ML13269A437: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML13269A437 | |||
| issue date = 09/26/2013 | |||
| title = Notification of TI-186 Inspection (NRC Inspection Report 05000483-13-405) and Request for Information | |||
| author name = Gaddy V | |||
| author affiliation = NRC/RGN-IV/DRS/OB | |||
| addressee name = Heflin A | |||
| addressee affiliation = Union Electric Co | |||
| docket = 05000483 | |||
| license number = NPF-030 | |||
| contact person = | |||
| case reference number = IR-13-405 | |||
| document report number = IR-13-405 | |||
| document type = Inspection Plan, Letter | |||
| page count = 4 | |||
}} | |||
See also: [[see also::IR 05000483/2013405]] | |||
=Text= | |||
{{#Wiki_filter:UNITE D S TATE S | |||
NUC LEAR RE GULATOR Y C OMMI S SI ON | |||
R E G IO N I V | |||
1600 EAST LAMAR BLVD | |||
AR L I NGTON , TEXAS 7 601 1- 4511 | |||
September 26, 2013 | |||
Mr. Adam C. Heflin, Senior Vice | |||
President and Chief Nuclear Officer | |||
Union Electric Company | |||
P.O. Box 620 | |||
Fulton, MO 65251 | |||
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF TI-186 INSPECTION | |||
(NRC INSPECTION REPORT 05000483/2013405) AND REQUEST FOR | |||
INFORMATION | |||
Dear Mr. Heflin: | |||
From December 2 to December 5, 2013, inspectors from the Nuclear Regulatory | |||
Commissions (NRC) Region IV office will perform the Temporary Instruction (TI)-186, | |||
Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. In order | |||
to minimize the impact to your onsite resources and to ensure a productive inspection, we have | |||
enclosed a request for documents needed for this inspection. It is important that all of these | |||
documents are up to date and complete in order to minimize the number of additional | |||
documents requested during the preparation and/or the onsite portions of the inspection. Also, | |||
in order to demonstrate compliance with TI-186, we ask that you have the necessary staff | |||
members available to the inspection team to assist in any plant walk-throughs, interviews, and | |||
simulator demonstrations. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Mr. Todd Witt of your licensing organization. | |||
If there are any questions about this inspection or the material requested, please contact Kelly | |||
Clayton, lead inspector, at (817) 200-1216 (kelly.clayton@nrc.gov) or Thomas Farina at | |||
(817) 200-1117 (thomas.farina@nrc.gov). | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
A. Heflin -2- | |||
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRCs Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC | |||
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket: 50-483 | |||
License: NPF-30 | |||
Enclosure: | |||
Inservice Inspection Document Request | |||
cc: Electronic Distribution for Callaway Plant | |||
ML13269A437 | |||
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: KDC | |||
Publicly Available Non-Sensitive | |||
. Non-publicly Available Sensitive | |||
SOE:OB C:OB | |||
KClayton VGaddy | |||
/RA/ /RA/ | |||
9/24/2013 9/26/2013 | |||
TI-186 INSPECTION DOCUMENT REQUEST | |||
FROM: Kelly Clayton | |||
Senior Operations Engineer, NRC RIV | |||
817-200-1216 | |||
TO: Todd Witt | |||
Associate Licensing Engineer, Callaway Plant | |||
314-478-5346 | |||
SUBJECT: INFORMATION REQUEST TO SUPPORT DECEMBER 2-5, 2013, TI-186 | |||
INSPECTION, INSPECTION OF PROCEDURES AND PROCESSES FOR | |||
RESPONDING TO POTENTIAL AIRCRAFT THREATS | |||
A. The following information is requested in order to support inspection preparation | |||
activities. Requested materials should be sent either electronically or hardcopy in | |||
order to arrive at the Region IV office no later than November 18, 2013. | |||
* Electronically: Via email, CD, or IMS Certrec | |||
and/or | |||
* Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV | |||
ATTN: Kelly Clayton | |||
1600 E. Lamar Blvd | |||
Arlington, TX 76011 | |||
Document Request: | |||
* Procedure(s) that describe actions taken to address potential aircraft threat | |||
notifications onsite. This may include procedures that operations, security, | |||
emergency preparedness, and health physics staff use. | |||
* Plant specific analyses prepared to support the designed actions you have taken to | |||
address this issue in your procedures. Such analyses were described for support of | |||
site actions in the topical Regulatory Guide 1.214 (dated January 2009). | |||
* Training materials used to train the various affected groups when contacted with a | |||
potential aircraft threat (licensed operators, operators in training for a license, non- | |||
licensed operators, security, EP, HP, fire brigade, and other support staff, as | |||
examples). | |||
* If the site has conducted exercises or drills to evaluate the ability of staff to | |||
implement these procedures in the past, provide any documentation summarizing | |||
the results of these events. If any condition reports came out of the exercises/drills, | |||
provide those as well. | |||
* Copies of any assessments of your procedure and corrective action that came out of | |||
these activities (if applicable). | |||
* Lists of personnel in the following organizations that will be available for interviews | |||
while the inspection team is onsite: operations (licensed and non-licensed | |||
operators); security, fire brigade; health physics support; maintenance. | |||
-1- Enclosure | |||
}} |
Latest revision as of 14:07, 4 November 2019
ML13269A437 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 09/26/2013 |
From: | Vincent Gaddy Operations Branch IV |
To: | Heflin A Union Electric Co |
References | |
IR-13-405 IR-13-405 | |
Download: ML13269A437 (4) | |
See also: IR 05000483/2013405
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NGTON , TEXAS 7 601 1- 4511
September 26, 2013
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF TI-186 INSPECTION
(NRC INSPECTION REPORT 05000483/2013405) AND REQUEST FOR
INFORMATION
Dear Mr. Heflin:
From December 2 to December 5, 2013, inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the Temporary Instruction (TI)-186,
Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. In order
to minimize the impact to your onsite resources and to ensure a productive inspection, we have
enclosed a request for documents needed for this inspection. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection. Also,
in order to demonstrate compliance with TI-186, we ask that you have the necessary staff
members available to the inspection team to assist in any plant walk-throughs, interviews, and
simulator demonstrations.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Todd Witt of your licensing organization.
If there are any questions about this inspection or the material requested, please contact Kelly
Clayton, lead inspector, at (817) 200-1216 (kelly.clayton@nrc.gov) or Thomas Farina at
(817) 200-1117 (thomas.farina@nrc.gov).
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
A. Heflin -2-
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-483
License: NPF-30
Enclosure:
Inservice Inspection Document Request
cc: Electronic Distribution for Callaway Plant
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: KDC
Publicly Available Non-Sensitive
. Non-publicly Available Sensitive
SOE:OB C:OB
KClayton VGaddy
/RA/ /RA/
9/24/2013 9/26/2013
TI-186 INSPECTION DOCUMENT REQUEST
FROM: Kelly Clayton
Senior Operations Engineer, NRC RIV
817-200-1216
TO: Todd Witt
Associate Licensing Engineer, Callaway Plant
314-478-5346
SUBJECT: INFORMATION REQUEST TO SUPPORT DECEMBER 2-5, 2013, TI-186
INSPECTION, INSPECTION OF PROCEDURES AND PROCESSES FOR
RESPONDING TO POTENTIAL AIRCRAFT THREATS
A. The following information is requested in order to support inspection preparation
activities. Requested materials should be sent either electronically or hardcopy in
order to arrive at the Region IV office no later than November 18, 2013.
- Electronically: Via email, CD, or IMS Certrec
and/or
- Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV
ATTN: Kelly Clayton
1600 E. Lamar Blvd
Arlington, TX 76011
Document Request:
- Procedure(s) that describe actions taken to address potential aircraft threat
notifications onsite. This may include procedures that operations, security,
emergency preparedness, and health physics staff use.
- Plant specific analyses prepared to support the designed actions you have taken to
address this issue in your procedures. Such analyses were described for support of
site actions in the topical Regulatory Guide 1.214 (dated January 2009).
- Training materials used to train the various affected groups when contacted with a
potential aircraft threat (licensed operators, operators in training for a license, non-
licensed operators, security, EP, HP, fire brigade, and other support staff, as
examples).
- If the site has conducted exercises or drills to evaluate the ability of staff to
implement these procedures in the past, provide any documentation summarizing
the results of these events. If any condition reports came out of the exercises/drills,
provide those as well.
- Copies of any assessments of your procedure and corrective action that came out of
these activities (if applicable).
- Lists of personnel in the following organizations that will be available for interviews
while the inspection team is onsite: operations (licensed and non-licensed
operators); security, fire brigade; health physics support; maintenance.
-1- Enclosure