ML12181A372: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR- | {{#Wiki_filter:RIVR40001 Revised: June 29, 2012 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | ||
("NRC Bulletin 87-01") | Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIVR00001 All Riverkeeper Hearing Exhibit List ("RIV Exhibit List") Dec. 22, 2011 RIV000002 RK-TC-2 Riverkeeper Initial Statement of Position Regarding Contention RK-TC Dec. 22, 2011 Flow Accelerated Corrosion ("RK-TC-2 SOP") | ||
RIV000003 RK-TC-2 Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Dec. 22, 2011 Testimony RK-TC-2") | |||
RIV000004 RK-TC-2; RK-TC-1B; Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV") Dec. 22, 2011 RK-TC-5 RIV000005 RK-TC-2 Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Dec. 22, 2011 Report") | |||
RIV000006 RK-TC-2 NRC Information Notice No 86-106, Feed Water Line Break, December 16, Dec. 22, 2011 1986 ("NRC IN 86-106") | |||
RIV000007 RK-TC-2 NRC Bulletin 87-01, Thinning Pipe Walls in Nuclear Plants, July 9, 1987 Dec. 22, 2011 | |||
("NRC Bulletin 87-01") | |||
RIV000008 RK-TC-2 NRC Information Notice 1991-019, Steam Generator Feed Water Distribution Dec. 22, 2011 Piping Damage," March 12, 1991 ("NRC IN 1991-019") | |||
RIV000009 RK-TC-2 Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Dec. 22, 2011 Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042") | |||
RIV000010 RK-TC-2 NRC Information Notice 1997-084, Rupture of Extraction Steam Piping," Dec. 22, 2011 December 11, 1997 ("NRC IN 1997-084") | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000011 RK-TC-2 NRC Information Notice 2006-008, Secondary Piping Rupture at Mihama Dec. 22, 2011 Power Station in Japan," March 16, 2006 ("NRC IN 2006-008") | |||
RIV000012 RK-TC-2 EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Dec. 22, 2011 Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3") | |||
RIV000013 RK-TC-2 Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Dec. 22, 2011 Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. | |||
(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval") | |||
RIV000014 RK-TC-2 Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP- Dec. 22, 2011 RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5") | |||
RIV000015 RK-TC-2 EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, Dec. 22, 2011 2010) ("Entergy FAC Program") | |||
RIV00016A RK-TC-2 Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Dec. 22, 2011 Graphs Part 1") | |||
RIV00016B RK-TC-2 Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Dec. 22, 2011 Graphs Part 2") | |||
2 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000017 RK-TC-2 V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Dec. 22, 2011 Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC") | |||
RIV000018 RK-TC-2 CHECWORKSTM Steam/Feedwater Application, Guidelines for Plant Dec. 22, 2011 Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599") | |||
RIV000019 RK-TC-2 Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Dec. 22, 2011 Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR | |||
("Hausler VY Testimony") | |||
RIV000020 RK-TC-2 CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re: | |||
LCF) ("IP3 CHECWORKS SFA Model Aug 2011") | |||
RIV000021 RK-TC-2 CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K - | |||
Components with Negative Time to Tcrit, IPEC00238096 ("CHECWORKS SFA Model Aug 2011 App K") | |||
3 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000022 RK-TC-2 Statement by Dr. F. Peter Ford, transcript of January 26, 2005 meeting of the Dec. 22, 2011 ACRS Subcommittee on Thermal Hydraulics (January 26, 2005), at 198, ADAMS Accession No. ML050400613 ("2005 ACRS Transcript") | |||
RIV000023 RK-TC-2 NUREG/CR-6936, PNNL 16186,Probabilities of Failure and Uncertainty Dec. 22, 2011 Estimate Information for Passive Components - a Literature Review (May 2007) ("NUREG/CR-6936") | |||
RIV000024 RK-TC-2 Entergy Engineering Report, Operating Experience Review Report, IP-RPT Dec. 22, 2011 LRD05, Rev. 3 (2008), IPEC00186046 ("Entergy Op Ex Rev Report") | |||
RIV000025 RK-TC-2 Daily DER Report, DER-01-01522, April 25, 2001, IPEC00020501 ("DER Dec. 22, 2011 Report") | |||
RIV000026 RK-TC-2 Entergy Operations, Inc, Condition Report List, IPEC00185743 ("Condition Dec. 22, 2011 Report List 1") | |||
RIV000027 RK-TC-2 Entergy Operations, Inc., Condition Report List, IPEC00092551 ("Condition Dec. 22, 2011 Report List 2") | |||
RIV000028 RK-TC-2 Entergy Condition Report CR-IP2-2001-10525, IPEC00092616 ("Entergy CR- Dec. 22, 2011 IP2-2001-10525") | |||
RIV000029 RK-TC-2 Entergy Condition Report CR-IP3-2006-02270, IPEC00025699 ("Entergy CR- Dec. 22, 2011 IP3-2006-02270") | |||
4 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000030 RK-TC-2 Transcript of Meeting of Advisory Committee on Reactor Safeguards (Sept. Dec. 22, 2011 10, 2009), ADAMS Accession No. ML092670114, at 90-96 ("ACRS Mtg Transcript Sept 2009") | |||
RIV000031 RK-TC-2 Lynn R. Sykes, John G. Armbruster, Won-Young Kim, & Leonardo Seeber, Dec. 22, 2011 Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, Bulletin of the Seismological Society of America, Vol. 98, No. 4, pp. 1696-1719, August 2008 ("Sykes Study") | |||
RIV000032 RK-TC-2 Generic Issue 199 (GI-199), Implications of Updated Probabilistic Seismic Dec. 22, 2011 Hazard Estimates in Central and Eastern United States on Existing Plants Safety/Risk Assessment, August 2010, at Appendix D ("Seismic Sore-Damage Frequencies) ("NRC GI-199") | |||
RIV000033 RK-TC-2 Bill Dedman, What are the odds? US nuke plants ranked by quake risk, March Dec. 22, 2011 17, 2011 ("Dedman Article") | |||
RIV000034 RK-TC-1B Dr.Hopenfeld Pre-filed Testimony Dec. 22, 2011 RIV000035 RK-TC-1B; RK-TC-5 Dr. Hopenfeld Report Dec. 22, 2011 RIV000036 RK-TC-1B; RK-TC-5 Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785 Dec. 22, 2011 RIV000037 RK-TC-1B; RK-TC-5 Official Transcript, ACRS Subcommittee, 12/6/2006 Dec. 22, 2011 RIV000038 RK-TC-1B; RK-TC-5 NRC IN 2011-04 Dec. 22, 2011 RIV000039 RK-TC-1B; RK-TC-5 Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08 Dec. 22, 2011 5 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000040 RK-TC-1B; RK-TC-5 Taylor, EPRI R & D Status Report, Jan/Feb 1983 Dec. 22, 2011 RIV000041 RK-TC-1B; RK-TC-5 Entergy, Table of Environmental Correction Actions for Metal Fatigue, Dec. 22, 2011 11/6/07 RIV000042 RK-TC-1B; RK-TC-5 DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294 Dec. 22, 2011 RIV000043 RK-TC-1B; RK-TC-5 Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179 Dec. 22, 2011 RIV000044 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Dec. 22, 2011 RIV000045 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 1 Dec. 22, 2011 RIV000046 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 2 Dec. 22, 2011 RIV000047 RK-TC-1B; RK-TC-5 NRC IN 97-46 Dec. 22, 2011 RIV000048 RK-TC-1B; RK-TC-5 Final Report of the NESC-Thermal Fatigue Project, EUR22763 Dec. 22, 2011 RIV000049 RK-TC-1B; RK-TC-5 Entergy Indian Point U3, FAC, 3RF13 Outage, 2005 Dec. 22, 2011 RIV000050 RK-TC-1B; RK-TC-5 Westinghouse, WCAP-14950, IPECPROP00059247 Dec. 22, 2011 RIV000051 RK-TC-1B; RK-TC-5 Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008 Dec. 22, 2011 RIV000052A- RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1110 Dec. 22, 2011 D | |||
RIV000053 RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1122 Dec. 22, 2011 RIV000054 RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11 Dec. 22, 2011 RIV000055 RK-TC-1B; RK-TC-5 Westinghouse CN-PAFM-09-64, IPECPROP00058077 Dec. 22, 2011 RIV000056 RK-TC-1B; RK-TC-5 Systems Standard Design Criteria, IPECPROP00059698 Dec. 22, 2011 6 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000057 RK-TC-1B; RK-TC-5 RAI Indian Point U2 and U3 LRA, 2/10/11 Dec. 22, 2011 RIV000058 RK-TC-1B; RK-TC-5 Response to RAI, Indian Point U2 and U3, 3/28/11 Dec. 22, 2011 RIV000059 RK-EC-3/CW-EC-1 Riverkeeper and Clearwater Initial Statement of Position Regarding Dec. 22, 2011 Consolidated Contention RK-EC-3/CW-EC-1 (Spent Fuel Pool Leaks) ("RK-EC-3-CW-EC-1 SOP") | |||
RIV000060 RK-EC-3/CW-EC-1 Testimony of Arnold Gundersen on Consolidated Contention RK-EC-3/CW- Dec. 22, 2011 EC Spent Fuel Pool Leaks ("Gundersen Testimony") | |||
RIV000061 RK-EC-3/CW-EC-1 Testimony of Gillian Stewart on Consolidated Contention RK-EC-3/CW-EC-1 Dec. 22, 2011 | |||
- Spent Fuel Pool Leaks ("Stewart Testimony") | |||
RIV000062 RK-EC-3/CW-EC-1 Curriculum Vitae of Arnold Gundersen ("Gundersen CV") Dec. 22, 2011 RIV000063 RK-EC-3/CW-EC-1 Curriculum Vitae of Gillian Stewart ("Stewart CV") Dec. 22, 2011 RIV000064 RK-EC-3/CW-EC-1 NUREG-1437, Revision 1, Generic Environmental Impact Statement for Dec. 22, 2011 License Renewal of Nuclear Plants (July 2009) Draft Report for Comment | |||
("GEIS Update") | |||
RIV000065 RK-EC-3/CW-EC-1 U.S. EPA, Radionuclides in Drinking Water: A Small Entity Compliance Dec. 22, 2011 Guide (February 2002) | |||
RIV000066 RK-EC-3/CW-EC-1 GZA, GeoEnvironmental, Inc., Hydrogeologic Site Investigation Report, Dec. 22, 2011 Indian Point Energy Center, January 7, 2008, IPEC00195418 7 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000067 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report Nos. Dec. 22, 2011 05000003/2007010 and 05000247/2007010, EA-08-088, May 13, 2008 RIV000068 RK-EC-3/CW-EC-1 Entergy, Groundwater Investigation Executive Summary, Indian Point Energy Dec. 22, 2011 Center, Buchanan, NY (January 2008) | |||
RIV000069 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. Dec. 22, 2011 05000247/2005011, March 16, 2006 RIV000070 RK-EC-3/CW-EC-1 Indian Point Energy Center Status Report (Sept. 6, 2007) Dec. 22, 2011 RIV000071 RK-EC-3/CW-EC-1 In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Prefiled Testimony of Matthew J. | |||
Barvenik, Issue for Adjudication No. 3 - Radiological Materials (July 22, 2011) | |||
RIV000072 RK-EC-3/CW-EC-1 E-mail from Michael Rutkoske to Steven Verrochi (Entergy), Re: SFP Exams - Dec. 22, 2011 What's Next? (Nov. 19, 2005), IPEC00065830 RIV000073 RK-EC-3/CW-EC-1 Entergy, U2 SFP Leak Monitoring Wells and Underground Piping (3/31/06), Dec. 22, 2011 IPEC00063518 RIV000074 RK-EC-3/CW-EC-1 Entergy, Problem Development Sheet - Groundwater, IPEC00207416 Dec. 22, 2011 8 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000075 RK-EC-3/CW-EC-1 E-mail from Ronald Sachatello to Donald Mayer (Entergy), Joseph Adler Dec. 22, 2011 (TLG), Gary Hinrichs (Entergy), Re: IS THE POOL LEAK OFF COLLECTION BOX EFFECTIVE?, IPEC00063351 RIV000076 RK-EC-3/CW-EC-1 GZA, GeoEnvironmental, Inc. Final IPEC Quarterly Long-Term Groundwater Dec. 22, 2011 Monitoring Report, Quarter Two 2010 (Report No. 10) (February 15, 2011), | |||
IPEC00227561 RIV000077 RK-EC-3/CW-EC-1 Entergy Chart of Leak Locations, I PEC00059360 Dec. 22, 2011 RIV000078 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2009), IPEC00225217 RIV000079 RK-EC-3/CW-EC-1 Annie Correal, Indian Pt. Broken Pipe Spurs Safety Worries, THE NEW Dec. 22, 2011 YORK TIMES (March 1, 2009) | |||
RIV000080 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2010), IPEC00225219 RIV000081 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 2, 2010), IPEC00225223 RIV000082 RK-EC-3/CW-EC-1 Entergy, Nuclear Management Manual, EN-MA-125, Rev. 4, Attachment 9.1, Dec. 22, 2011 Initial Investigation, Troubleshooting Plan for H-3 Investigation, Storm Drain System A, March/April 2009, IPEC00194517 9 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000083 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 4, 2010), IPEC00233519 RIV000084 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 4, 10.7 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2011), IPEC00233515 RIV000085 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report Dec. 22, 2011 05000286/2011004 (November 7, 2011) | |||
RIV000086 RK-EC-3/CW-EC-1 Entergy correspondence, e-mails regarding approach to groundwater Dec. 22, 2011 contamination, IPEC00067228, IPEC00065510, IPEC00130549, IPEC00062936 RIV000087 RK-EC-3/CW-EC-1 Potential Sources of Tritium at IPEC & Inspection Method, IPEC00065506 Dec. 22, 2011 RIV000088 RK-EC-3/CW-EC-1 Supplemental Report of the Public Oversight Panel Regarding the Dec. 22, 2011 Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant, July 20, 2010 RIV000089 RK-EC-3/CW-EC-1 GAO Report to Congressional Requesters, Nuclear Regulatory Commission, Dec. 22, 2011 Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks, GAO-11-563 (June 2011) 10 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000090 RK-EC-3/CW-EC-1 Entergy Groundwater Well Data, Quarter 2, 2011, IPEC00225100 Dec. 22, 2011 RIV000091 RK-EC-3/CW-EC-1 Liquid Radioactive Release Lessons Learned Task Force Final Report, U.S. Dec. 22, 2011 NRC (September 1, 2006) | |||
RIV000092 RK-EC-3/CW-EC-1 Coastal Fish & Wildlife Habitat Rating Form, Haverstraw Bay Dec. 22, 2011 RIV000093 RK-EC-3/CW-EC-1 National Research Council, Health Risks from Exposure to Low Levels of Dec. 22, 2011 Ionizing Radiation: BEIR VII - Phase 2 (2006) | |||
RIV000094 RK-EC-3/CW-EC-1 Entergy E-mail from David Winslow (GZA) to Donald Mayer (Entergy), G. Dec. 22, 2011 Hinrichs (Entergy), Re: Remedial Report (May 19, 2006), IPEC00064221 RIV000095 RK-EC-3/CW-EC-1 Groundwater Investigation 06 Quarter 4 Activities and Results, Dec. 22, 2011 IPEC00063899 RIV000096 RK-EC-3/CW-EC-1 Entergy E-mail from Kathleen McMullin (Entergy) to various, Re: IPEC Status Dec. 22, 2011 Report for Dec. 21 RIV000097 RK-EC-3/CW-EC-1 Entergy Document, Unit 1 Status for ENC Presentation notes, Groundwater Dec. 22, 2011 Status, IPEC00062939 RIV000098 RK-EC-3/CW-EC-1 Letter from Kathryn Sutton (Counsel for Entergy) to Deborah Brancato Dec. 22, 2011 (Riverkeeper), Re: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR (June 24, 2011) 11 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000099 RK-EC-3/CW-EC-1 In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Combined Prefiled Rebuttal Testimony of Thomas C. Esselman, Ph.D., Matthew J. Barvenik, and Owen Hoffman, Ph.D., Radiological - Issue for Adjudication No. 3 (October 4, 2011) | |||
RIV000100 RK-EC-3/CW-EC-1 E-mail From Dara Gray (Entergy) to J. Noggle (NRC) (Jan. 24, 2007), Re: Dec. 22, 2011 Historical Sr Data (Exhibit RIV000100) | |||
RIV000101 RK-EC-3/CW-EC-1 Haverstraw Water Supply Project DEIS, Draft EIS Chapter 2 Dec. 22, 2011 RIV000102 RK-TC-5 Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5 June 19, 2012 RIV000103 RK-TC-5; RK-TC-1B Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak June 19, 2012 Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976) | |||
RIV000104 RK-TC-5; RK-TC-1B Memorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam June 19, 2012 Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011 12 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000105 RK-TC-5; RK-TC-1B NUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the June 19, 2012 Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001) | |||
RIV000106 RK-TC-5; RK-TC-1B Associated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox June 19, 2012 News.com, February 3, 2012 RIV000107 RK-TC-2 Riverkeeper Revised Statement of Position Regarding Contention RK-TC-2 June 29, 2012 (Flow Accelerated Corrosion) | |||
RIV000108 RK-TC-2 Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Riverkeeper June 29, 2012 Contention TC Flow Accelerated Corrosion RIV000109 RK-TC-2 Official Transcript of Proceedings, Nuclear Regulatory Commission, Entergy June 29, 2012 Nuclear Vermont Yankee, 50-271-LR; ASLBP No. 06-849-03-LR, Newfane, Vermont, pages 1451-1741 (July 24, 2008), at 1477 (excerpt) | |||
RIV000110 RK-TC-2 Stéphane Trevin & Marie-Pierre Moutrille, Optimization of EDFs NPPs June 29, 2012 Maintenance due to Flow Accelerated Corrosion and BRT-CICEROTM Improvement by NDT Results Analysis (18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa) 13 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000111 RK-TC-2 Hopenfeld, Demonstration of Flawed Presentation of CHECWORKS Data June 29, 2012 RIV000112 RK-TC-2 Graphs from CHECWORKS Reports (Excerpts) June 29, 2012 RIV000113 RK-TC-2 In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear June 29, 2012 Operations, Inc. (Vermont Yankee Nuclear Power Station), Docket No. 50-271 | |||
-LR, ASLBP No. 06-849-03-LR, Testimony of Jeffrey S. Horowitz and James C. Fitzpatrick on NEC Contention 4 - Flow-Accelerated Corrosion (May 12, 2008), at 12-13 (excerpt) | |||
RIV000114 RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention June 29, 2012 NYS-26B/TC-1B - Metal Fatigue RIV000115 RK-TC-1B NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification June 29, 2012 (December 20, 1988) | |||
RIV000116 RK-TC-1B Audit of NRCs License Renewal Program, OIG-07-A-15, September 6, 2007 June 29, 2012 RIV000117 RK-TC-1B Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an June 29, 2012 Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering Vol. 6, No. 2, 2011 14 | |||
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), | |||
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000118 RK-TC-1B G. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K. June 29, 2012 Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119 RK-TC-1B International Atomic Energy Agency, Applicability of the leak before break June 29, 2012 concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 15}} |
Latest revision as of 01:25, 12 November 2019
ML12181A372 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 06/29/2012 |
From: | Riverkeeper |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
Shared Package | |
ML12181A367 | List: |
References | |
RAS 22866, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
Download: ML12181A372 (15) | |
Text
RIVR40001 Revised: June 29, 2012 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIVR00001 All Riverkeeper Hearing Exhibit List ("RIV Exhibit List") Dec. 22, 2011 RIV000002 RK-TC-2 Riverkeeper Initial Statement of Position Regarding Contention RK-TC Dec. 22, 2011 Flow Accelerated Corrosion ("RK-TC-2 SOP")
RIV000003 RK-TC-2 Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Dec. 22, 2011 Testimony RK-TC-2")
RIV000004 RK-TC-2; RK-TC-1B; Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV") Dec. 22, 2011 RK-TC-5 RIV000005 RK-TC-2 Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Dec. 22, 2011 Report")
RIV000006 RK-TC-2 NRC Information Notice No 86-106, Feed Water Line Break, December 16, Dec. 22, 2011 1986 ("NRC IN 86-106")
RIV000007 RK-TC-2 NRC Bulletin 87-01, Thinning Pipe Walls in Nuclear Plants, July 9, 1987 Dec. 22, 2011
RIV000008 RK-TC-2 NRC Information Notice 1991-019, Steam Generator Feed Water Distribution Dec. 22, 2011 Piping Damage," March 12, 1991 ("NRC IN 1991-019")
RIV000009 RK-TC-2 Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Dec. 22, 2011 Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")
RIV000010 RK-TC-2 NRC Information Notice 1997-084, Rupture of Extraction Steam Piping," Dec. 22, 2011 December 11, 1997 ("NRC IN 1997-084")
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000011 RK-TC-2 NRC Information Notice 2006-008, Secondary Piping Rupture at Mihama Dec. 22, 2011 Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")
RIV000012 RK-TC-2 EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Dec. 22, 2011 Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")
RIV000013 RK-TC-2 Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Dec. 22, 2011 Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.
(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")
RIV000014 RK-TC-2 Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP- Dec. 22, 2011 RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")
RIV000015 RK-TC-2 EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, Dec. 22, 2011 2010) ("Entergy FAC Program")
RIV00016A RK-TC-2 Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Dec. 22, 2011 Graphs Part 1")
RIV00016B RK-TC-2 Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Dec. 22, 2011 Graphs Part 2")
2
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000017 RK-TC-2 V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Dec. 22, 2011 Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")
RIV000018 RK-TC-2 CHECWORKSTM Steam/Feedwater Application, Guidelines for Plant Dec. 22, 2011 Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599")
RIV000019 RK-TC-2 Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Dec. 22, 2011 Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR
("Hausler VY Testimony")
RIV000020 RK-TC-2 CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re:
LCF) ("IP3 CHECWORKS SFA Model Aug 2011")
RIV000021 RK-TC-2 CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -
Components with Negative Time to Tcrit, IPEC00238096 ("CHECWORKS SFA Model Aug 2011 App K")
3
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000022 RK-TC-2 Statement by Dr. F. Peter Ford, transcript of January 26, 2005 meeting of the Dec. 22, 2011 ACRS Subcommittee on Thermal Hydraulics (January 26, 2005), at 198, ADAMS Accession No. ML050400613 ("2005 ACRS Transcript")
RIV000023 RK-TC-2 NUREG/CR-6936, PNNL 16186,Probabilities of Failure and Uncertainty Dec. 22, 2011 Estimate Information for Passive Components - a Literature Review (May 2007) ("NUREG/CR-6936")
RIV000024 RK-TC-2 Entergy Engineering Report, Operating Experience Review Report, IP-RPT Dec. 22, 2011 LRD05, Rev. 3 (2008), IPEC00186046 ("Entergy Op Ex Rev Report")
RIV000025 RK-TC-2 Daily DER Report, DER-01-01522, April 25, 2001, IPEC00020501 ("DER Dec. 22, 2011 Report")
RIV000026 RK-TC-2 Entergy Operations, Inc, Condition Report List, IPEC00185743 ("Condition Dec. 22, 2011 Report List 1")
RIV000027 RK-TC-2 Entergy Operations, Inc., Condition Report List, IPEC00092551 ("Condition Dec. 22, 2011 Report List 2")
RIV000028 RK-TC-2 Entergy Condition Report CR-IP2-2001-10525, IPEC00092616 ("Entergy CR- Dec. 22, 2011 IP2-2001-10525")
RIV000029 RK-TC-2 Entergy Condition Report CR-IP3-2006-02270, IPEC00025699 ("Entergy CR- Dec. 22, 2011 IP3-2006-02270")
4
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000030 RK-TC-2 Transcript of Meeting of Advisory Committee on Reactor Safeguards (Sept. Dec. 22, 2011 10, 2009), ADAMS Accession No. ML092670114, at 90-96 ("ACRS Mtg Transcript Sept 2009")
RIV000031 RK-TC-2 Lynn R. Sykes, John G. Armbruster, Won-Young Kim, & Leonardo Seeber, Dec. 22, 2011 Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, Bulletin of the Seismological Society of America, Vol. 98, No. 4, pp. 1696-1719, August 2008 ("Sykes Study")
RIV000032 RK-TC-2 Generic Issue 199 (GI-199), Implications of Updated Probabilistic Seismic Dec. 22, 2011 Hazard Estimates in Central and Eastern United States on Existing Plants Safety/Risk Assessment, August 2010, at Appendix D ("Seismic Sore-Damage Frequencies) ("NRC GI-199")
RIV000033 RK-TC-2 Bill Dedman, What are the odds? US nuke plants ranked by quake risk, March Dec. 22, 2011 17, 2011 ("Dedman Article")
RIV000034 RK-TC-1B Dr.Hopenfeld Pre-filed Testimony Dec. 22, 2011 RIV000035 RK-TC-1B; RK-TC-5 Dr. Hopenfeld Report Dec. 22, 2011 RIV000036 RK-TC-1B; RK-TC-5 Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785 Dec. 22, 2011 RIV000037 RK-TC-1B; RK-TC-5 Official Transcript, ACRS Subcommittee, 12/6/2006 Dec. 22, 2011 RIV000038 RK-TC-1B; RK-TC-5 NRC IN 2011-04 Dec. 22, 2011 RIV000039 RK-TC-1B; RK-TC-5 Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08 Dec. 22, 2011 5
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000040 RK-TC-1B; RK-TC-5 Taylor, EPRI R & D Status Report, Jan/Feb 1983 Dec. 22, 2011 RIV000041 RK-TC-1B; RK-TC-5 Entergy, Table of Environmental Correction Actions for Metal Fatigue, Dec. 22, 2011 11/6/07 RIV000042 RK-TC-1B; RK-TC-5 DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294 Dec. 22, 2011 RIV000043 RK-TC-1B; RK-TC-5 Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179 Dec. 22, 2011 RIV000044 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Dec. 22, 2011 RIV000045 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 1 Dec. 22, 2011 RIV000046 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 2 Dec. 22, 2011 RIV000047 RK-TC-1B; RK-TC-5 NRC IN 97-46 Dec. 22, 2011 RIV000048 RK-TC-1B; RK-TC-5 Final Report of the NESC-Thermal Fatigue Project, EUR22763 Dec. 22, 2011 RIV000049 RK-TC-1B; RK-TC-5 Entergy Indian Point U3, FAC, 3RF13 Outage, 2005 Dec. 22, 2011 RIV000050 RK-TC-1B; RK-TC-5 Westinghouse, WCAP-14950, IPECPROP00059247 Dec. 22, 2011 RIV000051 RK-TC-1B; RK-TC-5 Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008 Dec. 22, 2011 RIV000052A- RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1110 Dec. 22, 2011 D
RIV000053 RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1122 Dec. 22, 2011 RIV000054 RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11 Dec. 22, 2011 RIV000055 RK-TC-1B; RK-TC-5 Westinghouse CN-PAFM-09-64, IPECPROP00058077 Dec. 22, 2011 RIV000056 RK-TC-1B; RK-TC-5 Systems Standard Design Criteria, IPECPROP00059698 Dec. 22, 2011 6
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000057 RK-TC-1B; RK-TC-5 RAI Indian Point U2 and U3 LRA, 2/10/11 Dec. 22, 2011 RIV000058 RK-TC-1B; RK-TC-5 Response to RAI, Indian Point U2 and U3, 3/28/11 Dec. 22, 2011 RIV000059 RK-EC-3/CW-EC-1 Riverkeeper and Clearwater Initial Statement of Position Regarding Dec. 22, 2011 Consolidated Contention RK-EC-3/CW-EC-1 (Spent Fuel Pool Leaks) ("RK-EC-3-CW-EC-1 SOP")
RIV000060 RK-EC-3/CW-EC-1 Testimony of Arnold Gundersen on Consolidated Contention RK-EC-3/CW- Dec. 22, 2011 EC Spent Fuel Pool Leaks ("Gundersen Testimony")
RIV000061 RK-EC-3/CW-EC-1 Testimony of Gillian Stewart on Consolidated Contention RK-EC-3/CW-EC-1 Dec. 22, 2011
- Spent Fuel Pool Leaks ("Stewart Testimony")
RIV000062 RK-EC-3/CW-EC-1 Curriculum Vitae of Arnold Gundersen ("Gundersen CV") Dec. 22, 2011 RIV000063 RK-EC-3/CW-EC-1 Curriculum Vitae of Gillian Stewart ("Stewart CV") Dec. 22, 2011 RIV000064 RK-EC-3/CW-EC-1 NUREG-1437, Revision 1, Generic Environmental Impact Statement for Dec. 22, 2011 License Renewal of Nuclear Plants (July 2009) Draft Report for Comment
("GEIS Update")
RIV000065 RK-EC-3/CW-EC-1 U.S. EPA, Radionuclides in Drinking Water: A Small Entity Compliance Dec. 22, 2011 Guide (February 2002)
RIV000066 RK-EC-3/CW-EC-1 GZA, GeoEnvironmental, Inc., Hydrogeologic Site Investigation Report, Dec. 22, 2011 Indian Point Energy Center, January 7, 2008, IPEC00195418 7
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000067 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report Nos. Dec. 22, 2011 05000003/2007010 and 05000247/2007010, EA-08-088, May 13, 2008 RIV000068 RK-EC-3/CW-EC-1 Entergy, Groundwater Investigation Executive Summary, Indian Point Energy Dec. 22, 2011 Center, Buchanan, NY (January 2008)
RIV000069 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. Dec. 22, 2011 05000247/2005011, March 16, 2006 RIV000070 RK-EC-3/CW-EC-1 Indian Point Energy Center Status Report (Sept. 6, 2007) Dec. 22, 2011 RIV000071 RK-EC-3/CW-EC-1 In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Prefiled Testimony of Matthew J.
Barvenik, Issue for Adjudication No. 3 - Radiological Materials (July 22, 2011)
RIV000072 RK-EC-3/CW-EC-1 E-mail from Michael Rutkoske to Steven Verrochi (Entergy), Re: SFP Exams - Dec. 22, 2011 What's Next? (Nov. 19, 2005), IPEC00065830 RIV000073 RK-EC-3/CW-EC-1 Entergy, U2 SFP Leak Monitoring Wells and Underground Piping (3/31/06), Dec. 22, 2011 IPEC00063518 RIV000074 RK-EC-3/CW-EC-1 Entergy, Problem Development Sheet - Groundwater, IPEC00207416 Dec. 22, 2011 8
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000075 RK-EC-3/CW-EC-1 E-mail from Ronald Sachatello to Donald Mayer (Entergy), Joseph Adler Dec. 22, 2011 (TLG), Gary Hinrichs (Entergy), Re: IS THE POOL LEAK OFF COLLECTION BOX EFFECTIVE?, IPEC00063351 RIV000076 RK-EC-3/CW-EC-1 GZA, GeoEnvironmental, Inc. Final IPEC Quarterly Long-Term Groundwater Dec. 22, 2011 Monitoring Report, Quarter Two 2010 (Report No. 10) (February 15, 2011),
IPEC00227561 RIV000077 RK-EC-3/CW-EC-1 Entergy Chart of Leak Locations, I PEC00059360 Dec. 22, 2011 RIV000078 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2009), IPEC00225217 RIV000079 RK-EC-3/CW-EC-1 Annie Correal, Indian Pt. Broken Pipe Spurs Safety Worries, THE NEW Dec. 22, 2011 YORK TIMES (March 1, 2009)
RIV000080 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2010), IPEC00225219 RIV000081 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 2, 2010), IPEC00225223 RIV000082 RK-EC-3/CW-EC-1 Entergy, Nuclear Management Manual, EN-MA-125, Rev. 4, Attachment 9.1, Dec. 22, 2011 Initial Investigation, Troubleshooting Plan for H-3 Investigation, Storm Drain System A, March/April 2009, IPEC00194517 9
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000083 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 4, 2010), IPEC00233519 RIV000084 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 4, 10.7 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2011), IPEC00233515 RIV000085 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report Dec. 22, 2011 05000286/2011004 (November 7, 2011)
RIV000086 RK-EC-3/CW-EC-1 Entergy correspondence, e-mails regarding approach to groundwater Dec. 22, 2011 contamination, IPEC00067228, IPEC00065510, IPEC00130549, IPEC00062936 RIV000087 RK-EC-3/CW-EC-1 Potential Sources of Tritium at IPEC & Inspection Method, IPEC00065506 Dec. 22, 2011 RIV000088 RK-EC-3/CW-EC-1 Supplemental Report of the Public Oversight Panel Regarding the Dec. 22, 2011 Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant, July 20, 2010 RIV000089 RK-EC-3/CW-EC-1 GAO Report to Congressional Requesters, Nuclear Regulatory Commission, Dec. 22, 2011 Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks, GAO-11-563 (June 2011) 10
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000090 RK-EC-3/CW-EC-1 Entergy Groundwater Well Data, Quarter 2, 2011, IPEC00225100 Dec. 22, 2011 RIV000091 RK-EC-3/CW-EC-1 Liquid Radioactive Release Lessons Learned Task Force Final Report, U.S. Dec. 22, 2011 NRC (September 1, 2006)
RIV000092 RK-EC-3/CW-EC-1 Coastal Fish & Wildlife Habitat Rating Form, Haverstraw Bay Dec. 22, 2011 RIV000093 RK-EC-3/CW-EC-1 National Research Council, Health Risks from Exposure to Low Levels of Dec. 22, 2011 Ionizing Radiation: BEIR VII - Phase 2 (2006)
RIV000094 RK-EC-3/CW-EC-1 Entergy E-mail from David Winslow (GZA) to Donald Mayer (Entergy), G. Dec. 22, 2011 Hinrichs (Entergy), Re: Remedial Report (May 19, 2006), IPEC00064221 RIV000095 RK-EC-3/CW-EC-1 Groundwater Investigation 06 Quarter 4 Activities and Results, Dec. 22, 2011 IPEC00063899 RIV000096 RK-EC-3/CW-EC-1 Entergy E-mail from Kathleen McMullin (Entergy) to various, Re: IPEC Status Dec. 22, 2011 Report for Dec. 21 RIV000097 RK-EC-3/CW-EC-1 Entergy Document, Unit 1 Status for ENC Presentation notes, Groundwater Dec. 22, 2011 Status, IPEC00062939 RIV000098 RK-EC-3/CW-EC-1 Letter from Kathryn Sutton (Counsel for Entergy) to Deborah Brancato Dec. 22, 2011 (Riverkeeper), Re: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR (June 24, 2011) 11
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000099 RK-EC-3/CW-EC-1 In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Combined Prefiled Rebuttal Testimony of Thomas C. Esselman, Ph.D., Matthew J. Barvenik, and Owen Hoffman, Ph.D., Radiological - Issue for Adjudication No. 3 (October 4, 2011)
RIV000100 RK-EC-3/CW-EC-1 E-mail From Dara Gray (Entergy) to J. Noggle (NRC) (Jan. 24, 2007), Re: Dec. 22, 2011 Historical Sr Data (Exhibit RIV000100)
RIV000101 RK-EC-3/CW-EC-1 Haverstraw Water Supply Project DEIS, Draft EIS Chapter 2 Dec. 22, 2011 RIV000102 RK-TC-5 Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5 June 19, 2012 RIV000103 RK-TC-5; RK-TC-1B Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak June 19, 2012 Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976)
RIV000104 RK-TC-5; RK-TC-1B Memorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam June 19, 2012 Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011 12
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000105 RK-TC-5; RK-TC-1B NUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the June 19, 2012 Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001)
RIV000106 RK-TC-5; RK-TC-1B Associated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox June 19, 2012 News.com, February 3, 2012 RIV000107 RK-TC-2 Riverkeeper Revised Statement of Position Regarding Contention RK-TC-2 June 29, 2012 (Flow Accelerated Corrosion)
RIV000108 RK-TC-2 Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Riverkeeper June 29, 2012 Contention TC Flow Accelerated Corrosion RIV000109 RK-TC-2 Official Transcript of Proceedings, Nuclear Regulatory Commission, Entergy June 29, 2012 Nuclear Vermont Yankee, 50-271-LR; ASLBP No. 06-849-03-LR, Newfane, Vermont, pages 1451-1741 (July 24, 2008), at 1477 (excerpt)
RIV000110 RK-TC-2 Stéphane Trevin & Marie-Pierre Moutrille, Optimization of EDFs NPPs June 29, 2012 Maintenance due to Flow Accelerated Corrosion and BRT-CICEROTM Improvement by NDT Results Analysis (18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa) 13
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000111 RK-TC-2 Hopenfeld, Demonstration of Flawed Presentation of CHECWORKS Data June 29, 2012 RIV000112 RK-TC-2 Graphs from CHECWORKS Reports (Excerpts) June 29, 2012 RIV000113 RK-TC-2 In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear June 29, 2012 Operations, Inc. (Vermont Yankee Nuclear Power Station), Docket No. 50-271
-LR, ASLBP No. 06-849-03-LR, Testimony of Jeffrey S. Horowitz and James C. Fitzpatrick on NEC Contention 4 - Flow-Accelerated Corrosion (May 12, 2008), at 12-13 (excerpt)
RIV000114 RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention June 29, 2012 NYS-26B/TC-1B - Metal Fatigue RIV000115 RK-TC-1B NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification June 29, 2012 (December 20, 1988)
RIV000116 RK-TC-1B Audit of NRCs License Renewal Program, OIG-07-A-15, September 6, 2007 June 29, 2012 RIV000117 RK-TC-1B Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an June 29, 2012 Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering Vol. 6, No. 2, 2011 14
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000118 RK-TC-1B G. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K. June 29, 2012 Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119 RK-TC-1B International Atomic Energy Agency, Applicability of the leak before break June 29, 2012 concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 15