Tech Spec Pages for Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water Piping
ML080240120
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/23/2008
From:
NRC/NRR/ADRO/DORL/LPLII-1
To:
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML073480281 List:
References
TAC MD4622, TAC MD4623
Download: ML080240120 (7)


Text

.8-3-'

Treiouu UIUS kM Ibd b

@MW b i audit n w bU*d o ft oniMot "dbdih finn fil-fi cmnbbn mpdnm IUffa O

dleft " st dlCFRPMd NO 3Sa*,40.41 ~oOf,10MRFt4OA swoum 5054 md a W of 10 OPH Pad lot ad Sscbn 7M* of 10OCR Put7%

WW b W*

mibbi pv.Iomf 1Ad WW O..

Wum, rdgolbu and mibau de Ow~o now orhuvuer"br gooud; and

9.

o BMW b

-~

tdbamr

i.

d p

mdo ArmwmMWu Nm 258 nu hutuhy bicroutdW In IM uunwaud lums.

Tim Sin oum's mlUqiiib bully bi umcrihm viii Ow Todw"n nw ftwm wmi "hsw~mvhV,.

raqdrmutnof Iss Tedudmi ISudkuiloau D.

ROW&~

The Icmas dMli kuep Uftl qierlhi nucrds In a~O1WGSm*i UtIke requoobuiu of fth To*"k. fufhcatb E.

Demetd byAMindmruan 65 F.

Deleted bVAmsadmunor71

e.

DeleidbyAmen"@Miit22 H.

Dlutad byAmendment2w L

E 7hoIms 11 imib1NphIWUi owd Psmnabuhi Imlo h uvhi. h

~~w PF-as desuou~

hi Uq pt.d Fna

1979,

[mad d a~ma~

das a-pprWi tou BE date Sqeptstr i9, s-,.qfm...

ob My 0 1980, Octber 9, 1960, 1982, 1&wanter 18,92 Jaimmy 17.1914, Fibn~ini 25, 198, anid "Roarwd Llcenas Np. DPR-32 Amendiment tio. 258 R. As discussed in the footnote to Technical Specifications 3.23.C.2.a.1 and 3.23.C.2.b.1, the use of temporary 45-day and 14-day allowed outage time extensions to permit replacement of the Main Control Room and Emergency Switchgear Room Air.Conditioning System chilled water piping shall be in accordance with the basis, risk evaluation, equipment unavailability restrictions, and compensatory actions provided in the licensee's submittal dated February 26, 2007 (Serial No. 07-0109) and in the associated supplemental transmittals, as approved by the NRC Safety Evaluation.

4. This renewed license is effective as of the date of issuance and shall expire at midnight on May 25, 2032.

FOR THE NUCLEAR REGULATORY COMMISSION original signed by:

Samuel J. Collins, Director Office of Nuclear Reactor Regulation

Attachment:

Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License No. DPR-32 Amendment No'. '258

-8.

E.

P1mani to eheta d 10CFR Putao W70, lopomambW tm sspaiabtU. 6Uc bypcddd and apechi guiha mdoalur as may he pmduced by to. parobn of Me adg.

umdbu-ha thb.-o ninbuhin mpuid*-b a

m,1 CFp*2-e.-........

Sicdm 80.401100 FRPaitl af.

im 40A1 a 10C!RPai40, Sedos MM.54 Od 50.o8f.1P0 oF Paid 0, and *.da-70* d 10 CFR PMu 70; MWd b m

id to d pabs of to Act vWndo nrub, mgukftom, MWd cade d the Camurban now or.uu*r hI offec and b wubject bi Ohe add~tk.1 c1onih. aoedlad bul A.

PwLv Ibe Ilauwwe bi anfflodkad bi *@oaa ths buow At alsadyatut ruato cr :owP r lv0ul IM In nmof a

ma na musm nMa.

7,ms TqndmW Suer!cdbu ca7sined In ApomnKAs Iw*uhm Aansndmmnan NM. 257,-&

hereby hmwaopmfd 1, Ide,wawud kwav..

Mni Ilousrio oham qpust 210 fadlIty In accindmnc M wih ii TedurkW C.

"i.

  • .?

The Haoluruiso as p fdd opemUng waolda In acdmknos wffi MIh r*qutrm~bantu f Teko SpuMVag.

.F D9lstqdy*ýanmndmani54 F.

Peleted by AMiridm.antl 9 nd Amndmmnl 66

a.

Deleted byhAnidmenlf22.

KI Dleted by~Monrdnment 227 Renewed I.anse U

VPR-37 Amendment No. 257 (3) Actions to minimize release to include consideration of:

a. Water spray scrubbing
b. Dose to onsite responders R. As discussed in the footnote to Technical Specifications 3.23.C.2.a.1 and 3.23.C.2.b.1, the use of temporary 45-day and 14-day allowed outage time extensions to permit replacement of the Main Control Room and Emergency Switchgear Room Air Conditioning System chilled water piping shall be in accordance with the basis, risk evaluation, equipment unavailability restrictions, and compensatory actions provided in the licensee's submittal dated February 26, 2007 (Serial No. 07-0109) and in the associated supplemental transmittals, as approved by the NRC Safety Evaluation.
4. This renewed license is effective as of the date of issuance and shall expire at midnight on January 29, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION original signed by:

Samuel J. Collins, Director Office of Nuclear Reactor Regulation

Attachment:

Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License No. DPR-37 Amendment No.

257

TS 1.0-2

5.

REACTOR CRITICAL When the neutron chain reaction is self-sustaining and keff= 1.0.

6.

POWER OPERATION When the reactor is critical and the neutron flux power range instrumentation indicates greater than 2% of rated power.

7.

REFUELING OPERATION Any operation involving movement of core components when the vessel head is unbolted or removed.

D.

OPERABLE A system, subsystem, train, component, or device shall be operable or have operability when it is capable of performing its specified function(s). Implicit in this definition shall be the assumption that all necessary attendant instrumentation, controls, normal and* emergency electrical power sources, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component or device to perform its function(s) are also capable of performing their related support function(s). The system or component shall be considered to have this capability when: (I) it satisfies the limiting conditions for operation defined in Section 3, and (2) it has been tested periodically in accordance with Section 4 and meets its performance requirements.

E.

PROTECTIVE INSTRUMENTATION LOGIC

1.

ANALOG CHANNEL An arrangemenrt of components and modules as required to generate a single protective action digital signal when required by a unit condition. An analog channel loses its identity when single action signals are combined.

  • For the purpose of performing Technical Specification-required surveillances that render an emergency diesel generator inoperable, the definition of OPERABLE for the air handling units on the operating chilled water loop is modified to require the normal or emergency electrical power source to be capable of performing its related support function. This footnote shall only apply to TS 3.23.C.2.a. 1, TS 3.23.C.2.b. 1, and TS 3.23.C.2.c.1 during the 45-day allowed outage time extensions to permit replacement of the Main Control Room and Emergency Switchgear Room Air Conditioning System chilled water piping.

AmendmentNos. 258, 257

TS 3.23-2

2. Air Handling Units (AHUs)
a. Unit 1 air handling units, 1-VS-AC-1, I-VS-AC-2, l-VS-AC-6, and 1-VS-AC-7, must be OPERABLE whenever Unit I is above COLD SHUTDOWN.
1. If either any single Unit I AHU or two Unit 1 AHUs on the same chilled water loop (I-VS-AC-1 and 1-VS-AC-7 or 1-VS-AC-2 and 1-VS-AC-6)* become inoperable, restore operability of the one inoperable AHU or two inoperable AHUs within seven (7),days or bring Unit 1 to HOT SHUTDOWN within the next six (6) hours and be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
2. If two. Unit I AHUs on different chilled water loops and in different air conditioning zones (1-VS-AC-1 and 1-VS-AC-6 or I-VS-AC-2 and 1-VS-AC-7) become inoperable, restore operability of the two inoperable AHUs within seven (7) days or bring Unit 1 to HOT SHUTDOWN within the next six (6) hours and be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
3. If two Unit I AHUs in the same air conditioning zone (1 -VS-AC-I and I-VS-AC-2 or I-VS-AC-6 and 1-VS-AC-7) become inoperable, restore operability of at least one Unit I AHU in each air conditioning zone (1-VS-:AC-1 or I-VS-AC-2 and 1-VS-AC-6 or I-VS-AC-7) within one (1) hour or bring Unit 1 to HOT SHUTDOWN within the next six (6) hours and be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
4. If more than two Unit 1 AHUs become inoperable, restore operability of at least one Unit I AHU in each air conditioning zone (I-VS-AC-1 or 1-VS-AC-2 and 1 -VS-AC-6 or.-VS-AC-7) within one (1) hour or bring Unit 1 to HOT SHUTDOWN within the next six (6) hours and be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. Unit 2 air handling units, 2-VS-AC-8, 2-VS-AC-9, 2-VS-AC-6, and 2-VS-AC-7 must be OPERABLE whenever Unit 2 is above COLD SHUTDOWN.

I. if either any single Unit 2 AHU or two Unit 2 AHUs on the same chilled water loop (2-VS-AC-7 and 2-VS-AC-9 or 2-VS-AC-6 and 2-VS-AC-8)* become inoperable, restore operability of the one inoperable AHU or two inoperable

  • 'AHUs within seven (7) days or bring Unit 2 to HOT SHUTDOWN within the next six (6) hours and be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The requirements of TS 3.23.C.2.a. I and TS 3.23.C.2.b.1 may be temporarily suspended according to the limitations noted in items 1, 2, 3 and 4 below for the purpose of replacement of the Main Control Room (MCR) and Emergency Switchgear Room (ESGR) Air Conditioning System (ACS) chilled water piping. The allowed outage time extensions specified in items 1, 2, 3 and 4 of this footnote shall not exceed 24 months beginning with entry into the first temporary extension. Each extension shall be limited to a one-time use which ends when the affected MCR and ESGR ACS components are returned to OPERABLE status. Concurrent use of more than one allowed outage time extension is not permitted.

1) The time period to accommodate replacement of the chilled water loop C piping in the MCR and the ESGR shall not exceed 45 days.
2) The time period to accommodate replacement of the chilled water loop A piping in the MCR and the ESGR shall not exceed 45 days.

'3) The time period to accommodate replacement of the chilled water piping in the Mechanical Equipment Room #3 (MER-3) associated with chiller I-VS-E-4A shall not exceed 14 days.

4) The time period to accommodate replacement of the chilled water piping in the MER-3 associated

-with chiller I-VS-E-4C shall not exceed 14 days.

AmendmentNos.

258, 257

TS 3.23-6 The exterior surface of the MCR and ESGR ACS chilled water piping located in the ESGR, the MCR, and MER-3 is exhibiting general corrosion. For the purpose of replacing the MCR and ESGR ACS chilled water piping, temporary 45-day and 14-day allowed outage times (AOTs) are provided, as discussed in the footnotetoTechnical Specifications 3.23.C.2.a.1 and 3.23.C.2.b.1. The basis for and the risk evaluation of the temporary AOTs, as well as equipment unavailability restrictions, and compensatory actions, are provided in the licensee's submittal dated February 26, 2007 (Serial No. 07-0109). Four entries into the temporary AOTs are permitted in a 24-month time span. The 24-month time frame begins upon entry into the first temporary AOT. The four entries accommodate replacement of 1) the chilled water loop C `iping in the ESGR and the MCR (45-day AOT), 2) the chilled water loop A piping in the ESGR and the MCR (45-day AOT), 3) the chilled water piping in MER-3 associated with chiller 1-VS-E-4A (14-day AOT), and 4) the chilled water piping in MER-3 associated with chiller 1-VS-E-4C (14-day AOT). Each AOT extension shall be limited to a one-time use which-ends when the affected MCR and ESGR ACS components are returned to OPERABLE status. Concurrent use of more than one allowed outage time extension is not permitted. Upon completion of the work associated with the fourth temporary AOT, the footnote is no longer applicable.

AmendmentNos. 258, 257