ML17329A381: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 6
| page count = 6
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:ACC~ELERATED DI!MUBVTION DEMONSTRATION SYSTEM REGULATO NFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBR:9202210291 DOC.DATE: 92/02/13 NOTARIZED:
{{#Wiki_filter:ACC~ELERATED DI!MUBVTION DEMONSTRATION SYSTEM REGULATO         NFORMATION DISTRIBUTION       TEM (RIDS)
NO DOCKET FACZL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
ACCESSION NBR:9202210291               DOC.DATE: 92/02/13   NOTARIZED: NO         DOCKET FACZL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME             AUTHOR AFFILIATION FITZPATRICK,E.       Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIP.NAME             RECIPIENT AFFILIATION MURLEY,T.E.           NRC No Detailed Affiliation Given
Indiana Michigan Power Co.(formerly Indiana a Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
NRC-No Detailed Affiliation Given  


==SUBJECT:==
==SUBJECT:==
Modifies 910225 application for amends to Licenses DPR-58 6 DPR-74,changing TS re missed surveillances per Generic Ltr 87-09 as result of NRC request.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
Modifies 910225 application for amends to Licenses DPR-58 6 DPR-74,changing TS re missed surveillances per Generic Ltr 87-09 as result of NRC request.
General Distribution NOTES: RECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: NRR/DET/ECMB 7D NRR/DOEA/OTSBll NRR/DST/SELB 7E NRR/DST/SRXB 8E OC/LEM G FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD3-1 PD NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: A001D           COPIES RECEIVED:LTR       ENCL     SIZE:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK.ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 16  
TITLE: OR Submittal: General Distribution NOTES:
~Ik Indiana Michigan Power Company P.O.Box 16631 Columbus, OH 43216 INSMNA NICM6iQN PQWM AEP:NRC:1036D Donald C.Cook Nuclear Plant Units 1 and 2 License Nos.DPR-58 and DPR-74 Docket Nos.50-315 and 50-316 MODIFICATION OF SUBMITTAL AEP:NRC:1036C, REGARDING PROPOSED TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH MISSED SURVEILLANCES U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 ATTN: T.E.Murley February 13, 1992  
RECIPIENT               COPIES          RECIPIENT          COPIES ID CODE/NAME              LTTR ENCL      ID CODE/NAME       LTTR ENCL PD3-1 LA                     1    1    PD3-1  PD              1    1 STANG,J                       2    2 INTERNAL: NRR/DET/ECMB 7D               1    1    NRR/DET/ESGB            1    1 NRR/DOEA/OTSBll               1    1    NRR/DST      8E2      1    1 NRR/DST/SELB 7E               1    1    NRR/DST/SICB8H7        1     1 NRR/DST/SRXB 8E              1    1    NUDOCS-ABSTRACT         1    1 OC/LEM                        1    0    OGC/HDS2               1    0 G  FILE      01          1    1    RES/DSIR/EIB           1     1 EXTERNAL: NRC PDR                        1     1     NSIC                    1     1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               18   ENCL   16
 
~ Ik Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 INSMNA NICM6iQN PQWM AEP:NRC:1036D Donald C. Cook Nuclear Plant Units         1 and 2 License Nos. DPR-58 and DPR-74 Docket Nos. 50-315 and 50-316 MODIFICATION OF SUBMITTAL AEP:NRC:1036C,               REGARDING PROPOSED TECHNICAL         SPECIFICATION   CHANGES     ASSOCIATED   WITH   MISSED SURVEILLANCES U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 ATTN:       T. E. Murley February 13, 1992
 
==Dear Dr. Murley:==
 
Our letter AEP:NRC:1036C, dated February 25, 1991, proposed to modify Technical Specification (T/S) 4.0.3 such that the action requirements of the T/Ss may be delayed for up to 24 hours to permit the completion of a missed surveillance when the allowable outage time limits of the action requirements are less than 24.
hours. The application of a 24-hour grace period was based on the guidance provided by the NRC in Generic Letter 87-09.
As a      result of your staff's review of our submittal, we were requested to modify our proposed T/S so that our proposed wording is more consistent with the suggested changes provided in the generic letter.            Specifically, we were requested to relocate explanatory language from the T/S to the Bases section.
The attachment to        this letter contains the proposed revised T/S and Bases pages that        incorporate the changes suggested by your staff.
Since the changes from our original submittal are administrative in nature,        it is our belief that publication of the changes in the Federal Register is not required.
.,9202210291        . '920213 P'' ', ADGCK PDR                0500031 5 PDR gyral l/j


==Dear Dr.Murley:==
Our letter AEP:NRC:1036C, dated February 25, 1991, proposed to modify Technical Specification (T/S)4.0.3 such that the action requirements of the T/Ss may be delayed for up to 24 hours to permit the completion of a missed surveillance when the allowable outage time limits of the action requirements are less than 24.hours.The application of a 24-hour grace period was based on the guidance provided by the NRC in Generic Letter 87-09.As a result of your staff's review of our submittal, we were requested to modify our proposed T/S so that our proposed wording is more consistent with the suggested changes provided in the generic letter.Specifically, we were requested to relocate explanatory language from the T/S to the Bases section.The attachment to this letter contains the proposed revised T/S and Bases pages that incorporate the changes suggested by your staff.Since the changes from our original submittal are administrative in nature, it is our belief that publication of the changes in the Federal Register is not required..,9202210291
.'920213 PDR', ADGCK 0500031 5 P''PDR gyral l/j
~'
~'
Dr.T.E.Murley-2-AEP:NRC:1036D This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Dr. T. E. Murley                                 AEP:NRC:1036D This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, E..itzp trick Vice Presid nt tjw Attachment CC: D.H.Williams, Jr.A.A.Blind-Bridgman J.R.Padgett G.Charnoff NFEM Section Chief A.B.Davis-Region III NRC Resident Inspector-Bridgman g II t A 4}}
Sincerely, E.   . itzp trick Vice Presid nt tjw Attachment CC:   D. H. Williams, Jr.
A. A. Blind - Bridgman J. R. Padgett G. Charnoff NFEM Section Chief A. B. Davis - Region   III NRC Resident Inspector - Bridgman
 
II g
t A
4}}

Latest revision as of 03:59, 10 November 2019

Modifies 910225 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Re Missed Surveillances Per Generic Ltr 87-09 as Result of NRC Request
ML17329A381
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/13/1992
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC
Shared Package
ML17329A382 List:
References
AEP:NRC:1036D, GL-87-09, GL-87-9, NUDOCS 9202210291
Download: ML17329A381 (6)


Text

ACC~ELERATED DI!MUBVTION DEMONSTRATION SYSTEM REGULATO NFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:9202210291 DOC.DATE: 92/02/13 NOTARIZED: NO DOCKET FACZL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. NRC No Detailed Affiliation Given

SUBJECT:

Modifies 910225 application for amends to Licenses DPR-58 6 DPR-74,changing TS re missed surveillances per Generic Ltr 87-09 as result of NRC request.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1 PD3-1 PD 1 1 STANG,J 2 2 INTERNAL: NRR/DET/ECMB 7D 1 1 NRR/DET/ESGB 1 1 NRR/DOEA/OTSBll 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 7E 1 1 NRR/DST/SICB8H7 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC/LEM 1 0 OGC/HDS2 1 0 G FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 16

~ Ik Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 INSMNA NICM6iQN PQWM AEP:NRC:1036D Donald C. Cook Nuclear Plant Units 1 and 2 License Nos. DPR-58 and DPR-74 Docket Nos. 50-315 and 50-316 MODIFICATION OF SUBMITTAL AEP:NRC:1036C, REGARDING PROPOSED TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH MISSED SURVEILLANCES U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 ATTN: T. E. Murley February 13, 1992

Dear Dr. Murley:

Our letter AEP:NRC:1036C, dated February 25, 1991, proposed to modify Technical Specification (T/S) 4.0.3 such that the action requirements of the T/Ss may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of a missed surveillance when the allowable outage time limits of the action requirements are less than 24.

hours. The application of a 24-hour grace period was based on the guidance provided by the NRC in Generic Letter 87-09.

As a result of your staff's review of our submittal, we were requested to modify our proposed T/S so that our proposed wording is more consistent with the suggested changes provided in the generic letter. Specifically, we were requested to relocate explanatory language from the T/S to the Bases section.

The attachment to this letter contains the proposed revised T/S and Bases pages that incorporate the changes suggested by your staff.

Since the changes from our original submittal are administrative in nature, it is our belief that publication of the changes in the Federal Register is not required.

.,9202210291 . '920213 P ', ADGCK PDR 0500031 5 PDR gyral l/j

~'

Dr. T. E. Murley AEP:NRC:1036D This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, E. . itzp trick Vice Presid nt tjw Attachment CC: D. H. Williams, Jr.

A. A. Blind - Bridgman J. R. Padgett G. Charnoff NFEM Section Chief A. B. Davis - Region III NRC Resident Inspector - Bridgman

II g

t A

4