ML11215A089: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/03/2011
| issue date = 08/03/2011
| title = Notification of an NRC Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspection; and Request for Information 05000305/2011005
| title = Notification of an NRC Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspection; and Request for Information 05000305/2011005
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000305/2011005]]
See also: [[see also::IR 05000305/2011005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION III
                                              REGION III
2443 WARRENVILLE ROAD, SUITE 210
                                2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532
                                        LISLE, IL 60532-4352
-4352 August 3, 2011
                                            August 3, 2011
  Mr. David A. Heacock
Mr. David A. Heacock
President and Chief Nuclear Officer
President and Chief Nuclear Officer
Dominion Energy Kewaunee, Inc.
Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center
Innsbrook Technical Center
5000 Dominion Boulevard
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
Glen Allen, VA 23060
SUBJECT:       KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT
-6711 SUBJECT: KEWAUNEE POWER STATION  
                OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT
- NOTIFICATION OF AN NRC MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION;
                REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND
AND REQUEST FOR INFORMATION 05000305/2011005 (DRS) Dear Mr. Heacock:
                REQUEST FOR INFORMATION 05000305/2011005 (DRS)
On November 14, 201
Dear Mr. Heacock:
1, the U. S. Nuclear Regulatory  
On November 14, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin the on-site
Commission (NRC) will begin the on
portion of the Temporary Instruction (TI) 2515/177 inspection, Gas Accumulation Management
-site portion of the Temporary Instruction
in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, at your
(TI) 2515/177 inspection, "Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
Kewaunee Power Station. This inspection will be performed in accordance with NRC
," at your Kewaunee Power Station. This inspection will be performed in
TI 2515/177 Procedure.
accordance with NRC  
In order to minimize the impact that the inspection may have on the site and to ensure
TI 2515/177 Procedure. In order to minimize the impact that the inspection
productive inspections, we have enclosed a request for documents needed for the inspection.
may have on the site and to ensure
The documents have been divided into three groups.
productive inspection
The first group lists information necessary for our initial inspection scoping activities. This
s, we have enclosed a request for documents
    information should be available to the inspector no later than September 26, 2011. By
needed for the inspection. The documents have been divided into three
    September 30, 2011, the inspector will communicate the initial selected samples.
groups. The first group lists information necessary for our initial inspection scoping activities. This information should be available to the inspector no later than September 26, 2011. By September 30, 2011, the inspector will communicate the initial selected samples. The second group of documents requested are those items needed to support our in
The second group of documents requested are those items needed to support our in-office
-office preparation activities. This set of documents
    preparation activities. This set of documents should be available at the Regional Office no
should be available at the Regional Office no later than
    later than October 31, 2011. This information should be separated by information request
October 31, 2011. This information should be separated
    number, especially if provided electronically (e.g., folder with the information request
by information
    number). During the in-office preparation activities, the inspector may identify additional
request number, especially if provided electronically (e.g., folder with the information request number). During the in
    information needed to support the inspection.
-office preparation activities, the inspector may identify additional information needed to support the inspection.
*   The last group includes additional information above, as well as plant specific reference
   The last group includes additional information above
    material. This information should be available to the inspector on November 14, 2011. It is
, as well as plant specific reference material. This information should be available to the inspector on November 14, 2011
    also requested that corrective action documents and/or questions developed during the
. It is also requested that corrective action documents and/or questions developed during the  
    inspection be provided to the inspector as the documents are generated.
inspection be provided to the inspector as the documents are generated.
Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov.
Please send the information to the following e-mail address
A hard-copy with the required information is also an acceptable option. It is important that these
nestor.feliz
documents be as complete as possible, in order to minimize the number of documents
-adorno@nrc.gov.   A hard-copy with the required informati
requested during the preparation week or during the on-site inspection.
on is also an acceptable option.
 
  It is important that these documents be as complete as possible, in order to minimize the number
D. Heacock                                       -2-
of documents requested during the preparation week or during the on
If no activities were accomplished associated with a specific request, then provide a statement
-site inspection.  
indicating that the request is not applicable.
D. Heacock
The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about
-2- If no activities were accomplished associated with a specific request, then provide a statement indicating that the request is not applicable.
the material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.
  The lead inspector for this inspection is Mr. Néstor J. Féliz
This letter does not contain new or amended information collection requirements subject to the
Adorno. If there are questions about the material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
-9739. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
requirements were approved by the Office of Management and Budget, control number 3150-
  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document  
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number."
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
enclosure will be available electronically for public inspection in the NRC Public Document
-rm/adams.html (the Public Electronic Reading Room).
Room or from the Publicly Available Records (PARS) component of NRC's document system
      Sincerely,   /RA by R. C. Daley For/
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
        Ann Marie Stone, Chief       Engineering Branch 2
Public Electronic Reading Room).
      Division of Reactor Safety
                                              Sincerely,
Docket Nos.  
                                              /RA by R. C. Daley For/
50-305 License Nos. DPR-43 Enclosure s: TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
                                              Ann Marie Stone, Chief
cc w/encl:
                                              Engineering Branch 2
Distribution via ListServe
                                              Division of Reactor Safety
 
Docket Nos. 50-305
TEMPORARY INSTRUCTION 2515/177
License Nos. DPR-43
DOCUMENT REQUEST
Enclosures:       TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
1 Enclosure Inspection Report
cc w/encl:       Distribution via ListServe
: 05000305/2011005(DRS) Inspection Dates
 
: November 14  
                TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
- 18, 2011; and November 28  
Inspection Report:             05000305/2011005(DRS)
- December 02, 2011
Inspection Dates:             November 14 - 18, 2011; and November 28 - December 02, 2011
Inspection ProcedureInspector s:   Néstor J. Féliz
Inspection Procedure:         Temporary Instruction (TI) 2515/177, Management of Gas
Adorno : Temporary Instruction (TI)
                              Accumulation in Emergency Core Cooling, Decay Heat Removal,
2515/177 , "Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
                              and Containment Spray Systems
" (630) 829-9739 nestor.fel
Inspectors:                    Néstor J. Féliz Adorno
iz-adorno@nrc.gov
                              (630) 829-9739
Jorge Corujo
                              nestor.feliz-adorno@nrc.gov
-Sandín (630) 829-9741 jorge.corujo
                              Jorge Corujo-Sandín
-sandin@nrc.gov
                              (630) 829-9741
I. Information Requested By September 26, 2011
                              jorge.corujo-sandin@nrc.gov
1. Copy of the
I.   Information Requested By September 26, 2011
station response to Generic Letter (GL) 2008
      1. Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental
-01 and any supplemental
          report.
report. 2. Copies of all the requests for additional information (RAIs) and the associated responses.
      2. Copies of all the requests for additional information (RAIs) and the associated
3. List of corrective action program documents (with a short description) associated with GL 2008-01, voids in piping
          responses.
, gas intrusion events, and pressure transients
      3. List of corrective action program documents (with a short description) associated
for the previous three years
          with GL 2008-01, voids in piping, gas intrusion events, and pressure transients for
that affected
          the previous three years that affected the subject systems (i.e., emergency core
the subject systems (i.e., emergency core cooling, decay heat removal, and containment spray systems
          cooling, decay heat removal, and containment spray systems).
). 4. List of the suction piping sections
      4. List of the suction piping sections identified as susceptible to gas accumulation (the
identified as susceptible to gas accumulation (the list should identify the corresponding system).
          list should identify the corresponding system).
5. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).
      5. List of the discharge piping sections identified as susceptible to gas accumulation
6. List of changes (with a short description
          (the list should identify the corresponding system).
and tracking number) to the Final Safety Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases, and Technical Requirement Manual associated with the resolution of GL 2008
      6. List of changes (with a short description and tracking number) to the Final Safety
-01. 7. List of calculations
          Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases,
associated with GL 2008
          and Technical Requirement Manual associated with the resolution of GL 2008-01.
-01 (with a short description of the calculation and the change), including calculations
      7. List of calculations associated with GL 2008-01 (with a short description of the
that have been change
          calculation and the change), including calculations that have been changed or
d or created in response to GL 2008-01.  
          created in response to GL 2008-01.
TEMPORARY INSTRUCTION 2515/177
                                            1                                        Enclosure
DOCUMENT REQUEST
 
2 Enclosure II. Information Requested By October 31, 2011
            TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
1. Copies of program documents and procedures developed to implement the resolution
II. Information Requested By October 31, 2011
of GL 2008-01. 2. Copies of the selected corrective action program documents
    1.   Copies of program documents and procedures developed to implement the
. 3. Copies of the selected licensing and design basis document
        resolution of GL 2008-01.
changes. 4. Copies of the selected calculations.
    2.   Copies of the selected corrective action program documents.
5. List of commitments (with a description) done in response to
    3.   Copies of the selected licensing and design basis document changes.
GL 2008-01. 6. List of actions that were completed in response to GL 2008
    4.   Copies of the selected calculations.
-01. 7. List of outstanding actions that will be completed in response to GL  
    5.   List of commitments (with a description) done in response to GL 2008-01.
2008-01 and the completion schedule (include the documents that are tracking their completion such as work orders or corrective action documents).
    6.   List of actions that were completed in response to GL 2008-01.
8. Copies of all the corrective actions identified in the nine
    7.   List of outstanding actions that will be completed in response to GL 2008-01 and the
-month response and supplemental reports.
        completion schedule (include the documents that are tracking their completion such
9. List (with a short description) of gas intrusion mechanisms that apply to the plant
        as work orders or corrective action documents).
and the affected system locations (e.g.
    8.   Copies of all the corrective actions identified in the nine-month response and
, identify the source, conditions, and expected void locations)
        supplemental reports.
. 10. Design basis documents of the subject systems.
    9.   List (with a short description) of gas intrusion mechanisms that apply to the plant
11. Design basis documents of kee
        and the affected system locations (e.g., identify the source, conditions, and
p-full systems of the subject systems.
        expected void locations).
12. Copies of the construction code pages of the subject systems that discuss water
    10. Design basis documents of the subject systems.
hammer or flow
    11. Design basis documents of keep-full systems of the subject systems.
-induced dynamic loading. Also, include the associated Design Specification pages.
    12. Copies of the construction code pages of the subject systems that discuss water
13. Provide the following description for t
        hammer or flow-induced dynamic loading. Also, include the associated Design
he pumps of the subject systems
        Specification pages.
(1) flowrate at best efficiency point; (2) maximum and minimum flowrate during accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump  
    13. Provide the following description for the pumps of the subject systems:
is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this determination); (5)
        (1) flowrate at best efficiency point; (2) maximum and minimum flowrate during
pump head required; and (6) un
        accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump
-degraded pump head.
        is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this
14. Copies of self
        determination); (5) pump head required; and (6) un-degraded pump head.
-assessments associated with the implementation of the GL 2008
    14. Copies of self-assessments associated with the implementation of the GL 2008-01
-01 program and the associated corrective action program documents (include the  
        program and the associated corrective action program documents (include the
attachments, if any).
        attachments, if any).
15. Copies of corrective action program implementing procedures.
    15. Copies of corrective action program implementing procedures.
16. Copies of the operability determination procedures.  
    16. Copies of the operability determination procedures.
TEMPORARY INSTRUCTION 2515/177
                                          2                                                Enclosure
DOCUMENT REQUEST
 
3 Enclosure 17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject systems. 18. If available, electronic copies of the current Technical Specifications, Technical Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.
              TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
III. Information
      17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject
Requested to be Available on First Day of Inspection , November 14, 2011 1. Copies of surveillance procedures associated with the resolution of GL 2008
          systems.
-01 and the results of the last two surveillances
      18. If available, electronic copies of the current Technical Specifications, Technical
for the subject systems
          Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.
. 2. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008
III. Information Requested to be Available on First Day of Inspection, November 14,
-01. 3. Copies of procedures use for detecting and determining void volumes.
      2011
4. Copies of procedures use for filling and venting.
      1. Copies of surveillance procedures associated with the resolution of GL 2008-01 and
5. Copies of surveillance procedures that establish flow at the subject systems (e.g., surveillances where the pumps are operated)
          the results of the last two surveillances for the subject systems.
6. Subject systems walkdown work documents associated with the resolution of  
      2. Copies of the modification packages for hardware modifications as part of the
GL 2008-01 and the
          resolution of GL 2008-01.
results of these walkdowns.
      3. Copies of procedures use for detecting and determining void volumes.
7. Copies of the engineering evaluations performed for all identified voids
      4. Copies of procedures use for filling and venting.
. 8. Provide a list of all piping locations that are currently voided and their associated evaluation.
      5. Copies of surveillance procedures that establish flow at the subject systems (e.g.,
9. Copies of trends of periodic
          surveillances where the pumps are operated)
gas accumulation
      6. Subject systems walkdown work documents associated with the resolution of
monitoring
          GL 2008-01 and the results of these walkdowns.
results (e.g., venting, UTs)
      7. Copies of the engineering evaluations performed for all identified voids.
. 10. Copy of the design change review checklist.
      8. Provide a list of all piping locations that are currently voided and their associated
11. Copies of training documents that ensure that personnel are aware of gas
          evaluation.
-related concerns. Include the scheduled or attendance list of training that was already conducted.
      9. Copies of trends of periodic gas accumulation monitoring results (e.g., venting, UTs).
12. Copy of the void transport analysis.
    10. Copy of the design change review checklist.
13. Basis for the void acceptance criteria (e.g.
    11. Copies of training documents that ensure that personnel are aware of gas-related
, calculation). If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office of Nuclear Reactor Regulations (NRR).
          concerns. Include the scheduled or attendance list of training that was already
14. Basis for horizontal pipe acceptance criteria (e.g.
          conducted.
, calculation).  
    12. Copy of the void transport analysis.
TEMPORARY INSTRUCTION 2515/177
    13. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the
DOCUMENT REQUEST
          justification for any deviation from the void acceptance criteria established by the
4 Enclosure 15. If applicable, provide a list of inaccessible locations where plant walkdowns of the subject systems have not been completed. Include an explanation of why each area is considered inaccessible.
          Office of Nuclear Reactor Regulations (NRR).
16. Hardcopies of isometric drawings of the subject systems
    14. Basis for horizontal pipe acceptance criteria (e.g., calculation).
(11"X17" or similar size is preferred if legible)
                                            3                                          Enclosure
. 17. Hardcopies of piping and instrumentation diagrams
 
(P&IDs) of the subject systems (11"X17" or similar size is preferred
                TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
if legible).
      15. If applicable, provide a list of inaccessible locations where plant walkdowns of the
If you have questions regarding the information requested, please contact the lead inspector.  
            subject systems have not been completed. Include an explanation of why each
  D. Heacock
            area is considered inaccessible.
-2- If no activities were accomplished associated with a specific request, then provide a statement indicating that the request is not applicable.  
      16. Hardcopies of isometric drawings of the subject systems (11X17 or similar size is
The lead inspector for this inspection is Mr. Néstor J. Féliz
            preferred if legible).
Adorno. If there are questions about the material requested, or the inspection, please call Mr. Féliz
      17. Hardcopies of piping and instrumentation diagrams (P&IDs) of the subject systems
Adorno at (630) 829
            (11X17 or similar size is preferred if legible).
-9739. This letter does not contain new or amended information collection requirements subject to the  
If you have questions regarding the information requested, please contact the lead inspector.
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
                                              4                                        Enclosure
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless
 
the requesting document displays a currently valid Office of Management and Budget control number."
D. Heacock                                                                   -2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document
If no activities were accomplished associated with a specific request, then provide a statement indicating
Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
that the request is not applicable.
-rm/adams.html (the Public Electronic Reading Room).
The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about the
      Sincerely,
material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.
/RA by R. C. Daley For/
This letter does not contain new or amended information collection requirements subject to the
 
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
      Ann Marie Stone, Chief
were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not
      Engineering Branch 2
conduct or sponsor, and a person is not required to respond to, a request for information or an
      Division of Reactor Safety
information collection requirement unless the requesting document displays a currently valid Office of
Docket Nos. 50
Management and Budget control number.
-305 License Nos. DPR
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
-43 Enclosures:
will be available electronically for public inspection in the NRC Public Document
TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
cc w/encl:
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Distribution via ListServe
Reading Room).
    DISTRIBUTION
                                                                          Sincerely,
: See next page
                                                                          /RA by R. C. Daley For/
DOCUMENT NAME:
                                                                          Ann Marie Stone, Chief
G:\DRSIII\DRS\Work in Progress
                                                                          Engineering Branch 2
\-Ltr 08__11 Kewaunee RFI  
                                                                          Division of Reactor Safety
- TI177 NFA.docx   -Publicly Available
Docket Nos. 50-305
  -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
License Nos. DPR-43
  OFFICE RIII  RIII        NAME NJFeliz Adorno: ls AMStone   DATE 08/03/11 08/03/11     OFFICIAL RECORD COPY  
Enclosures:               TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST
  Letter to Mr. David A. Heacock from Ms. Ann Marie Stone dated August  
cc w/encl:               Distribution via ListServe
3, 2011. SUBJECT: KEWAUNEE POWER STATION  
DISTRIBUTION:
- NOTIFICATION OF AN NRC MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION;
See next page
AND REQUEST FOR INFORMATION 05000305/2011005 (DRS)
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 08__11 Kewaunee RFI - TI177 NFA.docx
DISTRIBUTION
Publicly Available                        Non-Publicly Available                   Sensitive              Non-Sensitive
: Daniel Merzke
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
RidsNrrDorlLpl3
  OFFICE                   RIII                             RIII
-1 Resource
  NAME                 NJFeliz Adorno:ls                     AMStone
RidsNrrPMKewaunee
DATE                 08/03/11                               08/03/11
RidsNrrDirsIrib Resource
                                                          OFFICIAL RECORD COPY
Cynthia Pederson
 
Steven Orth
Letter to Mr. David A. Heacock from Ms. Ann Marie Stone dated August 3, 2011.
Jared Heck
SUBJECT:       KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT
Allan Barker
              OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT
Carole Ariano
              REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND
Linda Linn
              REQUEST FOR INFORMATION 05000305/2011005 (DRS)
DRPIII DRSIII Patricia Buckley
DISTRIBUTION:
Tammy Tomczak
Daniel Merzke
ROPreports Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrPMKewaunee
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Patricia Buckley
Tammy Tomczak
ROPreports Resource
}}
}}

Latest revision as of 16:42, 12 November 2019

Notification of an NRC Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspection; and Request for Information 05000305/2011005
ML11215A089
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/03/2011
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Heacock D
Dominion Energy Kewaunee
References
IR-11-005
Download: ML11215A089 (8)


See also: IR 05000305/2011005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

August 3, 2011

Mr. David A. Heacock

President and Chief Nuclear Officer

Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT

OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT

REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND

REQUEST FOR INFORMATION 05000305/2011005 (DRS)

Dear Mr. Heacock:

On November 14, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin the on-site

portion of the Temporary Instruction (TI) 2515/177 inspection, Gas Accumulation Management

in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, at your

Kewaunee Power Station. This inspection will be performed in accordance with NRC

TI 2515/177 Procedure.

In order to minimize the impact that the inspection may have on the site and to ensure

productive inspections, we have enclosed a request for documents needed for the inspection.

The documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the inspector no later than September 26, 2011. By

September 30, 2011, the inspector will communicate the initial selected samples.

  • The second group of documents requested are those items needed to support our in-office

preparation activities. This set of documents should be available at the Regional Office no

later than October 31, 2011. This information should be separated by information request

number, especially if provided electronically (e.g., folder with the information request

number). During the in-office preparation activities, the inspector may identify additional

information needed to support the inspection.

  • The last group includes additional information above, as well as plant specific reference

material. This information should be available to the inspector on November 14, 2011. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov.

A hard-copy with the required information is also an acceptable option. It is important that these

documents be as complete as possible, in order to minimize the number of documents

requested during the preparation week or during the on-site inspection.

D. Heacock -2-

If no activities were accomplished associated with a specific request, then provide a statement

indicating that the request is not applicable.

The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about

the material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA by R. C. Daley For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-305

License Nos. DPR-43

Enclosures: TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

cc w/encl: Distribution via ListServe

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

Inspection Report: 05000305/2011005(DRS)

Inspection Dates: November 14 - 18, 2011; and November 28 - December 02, 2011

Inspection Procedure: Temporary Instruction (TI) 2515/177, Management of Gas

Accumulation in Emergency Core Cooling, Decay Heat Removal,

and Containment Spray Systems

Inspectors: Néstor J. Féliz Adorno

(630) 829-9739

nestor.feliz-adorno@nrc.gov

Jorge Corujo-Sandín

(630) 829-9741

jorge.corujo-sandin@nrc.gov

I. Information Requested By September 26, 2011

1. Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental

report.

2. Copies of all the requests for additional information (RAIs) and the associated

responses.

3. List of corrective action program documents (with a short description) associated

with GL 2008-01, voids in piping, gas intrusion events, and pressure transients for

the previous three years that affected the subject systems (i.e., emergency core

cooling, decay heat removal, and containment spray systems).

4. List of the suction piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

5. List of the discharge piping sections identified as susceptible to gas accumulation

(the list should identify the corresponding system).

6. List of changes (with a short description and tracking number) to the Final Safety

Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases,

and Technical Requirement Manual associated with the resolution of GL 2008-01.

7. List of calculations associated with GL 2008-01 (with a short description of the

calculation and the change), including calculations that have been changed or

created in response to GL 2008-01.

1 Enclosure

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

II. Information Requested By October 31, 2011

1. Copies of program documents and procedures developed to implement the

resolution of GL 2008-01.

2. Copies of the selected corrective action program documents.

3. Copies of the selected licensing and design basis document changes.

4. Copies of the selected calculations.

5. List of commitments (with a description) done in response to GL 2008-01.

6. List of actions that were completed in response to GL 2008-01.

7. List of outstanding actions that will be completed in response to GL 2008-01 and the

completion schedule (include the documents that are tracking their completion such

as work orders or corrective action documents).

8. Copies of all the corrective actions identified in the nine-month response and

supplemental reports.

9. List (with a short description) of gas intrusion mechanisms that apply to the plant

and the affected system locations (e.g., identify the source, conditions, and

expected void locations).

10. Design basis documents of the subject systems.

11. Design basis documents of keep-full systems of the subject systems.

12. Copies of the construction code pages of the subject systems that discuss water

hammer or flow-induced dynamic loading. Also, include the associated Design

Specification pages.

13. Provide the following description for the pumps of the subject systems:

(1) flowrate at best efficiency point; (2) maximum and minimum flowrate during

accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump

is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this

determination); (5) pump head required; and (6) un-degraded pump head.

14. Copies of self-assessments associated with the implementation of the GL 2008-01

program and the associated corrective action program documents (include the

attachments, if any).

15. Copies of corrective action program implementing procedures.

16. Copies of the operability determination procedures.

2 Enclosure

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject

systems.

18. If available, electronic copies of the current Technical Specifications, Technical

Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.

III. Information Requested to be Available on First Day of Inspection, November 14,

2011

1. Copies of surveillance procedures associated with the resolution of GL 2008-01 and

the results of the last two surveillances for the subject systems.

2. Copies of the modification packages for hardware modifications as part of the

resolution of GL 2008-01.

3. Copies of procedures use for detecting and determining void volumes.

4. Copies of procedures use for filling and venting.

5. Copies of surveillance procedures that establish flow at the subject systems (e.g.,

surveillances where the pumps are operated)

6. Subject systems walkdown work documents associated with the resolution of

GL 2008-01 and the results of these walkdowns.

7. Copies of the engineering evaluations performed for all identified voids.

8. Provide a list of all piping locations that are currently voided and their associated

evaluation.

9. Copies of trends of periodic gas accumulation monitoring results (e.g., venting, UTs).

10. Copy of the design change review checklist.

11. Copies of training documents that ensure that personnel are aware of gas-related

concerns. Include the scheduled or attendance list of training that was already

conducted.

12. Copy of the void transport analysis.

13. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the

Office of Nuclear Reactor Regulations (NRR).

14. Basis for horizontal pipe acceptance criteria (e.g., calculation).

3 Enclosure

TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

15. If applicable, provide a list of inaccessible locations where plant walkdowns of the

subject systems have not been completed. Include an explanation of why each

area is considered inaccessible.

16. Hardcopies of isometric drawings of the subject systems (11X17 or similar size is

preferred if legible).

17. Hardcopies of piping and instrumentation diagrams (P&IDs) of the subject systems

(11X17 or similar size is preferred if legible).

If you have questions regarding the information requested, please contact the lead inspector.

4 Enclosure

D. Heacock -2-

If no activities were accomplished associated with a specific request, then provide a statement indicating

that the request is not applicable.

The lead inspector for this inspection is Mr. Néstor J. Féliz Adorno. If there are questions about the

material requested, or the inspection, please call Mr. Féliz Adorno at (630) 829-9739.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA by R. C. Daley For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-305

License Nos. DPR-43

Enclosures: TEMPORARY INSTRUCTION 2515/177 DOCUMENT REQUEST

cc w/encl: Distribution via ListServe

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 08__11 Kewaunee RFI - TI177 NFA.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII

NAME NJFeliz Adorno:ls AMStone

DATE 08/03/11 08/03/11

OFFICIAL RECORD COPY

Letter to Mr. David A. Heacock from Ms. Ann Marie Stone dated August 3, 2011.

SUBJECT: KEWAUNEE POWER STATION - NOTIFICATION OF AN NRC MANAGEMENT

OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT

REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND

REQUEST FOR INFORMATION 05000305/2011005 (DRS)

DISTRIBUTION:

Daniel Merzke

RidsNrrDorlLpl3-1 Resource

RidsNrrPMKewaunee

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource