ML16125A386: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16125A386
| number = ML16125A386
| issue date = 04/26/2016
| issue date = 04/26/2016
| title = Three Mile Island, Units 1 and 2 - Submittal of EP-AA-1009, Addendum 3, Revision 1 to Emergency Action Levels for Three Mile Island (Tm!) Station
| title = Submittal of EP-AA-1009, Addendum 3, Revision 1 to Emergency Action Levels for Three Mile Island (Tm!) Station
| author name = Helker D P
| author name = Helker D
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,Mhi 7 ) y Exelon Generation 200 Exelon Way Kennett Square, PA 19348 TMl-16-042 April 26, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRG Docket No. 50-320 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 1 O CFR 72.44(f)
{{#Wiki_filter:,Mhi   7
)     y   Exelon Generation                                                 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)
TMl-16-042 April 26, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRG Docket No. 50-320


==Subject:==
==Subject:==
Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 1 O CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting an Emergency Plan Addendum revision for Three Mile Island Nuclear Station (TMI) as listed in the table below. Document Revision. Title EP-AA-1009, Addendum 3 1 Emergency Action Levels for Three Mile Island (TM!) Station The change to the Emergency Plan Addendum was evaluated under the requirements of 10 CFR 50.54(q) and was determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 1 O CFR 50.4{b)(5). The changes continue to meet the applicable planning standards established in 1 O CFR 50.47{b) and 1 O CFR 50, Appendix E. In addition, as required by 1 O CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1 ). This submittal also satisfies the reporting requirements associated with 1 O CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation. . "'/ q 5 /} J.Jf< /<...
Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting an Emergency Plan Addendum revision for Three Mile Island Nuclear Station (TMI) as listed in the table below.
U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRG Docket Nos. 50-289 and 50-320 April 26, 2016 Page 2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter. There are no regulatory commitments in this submittal. If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557. Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 2) 1 O CFR 50.54(q)(5) Procedure Change Summary Analysis EP-AA-1009, Addendum 3, Revision 1, "Emergency Action Levels for Three Mile Island (TMI) Station" cc: w/ Attachment 1 only Regional Administrator -NRG Region I Director, NRG Division of Spent Fuel Storage and Transportation, ONMSS NRG Senior Resident Inspector -Three Mile Island Nuclear Station NRG Project Manager, NRR -Three Mile Island Nuclear Station Director, Bureau of Radiation Protection -Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA
Document                 Revision.                           Title Emergency Action Levels for Three Mile Island EP-AA-1009, Addendum 3             1 (TM!) Station The change to the Emergency Plan Addendum was evaluated under the requirements of 10 CFR 50.54(q) and was determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.4{b)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47{b) and 10 CFR 50, Appendix E.
,Mhi 7 ) y Exelon Generation 200 Exelon Way Kennett Square, PA 19348 TMl-16-042 April 26, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRG Docket No. 50-320 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 1 O CFR 72.44(f)
In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1).
This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),
which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation.                                         . "'/ q5
                                                                                                      /} J.Jf< /<...
 
U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRG Docket Nos. 50-289 and 50-320 April 26, 2016 Page 2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter.
There are no regulatory commitments in this submittal.
If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.
Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1)       10 CFR 50.54(q)(5) Procedure Change Summary Analysis
: 2)    EP-AA-1009, Addendum 3, Revision 1, "Emergency Action Levels for Three Mile Island (TMI) Station" cc:     w/ Attachment 1 only Regional Administrator - NRG Region I Director, NRG Division of Spent Fuel Storage and Transportation, ONMSS NRG Senior Resident Inspector - Three Mile Island Nuclear Station NRG Project Manager, NRR - Three Mile Island Nuclear Station Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA
 
  ,Mhi   7
)     y   Exelon Generation                                                 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)
TMl-16-042 April 26, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRG Docket No. 50-320


==Subject:==
==Subject:==
Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 1 O CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting an Emergency Plan Addendum revision for Three Mile Island Nuclear Station (TMI) as listed in the table below. Document Revision. Title EP-AA-1009, Addendum 3 1 Emergency Action Levels for Three Mile Island (TM!) Station The change to the Emergency Plan Addendum was evaluated under the requirements of 10 CFR 50.54(q) and was determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 1 O CFR 50.4{b)(5). The changes continue to meet the applicable planning standards established in 1 O CFR 50.47{b) and 1 O CFR 50, Appendix E. In addition, as required by 1 O CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1 ). This submittal also satisfies the reporting requirements associated with 1 O CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation. . "'/ q 5 /} J.Jf< /<...
Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting an Emergency Plan Addendum revision for Three Mile Island Nuclear Station (TMI) as listed in the table below.
U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRG Docket Nos. 50-289 and 50-320 April 26, 2016 Page 2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter. There are no regulatory commitments in this submittal. If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557. Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 2) 1 O CFR 50.54(q)(5) Procedure Change Summary Analysis EP-AA-1009, Addendum 3, Revision 1, "Emergency Action Levels for Three Mile Island (TMI) Station" cc: w/ Attachment 1 only Regional Administrator -NRG Region I Director, NRG Division of Spent Fuel Storage and Transportation, ONMSS NRG Senior Resident Inspector -Three Mile Island Nuclear Station NRG Project Manager, NRR -Three Mile Island Nuclear Station Director, Bureau of Radiation Protection -Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA}}
Document                 Revision.                           Title Emergency Action Levels for Three Mile Island EP-AA-1009, Addendum 3             1 (TM!) Station The change to the Emergency Plan Addendum was evaluated under the requirements of 10 CFR 50.54(q) and was determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.4{b)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47{b) and 10 CFR 50, Appendix E.
In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1).
This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),
which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation.                                         . "'/ q5
                                                                                                      /} J.Jf< /<...
 
U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRG Docket Nos. 50-289 and 50-320 April 26, 2016 Page 2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter.
There are no regulatory commitments in this submittal.
If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.
Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1)       10 CFR 50.54(q)(5) Procedure Change Summary Analysis
: 2)    EP-AA-1009, Addendum 3, Revision 1, "Emergency Action Levels for Three Mile Island (TMI) Station" cc:     w/ Attachment 1 only Regional Administrator - NRG Region I Director, NRG Division of Spent Fuel Storage and Transportation, ONMSS NRG Senior Resident Inspector - Three Mile Island Nuclear Station NRG Project Manager, NRR - Three Mile Island Nuclear Station Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA}}

Latest revision as of 18:42, 10 November 2019

Submittal of EP-AA-1009, Addendum 3, Revision 1 to Emergency Action Levels for Three Mile Island (Tm!) Station
ML16125A386
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 04/26/2016
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16132A038 List:
References
TMl-16-042 EPA-AA-1009, Add. 3, Rev.1
Download: ML16125A386 (2)


Text

,Mhi 7

) y Exelon Generation 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)

TMl-16-042 April 26, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRG Docket No. 50-320

Subject:

Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting an Emergency Plan Addendum revision for Three Mile Island Nuclear Station (TMI) as listed in the table below.

Document Revision. Title Emergency Action Levels for Three Mile Island EP-AA-1009, Addendum 3 1 (TM!) Station The change to the Emergency Plan Addendum was evaluated under the requirements of 10 CFR 50.54(q) and was determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.4{b)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47{b) and 10 CFR 50, Appendix E.

In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1).

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),

which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation. . "'/ q5

/} J.Jf< /<...

U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRG Docket Nos. 50-289 and 50-320 April 26, 2016 Page 2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 10 CFR 50.54(q)(5) Procedure Change Summary Analysis

2) EP-AA-1009, Addendum 3, Revision 1, "Emergency Action Levels for Three Mile Island (TMI) Station" cc: w/ Attachment 1 only Regional Administrator - NRG Region I Director, NRG Division of Spent Fuel Storage and Transportation, ONMSS NRG Senior Resident Inspector - Three Mile Island Nuclear Station NRG Project Manager, NRR - Three Mile Island Nuclear Station Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA

,Mhi 7

) y Exelon Generation 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)

TMl-16-042 April 26, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRG Docket No. 50-320

Subject:

Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting an Emergency Plan Addendum revision for Three Mile Island Nuclear Station (TMI) as listed in the table below.

Document Revision. Title Emergency Action Levels for Three Mile Island EP-AA-1009, Addendum 3 1 (TM!) Station The change to the Emergency Plan Addendum was evaluated under the requirements of 10 CFR 50.54(q) and was determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.4{b)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47{b) and 10 CFR 50, Appendix E.

In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1).

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),

which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation. . "'/ q5

/} J.Jf< /<...

U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision NRG Docket Nos. 50-289 and 50-320 April 26, 2016 Page 2 A copy of the revised Emergency Plan Addendum and supporting change summary analysis are included in the attachments to this letter.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 10 CFR 50.54(q)(5) Procedure Change Summary Analysis

2) EP-AA-1009, Addendum 3, Revision 1, "Emergency Action Levels for Three Mile Island (TMI) Station" cc: w/ Attachment 1 only Regional Administrator - NRG Region I Director, NRG Division of Spent Fuel Storage and Transportation, ONMSS NRG Senior Resident Inspector - Three Mile Island Nuclear Station NRG Project Manager, NRR - Three Mile Island Nuclear Station Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA