ML13081A142: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13081A142
| number = ML13081A142
| issue date = 03/08/2013
| issue date = 03/08/2013
| title = and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 29, 2012, Through March 01, 2013
| title = the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 29, 2012, Through March 01, 2013
| author name = St.Onge R J
| author name = St.Onge R
| author affiliation = Southern California Edison Co
| author affiliation = Southern California Edison Co
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:SOUTHERN CALIFORNI A EDISONRichard[, St.Onge Director , Nuclear RegulatoryAffairs and EmergencyPlann ing An EDISO N INTER NA TIO N ALCompa n yU.S.Nuclea r Regulatory Commission ATTN: Document Control Desk Wash ington, D.C.20555-0001 March 8, 201310CFR50.4
{{#Wiki_filter:SOUTHERN CALIFORNIA                                                        Richard [, St. Onge EDISON                                                                    Director, Nuclear Regulatory Affairs and Emergency Planning An EDISON INTERNATIONAL Company 10 CFR 50.4 March 8, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C . 20555-0001


==Subject:==
==Subject:==
DocketNos.50-206,50-361,50
Docket Nos. 50-206, 50-361, 50-362, and 72-41 Summary Report of Commitment Changes Implemented During the Period From March 29, 2012, Through March 01, 2013 San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation Dea r Sir or Mada m:
-362,and72-41 Summary Report of Commitment Changes Implemented During the Period From March29,2012, Through March01,2013 San Onofre Nuclear Generating Station (SONGS)Units1,2and3,and the Independent Spent Fue l Storage Installation Dea rSiro r Mada m: Pursuan t t o the guidance in Nuclear Energy Institute(NEI)99-04,"Guidelines for Managing NRC Commitment Changes ," Rev ision 0 , attachedisa summa ryofcomm itments changed duringtheperiodfromMa rch 29 , 2012 throughMarch01
Pursuant to the guidance in Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitme nt Changes ," Revision 0, attached is a summary of comm itments changed during the period from March 29 , 2012 through March 01 , 2013. These commitment changes were evaluated by SONGS as not requ iring prior NRC approval. This letter provides NRC notification of these changes .
, 2013.These commi tment changes were evaluated by SONGS as notrequiring p rior NRC approval.Thisle tter provides NRC notification of these changes.Attachment 1 includes a summary of regulatory commitment changesandabasisforeachchange.In addition , Attachment2prov ides a summary of changes to several vo luntary commitments described i n pre vious correspo ndencetotheNRC.Althoug h not considered formal regulato ry commitments, SONGS has included these changes for your information.
Attachme nt 1 includes a summary of regulatory commitment changes and a basis for each change. In addition , Attachment 2 provides a summary of changes to several voluntary commitments described in previous correspondence to the NRC. Althoug h not considered formal regulato ry commitments, SONGS has included these changes for your information.
This letter does not containanynew commitments
This letter does not contain any new commitments . If you have any questions or would like any additional information , please contact Lee Kelly at (949) 368-6657.
.Ifyouhaveany questionsorwouldlikeany additio nal in formation , please contactLeeKellyat(949) 368-6657.Sincerely , Attachments: As Statedcc:E.E.Collins , Regiona l Adm inistrator
Sincerely, Attachments: As Stated cc:     E. E. Collins , Regional Adm inistrator, NRC Region IV R. Hall , NRC Project Manager, San Onofre Units 2 and 3 B. Benney, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warn ick , NRC Senior Res ident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92672
,NRCRegionIV R.Hall ,NRCP ro ject Manager , San Onofre Un its2and3 B.Benney , NRC Project Manager , San Onofre Uni ts2and3G.G.Warnick, NRC Senior Res ident Inspector , San Onofre Un its2and3 P.O.Box128 Sa n C lemente, CA 92672 ATTACHMENT 1-
 
ATTACHMENT 1-  


==SUMMARY==
==SUMMARY==
REPORTOF REGULATORY COMMITMENT CHANGES IMPLEMENTEDDURINGTHEPERIODFROMMARCH29,2012THROUGHMARCH01,2013SONGSTrackingNos.
REPORT OF REGULATORY COMMITMENT CHANGES IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos.       Source(s)                         Proposed Action                      Change Summary and Basis for Change NRCTS 2007-04-001  SCE letter to NRC,     The following action was stated in the April 16, 2007 The action was modified to allow alternate NN 202315010        dated April 16, 2007 , NOV response letter to NRC.                          methods of confirming proper area checks .
Source(s)ProposedActionChangeSummaryandBasisforChangeNRCTS2007-04-001SCElettertoNRC
Reply to a Notice of                                                        The revised commitment wording is as Violation ; EA-06-303                                                       follows :
,Thefollow ingactionwasstatedintheApril16
Inspection Report No. "Corrective actions will be taken to provide a more 5000361/2007402 and    positive confirmation of proper check performance, a "Corrective actions will be taken to provide a 5000362/2007402 San    long-term project was created to use hand-held        more positive confirmation of proper area Onofre Nuclear        computers , in conjunction with bar codes, to        check performance. "
,2007Theact ionwasmodif iedtoallowalternateNN202315010 da tedApril16 , 2007 ,NOVresponseletter toNRC.methodsofconf irmingproperareachecks
Generation Station ,   document area checks electronically."
.ReplytoaNot ice ofTherev ised commitmentwordingisas Violation;EA-06-303 follows:InspectionReportNo.
Units 2 and 3 Page 1 of 1
"Correctiveact ions w illbetakentoprovideamore 5000361/2007402andpositive confirmat ionofprope r check performance
 
, a"Correctiveact ionswillbetakentoprovidea 5000362/2007402Sanlong-termprojectwascreatedtousehand-heldmorepos itive conf irmationofproperareaOnofreNuclear computers ,inconjunctionwithbarcodes,tocheckperformance.
ATTACHMENT 2 -  
"GenerationStation
, documentareachecks electronically
."Units2and3Page1of1 ATTACHMENT2-


==SUMMARY==
==SUMMARY==
OFCHANGESTO VOLUNTARY COMMITMENTSDESCRIBEDINPREVIOUS CORRESPONDENCETONRC IMPLEMENTEDDURINGTHEPERIODFROMMARCH29,2012THROUGHMARCH01,2013SONGSTrackingNos.
OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos.                 Source(s)                     Proposed Action            Change Summary and Basis for Change NRCTS 2009-10-025          SCE letter to NRC, dated October The following action was stated in    Remove commitment from procedure NN202312775                 29,2009, Independent Safety     the October 29, 2009, letter to the  S0123-XV-50.7 Change Management.
Source(s)ProposedAction Change SummaryandBasisforChangeNRCTS2009-10-025SCElettertoNRC
Culture Assessment Results and  NRC.
, dated OctoberThefollowingactionwasstatedin Remove commitmentfromprocedure NN202312775 29,2009, Independent Safety the October29,2009,lettertothe S0123-XV-50.7ChangeManagement.
Action Plans (Response to NRC                                          The Performance Improvement Mid-Cycle Performance Review                                          Organization Chart no longer has a change Letter)                         "Appoint a site leader to drive the  management leader position. The Manage r applicat ion of change                of Organizational Effectiveness will perform management."                         similar duties . SONGS procedure governing change management (S0123-XV-50.7) ensures this responsibility is implemented at SONGS .
Culture AssessmentResultsandNRC.ActionPlans(ResponsetoNRC The Performance Improvement Mid-Cycle Performance ReviewOrganizationChartnolongerhasachange Letter)"Appointasiteleadertodrivethe managementleaderposition.TheManage r applicat ionofchange of OrganizationalEffectivenesswillperform management."similarduties
NRCTS 2010-10-131          SCE letter to NRC, dated March  The following action was stated in    Revise the action to state:
.SONGSproceduregoverningchange management (S0123-XV-50.7)ensuresthisresponsibilityis implementedatSONGS.NRCTS2010-10-131SCElettertoNRC,datedMarchThefollowingactionwasstatedinRevisetheactiontostate
NN 201989673                31,2010, Response to NRC to      the October 12, 2010 , letter to the  "After CARB approval of an RCE, evaluate SIBP 5.23.1.0              NRC Mid-Cycle Performance       NRC.                                 the need for a Change Management Plan, Review Letter - Modifications to                                      IF required Submittals                                                            Then submit the Change Management Plan "Issue an approved Change            to CARB for review in accordance with SCE letter to NRC, dated October Management Plan in accordance         S0123-XV-50.7."
:NN201989673 31,2010 ,ResponsetoNRCto the October 12 , 2010 ,lettertothe "AfterCARBapprovalofanRCE
12,2010, Response to the NRC    with procedure S0123-XV-50.7 Letter Regarding Midcycle        (Change Management) with in 15        Removing the 15 day requirement allows Performance Review and          calendar days , after CARB            the RCE team and CARB the ability to Inspection Plan                  approval of the RCE and              determine the appropriate time period to submitted to CARB for review , that  complete this evaluation and submit it to address potential resources ,         CARB.
, evaluate SIBP 5.23.1.0NRCMid-Cycle Performance NRC.theneedforaChange Management Plan ,ReviewLetter-Modifications toIFrequired SubmittalsThensubmittheChange Management Plan"IssueanapprovedChangetoCARBforreviewinaccordancewithSCElettertoNRC
priority, and cost challenges throughout the station and includes , as appropriate, a training needs analys is."
, dated October ManagementPlanin accordance S0123-XV-50.7." 12 ,2010 ,ResponsetotheNRCwithprocedure S0123-XV-50
[CARB - Corrective Action Review Board RCE - Root Cause Evaluation Page 1 of 4
.7LetterRegardingMidcycle (Change Management) with in 15Removingthe15day requirement allows PerformanceReviewand calendar days ,afterCARBtheRCEteamandCARBtheabilitytoInspectionPlanapprovaloftheRCEand determine the appropriatetimeperiodtosubmittedtoCARBforreview
 
, thatcompletethisevaluationandsubmitittoaddresspotentialresources
ATTACHMENT 2 -  
, CARB.priority ,andcost challenges throughoutthestationand includes ,asappropriate,atrainingneedsanalysis."[CARB-CorrectiveActionReview BoardRCE-RootCauseEvaluationPage1of4 ATTACHMENT2-


==SUMMARY==
==SUMMARY==
OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCETONRC IMPLEMENTED DURING THE PERIOD FROMMARCH29, 2012 THROUGH MARCH01,2013 SONGSTrackingNos.
OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos.                 Source(s)                   Proposed Action              Change Summary and Basis for Change NRCTS 2010-10-132            SCE letter to NRC, dated October The following action was stated in    Revise the action to state :
Source(s)ProposedActionChangeSummaryandBasisforChangeNRCTS2010-10-132SCEletter toNRC , dated October The followingactionwasstated inRev isetheaction tostate: NN 201872119-119 12,2010,Respo nsetotheNRC the October 12 , 2010 ,lettertothe "Periodicupdateby MANAGEMENTSIBP5.23.1.ELetterRegardingM idcycle NRC.SPONSOR(s)onthei rassignedRCEthat Perfo rmanceReviewandisbeingconducted
NN 201872119-119             12, 2010, Response to the NRC    the October 12, 2010, letter to the  "Periodic update by MANAGEMENT SIBP 5.23.1.E                Letter Regarding Midcycle        NRC.                                 SPONSOR(s) on their assigned RCE that Performance Review and                                                is being conducted ."
."InspectionPlan "Weeklyupdateby Management SponsorontheirassignedRCEthatisbeingconducted.
Inspection Plan                  "Weekly update by Management Sponsor on their assigned RCE that is being conducted. "           The Performance Improvement Division consistently monito rs the open CAP items, and works with the individual work groups to ensure timely and quality products are submitted to the CARB members in accordance with the CAP program requirements .
" The Performance Improvement Division cons istently monito rstheopenCAPitems
NRCTS 2010-10-133            SCE letter to NRC, dated October The following action was stated in    Revise the action to state:
,andworkswiththeind ividualworkgroupstoensuretimelyandqualityproductsare subm ittedtotheCARB members inaccordancewiththeCAPprogram requirements
NN 201872119 -120           12,2010, Response to the NRC    the Octobe r 12, 2010 , letter to the "Periodic review of open RCEs , ACEs ,
.NRCTS2010-10-133SCElettertoNRC
SIBP 5.23.1.F                Letter Regarding Midcycle        NRC.                                 EFRs, and CAPRs completed but NOT yet Performance Review and                                                reviewed by CARB" Inspection Plan                  "Weekly review of open RCEs, ACEs , EFRs, and CAPRs                The Performance Improvement Division completed but not yet reviewed by    consistently monitors the open CAP items, CARB "                               and works with the individ ual work groups to ensure timely and quality products are submitted to the CARB members in accordance with the CAP program requirements .
, dated OctoberThefollowingactionwasstatedinRevisetheactiontostate
Page 2 of 4
:NN201872119
 
-120 12 ,2010 ,ResponsetotheNRCtheOctobe r 12 , 2010 ,lettertothe"PeriodicreviewofopenRCEs
ATTACHMENT 2 -  
, ACEs ,SIBP5.23.1.FLetterRegardingMidcycle NRC.EFRs,andCAPRscompletedbutNOTyet PerformanceReviewandreviewedbyCARB "InspectionPlan "WeeklyreviewofopenRCEs, ACEs , EFRs ,andCAPRs The Performance Improvement DivisioncompletedbutnotyetreviewedbyconsistentlymonitorstheopenCAP items, CARB"andworksw iththeindivid ualworkgroupstoensuretimelyandqualityproduc ts aresubmittedtotheCARB members inaccordancewiththeCAPprogram requirements
.Page2of4 ATTACHMENT 2-


==SUMMARY==
==SUMMARY==
OFCHANGESTO VOLUNTARY COMMITMENTSDESCRIBEDIN PREVIOUS CORRESPONDENCETONRCIMP LEMENTEDDURINGTHEPERIODFROMMARCH29
OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos.                   Source(s)                     Proposed Action            Change Summary and Basis for Change NRCTS 2010-03-007             SCE letter to NRC, dated October The original proposed action was    The commitment has been changed as NN 20 1994125-004             12,2010, Response to the NRC    stated in the March 31, 2010 letter follows: "(CA PR) Revise S0123-XV-52 ,
,2012THROUGHMARCH01,2013SONGSTrackingNos.
SIBP 4.6.1.A and 4.21.1.A     Letter Regarding Midcycle        to NRC. Subsequently, the due      Functio nality Assessments and Operab ility Performance Review and          date was changed from January      Determinations to incorporate industry Inspection Plan                  23, 2010 June 1, 20 10, in SCE      benchmarking and include: Clarity and letter to NRC, dated March 31,     accuracy of process actions in an SCE letter to NRC, dated March  2010. The commitment was            executable step format; the transfer of 31,2010, Response to NRC to      reiterated in the October 12, 2010  depart menta l ownership of the process to NRC Mid-Cycle Performa nce       letter, as follows :               Operatio ns; incorporation of the INPO Review Letter - Modifications to                                    Principles for an Effective Operational Submittals                       "(CAPR) Revise S0123-XV-52,         Decision Making; an appropr iate Functionality Assessments and      operabil ity checklist; real time, in line Operab ility Determinations to      expert independent review of PODs and incorporate industry benchma rking periodic quality checks of 10Ds; appropr iate and include: Clarity and accuracy  linkages to other processes (e.g., the of process actions in an            Operational Decision Making Process)"
Sourc e(s)ProposedAction Change SummaryandBasisforChange NRCTS 2010-03-007 SCE lettertoNRC
executable step format; the transfer of departmen tal          SCE Management has determined that the ownership of the process to        POD Real Time in-line review requirement Operations; incorpo ration of the  is no longer necessary due to procedure INPO Principles for an Effective    and traini ng enhancements , along with the Operational Decision Marking; an    implemen tation of the operability appropriate opera bility checklist; determination quality review panel.
,datedOcto ber T he original pro posedactionwasThecommitmenthasbeenchanged asNN201994125-004 12,2010 , Respo nse to theNRCstatedi n theMarch31,2010 letter follows: "(CAPR)ReviseS0123-XV-52,SIBP4.6.1.Aand4.21.1.A Lette r Rega rding Midc ycletoNRC.Subsequently,thedueFunctionality Assessmen tsandOperability PerformanceReviewanddatewaschangedfromJanuaryDeterminationstoincorpo rate industryInspectionPlan 23 ,2010Ju ne 1 , 2010,inSC E benchmarking andinclude:Cla rity andlettertoNRC
real-time, in-line expert independent review of PODs and periodic quality checks of 10Ds; appropriate linkages to other processes (e.g., the Operational Decision Making Process )"
,datedMarch31, accu racyofprocessac tionsinanSCElettertoNRC,da tedMarch2010.Thecommitmentwasexecutable step format;t he transfer of 31 ,2010 , Response toNRCtoreite ratedinthe October 12 ,2010depart menta l ownership oftheprocesstoNRCMid-Cycle Performa nce letter ,asfollows: Operations;incorporationof theINPOReviewLette r-Modificationst o Pri nciplesfora nEffectiveOperational Submittals
Page 3 of 4
"(CAPR)Revise S0123-XV-52
 
, Decision Making;anappropr iate Functionality Assessments a nd operabil ity checklist;rea l time ,inline Operability De terminatio nstoexpert independentreviewofPODsand inco rporate ind ustry benchma rking periodicqualitychecksof10Ds
ATTACHMENT 2 -  
;appropr iate and include:C larityandaccuracy l inkagestootherprocesses(e.g.,theofp rocessactionsinan OperationalDecisionMakingProcess
)" executablestepformat;the transfer o f departmental SCE Managemen thasdeterminedthatthe owne rshipoftheprocess t oPODRealTime in-linerev iew requirement Operations;incorporationoftheisnolonger necessaryduetoprocedure INPOPrinciplesforanEffectiveandtraini ng enhancements,alongwiththe OperationalDecisionMarking;a n implementationoftheoperability appropriate operability checklis t;determination qualityreview panel.real-time, in-lineexpert independentreviewofPODsand periodicq ualitychecksof10Ds
;appropriate linkages toother processes(e.g.
,theOpe rational De cisionMakingProcess
)"Page3of 4 ATTACHMENT2-


==SUMMARY==
==SUMMARY==
OFCHANGESTO VOLUNTARY COMMITMENTS DESCRIBEDINPREVIOUS CORRESPONDENCETONRC IMPLEMENTEDDURINGTHEPERIODFROMMARCH29,2012THROUGHMARCH01,2013SONGSTrackingNos.
OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos.                 Source(s)                 Proposed Action          Change Summary and Basis for Change NRCTS 2008-02-019          SCE letter to NRC, dated      The following action was stated    This action was removed from the NN 202135160                February 2, 2008 , Response to SCE letter to NRC, dated           surveillance program .
Source(s)ProposedActionChangeSummaryandBasisforChange NRCTS 2008-02-019SCElettertoNRC
SIBP 9.7.2.F               Confirmatory Order Item 2 with February 2, 2008.
, datedThefollowingactionwasstatedThisactionwas removedfromthe NN 202135160February2 , 2008 ,ResponsetoSCElettertoNRC,dated surve illance program.S IBP 9.7.2.F Confi rmatoryOrderItem2withFebruary2,2008.CorrectiveActionPlanandThesurvei llanceprogramhasprovided Mon itoring Program"ByApril1 , 2008 ,SCEw ill reasonab le assurancethatactionsto deter incorporate intotheSONGSanddetectinstancesofdeliberatenon
Corrective Action Plan and                                        The surveillance program has provided Monitoring Program             "By April 1, 2008, SCE will        reasonab le assurance that actions to deter incorporate into the SONGS        and detect instances of deliberate non-oversight surveillance program ,   compliance are effective. In addition, in a periodic sampling of repetitive    NRC letter dated 02/10/11 , the NRC rounds and log keeping activities  determined that SCE has satisfied the to provide reasonable assurance    terms of the Confirmatory Order. Therefore, that actions to deter and detect  based on these results and NRC's instances of deliberate non-       determination that the terms of the compliance are effective. This     Confirmatory Order have been satisfied, oversight will include sampling of continuation of these surveillances is no SCE and contractor activities. (CO longer warranted.
-ove rsightsurveillanceprogram
Item 2.j)"
,complianceareeffective.Inadd ition ,ina per iodicsamplingofrepetitiveNRCletterdated02/10/11
Page 4 of4}}
,theNRCroundsandlogkeep ing activitiesdeterminedthatSCEhassatisfied thetoprov ide reasonable assurancetermsofthe ConfirmatoryOrder.Therefore,thatact ionstodeteranddetectbasedontheseresu ltsandNRC'sinstancesofdeliberatenon-determinationthatthetermsofthe complianceareeffective.This ConfirmatoryOrderhavebeensatisfied, overs ight will includesamplingofcont inuationofthese surveillancesisnoSCEand contractoractivities.(COlongerwarranted.Item2.j)"Page4 of4}}

Latest revision as of 20:26, 4 November 2019

the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 29, 2012, Through March 01, 2013
ML13081A142
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/08/2013
From: St.Onge R
Southern California Edison Co
To:
NRC/FSME, Office of Nuclear Material Safety and Safeguards, Document Control Desk
References
Download: ML13081A142 (6)


Text

SOUTHERN CALIFORNIA Richard [, St. Onge EDISON Director, Nuclear Regulatory Affairs and Emergency Planning An EDISON INTERNATIONAL Company 10 CFR 50.4 March 8, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C . 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Summary Report of Commitment Changes Implemented During the Period From March 29, 2012, Through March 01, 2013 San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation Dea r Sir or Mada m:

Pursuant to the guidance in Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitme nt Changes ," Revision 0, attached is a summary of comm itments changed during the period from March 29 , 2012 through March 01 , 2013. These commitment changes were evaluated by SONGS as not requ iring prior NRC approval. This letter provides NRC notification of these changes .

Attachme nt 1 includes a summary of regulatory commitment changes and a basis for each change. In addition , Attachment 2 provides a summary of changes to several voluntary commitments described in previous correspondence to the NRC. Althoug h not considered formal regulato ry commitments, SONGS has included these changes for your information.

This letter does not contain any new commitments . If you have any questions or would like any additional information , please contact Lee Kelly at (949) 368-6657.

Sincerely, Attachments: As Stated cc: E. E. Collins , Regional Adm inistrator, NRC Region IV R. Hall , NRC Project Manager, San Onofre Units 2 and 3 B. Benney, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warn ick , NRC Senior Res ident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92672

ATTACHMENT 1-

SUMMARY

REPORT OF REGULATORY COMMITMENT CHANGES IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos. Source(s) Proposed Action Change Summary and Basis for Change NRCTS 2007-04-001 SCE letter to NRC, The following action was stated in the April 16, 2007 The action was modified to allow alternate NN 202315010 dated April 16, 2007 , NOV response letter to NRC. methods of confirming proper area checks .

Reply to a Notice of The revised commitment wording is as Violation ; EA-06-303 follows :

Inspection Report No. "Corrective actions will be taken to provide a more 5000361/2007402 and positive confirmation of proper check performance, a "Corrective actions will be taken to provide a 5000362/2007402 San long-term project was created to use hand-held more positive confirmation of proper area Onofre Nuclear computers , in conjunction with bar codes, to check performance. "

Generation Station , document area checks electronically."

Units 2 and 3 Page 1 of 1

ATTACHMENT 2 -

SUMMARY

OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos. Source(s) Proposed Action Change Summary and Basis for Change NRCTS 2009-10-025 SCE letter to NRC, dated October The following action was stated in Remove commitment from procedure NN202312775 29,2009, Independent Safety the October 29, 2009, letter to the S0123-XV-50.7 Change Management.

Culture Assessment Results and NRC.

Action Plans (Response to NRC The Performance Improvement Mid-Cycle Performance Review Organization Chart no longer has a change Letter) "Appoint a site leader to drive the management leader position. The Manage r applicat ion of change of Organizational Effectiveness will perform management." similar duties . SONGS procedure governing change management (S0123-XV-50.7) ensures this responsibility is implemented at SONGS .

NRCTS 2010-10-131 SCE letter to NRC, dated March The following action was stated in Revise the action to state:

NN 201989673 31,2010, Response to NRC to the October 12, 2010 , letter to the "After CARB approval of an RCE, evaluate SIBP 5.23.1.0 NRC Mid-Cycle Performance NRC. the need for a Change Management Plan, Review Letter - Modifications to IF required Submittals Then submit the Change Management Plan "Issue an approved Change to CARB for review in accordance with SCE letter to NRC, dated October Management Plan in accordance S0123-XV-50.7."

12,2010, Response to the NRC with procedure S0123-XV-50.7 Letter Regarding Midcycle (Change Management) with in 15 Removing the 15 day requirement allows Performance Review and calendar days , after CARB the RCE team and CARB the ability to Inspection Plan approval of the RCE and determine the appropriate time period to submitted to CARB for review , that complete this evaluation and submit it to address potential resources , CARB.

priority, and cost challenges throughout the station and includes , as appropriate, a training needs analys is."

[CARB - Corrective Action Review Board RCE - Root Cause Evaluation Page 1 of 4

ATTACHMENT 2 -

SUMMARY

OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos. Source(s) Proposed Action Change Summary and Basis for Change NRCTS 2010-10-132 SCE letter to NRC, dated October The following action was stated in Revise the action to state :

NN 201872119-119 12, 2010, Response to the NRC the October 12, 2010, letter to the "Periodic update by MANAGEMENT SIBP 5.23.1.E Letter Regarding Midcycle NRC. SPONSOR(s) on their assigned RCE that Performance Review and is being conducted ."

Inspection Plan "Weekly update by Management Sponsor on their assigned RCE that is being conducted. " The Performance Improvement Division consistently monito rs the open CAP items, and works with the individual work groups to ensure timely and quality products are submitted to the CARB members in accordance with the CAP program requirements .

NRCTS 2010-10-133 SCE letter to NRC, dated October The following action was stated in Revise the action to state:

NN 201872119 -120 12,2010, Response to the NRC the Octobe r 12, 2010 , letter to the "Periodic review of open RCEs , ACEs ,

SIBP 5.23.1.F Letter Regarding Midcycle NRC. EFRs, and CAPRs completed but NOT yet Performance Review and reviewed by CARB" Inspection Plan "Weekly review of open RCEs, ACEs , EFRs, and CAPRs The Performance Improvement Division completed but not yet reviewed by consistently monitors the open CAP items, CARB " and works with the individ ual work groups to ensure timely and quality products are submitted to the CARB members in accordance with the CAP program requirements .

Page 2 of 4

ATTACHMENT 2 -

SUMMARY

OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos. Source(s) Proposed Action Change Summary and Basis for Change NRCTS 2010-03-007 SCE letter to NRC, dated October The original proposed action was The commitment has been changed as NN 20 1994125-004 12,2010, Response to the NRC stated in the March 31, 2010 letter follows: "(CA PR) Revise S0123-XV-52 ,

SIBP 4.6.1.A and 4.21.1.A Letter Regarding Midcycle to NRC. Subsequently, the due Functio nality Assessments and Operab ility Performance Review and date was changed from January Determinations to incorporate industry Inspection Plan 23, 2010 June 1, 20 10, in SCE benchmarking and include: Clarity and letter to NRC, dated March 31, accuracy of process actions in an SCE letter to NRC, dated March 2010. The commitment was executable step format; the transfer of 31,2010, Response to NRC to reiterated in the October 12, 2010 depart menta l ownership of the process to NRC Mid-Cycle Performa nce letter, as follows : Operatio ns; incorporation of the INPO Review Letter - Modifications to Principles for an Effective Operational Submittals "(CAPR) Revise S0123-XV-52, Decision Making; an appropr iate Functionality Assessments and operabil ity checklist; real time, in line Operab ility Determinations to expert independent review of PODs and incorporate industry benchma rking periodic quality checks of 10Ds; appropr iate and include: Clarity and accuracy linkages to other processes (e.g., the of process actions in an Operational Decision Making Process)"

executable step format; the transfer of departmen tal SCE Management has determined that the ownership of the process to POD Real Time in-line review requirement Operations; incorpo ration of the is no longer necessary due to procedure INPO Principles for an Effective and traini ng enhancements , along with the Operational Decision Marking; an implemen tation of the operability appropriate opera bility checklist; determination quality review panel.

real-time, in-line expert independent review of PODs and periodic quality checks of 10Ds; appropriate linkages to other processes (e.g., the Operational Decision Making Process )"

Page 3 of 4

ATTACHMENT 2 -

SUMMARY

OF CHANGES TO VOLUNTARY COMMITMENTS DESCRIBED IN PREVIOUS CORRESPONDENCE TO NRC IMPLEMENTED DURING THE PERIOD FROM MARCH 29, 2012 THROUGH MARCH 01, 2013 SONGS Tracking Nos. Source(s) Proposed Action Change Summary and Basis for Change NRCTS 2008-02-019 SCE letter to NRC, dated The following action was stated This action was removed from the NN 202135160 February 2, 2008 , Response to SCE letter to NRC, dated surveillance program .

SIBP 9.7.2.F Confirmatory Order Item 2 with February 2, 2008.

Corrective Action Plan and The surveillance program has provided Monitoring Program "By April 1, 2008, SCE will reasonab le assurance that actions to deter incorporate into the SONGS and detect instances of deliberate non-oversight surveillance program , compliance are effective. In addition, in a periodic sampling of repetitive NRC letter dated 02/10/11 , the NRC rounds and log keeping activities determined that SCE has satisfied the to provide reasonable assurance terms of the Confirmatory Order. Therefore, that actions to deter and detect based on these results and NRC's instances of deliberate non- determination that the terms of the compliance are effective. This Confirmatory Order have been satisfied, oversight will include sampling of continuation of these surveillances is no SCE and contractor activities. (CO longer warranted.

Item 2.j)"

Page 4 of4