Line 3: Line 3:
| issue date = 04/18/2011
| issue date = 04/18/2011
| title = IR 05000266-11-403; 05000301-11-403; 03/21/2011 - 03/25/2011; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter
| title = IR 05000266-11-403; 05000301-11-403; 03/21/2011 - 03/25/2011; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Meyer L
| addressee name = Meyer L
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ril 18, 2011
[[Issue date::April 18, 2011]]


Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
==SUBJECT:==
 
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2011403(DRS);
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2011403(DRS);
5000301/2011403(DRS)
5000301/2011403(DRS)


==Dear Mr. Meyer:==
==Dear Mr. Meyer:==
On March 25, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 25, 2011, with Mr. P. Wells and other members of your staff.
On March 25, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 25, 2011, with Mr. P. Wells and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings of significance were identified. However, a licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a Non-Cited Violation consistent with Section 2.3.2. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest the subject or severity of a Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with a copy to the Regional Administrator, U. S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; and the Resident Inspector at the Point Beach Nuclear Plant.
Based on the results of this inspection, no findings of significance were identified. However, a licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a Non-Cited Violation consistent with Section 2.3.2. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest the subject or severity of a Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with a copy to the Regional Administrator, U. S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; and the Resident Inspector at the Point Beach Nuclear Plant.
Line 35: Line 35:
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS.


ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Nonpublic  
Sincerely,
 
/RA/
===Enclosure:===
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2011403(DRS);
Inspection Report 05000266/2011403(DRS); 05000301/2011403(DRS)  
05000301/2011403(DRS)
 
w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV A. Silakoski, Nuclear Fleet Security cc w/o encl: Distribution via ListServ
===w/Attachment:===
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV A. Silakoski, Nuclear Fleet Security cc w/o encl: Distribution via ListServ
}}
}}

Latest revision as of 01:39, 13 November 2019

IR 05000266-11-403; 05000301-11-403; 03/21/2011 - 03/25/2011; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter
ML11111A202
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/18/2011
From: Richard Skokowski
Plant Support Branch II
To: Meyer L
Point Beach
References
IR-11-403
Download: ML11111A202 (4)


Text

ril 18, 2011

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2011403(DRS);

5000301/2011403(DRS)

Dear Mr. Meyer:

On March 25, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 25, 2011, with Mr. P. Wells and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. However, a licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a Non-Cited Violation consistent with Section 2.3.2. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest the subject or severity of a Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with a copy to the Regional Administrator, U. S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U. S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; and the Resident Inspector at the Point Beach Nuclear Plant.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2011403(DRS);

05000301/2011403(DRS)

w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV A. Silakoski, Nuclear Fleet Security cc w/o encl: Distribution via ListServ