| number = ML13099A242
| number = ML13099A242
| issue date = 04/09/2013
| issue date = 04/09/2013
| title = IR 05000237-13-403 & 05000249-13-403, 03/04/2013 - 03/07/2013, Dresden Nuclear Power Station, Units 2 and 3, Routine Security Baseline Inspection (Cover Letter Only)
| title = IR 05000237-13-403 & 05000249-13-403, 03/04/2013 - 03/07/2013, Dresden Nuclear Power Station, Units 2 and 3, Routine Security Baseline Inspection (Cover Letter Only)
| author name = Funk D E
| author name = Funk D
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:April 9, 2013
[[Issue date::April 9, 2013]]


Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
==SUBJECT:==
 
DRESDEN NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000237/2013403; 05000249/2013403
SUBJECT: DRESDEN NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000237/2013403; 05000249/2013403


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On March 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Dresden Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 7, 2013, with Mr. D. Czufin and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.
On March 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Dresden Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 7, 2013, with Mr. D. Czufin and other members of your staff.


The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.


Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


Sincerely,/RA/ Donald E. Funk, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic
No findings were identified during this inspection.


===Enclosure:===
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Inspection Report 05000237/2013403; 05000249/2013403


===w/Attachment:===
Sincerely,
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV D. O'Flanagan, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via ListServŽ
/RA/
Donald E. Funk, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure: Inspection Report 05000237/2013403; 05000249/2013403 w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV D. OFlanagan, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via ListServ'
}}
}}

Latest revision as of 19:45, 4 November 2019

IR 05000237-13-403 & 05000249-13-403, 03/04/2013 - 03/07/2013, Dresden Nuclear Power Station, Units 2 and 3, Routine Security Baseline Inspection (Cover Letter Only)
ML13099A242
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/09/2013
From: Funk D
Plant Support Branch II
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
IR-13-403
Download: ML13099A242 (4)


Text

April 9, 2013

SUBJECT:

DRESDEN NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000237/2013403; 05000249/2013403

Dear Mr. Pacilio:

On March 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Dresden Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 7, 2013, with Mr. D. Czufin and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Donald E. Funk, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure: Inspection Report 05000237/2013403; 05000249/2013403 w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV D. OFlanagan, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via ListServ'