Letter Sequence Withholding Request Acceptance |
---|
|
Results
Other: BSEP 07-0053, Areva Np, Inc., Topical Report, ANP-2637, Revision 1, Boiling Water Reactor Licensing Methodology Compendium., BSEP 07-0067, BSEP 07-0067 Enclosure 9; Areva Report ANP-2624(NP), Revision 0, Brunswick, Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limit for ATRIUM-1O Fuel, Dated June 2007, BSEP 07-0075, Areva Report ANP-2638NP, Revision 0, Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Enclosure 6, BSEP 07-0102, ANP-2661 (Np), Revision 0, Brunswick Nuclear Plant New Fuel Storage Vault Criticality Safety Analysis for ATRIUM-10 Fuel., ML072070311, ML072070318, ML072180372, ML072340562, ML072570210, ML072840219
|
MONTHYEARBSEP 06-0128, Request for License Amendments Regarding Fuel Design and Storage Requirements for Areva Np Fuel2007-01-22022 January 2007 Request for License Amendments Regarding Fuel Design and Storage Requirements for Areva Np Fuel Project stage: Request ML0718402152007-06-21021 June 2007 Additional Information in Support of Request for License Amendment Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel Project stage: Request BSEP 07-0053, Areva Np, Inc., Topical Report, ANP-2637, Revision 1, Boiling Water Reactor Licensing Methodology Compendium.2007-06-30030 June 2007 Areva Np, Inc., Topical Report, ANP-2637, Revision 1, Boiling Water Reactor Licensing Methodology Compendium. Project stage: Other ML0720703112007-06-30030 June 2007 BSEP 07-0067 Enclosure 3; Areva Report ANP-2646(NP), Revision 0, Brunswick, Unit 1, Thermal-Hydraulic Design Report for ATRIUM-10 Fuel Assemblies, Dated June 2007 Project stage: Other ML0720703182007-06-30030 June 2007 BSEP 07-0067 Enclosure 6; Areva Report ANP-2625(NP), Revision 0, Brunswick, Units 1 and 2 LOCA Break Spectrum Analysis for ATRIUM-10 Fuel, Dated June 2007 Project stage: Other BSEP 07-0067, BSEP 07-0067 Enclosure 9; Areva Report ANP-2624(NP), Revision 0, Brunswick, Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limit for ATRIUM-1O Fuel, Dated June 20072007-06-30030 June 2007 BSEP 07-0067 Enclosure 9; Areva Report ANP-2624(NP), Revision 0, Brunswick, Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limit for ATRIUM-1O Fuel, Dated June 2007 Project stage: Other ML0720703052007-07-18018 July 2007 Additional Information in Support of Request for License Amendment Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel Project stage: Request BSEP 07-0075, Areva Report ANP-2638NP, Revision 0, Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Enclosure 62007-07-31031 July 2007 Areva Report ANP-2638NP, Revision 0, Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Enclosure 6 Project stage: Other ML0721803722007-07-31031 July 2007 Areva Report ANP-2658(NP), Revision 0, Brunswick Unit 1 Cycle 17 Fuel Cycle Design, Enclosure 3 Project stage: Other ML0721803702007-07-31031 July 2007 Additional Information in Support of Request for License Amendment Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel Project stage: Request ML0723405622007-08-22022 August 2007 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing Project stage: Other ML0728402172007-09-28028 September 2007 Additional Information in Support of Request for License Amendments Regarding Fuel Design and Storage Requirements for Areva Np Fuel Project stage: Request BSEP 07-0102, ANP-2661 (Np), Revision 0, Brunswick Nuclear Plant New Fuel Storage Vault Criticality Safety Analysis for ATRIUM-10 Fuel.2007-09-30030 September 2007 ANP-2661 (Np), Revision 0, Brunswick Nuclear Plant New Fuel Storage Vault Criticality Safety Analysis for ATRIUM-10 Fuel. Project stage: Other ML0728402192007-09-30030 September 2007 ANP-2642(NP), Revision 0, Brunswick Nuclear Plant Spent Fuel Storage Pool Criticality Safety Analysis for ATRIUM-10 Fuel. Project stage: Other ML0725701472007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance ML0725701702007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance ML0725702102007-11-0909 November 2007 Withholding from Public Disclosure, Areva Report ANP-2638(P): Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Dated July 2007 (Tac. MD4061 and MD4062) Project stage: Other ML0725702512007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance ML0725702842007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance ML0733203672007-11-27027 November 2007 Technical Specifications, Issuance of Amendment Storage of Areva Np Fuel Project stage: Approval ML0733105522007-11-27027 November 2007 License Amendment, Issuance of Amendment Storage of Areva Np Fuel Project stage: Approval 2007-06-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 – Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 05000324/LER-2023-001, Two Main Steam Line Safety Relief Valves Inoperable2023-07-17017 July 2023 Two Main Steam Line Safety Relief Valves Inoperable 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram2023-06-15015 June 2023 Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 – Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations 2024-09-04
[Table view] Category:Proprietary Information Review
MONTHYEARML21281A1392021-10-26026 October 2021 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML21181A3842021-07-16016 July 2021 Request for Withholding Information from Public Disclosure ML20188A2782020-08-10010 August 2020 Request for Withholding Information from Public Disclosure for Brunswick Steam Electric Plant ML18010A8472018-04-0505 April 2018 Request for Withholding Information from Public Disclosure for Brunswick Steam Electric Plant, Units 1 and 2, Regarding Core Flow Operating Range Expansion (CAC No. MF8363 and MF8364; EPID L-2016-LLA-0009) ML14056A1242014-03-12012 March 2014 Request for Withholding Proprietary Information from Public Disclosure Related to Operability Assessment ML13023A2242013-02-0404 February 2013 Request for Withholding Information from Public Disclosure ML12305A2082012-12-20020 December 2012 Request for Withholding Information from Public Disclosure ML12305A1982012-12-20020 December 2012 Request for Withholding Information from Public Disclosure ML12300A3812012-12-0505 December 2012 Request for Withholding Information from Public Disclosure (TAC TAC ME8135 and ME8136) ML12062A2822012-03-16016 March 2012 Request for Withholding Information from Public Disclosure ML11265A2632011-10-12012 October 2011 ISFSI, Shearon Harris Unit 1, H. B. Robinson, Unit 2, H. B. Robinson ISFSI, Crystal River, Unit 3, Request for Withholding Information from Public Disclosure ML11097A0162011-04-15015 April 2011 Request for Withholding Information from Public Disclosure ML11097A0132011-04-15015 April 2011 Request for Withholding Information from Public Disclosure. ML11089A0082011-04-14014 April 2011 Request for Withholding Information from Public Disclosure ML11091A0002011-04-14014 April 2011 Request for Withholding Information from Public Disclosure ML0725702102007-11-0909 November 2007 Withholding from Public Disclosure, Areva Report ANP-2638(P): Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Dated July 2007 (Tac. MD4061 and MD4062) ML0725701702007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 ML0725701472007-11-0909 November 2007 Progress Energy Carolinas, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 ML0528500572005-10-24024 October 2005 Letter, Request for Withholding Information from Public Disclosure - Applied Analysis Corporation ML0411106462004-04-19019 April 2004 Withholding from Public Disclosure, Information Reference in CP&L Letter, Serial No. BSEP 04-0043, Brunswick Steam Electric Plant, Unit No. 1, Docket No. 50-325/License No. DPR-71, Request for Additional Information ML0407708982004-03-29029 March 2004 Global Nuclear Fuel, Request for Withholding Information from Public Disclosure, Brunswick Steam Electric Plant, Unit 1 ML0310001222003-04-10010 April 2003 Ltr, General Electric Request for Withholding Information from Public Disclosure for Brunswick Steam Electric Plant, Unit No. 2 ML0301608612003-01-16016 January 2003 Withholding from Public Disclosure, NEDC-33063P, MB6692 & MB6693 ML0212106942002-04-26026 April 2002 General Electric Co., Request for Withholding Information from Public Disclosure Letter Dated 03/12/02 ML0212105202002-04-26026 April 2002 General Electric Co., Request for Withholding Information from Public Disclosure (TACs MB2700 and MB2701) ML0205400052002-02-22022 February 2002 General Electric Company, Request for Withholding Information from Public Disclosure, RAI 5-13, 5-15, 5-17b and 5-25(a), TAC Nos. MB2700 and MB2701 2021-07-16
[Table view] |
Text
November 9, 2007 Mr. James Scarola, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461
SUBJECT:
PROGRESS ENERGY CAROLINAS, INC. - REQUEST FOR WITHHOLDING OF PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 (TAC NOS. MD4061 AND MD4062)
Dear Mr. Scarola:
By letter dated July 31, 2007, you submitted an affidavit dated July 18, 2007, executed by Jerald S. Holm, Manager of Product Licensing for AREVA NP, Inc., requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
AREVA Report ANP-2658(P): Brunswick Unit 1 Cycle 17 Fuel Cycle Design, dated July 2007.
A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause substantial harm to the competitive position of AREVA NP.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
J. Scarola Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future; for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1321.
Sincerely,
/RA/
Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324 cc: See next page
November 9, 2007 J. Scarola Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future; for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1321.
Sincerely,
/RA/
Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324 cc: See next page DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsNrrPMSBailey RidsNrrLABClayton RidsNrrDorlLpl2-2 RidsNrrDssSrsb RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn2MailCenter MVaaler ADAMS Accession Number: ML072570170 NRR-084 OFFICE LPL2-2 LPL2-2/PM LPL2-2/LA SRSB/BC LPL2-2/BC NAME MVaaler SBailey BClayton GCranston EMarinos for TBoyce DATE 09/14/07 11/09/07 09/15/07 10/22/07 11/09/07 OFFICIAL RECORD COPY
Mr. James Scarola Brunswick Steam Electric Plant, Carolina Power & Light Company Units 1 and 2 cc:
David T. Conley Mr. Robert P. Gruber Associate General Counsel II - Executive Director Legal Department Public Staff - NCUC Progress Energy Service Company, LLC 4326 Mail Service Center Post Office Box 1551 Raleigh, North Carolina 27699-4326 Raleigh, North Carolina 27602-1551 Ben Waldrep Mr. David R. Sandifer, Chairperson Director, Site Operations Brunswick County Board of Commissioners Brunswick Steam Electric Plant Post Office Box 249 Carolina Power & Light Company Bolivia, North Carolina 28422 Post Office Box 10429 Southport, North Carolina 28461-0429 Resident Inspector U. S. Nuclear Regulatory Commission Mr. Norman R. Holden, Mayor 8470 River Road City of Southport Southport, North Carolina 28461 201 East Moore Street Southport, North Carolina 28461 Mr. John H. ONeill, Jr.
Pillsbury Winthrop Shaw Pittman, LLP Mr. Warren Lee 2300 N Street NW. Emergency Management Director Washington, DC 20037-1128 New Hanover County Department of Emergency Management Ms. Beverly Hall, Section Chief Post Office Box 1525 Division of Radiation Protection Wilmington, North Carolina 28402-1525 N.C. Department of Environment and Natural Resources Mr. J. Paul Fulford 3825 Barrett Dr. Manager, Performance Evaluation and Raleigh, North Carolina 27609-7721 Regulatory Affairs PEB5 Carolina Power & Light Company Mr. Terry D. Hobbs Post Office Box 1551 Plant General Manager Raleigh, North Carolina 27602-1551 Brunswick Steam Electric Plant Carolina Power & Light Company Mr. Randy C. Ivey Post Office Box 10429 Manager - Support Services Southport, North Carolina 28461-0429 Brunswick Steam Electric Plant Carolina Power & Light Company Public Service Commission Post Office Box 10429 State of South Carolina Southport, North Carolina 28461 Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602