ML11265A263
| ML11265A263 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Harris, Brunswick, Crystal River, 07200006, 07200003, 07200060 |
| Issue date: | 10/12/2011 |
| From: | Farideh Saba Plant Licensing Branch II |
| To: | Scarola J Carolina Power & Light Co, Florida Power Corp, Progress Energy Co |
| Saba, Farideh | |
| References | |
| TAC ME5970, TAC ME5971, TAC ME5972, TAC ME5973, TAC ME5974, TAC L24550 | |
| Download: ML11265A263 (3) | |
Text
...",1'1 REGUl UNITED STATES c."
1)
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 q
0
~ l~¥"\\:
~
~
October 12, 2011
¥"~
i'
"'?
~O Mr. James Scarola Senior Vice President and Chief Nuclear Officer Carolina Power & Light Company Florida Power Corporation Progress Energy, Inc.
P.O. Box 1511 411 Fayetteville Street Raleigh, NC 27602
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; BRUNSWICK STEAM ELECTRIC PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2; H. B. ROBINSON STEAM ELECTRIC PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS; AND CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. ME5970, ME5971, ME5972, ME5973, ME5974, AND L24550)
Dear Mr. Scarola:
By letter dated September 2, 2011, you submitted an affidavit dated September 2, 2011, and requested that the information contained in the following organizational charts found in to Enclosure 1 of transmittal letter RA-11-025 dated September 2,2011, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
- Nuclear Generation Organization Design Tier 3
- Nuclear Generation Organization Design Tier 4 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in the Agencywide Documents Access and Management System.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- The new Duke Energy Organizational Structure reveals changes to employee positions within the Applicants' organizations.
- These changes have not been shared with affected employees, outside of the integration team formed by Progress Energy and Duke Energy, much less the public.
- The premature release of this information could harm the Applicants' ability to retain talent, and thus, impact the Applicants' competitive position.
J. Scarola
- 2 Further, you stated that the applicants will advise the NRC staff when these organizational charts are made public and at that time will withdraw the request for withholding confidential information from public disclosure.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our conSUltants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1447.
Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 72-6, 50-302 50-400, 50-260, 72-60, 72-3 cc: Distribution via Listserv
ML11265A263 OFFICE DORULPL2-2/PM DORLfLPL2-2/PM DORULPL2-2fLA NAME FSaba BMozafari (FSaba for)
CSoia DATE 09/23/11 09/23/11 09/22/11 OFFICE DIRS/IHPB/BC DORULPL2-2/BC DORLlLPL2-2/PM NAME UShoop DBroaddus FSaba DATE 09/23/11 10/11/11 10/12/11