ML13154A276: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13154A276 | | number = ML13154A276 | ||
| issue date = 03/06/2013 | | issue date = 03/06/2013 | ||
| title = | | title = NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | ||
| author name = Fish T | | author name = Fish T | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| addressee name = Kelly M | | addressee name = Kelly M | ||
Line 9: | Line 9: | ||
| docket = 05000277, 05000278 | | docket = 05000277, 05000278 | ||
| license number = DPR-044, DPR-056 | | license number = DPR-044, DPR-056 | ||
| contact person = Jackson D | | contact person = Jackson D | ||
| case reference number = TAC U01867 | | case reference number = TAC U01867 | ||
| package number = ML12318A009 | | package number = ML12318A009 | ||
| document type = License-Operator, Part 55 Examination Related Material, Memoranda | | document type = License-Operator, Part 55 Examination Related Material, Memoranda | ||
| page count = 2 | | page count = 2 | ||
| project = TAC:U01867 | |||
| stage = Draft Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:To: Todd Fish, NRC Chief Examiner From: Mike Kelly, Peach Bottom Regulatory Exam Author | {{#Wiki_filter:To: Todd Fish, NRC Chief Examiner From: Mike Kelly, Peach Bottom Regulatory Exam Author | ||
==Subject:== | ==Subject:== | ||
Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date: March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013. | Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date: March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013. | ||
A. Administrative IPMs: Replaced two RO Admin JPMs based on LOO-l and being discriminatory. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM. Added additional cue to 1 SRO Conduct of Operations JPM. Clarified the 'deliverable' for the SRO Radiation Control JPM. Made additional editorial changes to various JPMs based on NRC examiner comments. | A. Administrative IPMs: | ||
B. Control Room JPMs: Modified critical versus non-critical steps for 3 JPMs. Added time-compression cues to one JPM. Made editorial changes to various JPMs based on NRC examiner comments. | : 1. Replaced two RO Admin JPMs based on LOO-l and being non discriminatory. | ||
C. In-plant JPMs: Changed one JPM performance unit to support geographic diversity. Modified critical versus non-critical steps for 1 JPM. Re-classified 1 JPM as alternate-path. Made editorial changes to various JPMs based on NRC examiner comments. -1 D. Simulator scenarios: Scenario 1 Minor changes to Simulator Operator instructions. Minor scripting modifications. Changed sequence of some events. Scenario 2 Minor scripting modifications Added 'C' event #6 for PRO. Added 'C' event #9 for URO. Modified Simulator Setup and Simulator Operator instructions to support new events. Scenario 3: Minor changes to Simulator Operator instructions. Minor scripting modifications. -2}} | : 2. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM. | ||
: 3. Added additional cue to 1 SRO Conduct of Operations JPM. | |||
: 4. Clarified the 'deliverable' for the SRO Radiation Control JPM. | |||
: 5. Made additional editorial changes to various JPMs based on NRC examiner comments. | |||
B. Control Room JPMs: | |||
: 1. Modified critical versus non-critical steps for 3 JPMs. | |||
: 2. Added time-compression cues to one JPM. | |||
: 3. Made editorial changes to various JPMs based on NRC examiner comments. | |||
C. In-plant JPMs: | |||
: 1. Changed one JPM performance unit to support geographic diversity. | |||
: 2. Modified critical versus non-critical steps for 1 JPM. | |||
: 3. Re-classified 1 JPM as alternate-path. | |||
: 4. Made editorial changes to various JPMs based on NRC examiner comments. | |||
- 1 | |||
D. Simulator scenarios: | |||
: 1. Scenario 1 | |||
: a. Minor changes to Simulator Operator instructions. | |||
: h. Minor scripting modifications. | |||
: c. Changed sequence of some events. | |||
: 2. Scenario 2 | |||
: a. Minor scripting modifications | |||
: h. Added 'C' event #6 for PRO. | |||
: c. Added 'C' event #9 for URO. | |||
: d. Modified Simulator Setup and Simulator Operator instructions to support new events. | |||
: 3. Scenario 3: | |||
: a. Minor changes to Simulator Operator instructions. | |||
: h. Minor scripting modifications. | |||
-2}} |
Latest revision as of 17:25, 4 November 2019
ML13154A276 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 03/06/2013 |
From: | Todd Fish Operations Branch I |
To: | Kelly M Exelon Generation Co |
Jackson D | |
Shared Package | |
ML12318A009 | List: |
References | |
TAC U01867 | |
Download: ML13154A276 (2) | |
Text
To: Todd Fish, NRC Chief Examiner From: Mike Kelly, Peach Bottom Regulatory Exam Author
Subject:
Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date: March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013.
A. Administrative IPMs:
- 2. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM.
- 5. Made additional editorial changes to various JPMs based on NRC examiner comments.
B. Control Room JPMs:
- 1. Modified critical versus non-critical steps for 3 JPMs.
- 2. Added time-compression cues to one JPM.
- 3. Made editorial changes to various JPMs based on NRC examiner comments.
C. In-plant JPMs:
- 1. Changed one JPM performance unit to support geographic diversity.
- 2. Modified critical versus non-critical steps for 1 JPM.
- 3. Re-classified 1 JPM as alternate-path.
- 4. Made editorial changes to various JPMs based on NRC examiner comments.
- 1
D. Simulator scenarios:
- 1. Scenario 1
- a. Minor changes to Simulator Operator instructions.
- h. Minor scripting modifications.
- c. Changed sequence of some events.
- 2. Scenario 2
- a. Minor scripting modifications
- h. Added 'C' event #6 for PRO.
- c. Added 'C' event #9 for URO.
- d. Modified Simulator Setup and Simulator Operator instructions to support new events.
- 3. Scenario 3:
- a. Minor changes to Simulator Operator instructions.
- h. Minor scripting modifications.
-2