{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 28, 2012  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 28, 2012 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708
 
Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708  


==SUBJECT:==
==SUBJECT:==
CRYSTAL RIVER UNIT 3 - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION  
CRYSTAL RIVER UNIT 3 - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Franke:==
==Dear Mr. Franke:==


From November 12 - 16, 2012, the NRC will perform baseline Emergency Preparedness inspections at the Crystal River Unit 3, (NRC Inspection Procedures: 71114.01 - Exercise Evaluation and the Emergency Preparedness Sections of 71151, Performance Indicator Verification).
From November 12 - 16, 2012, the NRC will perform baseline Emergency Preparedness inspections at the Crystal River Unit 3, (NRC Inspection Procedures: 71114.01 - Exercise Evaluation and the Emergency Preparedness Sections of 71151, Performance Indicator Verification).
Experience has shown that this inspection is resource-intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
Experience has shown that this inspection is resource-intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Frieda Frando of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at (404) 997-4759 (mark.speck@nrc.gov) or the Chief of Plant Support Branch 1, Brian Bonser at (404) 997-4653.  
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Frieda Frando of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at (404) 997-4759 (mark.speck@nrc.gov) or the Chief of Plant Support Branch 1, Brian Bonser at (404) 997-4653.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document PROGRESS ENERGY 2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
 
Sincerely,              /RA/


Brian Bonser, Chief       Plant Support Branch 1       Division of Reactor Safety Docket No. 50-302 License No. DPR-72  
PROGRESS ENERGY                          2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                          /RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-302 License No. DPR-72


==Enclosure:==
==Enclosure:==
As stated cc w/encl:  (See page 3)
__ML12094A195
_________X  SUNSI REVIEW COMPLETE X  FORM 665 ATTACHED OFFICE RII:  DRS RII:  DRS    SIGNATURE /RA/ /RA/    NAME M. SPECK B. BONSER    DATE 3/  27  /2012 3/  27  /2012    E-MAIL COPY YES NO YES NO PROGRESS ENERGY  3 cc w/encl: Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution
Robert J. Duncan II, Vice President Nuclear Operations Progress Energy Electronic Mail Distribution
Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution
Terry Hobbs Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL  34428-6708
Stephen J. Cahill Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
R. Alexander Glenn, General Counsel Progress Energy Electronic Mail Distribution
Jeffrey R. Swartz Director Site Operations Crystal River Nuclear Plant Electronic Mail Distribution
Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim) Progress Energy Electronic Mail Distribution Thomas Sapporito Consulting Associate (Public Correspondence Only) Post Office Box 8413 Jupiter, FL  33468
William A. Passetti, Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Daniel R. Westcott, Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution Joseph W. Donahue, Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley, Senior Counsel Legal Department Progress Energy Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL  34428 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL  32399-1050 Bryan Koon, Director Florida Division of Emergency Management Electronic Mail Distribution


Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL  36250 Enclosure Document Request List
As stated cc w/encl: (See page 3)


Inspection Dates:   November 12-16, 2012 Inspection Procedures: IP 71114.01 Exercise Evaluation IP 71151 Performance Indicator Verification Note:  This is a list of the documents to be delivered to the NRC Region II Office (Attention: Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or provided to the Team Lead Inspector upon arrival for the inspections. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable ".pdf" files on CDROM or "thumb" drive). Please organize the information as it is arranged below (e.g. a folder labeled "Miscellaneous"). It is not the intent that large or burdensome data be scanned for this purpose. This data will be inspected using original documentation. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector. 
__ML12094A195_________X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE                  RII: DRS          RII: DRS SIGNATURE                  /RA/              /RA/
NAME                    M. SPECK          B. BONSER DATE                    3/ 27 /2012      3/ 27 /2012 E-MAIL COPY            YES      NO      YES      NO


EP1 Exercise Evaluation Drill and exercise related procedures  Core damage assessment procedure  Dose assessment procedure  Special/emergency exposure procedure  Potassium Iodide distribution procedure  Assembly/accountability procedure  Emergency Facility Activation procedures  Previous two exercise packages: scenario timeline drill reports or assessment, and respective Final FEMA/ DHS exercise reports  All drill reports within inspection period  Current exercise package: scenario timeline, expected Drill and Exercise Performance opportunities, exercise objectives, radiological assumptions, and scope of play and participation  Corrective action program entries related to the exercises and drills for the two year inspection period EP01/EP02/EP03 Performance Indicators (PI) Verification Governing document for the performance indicator process  Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) PI data submitted for the two year inspection period  DEP documentation and evaluations for the two year inspection period  Current ERO roster  Corrective action program entries related to performance indicators (i.e. DEP, ERO training and participation, and ANS) for the two year inspection period
PROGRESS ENERGY                    3 cc w/encl:                           William A. Passetti, Chief Kelvin Henderson                      Florida Bureau of Radiation Control General Manager                      Department of Health Nuclear Fleet Operations              Electronic Mail Distribution Progress Energy Electronic Mail Distribution          Daniel R. Westcott, Supervisor Licensing & Regulatory Programs Robert J. Duncan II, Vice President  Crystal River Nuclear Plant (NA1B)
Nuclear Operations                    Electronic Mail Distribution Progress Energy Electronic Mail Distribution          Joseph W. Donahue, Vice President Nuclear Oversight Brian C. McCabe                      Progress Energy Manager, Nuclear Oversight            Electronic Mail Distribution Shearon Harris Nuclear Power Plant Progress Energy                      Jack E. Huegel Electronic Mail Distribution          Manager, Nuclear Oversight Crystal River Nuclear Plant Terry Hobbs                          Electronic Mail Distribution Plant General Manager Crystal River Nuclear Plant (NA2C)   David T. Conley, Senior Counsel 15760 W. Power Line Street            Legal Department Crystal River, FL 34428-6708          Progress Energy Electronic Mail Distribution Stephen J. Cahill Director - Engineering Nuclear        Mark Rigsby Crystal River Nuclear Plant (NA2C)   Manager, Support Services - Nuclear Electronic Mail Distribution          Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution R. Alexander Glenn, General Counsel Progress Energy                      Senior Resident Inspector Electronic Mail Distribution          U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant Jeffrey R. Swartz                    U.S. NRC Director Site Operations              6745 N Tallahassee Rd Crystal River Nuclear Plant          Crystal River, FL 34428 Electronic Mail Distribution Attorney General Donna B. Alexander                    Department of Legal Affairs Manager, Nuclear Regulatory Affairs  The Capitol PL-01 (interim)                             Tallahassee, FL 32399-1050 Progress Energy Electronic Mail Distribution          Bryan Koon, Director Florida Division of Emergency Management Thomas Sapporito                      Electronic Mail Distribution Consulting Associate (Public Correspondence Only)          Chairman Post Office Box 8413                  Board of County Commissioners Jupiter, FL 33468                    Citrus County 110 N. Apopka Avenue Inverness, FL 36250


Miscellaneous Procedures Current Emergency Plan and Emergency Action Levels Safety Evaluation Report approved Emergency Plan and Emergency Action Levels Current Emergency Plan implementing procedures Corrective Action Program procedures}}
Document Request List Inspection Dates:                        November 12-16, 2012 Inspection Procedures:                  IP 71114.01  Exercise Evaluation IP 71151      Performance Indicator Verification Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:
Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or provided to the Team Lead Inspector upon arrival for the inspections. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable .pdf files on CDROM or thumb drive). Please organize the information as it is arranged below (e.g. a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose.
This data will be inspected using original documentation. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
EP1 Exercise Evaluation Drill and exercise related procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Emergency Facility Activation procedures Previous two exercise packages: scenario timeline drill reports or assessment, and respective Final FEMA/ DHS exercise reports All drill reports within inspection period Current exercise package: scenario timeline, expected Drill and Exercise Performance opportunities, exercise objectives, radiological assumptions, and scope of play and participation Corrective action program entries related to the exercises and drills for the two year inspection period EP01/EP02/EP03 Performance Indicators (PI) Verification Governing document for the performance indicator process Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) PI data submitted for the two year inspection period DEP documentation and evaluations for the two year inspection period Current ERO roster Corrective action program entries related to performance indicators (i.e. DEP, ERO training and participation, and ANS) for the two year inspection period Miscellaneous Procedures Current Emergency Plan and Emergency Action Levels Safety Evaluation Report approved Emergency Plan and Emergency Action Levels Current Emergency Plan implementing procedures Corrective Action Program procedures Enclosure}}

Latest revision as of 05:27, 12 November 2019

Emergency Preparedness Inspection and Request for Information
ML12094A195
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/28/2012
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Franke J
Progress Energy Florida
Dana Burley x-4503 (input by L. Gruhler)
References
Download: ML12094A195 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 28, 2012 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Franke:

From November 12 - 16, 2012, the NRC will perform baseline Emergency Preparedness inspections at the Crystal River Unit 3, (NRC Inspection Procedures: 71114.01 - Exercise Evaluation and the Emergency Preparedness Sections of 71151, Performance Indicator Verification).

Experience has shown that this inspection is resource-intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Frieda Frando of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at (404) 997-4759 (mark.speck@nrc.gov) or the Chief of Plant Support Branch 1, Brian Bonser at (404) 997-4653.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document

PROGRESS ENERGY 2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-302 License No. DPR-72

Enclosure:

As stated cc w/encl: (See page 3)

__ML12094A195_________X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RII: DRS SIGNATURE /RA/ /RA/

NAME M. SPECK B. BONSER DATE 3/ 27 /2012 3/ 27 /2012 E-MAIL COPY YES NO YES NO

PROGRESS ENERGY 3 cc w/encl: William A. Passetti, Chief Kelvin Henderson Florida Bureau of Radiation Control General Manager Department of Health Nuclear Fleet Operations Electronic Mail Distribution Progress Energy Electronic Mail Distribution Daniel R. Westcott, Supervisor Licensing & Regulatory Programs Robert J. Duncan II, Vice President Crystal River Nuclear Plant (NA1B)

Nuclear Operations Electronic Mail Distribution Progress Energy Electronic Mail Distribution Joseph W. Donahue, Vice President Nuclear Oversight Brian C. McCabe Progress Energy Manager, Nuclear Oversight Electronic Mail Distribution Shearon Harris Nuclear Power Plant Progress Energy Jack E. Huegel Electronic Mail Distribution Manager, Nuclear Oversight Crystal River Nuclear Plant Terry Hobbs Electronic Mail Distribution Plant General Manager Crystal River Nuclear Plant (NA2C) David T. Conley, Senior Counsel 15760 W. Power Line Street Legal Department Crystal River, FL 34428-6708 Progress Energy Electronic Mail Distribution Stephen J. Cahill Director - Engineering Nuclear Mark Rigsby Crystal River Nuclear Plant (NA2C) Manager, Support Services - Nuclear Electronic Mail Distribution Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution R. Alexander Glenn, General Counsel Progress Energy Senior Resident Inspector Electronic Mail Distribution U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant Jeffrey R. Swartz U.S. NRC Director Site Operations 6745 N Tallahassee Rd Crystal River Nuclear Plant Crystal River, FL 34428 Electronic Mail Distribution Attorney General Donna B. Alexander Department of Legal Affairs Manager, Nuclear Regulatory Affairs The Capitol PL-01 (interim) Tallahassee, FL 32399-1050 Progress Energy Electronic Mail Distribution Bryan Koon, Director Florida Division of Emergency Management Thomas Sapporito Electronic Mail Distribution Consulting Associate (Public Correspondence Only) Chairman Post Office Box 8413 Board of County Commissioners Jupiter, FL 33468 Citrus County 110 N. Apopka Avenue Inverness, FL 36250

Document Request List Inspection Dates: November 12-16, 2012 Inspection Procedures: IP 71114.01 Exercise Evaluation IP 71151 Performance Indicator Verification Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:

Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or provided to the Team Lead Inspector upon arrival for the inspections. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable .pdf files on CDROM or thumb drive). Please organize the information as it is arranged below (e.g. a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose.

This data will be inspected using original documentation. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.

EP1 Exercise Evaluation Drill and exercise related procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Emergency Facility Activation procedures Previous two exercise packages: scenario timeline drill reports or assessment, and respective Final FEMA/ DHS exercise reports All drill reports within inspection period Current exercise package: scenario timeline, expected Drill and Exercise Performance opportunities, exercise objectives, radiological assumptions, and scope of play and participation Corrective action program entries related to the exercises and drills for the two year inspection period EP01/EP02/EP03 Performance Indicators (PI) Verification Governing document for the performance indicator process Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) PI data submitted for the two year inspection period DEP documentation and evaluations for the two year inspection period Current ERO roster Corrective action program entries related to performance indicators (i.e. DEP, ERO training and participation, and ANS) for the two year inspection period Miscellaneous Procedures Current Emergency Plan and Emergency Action Levels Safety Evaluation Report approved Emergency Plan and Emergency Action Levels Current Emergency Plan implementing procedures Corrective Action Program procedures Enclosure