{{#Wiki_filter:Annual Assessment Meeting for the Palisades Nuclear 1Nuclear Regulatory Commission -Region IIISouth Haven Michigan March 21, 2012 Plan tReactor Oversight Process -2011 Purpose of Today's Meeting*A public forum for discussion of the licensee's performance in 2011*NRC will address the performance 2issues identified in the annual assessment letter*Licensee will be given the opportunity to respond and inform the NRC of new
{{#Wiki_filter:Annual Assessment Meeting for the Palisades Nuclear Plant Reactor Oversight Process - 2011 Nuclear Regulatory Commission - Region III South Haven Michigan March 21, 2012 1


or existing programs to maintain or  
Purpose of Todays Meeting
* A public forum for discussion of the licensees performance in 2011
* NRC will address the performance issues identified in the annual assessment letter
* Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance 2


improve performance Agenda*Introduction *Review of Reactor Oversight Process
Agenda
*National Summary of Plant PerformanceDiifPlPfRl 3*Di scuss i on o f Pl ant P er f ormance R esu l ts*Licensee Response and Remarks
* Introduction
*NRC Closing Remarks
* Review of Reactor Oversight Process
*Break
* National Summary of Plant Performance
*NRC available to address public questions Region III OrganizationCynthia D. PedersonActing Regional AdministratorJennifer L. UhleActing Deputy Regional AdministratorDivision of Reactor ProjectsDivision of Reactor SafetyDivision of Nuclear Materials Safety 4K. Steven West, DirectorGary Shear, Deputy DirectorSteven A. Reynolds, DirectorKenneth O'Brien, Deputy DirectorJack GiessnerBranch 4 ChiefRegional SpecialistsPalisades Resident Inspection StaffTom Taylor, Senior Resident InspectorApril Scarbeary, Resident InspectorBranch StaffRobert Lerch, Project EngineerDiana Betancourt, Reactor EngineerSwetha Shah, Reactor EngineerAnne T. Boland, DirectorPatrick Louden, Deputy DirectorRegional Specialists Our Mission License and regulate nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
* Di Discussion i   off Pl Plant Performance P f         Results R   l
5-Establishing rules and regulations-Issuing licenses
* Licensee Response and Remarks
-Providing oversight through inspection, enforcement, and evaluation of operational experience-Conducting research to provide support for regulatory decisions-Responding to events and emergencies Some Nuclear Facts*104 nuclear power plants supply about 20 percent of the electricity in the U.S.*Nuclear materials are used inmedicinefordiagnosis 6 in medicine for diagnosis and cancer treatment.*Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and
* NRC Closing Remarks
* Break
* NRC available to address public questions 3


irradiators.
Region III Organization Cynthia D. Pederson Acting Regional Administrator Jennifer L. Uhle Acting Deputy Regional Administrator Division of Reactor Safety                  Division of Reactor Projects            Division of Nuclear Materials Safety Steven A. Reynolds, Director                    K. Steven West, Director                    Anne T. Boland, Director Kenneth OBrien, Deputy Director                Gary Shear, Deputy Director                Patrick Louden, Deputy Director Jack Giessner Regional Specialists                                                                      Regional Specialists Branch 4 Chief Branch Staff Palisades Resident Inspection Staff Robert Lerch, Project Engineer Tom Taylor, Senior Resident Inspector Diana Betancourt, Reactor Engineer April Scarbeary, Resident Inspector Swetha Shah, Reactor Engineer 4
The NRC Regulates*Nuclear reactors-commercial power reactors, research and test reactors, new reactor designs*Nuclear materials-nuclear reactor fuel, radioactive materials for medical, industrial, and academic use 7*Nuclear waste-transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities*Nuclear security-physical security of nuclear facilities and materials from sabotage or attacks What We Don't Do*Regulate nuclear weapons, military reactors, or space vehicle reactors 8*Own or operate nuclear power plants*Regulate some radioactive materials, such as X-rays and naturally


occurring radon Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsPerformance IndicatorResultsStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsPerformance IndicatorResultsStrategicPerformance Areas 9Significance ThresholdAction MatrixSignificance ThresholdRegulatory ResponseSignificance ThresholdAction MatrixSignificance ThresholdRegulatory Response Reactor Oversight Process Cornerstones Mission Strategic Pf 10 P er f ormance AreasCornerstones Cross-Cutting AreasHuman Performance--Safety Conscious Work Environment--Problem Identification &
Our Mission License and regulate nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
Resolution Significance Threshold of Inspection Findings and IndicatorsSafety significance NRC ResponseGreen (very low)Routine NRC InspectionsWhite(lowtomoderate)IncreasesNRCoversight 11 White (low to moderate)Increases NRC oversightYellow(substantial)Increases NRC oversight Red (high)Increases NRC oversight Action Matrix ConceptLicensee Response IRegulatory Response IIDegraded Cornerstone III Multiple/RepDegraded Cornerstone IVUnacceptable Performance V 12Increasing Safety SignificanceIncreasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions National Summary of Plant Performance Status as of 2/15/2012I  Licensee Response  88 II  Regulatory Response 11IIIDegradedCornerstonePalisadesnow 3 13 III Degraded Cornerstone      Palisades now 3IV Multiple/Repetitive Deg. Cornerstone1 V  Unacceptable  0Total*103*Fort Calhoun not included -shutdown and requires NRC permission to restart National Summary*Performance Indicator Results for 2011-Green 6585-White9
  - Establishing rules and regulations
-Yellow 0 Red 0 14-Red 0*Total Inspection Findings in 2011-Green 846-White13
  - Issuing licenses
-Yellow 2-Red 0 Palisades Assessment ResultsJanuary 1 -December 31, 2011*In the fourth q uarter of 2011 NRC 15 qplaced Palisades in Column III -Degraded Cornerstone Column Summary of Safety Significant FindingsPlant continues to operate safely, but performance has degraded*Operator leaves his post -Confirmatory Order
  - Providing oversight through inspection, enforcement, and evaluation of operational experience
*AnAuxiliaryFeedWaterpumpfailedtofunction
  - Conducting research to provide support for regulatory decisions
-16 An Auxiliary Feed Water pump failed to function (low to moderate safety significance)*Service Water pump coupling failure -(low to moderate safety significance)*Complicated shutdown caused by fault during work on an electric panel -(substantial safety significance)
  - Responding to events and emergencies 5
Cornerstones Mission Strategic Pf P er f ormance AreasCornerstones SW pump failure DC bus failure AF pump failure NRC's Response to Issues 2011 *Routine inspections ~ 2500 hours 18*Additional inspections to address plant issues -over 1000 hours Palisades Inspection ActivitiesJanuary 1 -December 31, 2011*Routine Inspections


*S pecial Ins pection Team -Service 19 pp water coupling failure*Special Inspection Team -Complicated shutdown caused by electrical fault Assessment Summary*Palisades continues to operate safely*NRC placed Palisades in Column III of the Action Matrix (Degraded Cornerstone) in 4 th quarter 2011
Some Nuclear Facts
*SubstantiveCross
* 104 nuclear power plants supply about 20 percent of the electricity in the U.S.
-cuttingIssues(SCCIs)
* Nuclear materials are used in medicine for diagnosis and cancer treatment.
-20*Substantive Cross-cutting Issues (SCCIs) -three in human performance area-Conservative Assumptions-Adequate Procedures
* Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
-Effective Oversight*If the NRC determines the plant is not operating safely, we will shut down the plant NRC's Response to Issues 2012*NRC will do routine/baseline activity*NRC will do follow-up inspections on all three greater than green findings and confirmatory order
6
*NRCwillindependentlyevaluatetheissues 21*NRC will independently evaluate the issues -Adequate actions to prevent the issue from occurring again-Determine if the condition that existed could exist in other equipment-Determine the root/underlying causes and evaluate if those causes could lead to other events-Determine if problems with safety culture caused or significantly contributed to the events Licensee Response and RemarksEntergyNuclearOperations 22 Entergy Nuclear Operations Palisades Nuclear Plant Remarks Closing Remarks C y nthia Pederson yActing Regional Administrator, RIII 23 Questions/Comments 24 Open to the Public*The NRC places a high priority on keeping the public and stakeholders informed of its


activities.
The NRC Regulates
25*At www.nrc.gov, you can:-Find public meeting dates and transcripts;-Read NRC testimony, speeches, press releases, and policy decisions; and -Access the agency's Electronic Reading Room to find NRC publications and documents.
* Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
Contacting the NRC*Report an emergency-(301) 816-5100 (call collect)*Report a safety concern 26-(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov
* Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
-Select "What We Do" for Public Affairs NRC Representatives*Viktoria Mitlyng, Office of Public Affairs, RIII-(630) 829-9662*John "Jack" Giessner, Branch Chief, Division of Reactor Pro j ects 27 j-(630) 829-9619*Tom Taylor, Senior Resident Inspector-(269) 764-8971*April Scarbeary, Resident Inspector-(269) 764-8972 Reference Sources*Reactor Oversight Process-http://www.nrc.gov/NRR/OVERSIGHT/
* Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
* Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks 7
 
What We Dont Do
* Regulate nuclear weapons, military reactors, or space vehicle reactors
* Own or operate nuclear power plants
* Regulate some radioactive materials, such as X-rays and naturally occurring radon 8
 
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance                    Significance Threshold                        Threshold Action Matrix Regulatory Response 9
 
Reactor Oversight Process Cornerstones Mission Strategic P f Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification &
Resolution 10
 
Significance Threshold of Inspection Findings and Indicators Safety significance    NRC Response Green (very low)        Routine NRC Inspections White (low to moderate) Increases NRC oversight Yellow (substantial)    Increases NRC oversight Red (high)              Increases NRC oversight 11
 
Action Matrix Concept Licensee  Regulatory Degraded    Multiple/Rep Unacceptable Response  Response  Cornerstone Degraded    Performance I        II        III    Cornerstone        V IV Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 12
 
National Summary of Plant Performance Status as of 2/15/2012 I Licensee Response                                      88 II Regulatory Response                                  11 III Degraded Cornerstone              Palisades now 3 IV Multiple/Repetitive Deg. Cornerstone                  1 V Unacceptable                                            0 Total                                              *103
*Fort Calhoun not included - shutdown and requires NRC permission to restart 13
 
National Summary
* Performance Indicator Results for 2011
  - Green      6585
  - White      9
  - Yellow      0
  - Red        0
* Total Inspection Findings in 2011
  - Green      846
  - White      13
  - Yellow      2
  - Red        0 14
 
Palisades Assessment Results January 1 - December 31, 2011
* In the fourth q quarter of 2011 NRC placed Palisades in Column III -
Degraded Cornerstone Column 15
 
Summary of Safety Significant Findings Plant continues to operate safely, but performance has degraded
* Operator leaves his post - Confirmatory Order
* An Auxiliary Feed Water pump failed to function -
(low to moderate safety significance)
* Service Water pump coupling failure -
(low to moderate safety significance)
* Complicated shutdown caused by fault during work on an electric panel -
(substantial safety significance) 16
 
Cornerstones Mission Strategic P f Performance Areas Cornerstones SW      AF pump  pump failure failure DC bus failure
 
NRCs Response to Issues 2011
* Routine inspections ~ 2500 hours
* Additional inspections to address plant issues - over 1000 hours 18
 
Palisades Inspection Activities January 1 - December 31, 2011
* Routine Inspections
* Special p      Inspection p      Team - Service water coupling failure
* Special Inspection Team - Complicated shutdown caused by electrical fault 19
 
Assessment Summary
* Palisades continues to operate safely
* NRC placed Palisades in Column III of the Action Matrix (Degraded Cornerstone) in 4th quarter 2011
* Substantive Cross-cutting Issues (SCCIs) -
three in human performance area
    - Conservative Assumptions
    - Adequate Procedures
    - Effective Oversight
* If the NRC determines the plant is not operating safely, we will shut down the plant 20
 
NRCs Response to Issues 2012
* NRC will do routine/baseline activity
* NRC will do follow-up inspections on all three greater than green findings and confirmatory order
* NRC will independently evaluate the issues
    - Adequate actions to prevent the issue from occurring again
    - Determine if the condition that existed could exist in other equipment
    - Determine the root/underlying causes and evaluate if those causes could lead to other events
    - Determine if problems with safety culture caused or significantly contributed to the events 21
 
Licensee Response and Remarks Entergy Nuclear Operations Palisades Nuclear Plant Remarks 22
 
Closing Remarks Cynthia y      Pederson Acting Regional Administrator, RIII 23
 
Questions/Comments 24
 
Open to the Public
* The NRC places a high priority on keeping the public and stakeholders informed of its activities.
* At www.nrc.gov, you can:
    - Find public meeting dates and transcripts;
    - Read NRC testimony, speeches, press releases, and policy decisions; and
    - Access the agencys Electronic Reading Room to find NRC publications and documents.
25
 
Contacting the NRC
* Report an emergency
  - (301) 816-5100 (call collect)
* Report a safety concern
  - (800) 695-7403
  - Allegation@nrc.gov
* General information or questions
  - www.nrc.gov
  - Select What We Do for Public Affairs 26
 
NRC Representatives
* Viktoria Mitlyng, Office of Public Affairs, RIII
    - (630) 829-9662
* John Jack Giessner, Branch Chief, Division of Reactor Projects j
  - (630) 829-9619
* Tom Taylor, Senior Resident Inspector
  - (269) 764-8971
* April Scarbeary, Resident Inspector
  - (269) 764-8972 27
 
Reference Sources
* Reactor Oversight Process
  - http://www.nrc.gov/NRR/OVERSIGHT/
ASSESS/index.html
ASSESS/index.html
*PublicElectronicReadingRoom 28 Public Electronic Reading Room-http://www.nrc.gov/reading-rm.html*NRC Information Digest-http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/*Public Document Room-1-800-397-4209 (Toll Free)
* Public Electronic Reading Room
NRC Social Media Channels*Blog:http://public-blog.nrc-gateway.gov/*Flickr:http://www.flickr.com/photos/nrcgov/*Twitter:https://twitter.com/#!/nrcgov*YouTube: http://www.youtube.com/user/NRCgov*RSS:http://www.nrc.gov/public-involve/listserver.html#rss 29}}
  - http://www.nrc.gov/reading-rm.html
* NRC Information Digest
  - http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
* Public Document Room 800-397-4209 (Toll Free) 28
 
NRC Social Media Channels
* Blog:       http://public-blog.nrc-gateway.gov/
* Flickr:     http://www.flickr.com/photos/nrcgov/
* Twitter: https://twitter.com/#!/nrcgov
* YouTube: http://www.youtube.com/user/NRCgov
* RSS:     http://www.nrc.gov/public-involve/listserver.html#rss 29}}

Latest revision as of 06:46, 12 November 2019

NRC EOC Slide Presentation for Public Meeting
ML12074A069
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/14/2012
From:
NRC/RGN-III
To:
References
Download: ML12074A069 (29)


Text

Annual Assessment Meeting for the Palisades Nuclear Plant Reactor Oversight Process - 2011 Nuclear Regulatory Commission - Region III South Haven Michigan March 21, 2012 1

Purpose of Todays Meeting

  • A public forum for discussion of the licensees performance in 2011
  • NRC will address the performance issues identified in the annual assessment letter
  • Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance 2

Agenda

  • Introduction
  • Review of Reactor Oversight Process
  • National Summary of Plant Performance
  • Di Discussion i off Pl Plant Performance P f Results R l
  • Licensee Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address public questions 3

Region III Organization Cynthia D. Pederson Acting Regional Administrator Jennifer L. Uhle Acting Deputy Regional Administrator Division of Reactor Safety Division of Reactor Projects Division of Nuclear Materials Safety Steven A. Reynolds, Director K. Steven West, Director Anne T. Boland, Director Kenneth OBrien, Deputy Director Gary Shear, Deputy Director Patrick Louden, Deputy Director Jack Giessner Regional Specialists Regional Specialists Branch 4 Chief Branch Staff Palisades Resident Inspection Staff Robert Lerch, Project Engineer Tom Taylor, Senior Resident Inspector Diana Betancourt, Reactor Engineer April Scarbeary, Resident Inspector Swetha Shah, Reactor Engineer 4

Our Mission License and regulate nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.

- Establishing rules and regulations

- Issuing licenses

- Providing oversight through inspection, enforcement, and evaluation of operational experience

- Conducting research to provide support for regulatory decisions

- Responding to events and emergencies 5

Some Nuclear Facts

  • 104 nuclear power plants supply about 20 percent of the electricity in the U.S.
  • Nuclear materials are used in medicine for diagnosis and cancer treatment.
  • Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.

6

The NRC Regulates

  • Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
  • Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
  • Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
  • Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks 7

What We Dont Do

  • Regulate nuclear weapons, military reactors, or space vehicle reactors
  • Own or operate nuclear power plants
  • Regulate some radioactive materials, such as X-rays and naturally occurring radon 8

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 9

Reactor Oversight Process Cornerstones Mission Strategic P f Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification &

Resolution 10

Significance Threshold of Inspection Findings and Indicators Safety significance NRC Response Green (very low) Routine NRC Inspections White (low to moderate) Increases NRC oversight Yellow (substantial) Increases NRC oversight Red (high) Increases NRC oversight 11

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep Unacceptable Response Response Cornerstone Degraded Performance I II III Cornerstone V IV Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 12

National Summary of Plant Performance Status as of 2/15/2012 I Licensee Response 88 II Regulatory Response 11 III Degraded Cornerstone Palisades now 3 IV Multiple/Repetitive Deg. Cornerstone 1 V Unacceptable 0 Total *103

  • Fort Calhoun not included - shutdown and requires NRC permission to restart 13

National Summary

  • Performance Indicator Results for 2011

- Green 6585

- White 9

- Yellow 0

- Red 0

  • Total Inspection Findings in 2011

- Green 846

- White 13

- Yellow 2

- Red 0 14

Palisades Assessment Results January 1 - December 31, 2011

  • In the fourth q quarter of 2011 NRC placed Palisades in Column III -

Degraded Cornerstone Column 15

Summary of Safety Significant Findings Plant continues to operate safely, but performance has degraded

  • Operator leaves his post - Confirmatory Order

(low to moderate safety significance)

(low to moderate safety significance)

  • Complicated shutdown caused by fault during work on an electric panel -

(substantial safety significance) 16

Cornerstones Mission Strategic P f Performance Areas Cornerstones SW AF pump pump failure failure DC bus failure

NRCs Response to Issues 2011

  • Routine inspections ~ 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br />
  • Additional inspections to address plant issues - over 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 18

Palisades Inspection Activities January 1 - December 31, 2011

  • Routine Inspections
  • Special Inspection Team - Complicated shutdown caused by electrical fault 19

Assessment Summary

  • Palisades continues to operate safely
  • NRC placed Palisades in Column III of the Action Matrix (Degraded Cornerstone) in 4th quarter 2011
  • Substantive Cross-cutting Issues (SCCIs) -

three in human performance area

- Conservative Assumptions

- Adequate Procedures

- Effective Oversight

  • If the NRC determines the plant is not operating safely, we will shut down the plant 20

NRCs Response to Issues 2012

  • NRC will do routine/baseline activity
  • NRC will do follow-up inspections on all three greater than green findings and confirmatory order
  • NRC will independently evaluate the issues

- Adequate actions to prevent the issue from occurring again

- Determine if the condition that existed could exist in other equipment

- Determine the root/underlying causes and evaluate if those causes could lead to other events

- Determine if problems with safety culture caused or significantly contributed to the events 21

Licensee Response and Remarks Entergy Nuclear Operations Palisades Nuclear Plant Remarks 22

Closing Remarks Cynthia y Pederson Acting Regional Administrator, RIII 23

Questions/Comments 24

Open to the Public

  • The NRC places a high priority on keeping the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

25

Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs 26

NRC Representatives

- (630) 829-9662

- (630) 829-9619

  • Tom Taylor, Senior Resident Inspector

- (269) 764-8971

  • April Scarbeary, Resident Inspector

- (269) 764-8972 27

Reference Sources

  • Reactor Oversight Process

- http://www.nrc.gov/NRR/OVERSIGHT/

ASSESS/index.html

  • Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html

  • NRC Information Digest

- http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/

  • Public Document Room 800-397-4209 (Toll Free) 28

NRC Social Media Channels