| {{#Wiki_filter:Annual Assessment Meeting for the Palisades Nuclear 1Nuclear Regulatory Commission -Region IIISouth Haven Michigan March 21, 2012 Plan tReactor Oversight Process -2011 Purpose of Today's Meeting*A public forum for discussion of the licensee's performance in 2011*NRC will address the performance 2issues identified in the annual assessment letter*Licensee will be given the opportunity to respond and inform the NRC of new | | {{#Wiki_filter:Annual Assessment Meeting for the Palisades Nuclear Plant Reactor Oversight Process - 2011 Nuclear Regulatory Commission - Region III South Haven Michigan March 21, 2012 1 |
|
| |
|
| or existing programs to maintain or | | Purpose of Todays Meeting |
| | * A public forum for discussion of the licensees performance in 2011 |
| | * NRC will address the performance issues identified in the annual assessment letter |
| | * Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance 2 |
|
| |
|
| improve performance Agenda*Introduction *Review of Reactor Oversight Process
| | Agenda |
| *National Summary of Plant PerformanceDiifPlPfRl 3*Di scuss i on o f Pl ant P er f ormance R esu l ts*Licensee Response and Remarks | | * Introduction |
| *NRC Closing Remarks | | * Review of Reactor Oversight Process |
| *Break | | * National Summary of Plant Performance |
| *NRC available to address public questions Region III OrganizationCynthia D. PedersonActing Regional AdministratorJennifer L. UhleActing Deputy Regional AdministratorDivision of Reactor ProjectsDivision of Reactor SafetyDivision of Nuclear Materials Safety 4K. Steven West, DirectorGary Shear, Deputy DirectorSteven A. Reynolds, DirectorKenneth O'Brien, Deputy DirectorJack GiessnerBranch 4 ChiefRegional SpecialistsPalisades Resident Inspection StaffTom Taylor, Senior Resident InspectorApril Scarbeary, Resident InspectorBranch StaffRobert Lerch, Project EngineerDiana Betancourt, Reactor EngineerSwetha Shah, Reactor EngineerAnne T. Boland, DirectorPatrick Louden, Deputy DirectorRegional Specialists Our Mission License and regulate nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. | | * Di Discussion i off Pl Plant Performance P f Results R l |
| 5-Establishing rules and regulations-Issuing licenses
| | * Licensee Response and Remarks |
| -Providing oversight through inspection, enforcement, and evaluation of operational experience-Conducting research to provide support for regulatory decisions-Responding to events and emergencies Some Nuclear Facts*104 nuclear power plants supply about 20 percent of the electricity in the U.S.*Nuclear materials are used inmedicinefordiagnosis 6 in medicine for diagnosis and cancer treatment.*Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and
| | * NRC Closing Remarks |
| | * Break |
| | * NRC available to address public questions 3 |
|
| |
|
| irradiators.
| | Region III Organization Cynthia D. Pederson Acting Regional Administrator Jennifer L. Uhle Acting Deputy Regional Administrator Division of Reactor Safety Division of Reactor Projects Division of Nuclear Materials Safety Steven A. Reynolds, Director K. Steven West, Director Anne T. Boland, Director Kenneth OBrien, Deputy Director Gary Shear, Deputy Director Patrick Louden, Deputy Director Jack Giessner Regional Specialists Regional Specialists Branch 4 Chief Branch Staff Palisades Resident Inspection Staff Robert Lerch, Project Engineer Tom Taylor, Senior Resident Inspector Diana Betancourt, Reactor Engineer April Scarbeary, Resident Inspector Swetha Shah, Reactor Engineer 4 |
| The NRC Regulates*Nuclear reactors-commercial power reactors, research and test reactors, new reactor designs*Nuclear materials-nuclear reactor fuel, radioactive materials for medical, industrial, and academic use 7*Nuclear waste-transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities*Nuclear security-physical security of nuclear facilities and materials from sabotage or attacks What We Don't Do*Regulate nuclear weapons, military reactors, or space vehicle reactors 8*Own or operate nuclear power plants*Regulate some radioactive materials, such as X-rays and naturally
| |
|
| |
|
| occurring radon Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsPerformance IndicatorResultsStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsPerformance IndicatorResultsStrategicPerformance Areas 9Significance ThresholdAction MatrixSignificance ThresholdRegulatory ResponseSignificance ThresholdAction MatrixSignificance ThresholdRegulatory Response Reactor Oversight Process Cornerstones Mission Strategic Pf 10 P er f ormance AreasCornerstones Cross-Cutting AreasHuman Performance--Safety Conscious Work Environment--Problem Identification &
| | Our Mission License and regulate nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. |
| Resolution Significance Threshold of Inspection Findings and IndicatorsSafety significance NRC ResponseGreen (very low)Routine NRC InspectionsWhite(lowtomoderate)IncreasesNRCoversight 11 White (low to moderate)Increases NRC oversightYellow(substantial)Increases NRC oversight Red (high)Increases NRC oversight Action Matrix ConceptLicensee Response IRegulatory Response IIDegraded Cornerstone III Multiple/RepDegraded Cornerstone IVUnacceptable Performance V 12Increasing Safety SignificanceIncreasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions National Summary of Plant Performance Status as of 2/15/2012I Licensee Response 88 II Regulatory Response 11IIIDegradedCornerstonePalisadesnow 3 13 III Degraded Cornerstone Palisades now 3IV Multiple/Repetitive Deg. Cornerstone1 V Unacceptable 0Total*103*Fort Calhoun not included -shutdown and requires NRC permission to restart National Summary*Performance Indicator Results for 2011-Green 6585-White9
| | - Establishing rules and regulations |
| -Yellow 0 Red 0 14-Red 0*Total Inspection Findings in 2011-Green 846-White13 | | - Issuing licenses |
| -Yellow 2-Red 0 Palisades Assessment ResultsJanuary 1 -December 31, 2011*In the fourth q uarter of 2011 NRC 15 qplaced Palisades in Column III -Degraded Cornerstone Column Summary of Safety Significant FindingsPlant continues to operate safely, but performance has degraded*Operator leaves his post -Confirmatory Order | | - Providing oversight through inspection, enforcement, and evaluation of operational experience |
| *AnAuxiliaryFeedWaterpumpfailedtofunction
| | - Conducting research to provide support for regulatory decisions |
| -16 An Auxiliary Feed Water pump failed to function (low to moderate safety significance)*Service Water pump coupling failure -(low to moderate safety significance)*Complicated shutdown caused by fault during work on an electric panel -(substantial safety significance) | | - Responding to events and emergencies 5 |
| Cornerstones Mission Strategic Pf P er f ormance AreasCornerstones SW pump failure DC bus failure AF pump failure NRC's Response to Issues 2011 *Routine inspections ~ 2500 hours 18*Additional inspections to address plant issues -over 1000 hours Palisades Inspection ActivitiesJanuary 1 -December 31, 2011*Routine Inspections
| |
|
| |
|
| *S pecial Ins pection Team -Service 19 pp water coupling failure*Special Inspection Team -Complicated shutdown caused by electrical fault Assessment Summary*Palisades continues to operate safely*NRC placed Palisades in Column III of the Action Matrix (Degraded Cornerstone) in 4 th quarter 2011 | | Some Nuclear Facts |
| *SubstantiveCross | | * 104 nuclear power plants supply about 20 percent of the electricity in the U.S. |
| -cuttingIssues(SCCIs)
| | * Nuclear materials are used in medicine for diagnosis and cancer treatment. |
| -20*Substantive Cross-cutting Issues (SCCIs) -three in human performance area-Conservative Assumptions-Adequate Procedures
| | * Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators. |
| -Effective Oversight*If the NRC determines the plant is not operating safely, we will shut down the plant NRC's Response to Issues 2012*NRC will do routine/baseline activity*NRC will do follow-up inspections on all three greater than green findings and confirmatory order
| | 6 |
| *NRCwillindependentlyevaluatetheissues 21*NRC will independently evaluate the issues -Adequate actions to prevent the issue from occurring again-Determine if the condition that existed could exist in other equipment-Determine the root/underlying causes and evaluate if those causes could lead to other events-Determine if problems with safety culture caused or significantly contributed to the events Licensee Response and RemarksEntergyNuclearOperations 22 Entergy Nuclear Operations Palisades Nuclear Plant Remarks Closing Remarks C y nthia Pederson yActing Regional Administrator, RIII 23 Questions/Comments 24 Open to the Public*The NRC places a high priority on keeping the public and stakeholders informed of its
| |
|
| |
|
| activities. | | The NRC Regulates |
| 25*At www.nrc.gov, you can:-Find public meeting dates and transcripts;-Read NRC testimony, speeches, press releases, and policy decisions; and -Access the agency's Electronic Reading Room to find NRC publications and documents.
| | * Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs |
| Contacting the NRC*Report an emergency-(301) 816-5100 (call collect)*Report a safety concern 26-(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov | | * Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use |
| -Select "What We Do" for Public Affairs NRC Representatives*Viktoria Mitlyng, Office of Public Affairs, RIII-(630) 829-9662*John "Jack" Giessner, Branch Chief, Division of Reactor Pro j ects 27 j-(630) 829-9619*Tom Taylor, Senior Resident Inspector-(269) 764-8971*April Scarbeary, Resident Inspector-(269) 764-8972 Reference Sources*Reactor Oversight Process-http://www.nrc.gov/NRR/OVERSIGHT/ | | * Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities |
| | * Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks 7 |
| | |
| | What We Dont Do |
| | * Regulate nuclear weapons, military reactors, or space vehicle reactors |
| | * Own or operate nuclear power plants |
| | * Regulate some radioactive materials, such as X-rays and naturally occurring radon 8 |
| | |
| | Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 9 |
| | |
| | Reactor Oversight Process Cornerstones Mission Strategic P f Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & |
| | Resolution 10 |
| | |
| | Significance Threshold of Inspection Findings and Indicators Safety significance NRC Response Green (very low) Routine NRC Inspections White (low to moderate) Increases NRC oversight Yellow (substantial) Increases NRC oversight Red (high) Increases NRC oversight 11 |
| | |
| | Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep Unacceptable Response Response Cornerstone Degraded Performance I II III Cornerstone V IV Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 12 |
| | |
| | National Summary of Plant Performance Status as of 2/15/2012 I Licensee Response 88 II Regulatory Response 11 III Degraded Cornerstone Palisades now 3 IV Multiple/Repetitive Deg. Cornerstone 1 V Unacceptable 0 Total *103 |
| | *Fort Calhoun not included - shutdown and requires NRC permission to restart 13 |
| | |
| | National Summary |
| | * Performance Indicator Results for 2011 |
| | - Green 6585 |
| | - White 9 |
| | - Yellow 0 |
| | - Red 0 |
| | * Total Inspection Findings in 2011 |
| | - Green 846 |
| | - White 13 |
| | - Yellow 2 |
| | - Red 0 14 |
| | |
| | Palisades Assessment Results January 1 - December 31, 2011 |
| | * In the fourth q quarter of 2011 NRC placed Palisades in Column III - |
| | Degraded Cornerstone Column 15 |
| | |
| | Summary of Safety Significant Findings Plant continues to operate safely, but performance has degraded |
| | * Operator leaves his post - Confirmatory Order |
| | * An Auxiliary Feed Water pump failed to function - |
| | (low to moderate safety significance) |
| | * Service Water pump coupling failure - |
| | (low to moderate safety significance) |
| | * Complicated shutdown caused by fault during work on an electric panel - |
| | (substantial safety significance) 16 |
| | |
| | Cornerstones Mission Strategic P f Performance Areas Cornerstones SW AF pump pump failure failure DC bus failure |
| | |
| | NRCs Response to Issues 2011 |
| | * Routine inspections ~ 2500 hours |
| | * Additional inspections to address plant issues - over 1000 hours 18 |
| | |
| | Palisades Inspection Activities January 1 - December 31, 2011 |
| | * Routine Inspections |
| | * Special p Inspection p Team - Service water coupling failure |
| | * Special Inspection Team - Complicated shutdown caused by electrical fault 19 |
| | |
| | Assessment Summary |
| | * Palisades continues to operate safely |
| | * NRC placed Palisades in Column III of the Action Matrix (Degraded Cornerstone) in 4th quarter 2011 |
| | * Substantive Cross-cutting Issues (SCCIs) - |
| | three in human performance area |
| | - Conservative Assumptions |
| | - Adequate Procedures |
| | - Effective Oversight |
| | * If the NRC determines the plant is not operating safely, we will shut down the plant 20 |
| | |
| | NRCs Response to Issues 2012 |
| | * NRC will do routine/baseline activity |
| | * NRC will do follow-up inspections on all three greater than green findings and confirmatory order |
| | * NRC will independently evaluate the issues |
| | - Adequate actions to prevent the issue from occurring again |
| | - Determine if the condition that existed could exist in other equipment |
| | - Determine the root/underlying causes and evaluate if those causes could lead to other events |
| | - Determine if problems with safety culture caused or significantly contributed to the events 21 |
| | |
| | Licensee Response and Remarks Entergy Nuclear Operations Palisades Nuclear Plant Remarks 22 |
| | |
| | Closing Remarks Cynthia y Pederson Acting Regional Administrator, RIII 23 |
| | |
| | Questions/Comments 24 |
| | |
| | Open to the Public |
| | * The NRC places a high priority on keeping the public and stakeholders informed of its activities. |
| | * At www.nrc.gov, you can: |
| | - Find public meeting dates and transcripts; |
| | - Read NRC testimony, speeches, press releases, and policy decisions; and |
| | - Access the agencys Electronic Reading Room to find NRC publications and documents. |
| | 25 |
| | |
| | Contacting the NRC |
| | * Report an emergency |
| | - (301) 816-5100 (call collect) |
| | * Report a safety concern |
| | - (800) 695-7403 |
| | - Allegation@nrc.gov |
| | * General information or questions |
| | - www.nrc.gov |
| | - Select What We Do for Public Affairs 26 |
| | |
| | NRC Representatives |
| | * Viktoria Mitlyng, Office of Public Affairs, RIII |
| | - (630) 829-9662 |
| | * John Jack Giessner, Branch Chief, Division of Reactor Projects j |
| | - (630) 829-9619 |
| | * Tom Taylor, Senior Resident Inspector |
| | - (269) 764-8971 |
| | * April Scarbeary, Resident Inspector |
| | - (269) 764-8972 27 |
| | |
| | Reference Sources |
| | * Reactor Oversight Process |
| | - http://www.nrc.gov/NRR/OVERSIGHT/ |
| ASSESS/index.html | | ASSESS/index.html |
| *PublicElectronicReadingRoom 28 Public Electronic Reading Room-http://www.nrc.gov/reading-rm.html*NRC Information Digest-http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/*Public Document Room-1-800-397-4209 (Toll Free) | | * Public Electronic Reading Room |
| NRC Social Media Channels*Blog:http://public-blog.nrc-gateway.gov/*Flickr:http://www.flickr.com/photos/nrcgov/*Twitter:https://twitter.com/#!/nrcgov*YouTube: http://www.youtube.com/user/NRCgov*RSS:http://www.nrc.gov/public-involve/listserver.html#rss 29}} | | - http://www.nrc.gov/reading-rm.html |
| | * NRC Information Digest |
| | - http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/ |
| | * Public Document Room 800-397-4209 (Toll Free) 28 |
| | |
| | NRC Social Media Channels |
| | * Blog: http://public-blog.nrc-gateway.gov/ |
| | * Flickr: http://www.flickr.com/photos/nrcgov/ |
| | * Twitter: https://twitter.com/#!/nrcgov |
| | * YouTube: http://www.youtube.com/user/NRCgov |
| | * RSS: http://www.nrc.gov/public-involve/listserver.html#rss 29}} |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 ML13010A2822013-01-10010 January 2013 January 12, 2013 Webinar Presentation Slides ML12338A1072012-12-11011 December 2012 NRC Public Meeting Slides for 12-11-12 PNP 2012-109, Public Meeting Slides for December 11, 2012 Meeting2012-12-0707 December 2012 Public Meeting Slides for December 11, 2012 Meeting ML12314A3712012-11-13013 November 2012 NFPA 805 Presubmittal Meeting 11 9 12 Rev 8 ML12255A0092012-09-11011 September 2012 Licensee Slides for Public Meeting September 12, 2012 ML12074A0692012-03-14014 March 2012 NRC EOC Slide Presentation for Public Meeting ML12058A4912012-02-27027 February 2012 Public Meeting Slides, Palisades Nuclear Plant ML1201000572012-01-11011 January 2012 Swp Presentation for Meeting January 11, 2012 at 9am ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1111605022011-05-0505 May 2011 EOC NRC Slides Presentation for Public Meeting ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1020206332010-07-21021 July 2010 July 21, 2010, Areva Meeting Slides ML1017400612010-06-22022 June 2010 Palisades NRC Planning Meeting TLAA 10 CFR 54.21(c)(1)(iii) Pressurized Thermal Shock 10CFR50.61 (Slides) ML1012602072010-05-11011 May 2010 Slides, Presentation for Palisades Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1013002252010-05-0707 May 2010 Draft Responses to NRC RAI in Preparation for Meeting on May 12 and 13, 2010 - GL 2004-02 2024-07-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24296B1652024-10-22022 October 2024 Pre-Submittal Meeting Slides Oct 24 GSI191 ML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 ML23075A3312023-03-16016 March 2023 KM Session OL Process February 9, 2023 ML23075A3322023-03-16016 March 2023 Containment 2008 ML23075A3332023-03-16016 March 2023 Ts/Rg 1.33 V. Appendix B, Criterion V ML23075A3352023-03-16016 March 2023 KM-KT Session Presentation Disputed Violations PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML22153A1702022-06-16016 June 2022 Public Presentation Slides for Palisades Webinar June 16, 2022 ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20231A2312020-08-17017 August 2020 2019 Palisades - EOC Presentation ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17335A0332017-11-28028 November 2017 Meeting Slides for November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Conformances ML17160A1952017-06-12012 June 2017 Meeting Slides for Pre-Submittal Meeting with Entergy Regarding the Plan for Decommissioning Licensing Actions PNP 2017-017, Notification in Response to Confirmatory Order, EA-15-0392017-05-0404 May 2017 Notification in Response to Confirmatory Order, EA-15-039 ML17080A1782017-03-20020 March 2017 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change ML16344A0882016-12-0707 December 2016 December 7, 2016, Summary of Public Meeting with Entergy Nuclear Operations, Inc.- Meeting Slides ML16277A6212016-09-28028 September 2016 GSI-191 Closure Plan: September 28, 2016 - Meeting Slides ML16167A3722016-06-23023 June 2016 Nrc'S Annual Performance Assessment of Palisades for 2015 ML15107A3062015-04-14014 April 2015 April 14, 2015, Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15107A3072015-04-14014 April 2015 April 14, 2015, Corrected Public Meeting Slides for Primary Coolant System Branch Connection Weld Volumetric Examination Status - Palisades Nuclear Plant ML15093A2902015-04-0303 April 2015 Licensee End-of-Cycle Meeting Slides ML15093A2942015-04-0303 April 2015 NRC Meeting Slides ML15012A3682015-01-12012 January 2015 EA-14-168; Palisades Nuclear Plant Conference Slides ML14175A2842014-06-24024 June 2014 NRC Presentation for Palisades 2013 Annual Assessment Public Meeting ML14175A2992014-06-24024 June 2014 Licensee Presentation for Palisades 2013 Annual Assessment Public Meeting ML13316C4722013-11-14014 November 2013 Palisades Independent Spent Fuel Storage Installation (ISFSI) at Nuclear Power Plants ML13262A4492013-09-23023 September 2013 October 9, 2013, EMA Presentation Slides for Conference Call with Entergy Nuclear Operations ML13193A3302013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13190A2552013-07-16016 July 2013 NRC Internet Event Briefing - Palisades Safety Injection Refueling Water Tank (SIRWT) Leak Repair and Inspections ML13140A3582013-05-20020 May 2013 May 23, 2013 NRC Presentation ML13093A1912013-04-0303 April 2013 EOC Public NRC Meeting Slides Final ML13091A1172013-04-0101 April 2013 EOC Licensee Slides for April 2, 2013 Meeting ML13091A2202013-03-29029 March 2013 Public Meeting Slides ML13080A3852013-03-21021 March 2013 NRC Slides for EOC Meeting 4/2/13 2024-07-30
[Table view] |
Text
Annual Assessment Meeting for the Palisades Nuclear Plant Reactor Oversight Process - 2011 Nuclear Regulatory Commission - Region III South Haven Michigan March 21, 2012 1
Purpose of Todays Meeting
- A public forum for discussion of the licensees performance in 2011
- NRC will address the performance issues identified in the annual assessment letter
- Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance 2
Agenda
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Di Discussion i off Pl Plant Performance P f Results R l
- Licensee Response and Remarks
- NRC available to address public questions 3
Region III Organization Cynthia D. Pederson Acting Regional Administrator Jennifer L. Uhle Acting Deputy Regional Administrator Division of Reactor Safety Division of Reactor Projects Division of Nuclear Materials Safety Steven A. Reynolds, Director K. Steven West, Director Anne T. Boland, Director Kenneth OBrien, Deputy Director Gary Shear, Deputy Director Patrick Louden, Deputy Director Jack Giessner Regional Specialists Regional Specialists Branch 4 Chief Branch Staff Palisades Resident Inspection Staff Robert Lerch, Project Engineer Tom Taylor, Senior Resident Inspector Diana Betancourt, Reactor Engineer April Scarbeary, Resident Inspector Swetha Shah, Reactor Engineer 4
Our Mission License and regulate nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
- Establishing rules and regulations
- Issuing licenses
- Providing oversight through inspection, enforcement, and evaluation of operational experience
- Conducting research to provide support for regulatory decisions
- Responding to events and emergencies 5
Some Nuclear Facts
- 104 nuclear power plants supply about 20 percent of the electricity in the U.S.
- Nuclear materials are used in medicine for diagnosis and cancer treatment.
- Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
6
The NRC Regulates
- Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
- Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
- Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
- Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks 7
What We Dont Do
- Regulate nuclear weapons, military reactors, or space vehicle reactors
- Own or operate nuclear power plants
- Regulate some radioactive materials, such as X-rays and naturally occurring radon 8
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 9
Reactor Oversight Process Cornerstones Mission Strategic P f Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification &
Resolution 10
Significance Threshold of Inspection Findings and Indicators Safety significance NRC Response Green (very low) Routine NRC Inspections White (low to moderate) Increases NRC oversight Yellow (substantial) Increases NRC oversight Red (high) Increases NRC oversight 11
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep Unacceptable Response Response Cornerstone Degraded Performance I II III Cornerstone V IV Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 12
National Summary of Plant Performance Status as of 2/15/2012 I Licensee Response 88 II Regulatory Response 11 III Degraded Cornerstone Palisades now 3 IV Multiple/Repetitive Deg. Cornerstone 1 V Unacceptable 0 Total *103
- Fort Calhoun not included - shutdown and requires NRC permission to restart 13
National Summary
- Performance Indicator Results for 2011
- Green 6585
- White 9
- Yellow 0
- Red 0
- Total Inspection Findings in 2011
- Green 846
- White 13
- Yellow 2
- Red 0 14
Palisades Assessment Results January 1 - December 31, 2011
- In the fourth q quarter of 2011 NRC placed Palisades in Column III -
Degraded Cornerstone Column 15
Summary of Safety Significant Findings Plant continues to operate safely, but performance has degraded
- Operator leaves his post - Confirmatory Order
(low to moderate safety significance)
(low to moderate safety significance)
- Complicated shutdown caused by fault during work on an electric panel -
(substantial safety significance) 16
Cornerstones Mission Strategic P f Performance Areas Cornerstones SW AF pump pump failure failure DC bus failure
NRCs Response to Issues 2011
- Routine inspections ~ 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br />
- Additional inspections to address plant issues - over 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 18
Palisades Inspection Activities January 1 - December 31, 2011
- Special Inspection Team - Complicated shutdown caused by electrical fault 19
Assessment Summary
- Palisades continues to operate safely
- NRC placed Palisades in Column III of the Action Matrix (Degraded Cornerstone) in 4th quarter 2011
- Substantive Cross-cutting Issues (SCCIs) -
three in human performance area
- Conservative Assumptions
- Adequate Procedures
- Effective Oversight
- If the NRC determines the plant is not operating safely, we will shut down the plant 20
NRCs Response to Issues 2012
- NRC will do routine/baseline activity
- NRC will do follow-up inspections on all three greater than green findings and confirmatory order
- NRC will independently evaluate the issues
- Adequate actions to prevent the issue from occurring again
- Determine if the condition that existed could exist in other equipment
- Determine the root/underlying causes and evaluate if those causes could lead to other events
- Determine if problems with safety culture caused or significantly contributed to the events 21
Licensee Response and Remarks Entergy Nuclear Operations Palisades Nuclear Plant Remarks 22
Closing Remarks Cynthia y Pederson Acting Regional Administrator, RIII 23
Questions/Comments 24
Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
25
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs 26
NRC Representatives
- (630) 829-9662
- (630) 829-9619
- Tom Taylor, Senior Resident Inspector
- (269) 764-8971
- April Scarbeary, Resident Inspector
- (269) 764-8972 27
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/
ASSESS/index.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
- Public Document Room 800-397-4209 (Toll Free) 28
NRC Social Media Channels