ML112550408: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML112550408
| number = ML112550408
| issue date = 09/12/2011
| issue date = 09/12/2011
| title = James A. FitzPatrick Nuclear Power Plant, ME6877, E-mail to Licensee, Acceptance of LAR Changes to the Licensing Basis, Authorizing the Use of on Load Tap Changers for Reserve Station Service Transformer
| title = ME6877, E-mail to Licensee, Acceptance of LAR Changes to the Licensing Basis, Authorizing the Use of on Load Tap Changers for Reserve Station Service Transformer
| author name = Vaidya B K
| author name = Vaidya B
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name = Dorman E, Pechacek J
| addressee name = Dorman E, Pechacek J
Line 9: Line 9:
| docket = 05000333
| docket = 05000333
| license number =  
| license number =  
| contact person = vaidya B K, NRR/Dorl/lpl1-1, 415-3308
| contact person = vaidya B, NRR/Dorl/lpl1-1, 415-3308
| case reference number = TAC ME6877
| case reference number = TAC ME6877
| document type = Acceptance Review Letter, E-Mail
| document type = Acceptance Review Letter, E-Mail
| page count = 1
| page count = 1
| project = TAC:ME6877
| project = TAC:ME6877
| stage = Other
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Vaidya, Bhalchandra Sent: Monday, September 12, 2011 2:06 PM To: 'Dorman, Eugene'; 'Pechacek, Joseph' Cc: Salgado, Nancy; Lingam, Siva; Boyle, Patrick; Waig, Gerald; Elliott, Robert; Mathew, Roy; Wilson, George; Basturescu, Sergiu; Mathew, Roy  
{{#Wiki_filter:From:                         Vaidya, Bhalchandra Sent:                         Monday, September 12, 2011 2:06 PM To:                           'Dorman, Eugene'; 'Pechacek, Joseph' Cc:                           Salgado, Nancy; Lingam, Siva; Boyle, Patrick; Waig, Gerald; Elliott, Robert; Mathew, Roy; Wilson, George; Basturescu, Sergiu; Mathew, Roy


==Subject:==
==Subject:==
ME6877- ACCEPTANCE OF REQUESTED LICENSING ACTION RE: License Amendment Request-On-Load Tap Changers for RSST
ME6877- ACCEPTANCE OF REQUESTED LICENSING ACTION RE: License Amendment Request-On-Load Tap Changers for RSST


==SUBJECT:==
==SUBJECT:==
James A. FitzPatrick Nuclear Power Plant (JAFNPP) - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: License Amendment Request to change the Current licensing Basis, Authorizing Use of On Load Tap Changers for Reserve Station Service Transformer (TAC NO. ME6877) By letter dated August 16, 2011, Energy Nuclear Operations, Inc., the licensee, submitted the License Amendment Request (LAR) to change the Current licensing Basis, Authorizing Use of On Load Tap Changers for Reserve Station Service Transformer.
James A. FitzPatrick Nuclear Power Plant (JAFNPP) - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: License Amendment Request to change the Current licensing Basis, Authorizing Use of On Load Tap Changers for Reserve Station Service Transformer (TAC NO. ME6877)
 
By letter dated August 16, 2011, Energy Nuclear Operations, Inc., the licensee, submitted the License Amendment Request (LAR) to change the Current licensing Basis, Authorizing Use of On Load Tap Changers for Reserve Station Service Transformer.
The purpose of this communication is to provide the results of the NRC staff's acceptance review of this relief request. The acceptance review was performed by the staff of NRC to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this communication is to provide the results of the NRC staffs acceptance review of this relief request. The acceptance review was performed by the staff of NRC to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
If you have any questions, please contact me.  
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
 
If you have any questions, please contact me.
Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov  
Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov}}
}}

Latest revision as of 16:01, 12 November 2019

ME6877, E-mail to Licensee, Acceptance of LAR Changes to the Licensing Basis, Authorizing the Use of on Load Tap Changers for Reserve Station Service Transformer
ML112550408
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/12/2011
From: Bhalchandra Vaidya
Plant Licensing Branch 1
To: Eugene Dorman, Joseph Pechacek
FitzPatrick
vaidya B, NRR/Dorl/lpl1-1, 415-3308
References
TAC ME6877
Download: ML112550408 (1)


Text

From: Vaidya, Bhalchandra Sent: Monday, September 12, 2011 2:06 PM To: 'Dorman, Eugene'; 'Pechacek, Joseph' Cc: Salgado, Nancy; Lingam, Siva; Boyle, Patrick; Waig, Gerald; Elliott, Robert; Mathew, Roy; Wilson, George; Basturescu, Sergiu; Mathew, Roy

Subject:

ME6877- ACCEPTANCE OF REQUESTED LICENSING ACTION RE: License Amendment Request-On-Load Tap Changers for RSST

SUBJECT:

James A. FitzPatrick Nuclear Power Plant (JAFNPP) - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: License Amendment Request to change the Current licensing Basis, Authorizing Use of On Load Tap Changers for Reserve Station Service Transformer (TAC NO. ME6877)

By letter dated August 16, 2011, Energy Nuclear Operations, Inc., the licensee, submitted the License Amendment Request (LAR) to change the Current licensing Basis, Authorizing Use of On Load Tap Changers for Reserve Station Service Transformer.

The purpose of this communication is to provide the results of the NRC staffs acceptance review of this relief request. The acceptance review was performed by the staff of NRC to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me.

Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov