 of 10CFR P0U1 40, Setsons I50.54 WW 80 of 10 OFR Pad 50, and Se odn 70A of 10OFR Pito7W; md h Sullect to,d pbalap povM= of toeAct on hV ruls, regublafm, and orders of the Canvisaln now or hereaer Inefec and I subject to the addionl conditio specled below.

A. ft t M IMe lOwngev Inmuthoid to operate, the Ieb yt itudn eafte macta core powr level not Inexom of 54 inegewaee (Uann,,.

The Teyu ScW,_ tbs cta,=ned InAppeDck ,S revind grah Amendment No.u- 4 *ah8 by borpoaMlad tn Ind rumaWted hmnL "ib flcensee ohm operate toe facdty In accordance w1h the Tectnical SpucllCalfons.

-me Sceiis.8 *M ha ake chrim reports Inaccordance 910th rqurements of dh Tech"ical SCIdticom.

The lomhue shaD keep= operating records Inaccordance v-f.-the

. requlgrmenas of the Te ca BPeOCllcaIDo.

F- Deletqd by Amendmmentl 54 F. Deleted by Arenderi.ent 5G sl Amendment 68 a6, Deleted byAmei0imenlW.'"

IL belated by Aneindmmnt 922?,

Renewed Ltemnse 9 tPR-37 Amendment o 254

TS 4.5-2

2. By verifying that each motor-operated valve in the recirculation spray flow paths performs satisfactorily when tested in accordance with the Inservice Testing Program.
3. By verifying each spray nozzle is unobstructed following maintenance which could cause nozzle blockage.

C. Each weight-loaded check valve in the containment spray and outside containment recirculation spray subsystems shall be demonstrated OPERABLE once per 18 months by cycling the valve one complete cycle of full travel and verifying that each valve opens when the discharge line of the pump is pressurized with air and seats when a vacuum is applied.

D. Verify, by visual inspection once per 18 months, that the recirculation spray containment sump components are not restricted by debris and show no evidence of structural distress or abnormal corrosion.

AmendmentNos. 255, 254

TS 4.5-4 The recirculation spray pumps outside the containment have the capability of being dry-run and flow tested. The test of an outside recirculation spray pump is performed by closing the containment sump suction line valve and the isolation valve between the pump discharge and the containment penetration. This allows the pump casing to be filled with water and the pump to recirculate water through a test line from the pump discharge to the pump casing.

With a system flush conducted to remove particulate matter prior to the installation of spray nozzles and with corrosion resistant nozzles and piping, it is not considered credible that a significant number of nozzles would plug during the life of the unit to reduce the effectiveness of the subsystems. Therefore, an inspection or air or smoke test of the nozzles following maintenance which could cause nozzle blockage is sufficient to indicate that plugging of the nozzles has not occurred.

The spray nozzles in the refueling water storage tank provide means to ensure that there is no particulate matter in the refueling water storage tank and the containment spray subsystems which could plug or cause deterioration of the spray nozzles. The nozzles in the tank are identical to those used on the containment spray headers. The flow test of the containment spray pumps and recirculation to the refueling water storage will indicate any plugging of the nozzles by a reduction of flow through the nozzles.

Periodic inspections of containment sump components ensure that the components are unrestricted and stay in proper operating condition. The 18 month frequency is based on the need to perform this surveillance under the conditions that apply during a unit outage and on the need to have access to the location. This frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.

References FSAR Section 6.3.1, Containment Spray Pumps FSAR Section 6.3.1, Recirculation Spray Pumps Amendment Nos. 2 5 5, 254

TS 4.11-3

c. Power may be restored to any valve or breaker referenced in Specifications 4.11.C.4.a and 4.11.C.4.b for the purpose of testing or maintenance provided that not more than one valve has power restored at one time, and the testing and maintenance is completed and power removed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
5. Once per 18 months by:
a. Verifying that each automatic valve capable of receiving a safety injection signal, actuates to its correct position upon receipt of a safety injection test signal. The charging and low head safety injection pumps may be immobilized for this test.
b. Verifying that each charging pump and safety injection pump circuit breaker actuates to its correct position upon receipt of a safety injection test signal. The charging and low head safety injection pumps may be immobilized for this test.
c. Verifying by visual inspection that the low head safety injection containment sump components are not restricted by debris and show no evidence of structural distress or abnormal corrosion.

Basis Complete system tests cannot be performed when the reactor is operating because a safety injection signal causes containment isolation. The method of assuring operability of these systems is therefore to combine system tests to be performed during unit outages, with more frequent component tests, which can be performed during reactor operation.

AmendmentNos. 255, 254

TS 4.11-4 The system tests demonstrate proper automatic operation of the Safety Injection System. A test signal is applied to initiate automatic operation action and verification is made that the components receive the safety injection signal in the proper sequence. The test may be performed with the pumps blocked from starting.

The test demonstrates the operation of the valves, pump circuit breakers, and automatic circuitry.

During reactor operation, the instrumentation which is depended on to initiate safety injection is checked periodically, and the initiating circuits are tested in accordance with Specification 4.1. In addition, the active components (pumps and valves) are to be periodically tested to check the operation of the starting circuits and to verify that the pumps are in satisfactory running order. The test interval is determined in accordance with the Inservice Testing Program. The accumulators are a passive safeguard.

Periodic inspections of containment sump components ensure that the components are unrestricted and stay in proper operating condition. The 18 month frequency is based on the need to perform this surveillance under the conditions that apply during a unit outage and on the need to have access to the location. This frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.

References UFSAR Section 6.2, Safety Injection System AmendmentNos. 255, 254