ML19319C358

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Accepted for Review - FitzPatrick License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation
ML19319C358
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/15/2019
From: Samson Lee
NRC/NRR/DORL/LPL1
To: Williams C
Exelon Generation Co
References
L-2019-LLA-0190
Download: ML19319C358 (2)


Text

From: Lee, Samson Sent: Friday, November 15, 2019 2:25 PM To: Williams, Christian D:(Exelon Nuclear)

Subject:

Accepted for Review - FitzPatrick License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation (EPID: L-2019-LLA-0190)

Mr. Williams, By letter dated September 5, 2019 (ADAMS Accession No. ML19248B085), as supplemented by letter dated November 6, 2019 (ADAMS Accession No. ML19310D579), Exelon submitted the subject request for FitzPatrick. The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff is expected to spend 975 hours40.625 days <br />5.804 weeks <br />1.336 months <br /> to complete the review within 12 months.

If you have any questions, please contact me.

Samson Lee FitzPatrick Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168 Docket No. 50-333 EPID: L-2019-LLA-0190

Hearing Identifier: NRR_DRMA Email Number: 314 Mail Envelope Properties (BL0PR0901MB3185F9003CA7131150F29E389A700)

Subject:

Accepted for Review - FitzPatrick License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation (EPID:

L-2019-LLA-0190)

Sent Date: 11/15/2019 2:24:34 PM Received Date: 11/15/2019 2:24:00 PM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:

"Williams, Christian D:(Exelon Nuclear)" <Christian.Williams@exeloncorp.com>

Tracking Status: None Post Office: BL0PR0901MB3185.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1880 11/15/2019 2:24:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: