ML12300A381
| ML12300A381 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/05/2012 |
| From: | Farideh Saba Plant Licensing Branch II |
| To: | Annacone M Carolina Power & Light Co |
| Saba, Farideh | |
| References | |
| TAC ME8135, TAC ME8136 | |
| Download: ML12300A381 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 5, 2012 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. ME8135 AND ME8136)
Dear Mr. Annacone:
By letter dated March 6, 2012, you submitted affidavits dated February 20,2012, executed by Alan B. Meginnis, Manager of Product Licensing for AREVA NP, Inc., requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
AREVA Document No. 51-9175814-000, "Brunswick Unit 1 Cycle 19 SLMCPR Analysis With SAFLlM3D Methodology (Proprietary Version)," dated February 2012 AREVA Document No. 51-9176407-000, "Brunswick Unit 1 Cycle 19 SLMCPR Analysis With SAFLlM3D Methodology - Operability Assessment (Proprietary Version)," dated February 2012 AREVA Document No. 51-9175787-000, "Brunswick Unit 2 Cycle 20 SLMCPR Analysis With SAFLlM3D Methodology (Proprietary Version)," dated February 2012 AREVA Document No. 51-9176342-000, "Brunswick Unit 2 Cycle 20 SLMCPR Analysis With SAFLlM3D Methodology - Operability Assessment (Proprietary Version)," dated February 2012 AREVA Document ANP-3086(P), Revision 0, "Brunswick Unit 1 and Unit 2 SLMCPR Operability Assessment Critical Power Correlation for ATRIUM 10XM Fuel - Improved K factor Model," dated February 2012 Nonproprietary copies of these documents have been placed in the U.S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the reasons specified in the following paragraphs:
M. Annacone
- 2 6(b)
Use of information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce or market a similar product or service.
6(d)
The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.
6(e)
The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause substantial harm to the competitive position of AREVA NP.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
M. Annacone
- 3 If you have any questions regarding this matter, I may be reached at 301-415-1447.
Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324 cc: Alan B. Meginnis, Manager Product Licensing AREVA NP Inc.
2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via ListServ
M. Annacone
- 3 If you have any questions regarding this matter, I may be reached at 301-415-1447.
Docket Nos. 50-325 and 50-324 cc: Alan B. Meginnis, Manager Product Licensing AREVA NP Inc.
2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via ListServ DISTRIBUTION:
Public LPL2-2 r/f RidsNrrLABTully RidsNrrPMBrunswick RidsNrrDssSnpb RidsN rrDssSrxb ADAMS Accession No'.. ML12300A381 Sincerely, IRA by Araceli Billoch Colon fori Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrDorlLpl2-2 RidsOgcMailCenter RidsRgn2MaliCenter RidsAcrsAcnw_MailCTR MPanicker, SNPB DWoodyatt SRXB OFFICE LPL2-21PM LPL2-21LA SNPB/BC SRXB/BC LPL2-21BC(A)
LPL2-21PM NAME FSaba BTuily AMendiola CJackson JQuichocho ABiliochColon for FSaba DATE 11/1112 1112112 11127112 11126112 1213/12 1215/12 OFFICIAL RECORD COpy