ML12275A465: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12275A465
| number = ML12275A465
| issue date = 09/27/2012
| issue date = 09/27/2012
| title = Prairie Island Nuclear Generating Plant Meeting September 27, 2012 - Handouts
| title = Meeting September 27, 2012 - Handouts
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 9: Line 9:
| docket = 05000282, 05000306
| docket = 05000282, 05000306
| license number = DPR-042, DPR-060
| license number = DPR-042, DPR-060
| contact person = Wengert T J
| contact person = Wengert T
| case reference number = TAC ME9468, TAC ME9469
| case reference number = TAC ME9468, TAC ME9469
| document type = Meeting Briefing Package/Handouts
| document type = Meeting Briefing Package/Handouts
| page count = 3
| page count = 3
| project = TAC:ME9468, TAC:ME9469
| project = TAC:ME9468, TAC:ME9469
| stage = RAI
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:3.8.1 AC Sources-Operating SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each required path. 7 days SR 3.8.1.2 ----------------------------
{{#Wiki_filter:AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.8.1.1       Verify correct breaker alignment and indicated           7 days power availability for each required path.
: 1. Performance of SR 3.8.1.6 satisfies this SR. 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR in consideration of manufacturer's recommendations.
SR 3.8.1.2   ----------------------------NOTES-------------------------
When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.6 must be met. Verify each DG starts from standby conditions and achieves steady state voltage V and V, and frequency 59.5§%;& Hz and 31 days Prairie Island Unit 1 -Amendment No. -l-§.& Units 1 and 2 3.8.1-6 Unit 2 -Amendment No. -l49 3.8.1 AC Sources-Operating SURVEILLANCE REQUIREMENTS (continued)
: 1. Performance of SR 3.8.1.6 satisfies this SR.
SURVEILLANCE FREQUENCY SR 3.8.1.6 All DG starts may be preceded by an engine prelube peliod. Verify each DG starts from standby condition and achieves:  
: 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
: a. In 10 seconds, voltage 3740 V and frequency 58.8 Hz; and b. Steady state voltage 4021J.+4G V and V, and frequency Hz and 60.5&J..d.
: 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR in consideration of manufacturer's recommendations. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.6 must be met.
Hz. 184 days SR 3.8.1.7 Verify each DG does not trip during and following a load rejection of: 1. Unit 1 650 kW; and 2. Unit 2 860 kW. 24 months SR 3.8.1.8 Verify each DG's automatic trips are bypassed on an actual or simulated safety injection signal except: a. Engine overspeed;  
Verify each DG starts from standby conditions and           31 days achieves steady state voltage ~ 4Q27~ V and
: b. Generator differential current; and c. Ground fault (Unit 1 only).
              ~ 4:tO_O~ V, and frequency ~ 59.5§%;& Hz and
SR 3.0.2 interval extension (1.25 times the interval) applies to this SR 24 months Prairie Island Unit 1 -Amendment No. -l-§.& Units 1 and 2 3.8.1-8 Unit 2 -Amendment No. -l49 3.8.1 AC Sources-Operating SURVEILLANCE REQUIREMENTS (continued)
              ~ 60 . 5.~ Hz.
SR 3.8.1.9 ----------------------------
Prairie Island                                       Unit 1 - Amendment No. -l-§.& ~
N Momentary transients outside the load and power factor ranges do not invalidate this test. If performed with DG synchronized with offsite power, it shall be performed at a power factor 0.85. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable. Verify each DG operates for 2:: 24 hours: For 2:: 2 hours loaded: Unit 1 2:: 2832 kW, and < 3000 kW Unit 2 2:: 5400 kW, and 5940 kW; and For the remaining hours of the test loaded: Unit 1 2:: 2500 kW, and Unit 2 2:: 4860 kW; and Achieves steady state voltage 2:: 4.Q21-3-f4.0 V and 4400#8Q V; and frequency 2:: 59.5.&sect;.8.:.8.
Units 1 and 2                             3.8.1-6   Unit 2 - Amendment No. -l49 ~
Hz and 60.5e-I:4 Hz.
 
24 months Prairie Island Unit 1 -Amendment No. 15S Units 1 and 2 3.8.1-9 Unit 2 -Amendment No. 149 178}}
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                     FREQUENCY SR 3.8.1.6   ----------------------------NOTE--------------------------
All DG starts may be preceded by an engine prelube peliod.
Verify each DG starts from standby condition and           184 days achieves:
: a. In ~ 10 seconds, voltage ~ 3740 V and frequency ~ 58.8 Hz; and
: b. Steady state voltage ~ 4021J.+4G V and
                    ~ ~ V, and frequency ~ 59.5~ Hz and ~ 60.5&J..d. Hz.
SR 3.8.1.7   Verify each DG does not trip during and following a         24 months load rejection of:
: 1. Unit 1 ~ 650 kW; and
: 2. Unit 2 ~ 860 kW.
SR 3.8.1.8   Verify each DG's automatic trips are bypassed on an         -------NOllE-----
actual or simulated safety injection signal except:        SR 3.0.2 interval extension (1.25
: a. Engine overspeed;                                     times the interval) applies
: b. Generator differential current; and                   to this SR
: c. Ground fault (Unit 1 only).
24 months Prairie Island                                           Unit 1 - Amendment No. -l-&sect;.& +94 Units 1 and 2                             3.8.1-8       Unit 2 - Amendment No. -l49 ~
 
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                      FREQUENCY SR 3.8.1 .9   ----------------------------N OTES-------------------------
: 1. Momentary transients outside the load and power factor ranges do not invalidate this test.
: 2. If performed with DG synchronized with offsite power, it shall be performed at a power factor
                    ~ 0.85. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable.
Verify each DG operates for 2:: 24 hours:                   24 months
: a. For 2:: 2 hours loaded:
Unit 1 2:: 2832 kW, and
                            < 3000 kW Unit 2 2:: 5400 kW, and
                            ~ 5940 kW; and
: b. For the remaining hours of the test loaded:
Unit 1 2:: 2500 kW, and Unit 2 2:: 4860 kW; and
: c. Achieves steady state voltage 2:: 4.Q21-3-f4.0 V and ~ 4400#8Q V; and frequency 2:: 59.5.&sect;.8.:.8. Hz and ~ 60.5e-I:4 Hz.
Prairie Island                                       Unit 1 - Amendment No. 15S 189-l%
Units 1 and 2                             3.8.1-9   Unit 2 - Amendment No. 149 178 ~}}

Latest revision as of 22:53, 11 November 2019

Meeting September 27, 2012 - Handouts
ML12275A465
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/27/2012
From:
Office of Nuclear Reactor Regulation
To:
Wengert T
References
TAC ME9468, TAC ME9469
Download: ML12275A465 (3)


Text

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated 7 days power availability for each required path.

SR 3.8.1.2 ----------------------------NOTES-------------------------

1. Performance of SR 3.8.1.6 satisfies this SR.
2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR in consideration of manufacturer's recommendations. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.6 must be met.

Verify each DG starts from standby conditions and 31 days achieves steady state voltage ~ 4Q27~ V and

~ 4:tO_O~ V, and frequency ~ 59.5§%;& Hz and

~ 60 . 5.~ Hz.

Prairie Island Unit 1 - Amendment No. -l-§.& ~

Units 1 and 2 3.8.1-6 Unit 2 - Amendment No. -l49 ~

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.6 ----------------------------NOTE--------------------------

All DG starts may be preceded by an engine prelube peliod.

Verify each DG starts from standby condition and 184 days achieves:

a. In ~ 10 seconds, voltage ~ 3740 V and frequency ~ 58.8 Hz; and
b. Steady state voltage ~ 4021J.+4G V and

~ ~ V, and frequency ~ 59.5~ Hz and ~ 60.5&J..d. Hz.

SR 3.8.1.7 Verify each DG does not trip during and following a 24 months load rejection of:

1. Unit 1 ~ 650 kW; and
2. Unit 2 ~ 860 kW.

SR 3.8.1.8 Verify each DG's automatic trips are bypassed on an -------NOllE-----

actual or simulated safety injection signal except: SR 3.0.2 interval extension (1.25

a. Engine overspeed; times the interval) applies
b. Generator differential current; and to this SR
c. Ground fault (Unit 1 only).

24 months Prairie Island Unit 1 - Amendment No. -l-§.& +94 Units 1 and 2 3.8.1-8 Unit 2 - Amendment No. -l49 ~

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1 .9 ----------------------------N OTES-------------------------

1. Momentary transients outside the load and power factor ranges do not invalidate this test.
2. If performed with DG synchronized with offsite power, it shall be performed at a power factor

~ 0.85. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable.

Verify each DG operates for 2:: 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: 24 months

a. For 2:: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded:

Unit 1 2:: 2832 kW, and

< 3000 kW Unit 2 2:: 5400 kW, and

~ 5940 kW; and

b. For the remaining hours of the test loaded:

Unit 1 2:: 2500 kW, and Unit 2 2:: 4860 kW; and

c. Achieves steady state voltage 2:: 4.Q21-3-f4.0 V and ~ 4400#8Q V; and frequency 2:: 59.5.§.8.:.8. Hz and ~ 60.5e-I:4 Hz.

Prairie Island Unit 1 - Amendment No. 15S 189-l%

Units 1 and 2 3.8.1-9 Unit 2 - Amendment No. 149 178 ~