| Q | CCA | Title |
---|
05000266/FIN-2010004-01 | 2010Q3 | | Failure to Identify Hydrogen Fire Hazards on Pre-Fire Plan |
05000266/FIN-2010004-02 | 2010Q3 | H.8 | Inadequate Acceptance Criteria for Fire Door Surveillance Procedure |
05000266/FIN-2010004-03 | 2010Q3 | | Failure to Ensure That RHR Would Be Capable to Respond to a LOCA in Mode 4 |
05000266/FIN-2010005-03 | 2010Q4 | | Failure to Submit LER per 10 CFR 50.73(a)(2)(v)(A) and (D) |
05000266/FIN-2010005-06 | 2010Q4 | P.2 | Failure to Document a 10 CFR 50.59 Evaluation For Changes Made to Procedure OI-38, Circulating Water System Operation |
05000301/FIN-2010005-04 | 2010Q4 | | High Energy Line Break Barrier Controls |
05000266/FIN-2010005-01 | 2010Q4 | H.13 | Inadequate Safety System Venting Procedure Void Assessment Requirements |
05000301/FIN-2010005-02 | 2010Q4 | H.2 | Failure to Perform Ultrasonic Assessment of Safety System Voids as Required by Procedure |
05000266/FIN-2010005-05 | 2010Q4 | | Multiple ESFAS Steam Line Pressure Channel Modules Inoperable Due to Inadequate Calibration Instructions |
05000266/FIN-2010005-07 | 2010Q4 | P.2 | Failure to Document a 10 CFR 50.59 Evaluation For Changes Made to Procedure OI-38, Circulating Water System Operation |
05000266/FIN-2010005-08 | 2010Q4 | H.12 | Failure to Follow Power Operation to Hot Standby Procedure |
05000266/FIN-2011002-01 | 2011Q1 | | Failure to Maintain Internal Flood Protection Features on Emergency Diesel Generators G-01 and G-02 Control Cabinets |
05000266/FIN-2011002-02 | 2011Q1 | H.8 | Failure to Perform Required Ultrasonic Exam in Accordance with Procedures |
05000266/FIN-2011002-04 | 2011Q1 | H.4 H.5 | Unacceptable Preconditioning of Technical Specification Required Surveillance Test |
05000266/FIN-2011002-03 | 2011Q1 | | Out-of-Service Radiation Monitors Potentially Impact Emergency Classification Ability |