| issue date = 05/09/2012
| issue date = 05/09/2012
| title = IR 05000482-12-009, Wolf Creek Nuclear Operating Corporation - NRC Augmented Inspection Team Follow-up Inspection Planning Letter
| title = IR 05000482-12-009, Wolf Creek Nuclear Operating Corporation - NRC Augmented Inspection Team Follow-up Inspection Planning Letter
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Sunseri M W
| addressee name = Sunseri M
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
| license number = NPF-042
| license number = NPF-042
| contact person = O'Keefe N F
| contact person = O'Keefe N
| document report number = IR-12-009
| document report number = IR-12-009
| document type = Letter
| document type = Letter
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000482/2012009]]
See also: [[see also::IR 05000482/2012009]]


=Text=
=Text=
{{#Wiki_filter:May 9, 2012    
{{#Wiki_filter:UNITED STATES
Mr. Matthew W. Sunseri President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000482/2012009 Dear Mr. Sunseri: The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct the augmented inspection team follow-up inspection at your Wolf Creek Generating Station. The inspection will be comprised of one senior resident, one resident and two regional reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight process baseline inspection procedures. The schedule for the inspection is as follows:   In-office preparation: May 21 - 25, 2012   Onsite inspection: May 28 - June 1, 2012 Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents are requested to be provided by May 14, 2012. We request that during the onsite inspection week, you ensure that copies of analyses, evaluations, or  
                              NUCLEAR REGULATORY COMMISSION
documentation regarding the root cause of the failures of the main generator output breaker and the startup transformer are available. Also, appropriate personnel knowledgeable of each of the unresolved items documented in Inspection Report 0500482/2012008 should be available to support the inspectors at the site during the inspection. We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be William Muilenburg of your licensing organization. If there are any questions about this inspection or the material requested, please contact the team lead, John Dixon, at 361-972-2507 or by email, john.dixon@nrc.gov.     UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 
                                                REGION I V
M. Sunseri - 2 -  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control No. 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control No. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Sincerely,  /RA/  Neil O'Keefe, Chief Project Branch B Division of Reactor Projects 
                                          1600 EAST LAMAR BLVD
Dockets:  50-482 Licenses:  NPF-42  Enclosure:  Augmented Inspection Team Follow-up Inspection Document Request 
                                      ARLINGTON, TEXAS 76011-4511
cc:  Electronic distribution for Wolf Creek Nuclear Operating Corporation     
                                              May 9, 2012
M. Sunseri - 3 -    Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov) Resident Inspector (Charles.Peabody@nrc.gov) Branch Chief, DRP/B (Neil.Okeefe@nrc.gov) Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov,  Project Engineer, DRP/B (Nestor.Makris@nrc.gov) WC Administrative Assistant (Shirley.Allen@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Randy.Hall@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource  Only inspection reports to the following: RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)              R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials NFO Publicly Avail  Yes  No Sensitive  Yes  No Sens. Type Initials NFO RIV:SRI:DRP/B D:DRP/B    JDixon NO'Keefe    /RA/ /RA/    05/9/2012 05/9/2012    OFFICIAL RECORD COPY    T=Telephone          E=E-mail        F=Fax 
Mr. Matthew W. Sunseri
    Augmented Inspection Team Follow-up Inspection Document Request  Inspection Dates:  In-office preparation:  May 21 - 25, 2012    Onsite :  May 28, 2012 - June 1, 2012  Inspection Procedures: IP 93800, Augmented Inspection Team Various Reactor Oversight Process Baseline Inspection Procedures  Inspectors:  John Dixon, Senior Resident Inspector, South Texas Project    Mica Baquera, Resident Inspector, Palo Verde    John Watkins, Reactor Inspector    Nnaerika Okonkwo, Reactor Inspector  Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012.  The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week.  Also, we request that you categorize the documents in your response with the numbered list below.  Please provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspectors and provide subject documentation during the first day of the onsite inspection.  If you have any questions regarding
President and Chief Executive Officer
this information request, please call the lead inspector as soon as possible. For the following items as related to the Augmented Inspection Team inspection, as documented in Inspection Report 05000482/2012008, please provide associated condition reports, work orders, root cause and/or apparent cause investigations, design basis documents, UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles: 1. Main generator output breaker fault 2. Startup transformer fault 3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed 4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings 5. Emergency diesel generator B ground 6. ESW water hammer 7. ESW piping corrosion 8. Source range nuclear instrument NI-31 response on loss of cavity cooling 9. Failure to maintain fire water pressure 10. Training/Operation/Procedures for temporary diesel-driven fire pump 11. Diesel-driven fire pump and temporary diesel-driven fire pump differences 12. Diesel-driven fire pump unavailability 13. Security issue   
Wolf Creek Nuclear Operating Corporation
    Inspector Contact Information: John Dixon Sr. Resident Inspector 361-972-2507 john.dixon@nrc.gov  Mailing Address: US NRC Region IV Attn: John Dixon 1600 East Lamar Blvd. Arlington, TX 76011-4511 
P.O. Box 411
Burlington, KS 66839
SUBJECT:       WOLF CREEK NUCLEAR OPERATING CORPORATION - NRC AUGMENTED
                INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER,
                INSPECTION REPORT 05000482/2012009
Dear Mr. Sunseri:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV
staff will conduct the augmented inspection team follow-up inspection at your Wolf Creek
Generating Station. The inspection will be comprised of one senior resident, one resident and
two regional reactor inspectors from the NRC Region IV office. The inspection will be
conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight
process baseline inspection procedures.
The schedule for the inspection is as follows:
In-office preparation: May 21 - 25, 2012
Onsite inspection: May 28 - June 1, 2012
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by May 14, 2012. We request
that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the root cause of the failures of the main generator output breaker and
the startup transformer are available. Also, appropriate personnel knowledgeable of each of the
unresolved items documented in Inspection Report 0500482/2012008 should be available to
support the inspectors at the site during the inspection.
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be William Muilenburg of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the team lead, John Dixon, at 361-972-2507 or by email, john.dixon@nrc.gov.


M. Sunseri                                    -2-
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control No. 3150 0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget Control No.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                  /RA/
                                                Neil OKeefe, Chief
                                                Project Branch B
                                                Division of Reactor Projects
Dockets: 50-482
Licenses: NPF-42
Enclosure: Augmented Inspection Team Follow-up Inspection Document Request
cc: Electronic distribution for Wolf Creek Nuclear Operating Corporation
M. Sunseri                                -3-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Chris.Long@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov)
Branch Chief, DRP/B (Neil.Okeefe@nrc.gov)
Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov,
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
WC Administrative Assistant (Shirley.Allen@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
Only inspection reports to the following:
RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)
R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc
SUNSI Rev Compl.          Yes  No      ADAMS      Yes  No Reviewer Initials    NFO
Publicly Avail            Yes  No      Sensitive  Yes  No  Sens. Type Initials NFO
RIV:SRI:DRP/B        D:DRP/B
JDixon              NOKeefe
  /RA/                /RA/
05/9/2012            05/9/2012
OFFICIAL RECORD COPY                                T=Telephone  E=E-mail        F=Fax
          Augmented Inspection Team Follow-up Inspection Document Request
Inspection Dates:              In-office preparation: May 21 - 25, 2012
                                Onsite : May 28, 2012 - June 1, 2012
Inspection Procedures:          IP 93800, Augmented Inspection Team
                                Various Reactor Oversight Process Baseline Inspection
                                Procedures
Inspectors:                    John Dixon, Senior Resident Inspector, South Texas Project
                                Mica Baquera, Resident Inspector, Palo Verde
                                John Watkins, Reactor Inspector
                                Nnaerika Okonkwo, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012. The
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection week. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspectors and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
For the following items as related to the Augmented Inspection Team inspection, as
documented in Inspection Report 05000482/2012008, please provide associated condition
reports, work orders, root cause and/or apparent cause investigations, design basis documents,
UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles:
    1. Main generator output breaker fault
    2. Startup transformer fault
    3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed
    4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings
    5. Emergency diesel generator B ground
    6. ESW water hammer
    7. ESW piping corrosion
    8. Source range nuclear instrument NI-31 response on loss of cavity cooling
    9. Failure to maintain fire water pressure
    10. Training/Operation/Procedures for temporary diesel-driven fire pump
    11. Diesel-driven fire pump and temporary diesel-driven fire pump differences
    12. Diesel-driven fire pump unavailability
    13. Security issue
Inspector Contact Information:
John Dixon
Sr. Resident Inspector
361-972-2507
john.dixon@nrc.gov
Mailing Address:
US NRC Region IV
Attn: John Dixon
1600 East Lamar Blvd.
Arlington, TX 76011-4511
}}
}}

Latest revision as of 04:42, 12 November 2019

IR 05000482-12-009, Wolf Creek Nuclear Operating Corporation - NRC Augmented Inspection Team Follow-up Inspection Planning Letter
ML12131A459
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/09/2012
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-B
To: Matthew Sunseri
Wolf Creek
O'Keefe N
References
IR-12-009
Download: ML12131A459 (5)


See also: IR 05000482/2012009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

May 9, 2012

Mr. Matthew W. Sunseri

President and Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - NRC AUGMENTED

INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER,

INSPECTION REPORT 05000482/2012009

Dear Mr. Sunseri:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV

staff will conduct the augmented inspection team follow-up inspection at your Wolf Creek

Generating Station. The inspection will be comprised of one senior resident, one resident and

two regional reactor inspectors from the NRC Region IV office. The inspection will be

conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight

process baseline inspection procedures.

The schedule for the inspection is as follows:

In-office preparation: May 21 - 25, 2012

Onsite inspection: May 28 - June 1, 2012

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by May 14, 2012. We request

that during the onsite inspection week, you ensure that copies of analyses, evaluations, or

documentation regarding the root cause of the failures of the main generator output breaker and

the startup transformer are available. Also, appropriate personnel knowledgeable of each of the

unresolved items documented in Inspection Report 0500482/2012008 should be available to

support the inspectors at the site during the inspection.

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be William Muilenburg of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the team lead, John Dixon, at 361-972-2507 or by email, john.dixon@nrc.gov.

M. Sunseri -2-

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control No. 3150 0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget Control No.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Neil OKeefe, Chief

Project Branch B

Division of Reactor Projects

Dockets: 50-482

Licenses: NPF-42

Enclosure: Augmented Inspection Team Follow-up Inspection Document Request

cc: Electronic distribution for Wolf Creek Nuclear Operating Corporation

M. Sunseri -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (Chris.Long@nrc.gov)

Resident Inspector (Charles.Peabody@nrc.gov)

Branch Chief, DRP/B (Neil.Okeefe@nrc.gov)

Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov,

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

WC Administrative Assistant (Shirley.Allen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Only inspection reports to the following:

RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)

R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials NFO

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials NFO

RIV:SRI:DRP/B D:DRP/B

JDixon NOKeefe

/RA/ /RA/

05/9/2012 05/9/2012

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Augmented Inspection Team Follow-up Inspection Document Request

Inspection Dates: In-office preparation: May 21 - 25, 2012

Onsite : May 28, 2012 - June 1, 2012

Inspection Procedures: IP 93800, Augmented Inspection Team

Various Reactor Oversight Process Baseline Inspection

Procedures

Inspectors: John Dixon, Senior Resident Inspector, South Texas Project

Mica Baquera, Resident Inspector, Palo Verde

John Watkins, Reactor Inspector

Nnaerika Okonkwo, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection week. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspectors and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the lead inspector as soon as possible.

For the following items as related to the Augmented Inspection Team inspection, as

documented in Inspection Report 05000482/2012008, please provide associated condition

reports, work orders, root cause and/or apparent cause investigations, design basis documents,

UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles:

1. Main generator output breaker fault

2. Startup transformer fault

3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed

4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings

5. Emergency diesel generator B ground

6. ESW water hammer

7. ESW piping corrosion

8. Source range nuclear instrument NI-31 response on loss of cavity cooling

9. Failure to maintain fire water pressure

10. Training/Operation/Procedures for temporary diesel-driven fire pump

11. Diesel-driven fire pump and temporary diesel-driven fire pump differences

12. Diesel-driven fire pump unavailability

13. Security issue

Inspector Contact Information:

John Dixon

Sr. Resident Inspector

361-972-2507

john.dixon@nrc.gov

Mailing Address:

US NRC Region IV

Attn: John Dixon

1600 East Lamar Blvd.

Arlington, TX 76011-4511