ML101330171

From kanterella
Jump to navigation Jump to search

Acceptance Review for FitzPatrick TAC ME3786
ML101330171
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/13/2010
From: Pickett D
NRC/NRR/DORL/LCPAB
To: Eugene Dorman
FitzPatrick
Pickett , NRR/DLPM, 415-1364
References
TAC ME3786
Download: ML101330171 (2)


Text

From: Pickett, Douglas Sent: Thursday, May 13, 2010 9:28 AM To: 'Dorman, Eugene' Cc: Lingam, Siva; Feintuch, Karl; Huang, Tai; Salgado, Nancy

Subject:

Acceptance Review for FitzPatrick TAC No. ME3786 Mr. Dorman:

By letter dated April 21, 2010, Entergy Nuclear Operations, Inc. submitted a license amendment request for the James A. FitzPatrick Nuclear Power Plant (TAC No. ME3786). The proposed amendment would modify the technical specifications by revising values for the Safety Limit Minimum Critical Power Ratio for both single and dual recirculation loop operation.

The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concludes that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.

Douglas V. Pickett, Senior Project Manager Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review for FitzPatrick TAC No. ME3786

Sent Date: 05/13/2010 9:22:35 AM Received Date: 05/13/2010 9:28:00 AM From: Pickett, Douglas Created By: Douglas.Pickett@nrc.gov Recipients:

EDorman@entergy.com ('Dorman, Eugene')

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Tai.Huang@nrc.gov (Huang, Tai)

Tracking Status: None Nancy.Salgado@nrc.gov (Salgado, Nancy)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 16351 05/13/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: