|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML12062A282 | | | number = ML12062A282 |
| | issue date = 03/16/2012 | | | issue date = 03/16/2012 |
| | title = Brunswick Steam Electric Plant, Unit 1 - Request for Withholding Information from Public Disclosure | | | title = Request for Withholding Information from Public Disclosure |
| | author name = Saba F E | | | author name = Saba F |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Annacone M J | | | addressee name = Annacone M |
| | addressee affiliation = Carolina Power & Light Co | | | addressee affiliation = Carolina Power & Light Co |
| | docket = 05000325, 05000324 | | | docket = 05000325, 05000324 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 March 16, 2012 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 16, 2012 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461 SUB~IECT: BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE |
|
| |
|
| ==Dear Mr. Annacone:== | | ==Dear Mr. Annacone:== |
|
| |
|
| By letter dated January 26,2012, you submitted an affidavit dated January 4,2012, executed by Alan B. Meginnis, Manager of Product Licensing for AREVA NP, Inc., requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Operability Assessment for Condition Report 2011-8616, entitled, "Operability Assessment (CR 2011-8616)" A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the reasons specified in the following paragraphs: | | By letter dated January 26,2012, you submitted an affidavit dated January 4,2012, executed by Alan B. Meginnis, Manager of Product Licensing for AREVA NP, Inc., requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: |
| 6(b) Use of information by a competitor would permit the competitor to significantly reduce its expenditures, in time or in resources, to design, produce or market a similar product or service. 6(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability. | | Operability Assessment for Condition Report 2011-8616, entitled, "Operability Assessment (CR 2011-8616)" |
| 6(e) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause substantial harm to the competitive position of AREVA NP. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. |
| M. -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. | | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the reasons specified in the following paragraphs: |
| If the need arises, we may send copies of this information to our consultants working in this area. We wifJ, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information. | | 6(b) Use of information by a competitor would permit the competitor to significantly reduce its expenditures, in time or in resources, to design, produce or market a similar product or service. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | 6(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability. |
| In all review situations, if the NRC makes a determination adverse to the above, you wifJ be notified in advance of any public disclosure. | | 6(e) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause substantial harm to the competitive position of AREVA NP. |
| | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | |
| | M. Annacone -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We wifJ, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you wifJ be notified in advance of any public disclosure. |
| If you have any questions regarding this matter, I may be reached at 301-415-1447. | | If you have any questions regarding this matter, I may be reached at 301-415-1447. |
| Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-325 Alan B. Meginnis, Manager Product Licensing AREVA NP Inc. 2101 Horn Rapids Road Richland, WA 99354 Distribution via ListServ M. -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. | | Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-325 cc: Alan B. Meginnis, Manager Product Licensing AREVA NP Inc. |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
| | 2101 Horn Rapids Road Richland, WA 99354 Distribution via ListServ |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
| | |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
| | ML12062A282 OFFICE LPL2-2/PM LPL2-21LA SNPBlBC LPL2-2/BC Saba BClayton AMendiola 03/05/12 03/09/12 03/16112}} |
| If you have any questions regarding this matter, I may be reached at 301-415-1447.
| |
| Sincerely, IRA by A. Bi/loch Colon fori Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-325 Alan B. Meginnis, Manager Product Licensing AREVA NP Inc. 2101 Horn Rapids Road Richland, WA 99354 Distribution via ListServ DISTRIBUTION:
| |
| Public LPL2-2 r/f RidsNrrDorlLpl2-2 RidsOgcMailCenter RidsNrrLABClayton RidsNrrPMBrunswick RidsRgn2MailCenter RidsAcrsAcnw_MailCTR RidsNrrDssSnpb MPanicker, SNPB SWu, SNPB ADAMS Accession No: ML 12062A282 OFFICE LPL2-21LA SNPBlBC LPL2-2/BC Saba LPL2-2/PM BClayton AMendiola 03/09/12 03/05/12 OFFICIAL RECORD COPY 03/16112}}
| |
|
---|
Category:Letter
MONTHYEARIR 05000324/20240032024-11-13013 November 2024 Integrated Inspection Report 05000324/2024003 and 05000325/2024003 IR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24218A0862024-09-0909 September 2024 NRC to NMFS, Designation of Duke Energy Progress LLC as the Non-Federal Representative for Brunswick Steam Electric Plant, Units 1 and 2 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24242A0322024-08-29029 August 2024 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, 10 CFR 54.37 Update, Technical Requirements Manuals, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Change IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 – Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 05000324/LER-2023-001, Two Main Steam Line Safety Relief Valves Inoperable2023-07-17017 July 2023 Two Main Steam Line Safety Relief Valves Inoperable 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram2023-06-15015 June 2023 Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 – Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 IR 05000324/20220042023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARML21281A1392021-10-26026 October 2021 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML21181A3842021-07-16016 July 2021 Request for Withholding Information from Public Disclosure ML20188A2782020-08-10010 August 2020 Request for Withholding Information from Public Disclosure for Brunswick Steam Electric Plant ML18010A8472018-04-0505 April 2018 Request for Withholding Information from Public Disclosure for Brunswick Steam Electric Plant, Units 1 and 2, Regarding Core Flow Operating Range Expansion (CAC No. MF8363 and MF8364; EPID L-2016-LLA-0009) ML14056A1242014-03-12012 March 2014 Request for Withholding Proprietary Information from Public Disclosure Related to Operability Assessment ML13023A2242013-02-0404 February 2013 Request for Withholding Information from Public Disclosure ML12305A2082012-12-20020 December 2012 Request for Withholding Information from Public Disclosure ML12305A1982012-12-20020 December 2012 Request for Withholding Information from Public Disclosure ML12300A3812012-12-0505 December 2012 Request for Withholding Information from Public Disclosure (TAC TAC ME8135 and ME8136) ML12062A2822012-03-16016 March 2012 Request for Withholding Information from Public Disclosure ML11265A2632011-10-12012 October 2011 ISFSI, Shearon Harris Unit 1, H. B. Robinson, Unit 2, H. B. Robinson ISFSI, Crystal River, Unit 3, Request for Withholding Information from Public Disclosure ML11097A0162011-04-15015 April 2011 Request for Withholding Information from Public Disclosure ML11097A0132011-04-15015 April 2011 Request for Withholding Information from Public Disclosure. ML11089A0082011-04-14014 April 2011 Request for Withholding Information from Public Disclosure ML11091A0002011-04-14014 April 2011 Request for Withholding Information from Public Disclosure ML0725702102007-11-0909 November 2007 Withholding from Public Disclosure, Areva Report ANP-2638(P): Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Dated July 2007 (Tac. MD4061 and MD4062) ML0725701702007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 ML0725701472007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 ML0528500572005-10-24024 October 2005 Letter, Request for Withholding Information from Public Disclosure - Applied Analysis Corporation ML0411106462004-04-19019 April 2004 Withholding from Public Disclosure, Information Reference in CP&L Letter, Serial No. BSEP 04-0043, Brunswick Steam Electric Plant, Unit No. 1, Docket No. 50-325/License No. DPR-71, Request for Additional Information ML0407708982004-03-29029 March 2004 Global Nuclear Fuel, Request for Withholding Information from Public Disclosure, Brunswick Steam Electric Plant, Unit 1 ML0310001222003-04-10010 April 2003 Ltr, General Electric Request for Withholding Information from Public Disclosure for Brunswick Steam Electric Plant, Unit No. 2 ML0301608612003-01-16016 January 2003 Withholding from Public Disclosure, NEDC-33063P, MB6692 & MB6693 ML0212106942002-04-26026 April 2002 General Electric Co., Request for Withholding Information from Public Disclosure Letter Dated 03/12/02 ML0212105202002-04-26026 April 2002 General Electric Co., Request for Withholding Information from Public Disclosure (TACs MB2700 and MB2701) ML0205400052002-02-22022 February 2002 General Electric Company, Request for Withholding Information from Public Disclosure, RAI 5-13, 5-15, 5-17b and 5-25(a), TAC Nos. MB2700 and MB2701 2021-07-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 16, 2012 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461 SUB~IECT: BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE
Dear Mr. Annacone:
By letter dated January 26,2012, you submitted an affidavit dated January 4,2012, executed by Alan B. Meginnis, Manager of Product Licensing for AREVA NP, Inc., requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Operability Assessment for Condition Report 2011-8616, entitled, "Operability Assessment (CR 2011-8616)"
A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the reasons specified in the following paragraphs:
6(b) Use of information by a competitor would permit the competitor to significantly reduce its expenditures, in time or in resources, to design, produce or market a similar product or service.
6(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.
6(e) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause substantial harm to the competitive position of AREVA NP.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
M. Annacone -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We wifJ, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you wifJ be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1447.
Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-325 cc: Alan B. Meginnis, Manager Product Licensing AREVA NP Inc.
2101 Horn Rapids Road Richland, WA 99354 Distribution via ListServ
ML12062A282 OFFICE LPL2-2/PM LPL2-21LA SNPBlBC LPL2-2/BC Saba BClayton AMendiola 03/05/12 03/09/12 03/16112