ML12054A055: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:i-",II REGUl "I;, -iI' &deg;11!! << 0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ii; "''1 : .tJ March 14, 2012 ****1' Tennessee Valley Authority Watts Bar Nuclear Power Plant, Unit 2  
{{#Wiki_filter:~c,'-
i-",II REGUl "I;,
UNITED STATES
    -iI'                 &deg;11                 NUCLEAR REGULATORY COMMISSION
!!                          ~                          WASHINGTON, D.C. 20555-0001
<<                            0 Ii;                         :
~                          ~                            March 14, 2012
    ~                    .tJ
      "''1              ~o
          ****1' LICENSEE:      Tennessee Valley Authority FACILITY:      Watts Bar Nuclear Power Plant, Unit 2
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF OCTOBER 12, 2010, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT SUBMITTALS On October 12, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF OCTOBER 12, 2010, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT SUBMITTALS On October 12, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.
The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.
The NRC staff and TVA discussed information regarding the review of the Fire Protection Report and outstanding issues in FSAR Sections 4, 9, and 15 (Reactor, Auxiliary Systems, and Accident Analysis, respectively).
The NRC staff and TVA discussed information regarding the review of the Fire Protection Report and outstanding issues in FSAR Sections 4, 9, and 15 (Reactor, Auxiliary Systems, and Accident Analysis, respectively).
During the discussion on the Fire Protection Report, the NRC staff stated that those changes that were made to allow for dual unit operation were incomplete.
During the discussion on the Fire Protection Report, the NRC staff stated that those changes that were made to allow for dual unit operation were incomplete. TVA stated that they would develop a plan and schedule, at a later date, for resolving the problems identified in connection with identifying and justifying the changes to the Fire Protection Report.
TVA stated that they would develop a plan and schedule, at a later date, for resolving the problems identified in connection with identifying and justifying the changes to the Fire Protection Report. For the discussions on FSAR Sections 4,9, and 15, the NRC staff and TVA went over proposed requests for additional information for each section. For Section 4, the discussions focused on the NRC staff's questions on fuel thermal conductivity.
For the discussions on FSAR Sections 4,9, and 15, the NRC staff and TVA went over proposed requests for additional information for each section. For Section 4, the discussions focused on the NRC staff's questions on fuel thermal conductivity. In Section 9, TVA gave an overview of the design of the component cooling water and essential raw cooling water systems for duel unit operation. The NRC staff and TVA also discussed changing the wording in the FSAR on the spent fuel pool cooling system. For the Accident Analysis section discussion, the NRC staff was interested in discussing TVA's plans for the inadvertent emergency core cooling system and chemical and volume control system malfunction analysis.
In Section 9, TVA gave an overview of the design of the component cooling water and essential raw cooling water systems for duel unit operation.
 
The NRC staff and TVA also discussed changing the wording in the FSAR on the spent fuel pool cooling system. For the Accident Analysis section discussion, the NRC staff was interested in discussing TVA's plans for the inadvertent emergency core cooling system and chemical and volume control system malfunction analysis.
                                              -2 Members of the public did not participate in the meeting.
-2 Members of the public did not participate in the meeting. Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv
Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv
-2 Members of the public did not participate in the Please direct any inquiries to me at 301-415-2048 or Docket No. 50-391 cc: Distribution via Listserv DISTRI BUTION: PUBLIC PMNS Resources RidsNrrPMWattsBar2 Resource RidsNrrDorlLp_WB Resource RidsNrrDorl Resource RHanna, RII ADAMS Accession No'.. ML12054A055 IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn2MailCenter Resource LPWB RtF RidsNrrlLABClayton (Hard copy) RidsOpaMaii Resource RidsAcrsAcnw_MailCTR Resource MKotzala, EDO RidsOgcMailCenter Resource RidsNrrOd Resource JLedford, RII CSteger, NRR OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton DATE 03/07/12 03/07/12 03/14/12 OFFICIAL RECORD COpy}}
 
                                                -2 Members of the public did not participate in the meeting.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv DISTRI BUTION:
PUBLIC                                RidsRgn2MailCenter Resource         LPWB RtF PMNS Resources                        RidsNrrlLABClayton (Hard copy)     RidsOpaMaii Resource RidsNrrPMWattsBar2 Resource            RidsAcrsAcnw_MailCTR Resource       MKotzala, EDO RidsNrrDorlLp_WB Resource              RidsOgcMailCenter Resource         RidsNrrOd Resource RidsNrrDorl Resource                  JLedford, RII                       CSteger, NRR RHanna, RII ADAMS Accession  No'.. ML12054A055 OFFICE         LPWB\PM           LPWB\LA           LPWB\BC NAME           JPoole             BClayton           SCam~beli DATE           03/07/12           03/07/12           03/14/12 OFFICIAL RECORD COpy}}

Revision as of 07:54, 12 November 2019

10/12/2010 Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Fire Protection
ML12054A055
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/14/2012
From: Justin Poole
Watts Bar Special Projects Branch
To:
Poole J
References
Download: ML12054A055 (3)


Text

~c,'-

i-",II REGUl "I;,

UNITED STATES

-iI' °11 NUCLEAR REGULATORY COMMISSION

!! ~ WASHINGTON, D.C. 20555-0001

<< 0 Ii;  :

~ ~ March 14, 2012

~ .tJ

"1 ~o

        • 1' LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF OCTOBER 12, 2010, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, FINAL SAFETY ANALYSIS REPORT SUBMITTALS On October 12, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss outstanding issues relating to TVA's Final Safety Analysis Report (FSAR) submittals.

The NRC staff and TVA discussed information regarding the review of the Fire Protection Report and outstanding issues in FSAR Sections 4, 9, and 15 (Reactor, Auxiliary Systems, and Accident Analysis, respectively).

During the discussion on the Fire Protection Report, the NRC staff stated that those changes that were made to allow for dual unit operation were incomplete. TVA stated that they would develop a plan and schedule, at a later date, for resolving the problems identified in connection with identifying and justifying the changes to the Fire Protection Report.

For the discussions on FSAR Sections 4,9, and 15, the NRC staff and TVA went over proposed requests for additional information for each section. For Section 4, the discussions focused on the NRC staff's questions on fuel thermal conductivity. In Section 9, TVA gave an overview of the design of the component cooling water and essential raw cooling water systems for duel unit operation. The NRC staff and TVA also discussed changing the wording in the FSAR on the spent fuel pool cooling system. For the Accident Analysis section discussion, the NRC staff was interested in discussing TVA's plans for the inadvertent emergency core cooling system and chemical and volume control system malfunction analysis.

-2 Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv

-2 Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

IRAJ Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv DISTRI BUTION:

PUBLIC RidsRgn2MailCenter Resource LPWB RtF PMNS Resources RidsNrrlLABClayton (Hard copy) RidsOpaMaii Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource MKotzala, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource RidsNrrDorl Resource JLedford, RII CSteger, NRR RHanna, RII ADAMS Accession No'.. ML12054A055 OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClayton SCam~beli DATE 03/07/12 03/07/12 03/14/12 OFFICIAL RECORD COpy