ML13154A276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13154A276
| number = ML13154A276
| issue date = 03/06/2013
| issue date = 03/06/2013
| title = Peach Bottom - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| title = NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| author name = Fish T H
| author name = Fish T
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Kelly M
| addressee name = Kelly M
Line 9: Line 9:
| docket = 05000277, 05000278
| docket = 05000277, 05000278
| license number = DPR-044, DPR-056
| license number = DPR-044, DPR-056
| contact person = Jackson D E
| contact person = Jackson D
| case reference number = TAC U01867
| case reference number = TAC U01867
| package number = ML12318A009
| package number = ML12318A009
| document type = License-Operator, Part 55 Examination Related Material, Memoranda
| document type = License-Operator, Part 55 Examination Related Material, Memoranda
| page count = 2
| page count = 2
| project = TAC:U01867
| stage = Draft Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:To: Todd Fish, NRC Chief Examiner From: Mike Kelly, Peach Bottom Regulatory Exam Author  
{{#Wiki_filter:To:           Todd Fish, NRC Chief Examiner From:         Mike Kelly, Peach Bottom Regulatory Exam Author


==Subject:==
==Subject:==
Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date: March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013.
Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date:         March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013.
A. Administrative IPMs: Replaced two RO Admin JPMs based on LOO-l and being discriminatory. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM. Added additional cue to 1 SRO Conduct of Operations JPM. Clarified the 'deliverable' for the SRO Radiation Control JPM. Made additional editorial changes to various JPMs based on NRC examiner comments.
A. Administrative IPMs:
B. Control Room JPMs: Modified critical versus non-critical steps for 3 JPMs. Added time-compression cues to one JPM. Made editorial changes to various JPMs based on NRC examiner comments.
: 1. Replaced two RO Admin JPMs based on LOO-l and being non discriminatory.
C. In-plant JPMs: Changed one JPM performance unit to support geographic diversity. Modified critical versus non-critical steps for 1 JPM. Re-classified 1 JPM as alternate-path. Made editorial changes to various JPMs based on NRC examiner comments. -1 D. Simulator scenarios: Scenario 1 Minor changes to Simulator Operator instructions. Minor scripting modifications. Changed sequence of some events. Scenario 2 Minor scripting modifications Added 'C' event #6 for PRO. Added 'C' event #9 for URO. Modified Simulator Setup and Simulator Operator instructions to support new events. Scenario 3: Minor changes to Simulator Operator instructions. Minor scripting modifications. -2}}
: 2. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM.
: 3. Added additional cue to 1 SRO Conduct of Operations JPM.
: 4. Clarified the 'deliverable' for the SRO Radiation Control JPM.
: 5. Made additional editorial changes to various JPMs based on NRC examiner comments.
B. Control Room JPMs:
: 1. Modified critical versus non-critical steps for 3 JPMs.
: 2. Added time-compression cues to one JPM.
: 3. Made editorial changes to various JPMs based on NRC examiner comments.
C. In-plant JPMs:
: 1. Changed one JPM performance unit to support geographic diversity.
: 2. Modified critical versus non-critical steps for 1 JPM.
: 3. Re-classified 1 JPM as         alternate-path.
: 4. Made editorial changes to various JPMs based on NRC examiner comments.
                                            - 1
 
D. Simulator scenarios:
: 1. Scenario 1
: a. Minor changes to Simulator Operator instructions.
: h. Minor scripting modifications.
: c. Changed sequence of some events.
: 2. Scenario 2
: a. Minor scripting modifications
: h. Added 'C' event #6 for PRO.
: c. Added 'C' event #9 for URO.
: d. Modified Simulator Setup and Simulator Operator instructions to support new events.
: 3. Scenario 3:
: a. Minor changes to Simulator Operator instructions.
: h. Minor scripting modifications.
                                    -2}}

Latest revision as of 17:25, 4 November 2019

NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML13154A276
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/06/2013
From: Todd Fish
Operations Branch I
To: Kelly M
Exelon Generation Co
Jackson D
Shared Package
ML12318A009 List:
References
TAC U01867
Download: ML13154A276 (2)


Text

To: Todd Fish, NRC Chief Examiner From: Mike Kelly, Peach Bottom Regulatory Exam Author

Subject:

Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date: March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013.

A. Administrative IPMs:

1. Replaced two RO Admin JPMs based on LOO-l and being non discriminatory.
2. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM.
3. Added additional cue to 1 SRO Conduct of Operations JPM.
4. Clarified the 'deliverable' for the SRO Radiation Control JPM.
5. Made additional editorial changes to various JPMs based on NRC examiner comments.

B. Control Room JPMs:

1. Modified critical versus non-critical steps for 3 JPMs.
2. Added time-compression cues to one JPM.
3. Made editorial changes to various JPMs based on NRC examiner comments.

C. In-plant JPMs:

1. Changed one JPM performance unit to support geographic diversity.
2. Modified critical versus non-critical steps for 1 JPM.
3. Re-classified 1 JPM as alternate-path.
4. Made editorial changes to various JPMs based on NRC examiner comments.

- 1

D. Simulator scenarios:

1. Scenario 1
a. Minor changes to Simulator Operator instructions.
h. Minor scripting modifications.
c. Changed sequence of some events.
2. Scenario 2
a. Minor scripting modifications
h. Added 'C' event #6 for PRO.
c. Added 'C' event #9 for URO.
d. Modified Simulator Setup and Simulator Operator instructions to support new events.
3. Scenario 3:
a. Minor changes to Simulator Operator instructions.
h. Minor scripting modifications.

-2