| issue date = 06/11/2012
| issue date = 06/11/2012
| title = IR 05000305-12-009 (Drs), Kewaunee Power Station Request for Information for NRC Triennial Baseline Component Design Bases Inspection
| title = IR 05000305-12-009 (Drs), Kewaunee Power Station Request for Information for NRC Triennial Baseline Component Design Bases Inspection
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000305/2012009]]
See also: [[see also::IR 05000305/2012009]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 11, 2012  
{{#Wiki_filter:UNITED STATES
Mr. David A. Heacock  
                          NUCLEAR REGULATORY COMMISSION
President and Chief Nuclear Officer  
                                              REGION III
Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUBJECT: KEWAUNEE POWER STATION REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) INSPECTION REPORT 05000305/2012009(DRS) Dear Mr. Heacock: On October 1, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial baseline Component Design Bases Inspection (CDBI) at your Kewaunee Power Station.
                                2443 WARRENVILLE ROAD, SUITE 210
A team of six inspectors will perform this 3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21. The CDBI focuses on the design, maintenance, and operation of risk significant components associated with one or more accident scenarios. The components to be reviewed during this baseline inspection will be identified during the in-office preparation week that occurs prior to the first on-site inspection week. In addition, operating experience issues, associated with the component samples, will also be selected for review. The inspection will include three weeks on-site. The inspection team will consist of six NRC inspectors, of which five will focus on engineering/maintenance, one on operations. The current inspection schedule is as follows: On-site weeks: October 1 through 5, 2012;   October 15 through 19, 2012; and   October 29 through November 2, 2012. The team will be preparing for the inspection, mainly during the week of September 24, 2012, as discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the inspection team during the week of October 1, 2012, to review probabilistic risk-assessment data, and assist in identifying risk significant components and/or specific component functions, which will be reviewed during the inspection.  
                                        LISLE, IL 60532-4352
D. Heacock -2- Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive
                                            June 11, 2012
inspection for both parties, we have enclosed a request for information needed for the
Mr. David A. Heacock
inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.  Insofar as possible, this information should be provided electronically to the lead inspector.  The information request has been divided into three groups: * The first group lists information necessary for our initial inspection scoping activities.  This information should be provided to the lead inspector no later than August 20, 2012.  By September 10, 2012, the lead inspector will communicate the initial selected set of approximately 20 components. * The second group is needed to support our in-office preparation activities.  This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector at the Regional Office no later than
President and Chief Nuclear Officer
September 17, 2012.  During the in-office preparation activities, the team may identify additional information needed to support the inspection. * The last group includes the additional information mentioned above, as well as plant specific reference material.  This information should be available to the team on-site on October 1, 2012.  It is also requested that corrective action documents and/or questions
Dominion Energy Kewaunee, Inc.
developed during the inspection be provided to the lead inspector as the documents are
Innsbrook Technical Center
generated. The lead inspector for this inspection is Mr. George M. Hausman.  We understand that our licensing contact for this inspection is Mr. Richard P. Repshas of your organization.  If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9743 or via e-mail at GeorgeHausman@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
5000 Dominion Boulevard
requirements were approved by the Office of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Glen Allen, VA 23060-6711
  D. Heacock    -3-  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
SUBJECT:         KEWAUNEE POWER STATION REQUEST FOR INFORMATION FOR AN
its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Sincerely,
                NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
/RA/ 
                (CDBI) INSPECTION REPORT 05000305/2012009(DRS)
Ann Marie Stone, Chief Engineering Branch 2
Dear Mr. Heacock:
Division of Reactor Safety 
On October 1, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial
Docket No. 50-305
baseline Component Design Bases Inspection (CDBI) at your Kewaunee Power Station.
License No. DPR-43 Enclosure: Component Design Bases Inspection Document Request
A team of six inspectors will perform this 3-week inspection. This inspection will be performed
cc w/encl: Distribution via ListServŽ 
in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.
COMPONENT DESIGN BASES INSPECTION DOCUMENT REQUEST    Enclosure 1Inspection Report:  05000305/2012009(DRS) Inspection Procedure: Inspection Procedure (IP) 71111.21 "Component Design Bases Inspection" Inspection Dates:  October 1 through 5, 2012; October 15 through 19, 2012; and    October 29 through November 2, 2012 Lead Inspector:  George M. Hausman, Lead Inspector (630) 829-9743    George.Hausman@nrc.gov I. Information Requested Prior to the On-Site Information Gathering/Inspection Week  The following information is requested by August 20, 2012, or sooner, to facilitate inspection preparation.  If you have any questions regarding this information, please call
The CDBI focuses on the design, maintenance, and operation of risk significant components
the team leader as soon as possible.  (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic
associated with one or more accident scenarios. The components to be reviewed during this
media (e.g., CDROM, DVD, flash drive, etc.).  The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.  Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology). 1. Risk ranking of top 250 components from your site specific probabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW).  Include values for Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV) (as applicable). 2. Risk ranking of top 100 containment-related components from your site specific PSA sorted by Large Early Release Frequency (LERF). 3. Provide a list of the top 200 cut-sets from your PSA. 4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that contributes more than 5 percent to the baseline plant core damage frequency (CDF). 5. Copies of PSA "system notebooks" and latest PSA summary document. 6. List of time critical operator actions.  Identify those actions that do not have job performance measures (JPMs). 7. Provide copies of the emergency operating procedures (EOPs).
baseline inspection will be identified during the in-office preparation week that occurs prior to the
COMPONENT DESIGN BASES INSPECTION DOCUMENT REQUEST    Enclosure 28. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire.  Provide narrative description of each coded event (including fire, flood zone description). 9. Electronic copy of the site IPEEE, if available. 10. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or
first on-site inspection week. In addition, operating experience issues, associated with the
pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal etc.). 11. List of available design (setup) margins in both the open and closed direction (identify safety-related direction) for valves in the motor-operated valve (MOV) and air-operated valve (AOV) programs.  Identify the basis for how the margin was determined. 12. List of high risk Maintenance Rule systems/components based on engineering or expert panel judgment (i.e., those systems/components not identified in the PRA). 13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category for the last three years. 14. Site top ten issues list (if applicable).
component samples, will also be selected for review.
15. A list of operating experience evaluations for the last three years. 16. Information of any common cause failure of components experienced in the last five years at your facility. 17. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last five years. 18. List of open operability evaluations. 19. List of components/systems considered operable but degraded/nonconforming. 20. Current management and engineering organizational chart. 21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements
The inspection will include three weeks on-site. The inspection team will consist of six NRC
Manual. 22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies). 23. Electronic copy of P&IDs (if available).
inspectors, of which five will focus on engineering/maintenance, one on operations. The current
COMPONENT DESIGN BASES INSPECTION DOCUMENT REQUEST    Enclosure 3II. Information Requested (for the approx. 20 selected components) to be Available by September 17, 2012, (will be reviewed by the team in the Regional Office during the week of September 24, 2012) This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations,
inspection schedule is as follows:
condition reports, maintenance history, etc.). 1. List of condition reports (corrective action documents) associated with each of the selected components for the last four years. 2. The maintenance history (corrective, preventive, and elective) associated with each of the selected components for the last ten years.  Identify the frequency of
    On-site weeks: October 1 through 5, 2012;
preventive maintenance activities. 3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files.  Please review the calculations and also provide copies of important referenced material (such as drawings,
                      October 15 through 19, 2012; and
engineering requests, and vendor letters). 4. System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans, associated with each of the selected components. 5. A list of modifications, including equivalency evaluations and setpoint changes, associated with each of the selected components.  This list should include a descriptive paragraph on the purpose of the modification.  Please ensure this list only includes design completed (not canceled) modifications. 6. Copies of operability evaluations (opened/closed for last three years) associated with each of the selected components and plans for restoring operability, if applicable. 7. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable. 8. Copies of any open temporary modifications associated with each of the selected components, if applicable. 9. Trend data on the selected electrical/mechanical components' performance for last three years; (For example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., for valves:  stroke time and
                      October 29 through November 2, 2012.
leak rate results, etc.). 10. Copy of latest completed surveillance tests for each component (for example, for pumps this would include:  comprehensive test; quarterly test; flow balance etc.; for valves:  stroke time testing; diagnostic testing; and leak testing, etc.).  Acceptance criteria basis calculations should also be included.
The team will be preparing for the inspection, mainly during the week of September 24, 2012, as
COMPONENT DESIGN BASES INSPECTION DOCUMENT REQUEST    Enclosure 411. Provide copies of the normal and abnormal operating procedures associated with the selected components. 12. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection. 13. A copy of engineering/operations related audits completed in the last two years. III. Additional Information to be provided on October 1, 2012, on-site (for final selected components)  During the in-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection.  The lead inspector
discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the
will provide a list of the additional information needed during the week of September 24, 2012.  IV. Information Requested to be Provided Throughout the Inspection 1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection
inspection team during the week of October 1, 2012, to review probabilistic risk-assessment
to each team member). 3. One complete set of P&IDs (paper copies). 4. Reference materials such as:  * IPE/PRA report; * Procurement documents for components selected (verify retrievable); * Plant procedures (normal, abnormal, emergency, surveillance, etc.); and * Vendor manuals. If you have questions regarding the information requested, please contact the lead inspector. 
data, and assist in identifying risk significant components and/or specific component functions,
  D. Heacock    -3-  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Sincerely,  /RA/  Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety 
which will be reviewed during the inspection.
Docket No. 50-305
License No. DPR-43 Enclosure: Component Design Bases Inspection Document Request cc w/encl: Distribution via ListServŽ  DISTRIBUTION: Michael McCoppin
RidsNrrDorlLpl3-1 Resource
RidsNrrPMKewaunee
RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Carole Ariano Linda Linn DRPIII
DRSIII
Patricia Buckley
Tammy Tomczak  DOCUMENT NAME:  Ltr 06-11-12 Kewaunee CDBI RFI GMH.docx  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII        NAME GHausman:ls AMStone    DATE 05/31/12 06/11/12    OFFICIAL RECORD COPY 


D. Heacock                                    -2-
Experience with previous baseline design inspections of similar depth and length has shown
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
inspection for both parties, we have enclosed a request for information needed for the
inspection.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into three groups:
*    The first group lists information necessary for our initial inspection scoping activities.
    This information should be provided to the lead inspector no later than August 20, 2012.
    By September 10, 2012, the lead inspector will communicate the initial selected set of
    approximately 20 components.
*    The second group is needed to support our in-office preparation activities. This set of
    documents, including the calculations associated with the initial selected components,
    should be provided to the lead inspector at the Regional Office no later than
    September 17, 2012. During the in-office preparation activities, the team may identify
    additional information needed to support the inspection.
*    The last group includes the additional information mentioned above, as well as plant
    specific reference material. This information should be available to the team on-site on
    October 1, 2012. It is also requested that corrective action documents and/or questions
    developed during the inspection be provided to the lead inspector as the documents are
    generated.
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
licensing contact for this inspection is Mr. Richard P. Repshas of your organization. If there are
any questions about the inspection or the material requested in the enclosure, please contact
the lead inspector at (630) 829-9743 or via e-mail at GeorgeHausman@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
D. Heacock                                      -3-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                /RA/
                                                Ann Marie Stone, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket No. 50-305
License No. DPR-43
Enclosure:    Component Design Bases Inspection Document Request
cc w/encl:    Distribution via ListServ'
                          COMPONENT DESIGN BASES INSPECTION
                                        DOCUMENT REQUEST
Inspection Report:              05000305/2012009(DRS)
Inspection Procedure:            Inspection Procedure (IP) 71111.21 Component Design Bases
                                Inspection
Inspection Dates:                October 1 through 5, 2012; October 15 through 19, 2012; and
                                October 29 through November 2, 2012
Lead Inspector:                  George M. Hausman, Lead Inspector
                                (630) 829-9743
                                George.Hausman@nrc.gov
I.    Information Requested Prior to the On-Site Information Gathering/Inspection
      Week
      The following information is requested by August 20, 2012, or sooner, to facilitate
      inspection preparation. If you have any questions regarding this information, please call
      the team leader as soon as possible. (Please provide the information electronically in
      pdf files, Excel, or other searchable formats, preferably on some portable electronic
      media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should
      contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.
      Information in lists should contain enough information to be easily understood by
      someone who has knowledge of light water reactor technology).
      1.      Risk ranking of top 250 components from your site specific probabilistic safety
                analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for
                Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)
                (as applicable).
      2.      Risk ranking of top 100 containment-related components from your site specific
                PSA sorted by Large Early Release Frequency (LERF).
      3.      Provide a list of the top 200 cut-sets from your PSA.
      4.      Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that
                contributes more than 5 percent to the baseline plant core damage frequency
                (CDF).
      5.      Copies of PSA system notebooks and latest PSA summary document.
      6.      List of time critical operator actions. Identify those actions that do not have job
                performance measures (JPMs).
      7.      Provide copies of the emergency operating procedures (EOPs).
                                                    1                                      Enclosure
                COMPONENT DESIGN BASES INSPECTION
                          DOCUMENT REQUEST
8.  If you have an External Events or Fire PSA Model, provide the information
    requested in Items 1 and 2 for external events and fire. Provide narrative
    description of each coded event (including fire, flood zone description).
9.  Electronic copy of the site IPEEE, if available.
10. Any pre-existing evaluation or list of components and associated calculations
    with low design margins, (i.e., pumps closest to the design limit for flow or
    pressure, diesel generator close to design required output, heat exchangers
    close to rated design heat removal etc.).
11. List of available design (setup) margins in both the open and closed direction
    (identify safety-related direction) for valves in the motor-operated valve (MOV)
    and air-operated valve (AOV) programs. Identify the basis for how the margin
    was determined.
12. List of high risk Maintenance Rule systems/components based on engineering or
    expert panel judgment (i.e., those systems/components not identified in the
    PRA).
13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)
    category for the last three years.
14. Site top ten issues list (if applicable).
15. A list of operating experience evaluations for the last three years.
16. Information of any common cause failure of components experienced in the last
    five years at your facility.
17. List of Root Cause Evaluations associated with component failures or design
    issues initiated/completed in the last five years.
18. List of open operability evaluations.
19. List of components/systems considered operable but degraded/nonconforming.
20. Current management and engineering organizational chart.
21. Electronic copies of Updated Final Safety Analysis Report, Technical
    Specifications, Technical Specifications Bases, and Technical Requirements
    Manual.
22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
23. Electronic copy of P&IDs (if available).
                                        2                                      Enclosure
                      COMPONENT DESIGN BASES INSPECTION
                                  DOCUMENT REQUEST
II. Information Requested (for the approx. 20 selected components) to be Available
    by September 17, 2012, (will be reviewed by the team in the Regional Office during
    the week of September 24, 2012)
    This information should be separated for each selected component, especially if
    provided electronically (e.g., folder with component name that includes calculations,
    condition reports, maintenance history, etc.).
    1.      List of condition reports (corrective action documents) associated with each of
            the selected components for the last four years.
    2.      The maintenance history (corrective, preventive, and elective) associated with
            each of the selected components for the last ten years. Identify the frequency of
            preventive maintenance activities.
    3.      Copies of calculations associated with each of the selected components (if not
            previously provided), excluding data files. Please review the calculations and
            also provide copies of important referenced material (such as drawings,
            engineering requests, and vendor letters).
    4.      System Health Reports, System Descriptions, Design Basis Documents, and/or
            Training Lesson Plans, associated with each of the selected components.
    5.      A list of modifications, including equivalency evaluations and setpoint changes,
            associated with each of the selected components. This list should include a
            descriptive paragraph on the purpose of the modification. Please ensure this list
            only includes design completed (not canceled) modifications.
    6.      Copies of operability evaluations (opened/closed for last three years) associated
            with each of the selected components and plans for restoring operability, if
            applicable.
    7.      Copies of selected operator work-around evaluations associated with each of the
            selected components and plans for resolution, if applicable.
    8.      Copies of any open temporary modifications associated with each of the selected
            components, if applicable.
    9.      Trend data on the selected electrical/mechanical components performance for
            last three years; (For example, pumps performance including in-service testing,
            other vibration monitoring, oil sample results, etc., for valves: stroke time and
            leak rate results, etc.).
    10.    Copy of latest completed surveillance tests for each component (for example, for
            pumps this would include: comprehensive test; quarterly test; flow balance etc.;
            for valves: stroke time testing; diagnostic testing; and leak testing, etc.).
            Acceptance criteria basis calculations should also be included.
                                              3                                        Enclosure
                            COMPONENT DESIGN BASES INSPECTION
                                        DOCUMENT REQUEST
        11.    Provide copies of the normal and abnormal operating procedures associated with
                the selected components.
        12.    A copy of any internal/external self-assessments and associated corrective
                action documents generated in preparation for the inspection.
        13.    A copy of engineering/operations related audits completed in the last two years.
III.    Additional Information to be provided on October 1, 2012, on-site (for final
        selected components)
        During the in-office preparation activities, the team will be making final selections and
        may identify additional information needed to support the inspection. The lead inspector
        will provide a list of the additional information needed during the week of
        September 24, 2012.
IV.    Information Requested to be Provided Throughout the Inspection
        1.      Copies of any corrective action documents generated as a result of the teams
                questions or queries during this inspection.
        2.      Copies of the list of questions submitted by the team members and the
                status/resolution of the information requested (provide daily during the inspection
                to each team member).
        3.      One complete set of P&IDs (paper copies).
        4.      Reference materials such as:
                *  IPE/PRA report;
                *  Procurement documents for components selected (verify retrievable);
                *  Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
                *  Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.
                                                    4                                      Enclosure
D. Heacock                                            -3-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                      Sincerely,
                                                      /RA/
                                                      Ann Marie Stone, Chief
                                                      Engineering Branch 2
                                                      Division of Reactor Safety
Docket No. 50-305
License No. DPR-43
Enclosure:        Component Design Bases Inspection Document Request
cc w/encl:        Distribution via ListServ'
DISTRIBUTION:
Michael McCoppin
RidsNrrDorlLpl3-1 Resource
RidsNrrPMKewaunee
RidsNrrDirsIrib Resource
Chuck Casto
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Patricia Buckley
Tammy Tomczak
DOCUMENT NAME: Ltr 06-11-12 Kewaunee CDBI RFI GMH.docx
Publicly Available            Non-Publicly Available        Sensitive      Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with
attach/encl "N" = No copy
OFFICE            RIII        E RIII
NAME              GHausman:ls      AMStone
DATE              05/31/12        06/11/12
                                          OFFICIAL RECORD COPY
}}
}}

Latest revision as of 03:23, 12 November 2019

IR 05000305-12-009 (Drs), Kewaunee Power Station Request for Information for NRC Triennial Baseline Component Design Bases Inspection
ML12164A330
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/11/2012
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Heacock D
Dominion Energy Kewaunee
References
IR-12-009
Download: ML12164A330 (8)


See also: IR 05000305/2012009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

June 11, 2012

Mr. David A. Heacock

President and Chief Nuclear Officer

Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: KEWAUNEE POWER STATION REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

(CDBI) INSPECTION REPORT 05000305/2012009(DRS)

Dear Mr. Heacock:

On October 1, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial

baseline Component Design Bases Inspection (CDBI) at your Kewaunee Power Station.

A team of six inspectors will perform this 3-week inspection. This inspection will be performed

in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.

The CDBI focuses on the design, maintenance, and operation of risk significant components

associated with one or more accident scenarios. The components to be reviewed during this

baseline inspection will be identified during the in-office preparation week that occurs prior to the

first on-site inspection week. In addition, operating experience issues, associated with the

component samples, will also be selected for review.

The inspection will include three weeks on-site. The inspection team will consist of six NRC

inspectors, of which five will focus on engineering/maintenance, one on operations. The current

inspection schedule is as follows:

On-site weeks: October 1 through 5, 2012;

October 15 through 19, 2012; and

October 29 through November 2, 2012.

The team will be preparing for the inspection, mainly during the week of September 24, 2012, as

discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the

inspection team during the week of October 1, 2012, to review probabilistic risk-assessment

data, and assist in identifying risk significant components and/or specific component functions,

which will be reviewed during the inspection.

D. Heacock -2-

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than August 20, 2012.

By September 10, 2012, the lead inspector will communicate the initial selected set of

approximately 20 components.

  • The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the initial selected components,

should be provided to the lead inspector at the Regional Office no later than

September 17, 2012. During the in-office preparation activities, the team may identify

additional information needed to support the inspection.

  • The last group includes the additional information mentioned above, as well as plant

specific reference material. This information should be available to the team on-site on

October 1, 2012. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the lead inspector as the documents are

generated.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

licensing contact for this inspection is Mr. Richard P. Repshas of your organization. If there are

any questions about the inspection or the material requested in the enclosure, please contact

the lead inspector at (630) 829-9743 or via e-mail at GeorgeHausman@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

D. Heacock -3-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-305

License No. DPR-43

Enclosure: Component Design Bases Inspection Document Request

cc w/encl: Distribution via ListServ'

COMPONENT DESIGN BASES INSPECTION

DOCUMENT REQUEST

Inspection Report: 05000305/2012009(DRS)

Inspection Procedure: Inspection Procedure (IP) 71111.21 Component Design Bases

Inspection

Inspection Dates: October 1 through 5, 2012; October 15 through 19, 2012; and

October 29 through November 2, 2012

Lead Inspector: George M. Hausman, Lead Inspector

(630) 829-9743

George.Hausman@nrc.gov

I. Information Requested Prior to the On-Site Information Gathering/Inspection

Week

The following information is requested by August 20, 2012, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on some portable electronic

media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should

contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology).

1. Risk ranking of top 250 components from your site specific probabilistic safety

analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2. Risk ranking of top 100 containment-related components from your site specific

PSA sorted by Large Early Release Frequency (LERF).

3. Provide a list of the top 200 cut-sets from your PSA.

4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that

contributes more than 5 percent to the baseline plant core damage frequency

(CDF).

5. Copies of PSA system notebooks and latest PSA summary document.

6. List of time critical operator actions. Identify those actions that do not have job

performance measures (JPMs).

7. Provide copies of the emergency operating procedures (EOPs).

1 Enclosure

COMPONENT DESIGN BASES INSPECTION

DOCUMENT REQUEST

8. If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description).

9. Electronic copy of the site IPEEE, if available.

10. Any pre-existing evaluation or list of components and associated calculations

with low design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

11. List of available design (setup) margins in both the open and closed direction

(identify safety-related direction) for valves in the motor-operated valve (MOV)

and air-operated valve (AOV) programs. Identify the basis for how the margin

was determined.

12. List of high risk Maintenance Rule systems/components based on engineering or

expert panel judgment (i.e., those systems/components not identified in the

PRA).

13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)

category for the last three years.

14. Site top ten issues list (if applicable).

15. A list of operating experience evaluations for the last three years.

16. Information of any common cause failure of components experienced in the last

five years at your facility.

17. List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last five years.

18. List of open operability evaluations.

19. List of components/systems considered operable but degraded/nonconforming.

20. Current management and engineering organizational chart.

21. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).

23. Electronic copy of P&IDs (if available).

2 Enclosure

COMPONENT DESIGN BASES INSPECTION

DOCUMENT REQUEST

II. Information Requested (for the approx. 20 selected components) to be Available

by September 17, 2012, (will be reviewed by the team in the Regional Office during

the week of September 24, 2012)

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes calculations,

condition reports, maintenance history, etc.).

1. List of condition reports (corrective action documents) associated with each of

the selected components for the last four years.

2. The maintenance history (corrective, preventive, and elective) associated with

each of the selected components for the last ten years. Identify the frequency of

preventive maintenance activities.

3. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of important referenced material (such as drawings,

engineering requests, and vendor letters).

4. System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans, associated with each of the selected components.

5. A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this list

only includes design completed (not canceled) modifications.

6. Copies of operability evaluations (opened/closed for last three years) associated

with each of the selected components and plans for restoring operability, if

applicable.

7. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8. Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9. Trend data on the selected electrical/mechanical components performance for

last three years; (For example, pumps performance including in-service testing,

other vibration monitoring, oil sample results, etc., for valves: stroke time and

leak rate results, etc.).

10. Copy of latest completed surveillance tests for each component (for example, for

pumps this would include: comprehensive test; quarterly test; flow balance etc.;

for valves: stroke time testing; diagnostic testing; and leak testing, etc.).

Acceptance criteria basis calculations should also be included.

3 Enclosure

COMPONENT DESIGN BASES INSPECTION

DOCUMENT REQUEST

11. Provide copies of the normal and abnormal operating procedures associated with

the selected components.

12. A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

13. A copy of engineering/operations related audits completed in the last two years.

III. Additional Information to be provided on October 1, 2012, on-site (for final

selected components)

During the in-office preparation activities, the team will be making final selections and

may identify additional information needed to support the inspection. The lead inspector

will provide a list of the additional information needed during the week of

September 24, 2012.

IV. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3. One complete set of P&IDs (paper copies).

4. Reference materials such as:

  • IPE/PRA report;
  • Procurement documents for components selected (verify retrievable);
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  • Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.

4 Enclosure

D. Heacock -3-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-305

License No. DPR-43

Enclosure: Component Design Bases Inspection Document Request

cc w/encl: Distribution via ListServ'

DISTRIBUTION:

Michael McCoppin

RidsNrrDorlLpl3-1 Resource

RidsNrrPMKewaunee

RidsNrrDirsIrib Resource

Chuck Casto

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

DOCUMENT NAME: Ltr 06-11-12 Kewaunee CDBI RFI GMH.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with

attach/encl "N" = No copy

OFFICE RIII E RIII

NAME GHausman:ls AMStone

DATE 05/31/12 06/11/12

OFFICIAL RECORD COPY