Acceptance of Requested Licensing Action Regarding Measurement Uncertainty Recapture Power Uprate.
ML100610330
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2010
From: Cotton K
Plant Licensing Branch II
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Cotton, Karen -301-415-1438 NRR/DORL
References
TAC ME3293, TAC ME3294
Download: ML100610330 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 l"larch 4, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NOS. ME3293 AND ME3294)

Dear Mr. Heacock:

By letter dated January 27,2010, Virginia Electric and Power Company (the licensee) submitted a license amendment request for Surry Power Station, Unit Nos. 1 and 2. The proposed amendment request would increase each unit's rated power (RP) level from 2546 megawatts thermal (MWt) to 2587 MWt, and make technical specification changes as necessary to support operation at the proposed uprated power level; an increase in RP of approximately 1.6 percent.

The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Part 50, Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR),

an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

D. Heacock -2 If you have any questions, please contact me at (301) 415-1438.

Sincerely,

~~

Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket l\Ios. 50-280 and 50-281 cc: Distribution via Listserv

D. Heacock -2 If you have any questions, please contact me at (301) 415-1438.

Sincerely, IRA!

Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Distribution via Listserv DISTRIBUTION:

Public RidsNrrLAMO'BrienResource RidsNrrDirs Resource LPL2-1 R/F RidsOgcRp Resource RidsRgn2MailCenter Resource RidsNrrDorlLpl2-1 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDoriDpr Resource RidsNrrPMSurry Resource ADAMS Accession No ML100610330 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME KCotton MOBrien GKulesa DATE 3/4/10 3/3/10 3/4/10 OFFICIAL RECORD COpy